Loading...
HomeMy WebLinkAboutWQ0041516_Application (FTSE)_20200302State of North Carolina Department of Environmental Quality IDWRI.O. Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: V,) QM "I If5)(to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Davie County Water System (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: Johnny Lambert per 15A NCAC 02T .0106(b) Title: Utilities Director N C Department of Environmental Quality4. Applicant's mailingaddress: 298 East Depot SReceived City: Mocksville State: NC Zip: 27028- MAR 0 2 2020 5. Applicant's contact information: Phone number: (2M) 753-6090 Email Address: ilambertadaviecountyWinston-Salemnc.gov Regional Office II. PROJECT INFORMATION: 1. Project name: Tanglewood Sewer 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000_ 3. County where project is located: Davie 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.004490' Longitude:-80.4487' 5. Parcel ID (if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: John Grey Firm: Grey Enaineerine.Inc. Mailing address: P.O. Box 9 City: Mocksville State: NC Phone number: (IM) 978-3222 License Number: 015407 Zip: 27028- Email Address: iarev(��reveneineerin¢.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Muddy Creek Permit Number: NCO050342 Owner Name: CCUC/Winston Salem V. RECEIVING DOWNSTREAM'SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W00035664 Downstream (Receiving) Sewer Size: 18 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No NN/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes [—]No NN/A 3. If the Applicant is a Home/Property Owners' Association has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No NN/A 4. Origin of wastewater: (check all that apply): N Residential Owned N Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse N Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f) ❑ Yes N No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl1 Daily Design Flow "b No. of Units Flow This is a pump station removal. gal/ GPD No additional W W is generated gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total GPD a See 15A NCAC 02T .0114(b), (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected N Other (Explain): Removal of existing pump station and replacement by gravity outfall. FORM: ETA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1890 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum senarations that shall be provided for sewer systems: ®,Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402 "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with .15A:NCAC t)2T. the Minlrttc and Force Maim (law version), and the QleYity Sower Minim II Dee ®yes ❑No If No, complete and submit the Variance/Altemative Design Request application (VADC 10.14) and supporting for review. Approval of the request is required prior to submittal of the Fast Track Application and i documents. 2. Professional Engineer's Certification: that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215,6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): 1, JOEUUVY Lf.wt''A=,X:T f�LZ=-dz:J*C L'C r1WTI�5 attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and Complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215. and 143-2154B. any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: y, \ /'cw..tA7r' Date: c2522 ` 26 Z� FORM: PTA 04-16 Page 5 of 5 WR Envision of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Davie County Water System Project Name for which flow is being requested: Tanglewood Sewer More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Muddy Creek b. WWTP Facility Permit #: NC0050342 Al[fTows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station Firm (Name or Permit Capacity, Number) No. MGD Smith 0-11 WQ0036294 1.44 Yadkin WQ0036294 1.85 (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Daily Current Not Yet Total Current Flow** Avg. Daily Tributary Flow Plus (Firm / pf), Flow, Daily Flow, Obligated Available MGD MGD MGD Flow Capacity*** 0.576 .20. 0 0.20 0.376 0.740 .30 0 0.30 0.40 * The Firm Capacity (design Dow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): CCUC Tanglewod Pump Station Downstream Permit Number: Page 1 of 6 FTSE 10-18 III. Certification Statement: I Johnny Lambert certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signature of Signing -2� Date Page 2 of 6 FTSE 10-18 State of North Carolina Department of Environmental Quality Division of Water Resources t)ivhion oE'"J.ttc: i.c-uni, -s Entity Requesting Allocation: Davie Flow Tracking for Sewer Extension Applications (FTSE 10-18) Project Name for which flow is being requested: 12436 Tanglewood Sewer More than one FTSE may be required for a single project f the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit MUDDY CREEK : NCO050342 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 21.000000 2.671600 16.620000 19.291600 91.9 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Total Pump Daily Current Not Yet Current Pump Station Station Firm Flow** Avg. Daily Tributary Flow Plus (Name or Permit Capacity, * (Firm / pfl, Flow, Daily Flow, Obligated Available Number) No. MOD MOD MOD MOD Flow Capacity*** Tanglewood 4 4,46000 1.784000 1.33521 0.033380 1.368591 0,415409 The Firm Capacity (design flow) of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a pealdng factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Muddy Creek Downstream Permit Number: WQCS00003 Page 1 of 6 FTSE 10-18 Ill. Certification Statement: I Courtney Driver, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station on route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Of Signature Date of Signing Page 2 of 6 FTSE 10-18 NAD83 COORDINATES LAT= 36.0044900075 LONG=—80.4487051770 07 r $� • • • USGS QUADS 0 1000 2000 TOP = CLEMMONS 36080—A4 BOTTOM = ADVANCE 35080-1-14 SCALE: 1"= 1000' CONTOURS AT 10' I ' _ �. I\ �� �/ri� '�� V seL jPa'Q ,n Jai.,"I✓/� _Tanglewd usgs SS permit GREY ENGINEERING, iNc. DAVI E COUNTY UTILITIES Civil Design and Surveying P.O. Box 9 Mocksville, N.C. 27028 greyengineering.com (336)751-2110 TANGLEWOOD SHOPPING CENTER 1 DRAWN BY: G. BULLARD PROJ. NO.: 202.131.GE SEWER EXTENSION ON USGS MAP 1 DESIGN BY: G. BULLARD DATE: 02/25/20 NAD83 COORDINATES LAT= 36.0044900075 LONG—80.4487051770 0 1000 SCALE: 1"= 1000' 2000 GREY ENGINEERING, INC. Civil Design and Surveying P.O. Box 9 Mocksville, N.C. 27028 greyenglneering.com (336)751-2110 DRAWN BY: G. BULLARD PROJ. NO.: 202.131.GE DESIGN BY: G. BULLARD DATE: 02/25/20 _Tanglewd aerial SS DAVIE COUNTY UTILITIES TANGLEWOOD SHOPPING CENTER SEWER EXTENSION ON AERIAL MAP r OAIG. GREY ENGINEERING, INC. 2/25/20 NC Department of Environmental Quality Winston Salem Regional Office Received Water Quality Section {NAIL 0 2 2020 450 Hanes Mill Rd, Suite 300 Winston-Salem, NC 27105 Winston-Salem Regional Office Re: Davie County Tanglewood Sewer Fast Track Permit Application The Davie County Water System proposes to remove its Tanglewood wastewater pump station from service and allow approximately 4,000gpd to flow by gravity to the County's existing 18" interceptor in Smith Creek where it is conveyed through the Smith Creek Pump station, the Yadkin River pump station, and CCUC's Tanglewood pump station to treatment and disposal at the Muddy Creek WWTP. No additional flow will be generated by the project. Maintenance expenses and risk will be avoided. Enclosed please find one original and one copy of the following: 1. A $480.00 check to NCDEQ — Water Quality for permit fees. 2. Executed form FTA 04-16 and supporting documentation. 3. Executed form FTSE 10-18 for intermediate sewers in Davie County. 4. Executed form FTSE 10-18 for Intermediate sewers and treatment in Forsyth County. 5. 8.5X11" USGS topo map of project area. 6. 8.5X11" aerial photomap of the project area. Thank you, Grey Engineering, Inc. John Grey, President Cc: Johnny Lambert P.O. Box 9 • Mocksville, NC 27028 • Phone: (336) 751-2110 • Fax: (336) 751-6348 • www.greyengineering.com Henderson, Justin L From: John Grey <jgrey@greyengineering.com> Sent: Tuesday, March 3, 2020 6:33 PM To: Henderson, Justin L Subject: [External] Re: Davie Tanglewood Sewer FTA Attachments: Davie Tanglewood FTA pg 5.pdf Justin, Please see the attached FTA Page 5 of 5 as requested. Also, for your convenience, here is a repeat of the flow explanation previously provided: To clarify, the Davie County Tanglewood pump station serves the Tanglewood Shopping Center in Davie County. It's flow is currently pumped to Davie's Yadkin River Pump Station which goes to Winston's Tanglewood pump station. After the project, Davie's Tanglewood station will be removed and it's flow will go by gravity to Davie's Smith Creek station and then to Davie's Yadkin River station then to Winston's Tanglewood station. There will be no net difference in either Davie's Yadkin River Station nor in Winston's Tanglewood station. The names are confusing. Hope this helps. On Mar 3, 2020, at 1:57 PM, Henderson, Justin L <lustin.henderson@ncdenr.eov> wrote: John, I am reviewing a Fast Track application for the subject sewer extension, and the following information is being requested: 1. Please submit a revised/completed p. 5 of 5 that includes a selection of yes or no for Section X. #1. Attached. 2. Is the flow of 4,000 GPD proposed to be removed from the Tanglewood P/S and redirected via the proposed gravity sewer currently tributary to each of the pump stations listed in the brief narrative and on the FTSE forms? Your application will be placed on hold until the above requested information is received by this office. Feel free to contact me with any questions you have regarding this inquiry. Thanks. Justin Henderson Environmental Specialist II Winston Salem Regional Office Division of Water Resources