Loading...
HomeMy WebLinkAboutNCG210356_Inspection Report_20200306ROY COOPER Governor MICHAELS.REGAN Secretary BRIAN WRENN Acting Director Parton Lumber Company Attention: David Evans 251 Parton Road Rutherfordton, North Carolina 28139 NORTH CAROLINA Environmental Quality March 6, 2020 Subject: Compliance Evaluation Inspection Permit: NCG210000 Certificate of Coverage: NCG210356 Rutherford County, North Carolina Dear Mr. Evans: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on February 27, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Ree , C Q, CEPSCI, MS CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rvoAm canouw. oznammenioi[mponm.nmauenry 828.296.4500 Permit: NCG210356 SOC: County: Rutherford Region: Asheville Contact Person: David Evans Compliance Inspection Report Effective: 08/01/18 Expiration: 07/31/23 Owner: Parton Lumber Company Inc Effective: Expiration: Facility: Parton Lumber Log Wetting Facility 251 Parton Rd Title: Rutherfordton NC 28139 Phone: 828-287-4257 Directions to Facility: From Rutherfordton, take Hwy 64 east to Parton Lumber on right just before crossing the Second Broad River. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/27/2020 Entry Time: 03:00PM Exit Time: 05:OOPM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: Compliant Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210356 Owner- Facility: Parton Lumber Company Inc Inspection Date: 02/27/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 27, 2020 this facility was inspected for compliance. I met with David Evans and Shane Poindexter on site. During the inspection, the following items were noted: 1) The Site plan did not contain all information required by the permit. The permittee is directed to immediately revise the site plan to meet all requirements outlined in the NCG210000 General Permit. 2) Secondary Containment was not provided for all bulk storage of liquid products on site. The permittee is directed to immediately begin efforts to provide secondary containment as outlined in the NCG210000 General Permit. 3) All annual updates have not been maintained in the Stormwater Pollution Prevention Plan. The permittee is directed to immediately begin annual updates as outlined in the NCG210000 General Permit. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210356 Owner- Facility: Parton Lumber Company Inc Inspection Date: 02/27/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ M ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ M ❑ ❑ # Does the Plan include a list of Responsible Party(s)? M ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? M ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3