Loading...
HomeMy WebLinkAboutNCC200889_NOI Application_20200305Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/4/2020 2:59:09 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 3/5/2020 9:38:06 AM (Review- Construction NOI 22775) . The task was assigned to Garcia, Lauren V by round robin distribution 3/4/2020 2:59 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 6, 2020 5:00 PM 3/4/2020 2:59 PM Submit by McCoy, Suzanne 3/5/2020 11:44:29 AM (Payment Verification for NCC200889) * Joseph marin • McCoy, Suzanne assigned the task to McCoy, Suzanne 3/5/2020 11:44 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 16, 2020 5:00 PM 3/5/2020 9:38 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Popeyes Wadesboro 1 b. Specific Lot This field any be used to list specifc lot nunbers. Numbers 2. County* Anson 3. Highway or Street 327 E Caswell Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Wadesboro 5. State * NC 6. Zip Code* 28170 7. Latitude* Enter the latitude in decimal degrees 34.9689 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -80.0729 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/30/2020 Estimated Construction Project Start Date 10. Date to End * 07/17/2020 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 0.65 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.18 (acres)* 14. Post- 0.44 construction (Estirated) impervious area (acres) * NCC Project NCC-ANSON-2020-Popeyes Wadesboro Tracking ID Assignedautorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Brush Fork Wate rbody* Nacre of waterbody into which storrrwater runoff w ill discharge 15b. Waterbody 13-42-1-3-1 Index No. * NC Waterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fa sponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Leblon Franchising Holdings LLC Name * If perrrittee is an individual (i.e., organization does not apply), enter first and last nave in this field. 2. First Name* Joseph IF Corporation, enter Plegistered Agent First Barre 3. Last Name* Marin If Corporation, enter Faegistered Agent Last Wre 3b. Title Development Officer 4. Permitee E-mail joseph.marin@leblon-us.com Address * 5. Permittee 786-853-9950 Telephone No.* 6. Permittee Mailing Street Address Address* 227 W 4th St Address Line 2 Suite 219 city Charlotte Fbstal / Zip Code 28202 Check box if the rJ Yes street address the same as mailing address State / Frovince / Faegion North Carolina Country USA 7. Permittee Street Street Address Address* 227 W 4th St Address Line 2 Suite 219 City State / Rovince / Fbgion Charlotte North Carolina Flostal / Zip Code Country 28202 USA 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Project Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Joseph Contact - First Name * 2. Primary Site Marin Contact - Last Name * 3. Title Development Officer 4. Site Contact E- joseph.marin@leblon-us.com mail Address* 5. Site Contact 786-853-9950 Telephone No. 6.Organization Leblon Name 7. Site Contact Street Address Mailing Address* 227 W 4th St Address Line 2 Suite 219 city Charlotte Postal / Zip Code 28202 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Province / Region North Carolina Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/14/2020 Approved * 2. E&SC Plan Project ANSON-2020-003 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Approval letter or Grading Permit Site Map (Optional) Notes (Optional) APPROVAL ANSON 2020 003 POPEYES 79.65KB WADESBORO.pdf Mast be RDFformat Helpful for linear project review Mast be FDFform3t Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies for linear projects if necessary. 6. NOI Certification NCG01 Notice of Intent (NOI) Certification Form.pdf 625.03KB Form Mast be FDFfon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Joseph Marin Title Development Officer Organization Leblon Franchising Holdings LLC Date * 03/04/2020 F. Tracking and COC Info NOI Tracking No. 22775 NC Reference No. NCG01-2020-0889 Uses 'count number' variable (incremrented by SP) Certificate of NCC200889 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 889 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)