HomeMy WebLinkAbout20200174 Ver 1_B-5534 Utility Permit Drawings_20200304Revised 3/4/2020
Revised 3/4/2020
Revised 3/4/2020
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 16+42 to 16+73
COMMUNICATION & POWER
RELOCATION < 0.01
2 17+94 to 19+40
COMMUNICATION & POWER
RELOCATION 0.02
3 20+64 to 21+48
COMMUNICATION & POWER
RELOCATION 0.02
4 21+69 to 24+57
COMMUNICATION & POWER
RELOCATION 0.05
TOTALS*:0.10 0 0 0
*Rounded totals are sum of actual impacts
NOTES:
Revised 2018 Feb SHEET 4 OF 4
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Duplin County
B-5534
55034.1.1
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
2/19/2020
Revised 3/4/2020