Loading...
HomeMy WebLinkAbout20200174 Ver 1_B-5534 Utility Permit Drawings_20200304Revised 3/4/2020 Revised 3/4/2020 Revised 3/4/2020 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 16+42 to 16+73 COMMUNICATION & POWER RELOCATION < 0.01 2 17+94 to 19+40 COMMUNICATION & POWER RELOCATION 0.02 3 20+64 to 21+48 COMMUNICATION & POWER RELOCATION 0.02 4 21+69 to 24+57 COMMUNICATION & POWER RELOCATION 0.05 TOTALS*:0.10 0 0 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 4 OF 4 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Duplin County B-5534 55034.1.1 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 2/19/2020 Revised 3/4/2020