HomeMy WebLinkAboutNCG180189_NOV_20200305ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
CERTIFIED MAIL
NORTH CAROLINA
Environmental Quality
March 5, 2020
7019 0700 0000 8867 7323
Fairfield Chair Company
Attn: Mitchell R. Dixon
Post Office Box 1710
Lenoir, North Carolina 28645
Subject: NOTICE OF VIOLATION (NOV-2020-PC-0126)
NPDES Stormwater General Permit NCG180000
Fairfield Chair Company
Fairfield Chair Co -Plant 2, Certificate of Coverage NCG180189
Caldwell County
Dear Mr. Dixon:
On February 25, 2020, Isaiah Reed from the Asheville Regional Office of the Division of Energy,
Mineral and Land Resources (DEMLR), conducted a site inspection of the Fairfield Chair Company
facility located at 606 Kincaid Circle, Caldwell County, North Carolina. A copy of the Compliance
Inspection Report is enclosed for your review. The site visit and file review revealed that the
subject facility is covered under NPDES Stormwater General Permit NCG180000 by Certificate of
Coverage NCG180189. Permit coverage authorizes the discharge of stormwater from the facility to
receiving waters designated as Gunpowder Creek, a Class C waterbody in the Catawba River Basin.
As a result of the site inspection, the following permit condition violation is noted:
Secondary Containment
Secondary containment has not been provided and maintained for all bulk storage of liquid
materials, including hazardous waste storage.
Other Observations:
Please refer to the enclosed Compliance Inspection Report for additional comments and
observations made during the inspection.
Requested Response:
You are asked to respond to this office, in writing, within 30 calendar days from receipt of this
notice. Your written response should include a reasonable explanation as to why the
aforementioned violation(s) have occurred as well as a Plan of Action to prevent this/these
violation(s) from recurring.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
ow+ mr�,mmommwomnp 828.296.4500
Notice of Violation
Fairfield Chair Company
March 5, 2020
Page 2 of 2
Thank you for your attention to this matter. This office requires that the violations, as detailed
above, be properly resolved. These violations and any future violations are subject to a civil
penalty assessment of up to $25,000 per day for each violation. Should you have any questions
regarding these matters, please contact Isaiah Reed or myself at (828) 296-4500.
Sincerely,
Stanley E. Aiken, P
Regional Engineer
Land Quality Section
Enclosure:
Compliance Inspection Report
ec: Alaina Morman, Environmental Specialist
Suzanne McCoy, Stonmvater Program Assistant
Permit: NCG180189
SOC:
County: Caldwell
Region: Asheville
Contact Person: Rick Pierce
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Represer ive(s):
Related Permits:
Compliance Inspection Report
Effective: 08/01/19 Expiration: 05/31/24 Owner: Fairfield Chair Co
Effective: Expiration: Facility: Fairfield Chair Co-Pint#2
606 Kincaid Cr SW
Inspection Date: 02/25/2020
Primary Inspector: Isaiah L Reed
Secondary Inspector(s):
Title:
Entry Time: 01:45PM
Certification:
Lenoir NC 28645
Phone: 828-758-5571
Phone:
Exit Time: 03:OOPM
Phone: 828-296-4614
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Furniture and Fixtures Stormwater Discharge COC
Facility Status: ❑ Compliant M Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG180189 Owner- Facility: Fairfield Chair Cc
Inspection Date: 02/25/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary
On February 25, 2020 this facility was inspected for compliance. I met with Rick Peirce and Mickey James on site. During
the inspection, he following items were noted:
1) The secondary containment structure provided for the storage of hazardous waste on site was cracked a various places
and is not in acceptable condition to qualify as secondary containment. In addition, the condition of the drainage pipes,
which run through the adjacent secondary containment, has removed the potential for that structure to serve as secondary
containment as well. The permittee is directed to immediately begin efforts to evaluate, repair, modify, or replace all
secondary containment at the facility so that it meets all requirements outlined in the NCG180000 General Permit.
2) Additional outfalls may need to be added to the Site plan and monitoring schedule. The permittee is directed to evaluate
the outfall locations for modification and to potentially add an outfall to the monitoring schedule.
Please give the above items your immediate attention. This facility will be re -inspected on or after April 8, 2020. If the above
items have not been addressed, further action will be taken.
If you have any questions, please contact this office at (828) 296-4614
Page 2 of 3
permit: NCG180189 Owner -Facility: Fairfield Chair Cc
Inspection Date: 02/25/2020 Inspection Type : Compliance Evaluation Reason for Veit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
0
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
0
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑
0 ❑ ❑
# Does the Plan include a BMP summary?
0
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑
0 ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑ ❑ ❑
Comment: Secondary Containment issues for Hazardous Waste storage.
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3