Loading...
HomeMy WebLinkAbout503 Ashebrook DriveROY COOPER Governor MICHAEL S. REGAN secrefary S. DANIEL SMITH Ulrcctur Daniel and Jessica Sims 509 Ashebrook Drive Raleigh, NC 27609 NORTH ;AROLINA Environmental Quality March 3, 2020 Subject: Buffer Determination Letter NBRRO #20-067 Wake County Determination Type: Buffer Intermittent/Perennial ® Neuse (15A NCAC 2B .0233) ❑ Tar -Pamlico (15A NCAC 2B .0259) ❑ Intermittent/Perennial Determination (where local buffer ordinances apply) ❑ Jordan (15A NCAC 26 ,0267) (governmental and/or interjurisdictional projects) Project Name: Address/Location: Stream(s): 509 Ashebrook Drive 509 Ashebrook Drive, Raleigh UT to Big Branch Determination Date: March 3, 2020 Staff: Stephanie Goss Stream E/1/P* Not Subject Subject Start@ Stop@ I Soil Survey USGS To o A X Throughout property X (1) E = Ephemeral, I = Intermittent, P = Perennial, NP = Not Present, N.-A--Not Applicable (2) Refers to State riparian buffer rules only. Stream, wetland, or pond impacts are still subject to applicable water quality standards and permitting requirements, Explanation: The stream(s) listed above has been located on the most recent published NRCS Soil Survey of Wake County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or is not present Streams that are checked "Subject" have been located on the property and possess characteristics that qualify it to be at least an intermittent stream. There may be other streams located on the property that do not show up on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers. 1-0 North Carolina Department or Environmental Quality Division of �Vatcr Rcsourr_cs 4!�_—D—EQ Raleigh Rc9ional 01 fice ' 3800 Barrett Drivc Ra169h, North Carotina 21o0 9 oroann+%VEe aemery 0, \. �/ 91n 791.1200 509 Ashebrook Drive Wake County March 3, 2020 Page 2 of 2 This on -site determination shall expire rive (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter. A request for a determination by the Director shall be referred to the Director in writing. Ifsending via US Postal Service: c/o Karen Higgins, DWR - 401 & Buffer Permitting Unit; 1617 Mail Service Center; Raleigh, NC 27699-1617. If sending via delivery service (UPS, FedEx, etc.): Karen Higgins, DWR - 401 & Buffer Permitting Unit, 512 N. Salisbury Street; Raleigh, NC27604. This determination is final and binding unless, as detailed above, unless an appeal is requested within sixty (60) days. This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4684. If you have questions regarding this determination, please feel free to contact Stephanie Goss at (919)791- 4256. Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: RRO DWR File Copy Daniel Sims via e-mail at dan simsftutlook.cQm 509 Ashebrook Drive Wake County, NC-DWR Project # 20-067 USGS Topographical Map afeigh West Quadrangle 2019 d rpm Locations are approxi. egend: mate and are provided for reference only :: nn Project boundary