HomeMy WebLinkAbout20171041 Ver 1_PCN Little Sebastian_20200303ID#* 20171041 Version* 1 Select Reviewer:* Mac Haupt Initial Review Completed Date 03/03/2020 Mitigation Project Submittal - 3/3/2020 Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No Type of Mitigation Project:* V Stream r- Wetlands r` Buffer r` Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Lin Xu Project Information ................................................................................... ID#:* 20171041 Existing IDI# Project Type: Project Name: County: Email Address:* lin.xu@ncdenr.gov Version: *1 Existing Version r DMS r Mitigation Bank Little Sebastian Stream Mitigation Site Mitigation Project Surry Document Information Mitigation Document Type:* Mitigation Plans File Upload: Approval Letter Little Sebastian Mitigation 105.62 KB Site_2017-01507_Surry County.pdf Little Sebastian Site-1 00027RES Comment 59.94K6 Responses_2018.pdf Little Sebastian_100027_MP 2018.pdf 49.47MB LittleSebastian401 COffice. pdf 48.97KB LittleSebastian401 FeeMemo.pdf 45.79KB PCN Little Sebastian.pdf 31.2MB Rease upload only one RDF of the conplete file that needs to be subnitted... Signature Print Name:* Lin Xu Signature:* ROY COOPER Governor MICHAEL S. REGAN Secretary TIM BAUMGARTNER Director NORTH CAROLINA Environmental Quality March 3, 2020 Mac Haupt, Acting 401 & Buffer Permitting Unit Supervisor Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 Re: Permit Application- Little Sebastian Stream Mitigation Site Mitigation Project, Surry County (DMS Full Delivery Project) Dear Mr. Haupt: Attached for your review is 404/401 permit application package for the subject project. A memo for the permit application fee is also included in the package. Per agreement between DMS and DWR, the hard copy of the final mitigation plan is not included in the submittal (However, I did include a final mitigation plan in this submittal since DMS has extra copies). The electronic copy of the final mitigation plan along with all other electronic files have been uploaded to NC DWR's file system. Please feel free to contact me with any questions regarding this plan (919- 707-8319). Thank you very much for your assistance. Sincerely Lin Xu Attachment: 404/401 Permit Application Package Permit Application Fee Memo d E Q North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W. Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 ROY COOPER Governor MICHAEL S. REGAN Secretary TIM BAUMGARTNER Director MEMORANDUM: NORTH CAROLINA Environmental Quality TO: Debby Davis FROM: Lin Xu L,( SUBJECT: Payment of Permit Fee 401 Permit Application DATE: March 3, 2020 The Division of Mitigation Services (DMS) is implementing a mitigation project for Little Sebastian Stream Mitigation Site Mitigation Project in Surry County (DMS IMS # 100064). The activities associated with this restoration project involve stream restoration related temporary stream and wetland impact. To conduct these activities, the DMS must submit a Pre -construction Notification (PCN) Form to the Division of Water Resources (DWR) for review and approval. The DWR assesses a fee of $570.00 for this review. Please transfer $570.00 from DMS Fund # 2984, Account # 535120 to DWR as payment for this review. If you have any questions concerning this matter I can be reached at 919-707-8319. Thanks for your assistance. cc: Mac Haupt, DWR North Carolina Department of Environmental Quality I Division of Mitigation Services 217 W. Jones Street 11652 Mail Service Center I Raleigh, North Carolina 27699-1652 919.707.8976 Office Use Only: Corps action ID no. DWQ project no.. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 27 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Litte Sebastian Site 2b. County: Surry County 2c. Nearest municipality / town: Elkin 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: See Supplemental 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1 4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: Permittee, DMS Lin Xu NC Division of Mitigation Services 217 W Jones Street Raleigh, NC 27603 919-707-8319 Iin.xu@ncdenr.gov 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Co -Applicant 5a. Name: Cara Conder 5b. Business name (if applicable): RES 302 Jefferson Street, Suite 110 5c. Street address: 5d. City, state, zip: Raleigh, NC 27605 5e. Telephone no.: 919-209-1052 5f. Fax no.: 5g. Email address: cconder@res.us Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 495600199069, 495600282159, & 495600581103 1 b. Site coordinates (in decimal degrees): Latitude: 36.397 Longitude:-80.859 1c. Property size: 25.91 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Mill Creek 2b. Water Quality Classification of nearest receiving water: Class C, Tr, & ORW 2c. River basin: Yadkin River Basin - 03040101 3. Project Description rSeeaDescribe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: the Supplemental Information and the existing conditions maps (Figure 1: Project Service Area and Vicinity Map, Figure 2: Existing Conditions, Figure 3: NWI, Figure 4: NRCS Soils Map, Figure 5: USGS Map, and Figure 6: FEMA Map). 3b. List the total estimated acreage of all existing wetlands on the property: 0.9 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 8,189 3d. Explain the purpose of the proposed project: See Supplemental 3e. Describe the overall project in detail, including the type of equipment to be used: See Supplemental 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ❑X Yes ❑ No Unknown Corps or State been requested or obtained for this property / project (including all priorphases) in thepast? Comments: The PJD 4b. If the Corps made the jurisdictional determination, what type ❑X Preliminary ❑ Final of determination was made. 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: RES Name (if known): RES_Jeremy Schmid Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Ajurisdictional determination request was sent to the USACE on October 26, 2017. The PJD was approved on May 22,2018. The PJD is included with this package, along with the updated linear feet of the project reaches (See supplemental for reach ID summary). 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ❑X No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): 0 Wetlands X❑ Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. J Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary T W1 P Stream Restoration Bottomland Hardwood Forest No Corps 0.08 W2 T Stream Restoration Bottomland Hardwood Forest No Corps 0.21 W3 P Stream Restoration Bottomland Hardwood Forest No Corps 0.07 W4 T Stream Restoration Bottomland Hardwood Forest No Corps 0.25 W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.61 2h. Comments: Wetland impacts associated with restoration efforts occurring adjacent to the existing wetlands will be minimized by the restoration plan. Creating a new stream channel and enhancing existing channels will only impact wetlands slightly and will provide an overall increase in wetland function with the addition of native trees and shrubs along the stream banks. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 Choose one See Supplemental S2 Choose one S3 Choose one S4 Choose one S5 f Choose one S6 Choose one 3h. Total stream and tributary impacts 3,042 3i. Comments: See Supplemental Page 4 of 10 PCN Form — Version 1 4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary T 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake constructionpro osed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require miti ation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — mitigation impact impact Permanent (P) or required? (square (square Temporary T feet) feet B1 Yes/No B2 Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. See supplemental 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. See supplemental 2. Com ensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps I ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Miti ation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) Zone 1 — 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: (square feet) 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. No increase in impervious surface. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Mana ement Plan? ❑Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No increase in impervious surface. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local � risdiction is this project? 3b. Which of the following locally -implemented Stormwater management programs apply (check all that apply): 3c. Has the approved Stormwater Management Plan with proof of approval been attached? 4. DWQ Stormwater Program Review 4a. Which of the following state -implemented stormwater management programs apply (check all that apply): 4b. Has the approved Stormwater Management Plan with proof of approval been attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? 5b. Have all of the 401 Unit submittal requirements been met? ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: ❑ Yes ❑ No ❑Coastal counties ❑HQW ❑ORW []Session Law 2006-246 ❑ Other: ❑ Yes ❑ Yes ❑ No ❑ No ❑ Yes ❑ No Page 8of10 PCN Form —Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the Yes El No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 213 .0200)? ❑ Yes ❑X No 2b. Is this an after -the -fact permit application? El Yes 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) ❑X No 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ©Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act 0 Yes ❑ No impacts.' 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPAC and Natural Heritage Program Database 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑X No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC SHPO GIS Database and confirmatlon from coordination with SHPO. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? © Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: See supplemental information. 8c. What source(s) did you use to make the floodplain determination? Map (FIRM) Panel 4946 (map number 3710494600J), effective date August 18, 2009 Lin Xu -GitJ ,3/3/zap Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agents signature is valid only If an authorization letter from the applicant is , rovided. Cara Conder Date Co Applicant's Printed Name Co -Applicant's Signature Page 10 of 10 PCN Supplemental Information Little Sebastian Mitigation Site Nationwide Permit 27 Pre-Construction Notification Name and address of the Applicant: NC Division of Mitigation Services c/o Lin Xu 217 W Jones Street Raleigh, NC 27603 & Resource Environmental Solutions c/o Cara Conder 302 Jefferson Street. Suite 110 Raleigh, NC 27605 PCN Supplemental Information-Little Sebastian Mitigation Project A. Application Information 3. Owner information (3a) Name(s) on Recorded Deed Gwyn Dobbins Nixon Christopher Edward Nixon The Byron Thomas Shaw II and Mary Beth Shaw Revocable Living Trust U/T/D of November 7, 2011 (3B) Deed Book and Page No. 00810/0325 00827/0243 01410/0856 (3d) Street Address 433 Ed Nixon Rd 431 Ed Nixon Rd 227 Hawthorne Rd (3e) City, State, Zip Thurmond, NC 28683- 8035 Thurmond, NC 28683- 8033 Elkin, NC 28621-3018 B. Project Information and Prior Project History 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The Little Sebastian Mitigation Site is a stream mitigation project located within a primarily rural watershed in Surry County, North Carolina. The Site is located within the Yadkin River Basin (HUC 03040101, TLW 03040101080020) and in the Middle Mitchell River Watershed, a Targeted Local Watershed (TLW). The Middle Mitchell River TLW encompasses 25 square miles of watershed area. Within the 3,261-acre drainage area of the project, the primary land use within the drainage area consists of approximately 70 percent forest, 25 percent agricultural land, and less than one percent of the total watershed is impervious surface. The Project area is comprised of two easement areas along Mill Creek; totaling 25.91 acres and 8,189 existing linear feet of stream. There are seven easement breaks on the project; one easement break/culvert occurs along JN2-C; one easement break/culvert occurs on JN2-D; one easement break occurs between MC1-A and MC1-B; one easement break occurs along MC1-B; one easement break/culvert occurs along JN3-B; one easement/ford crossing breaks occurs on MC3-B; and one easement break/culvert occurs along BS1-E. The stream channels include Mill Creek and three unnamed tributaries, split into 18 reaches based on proposed treatment type. The US Fish and Wildlife Service (USFWS) National Wetland Inventory Map (NWI) does not depict any potential wetland areas within the Project, but there is freshwater pond mapped adjacent to Reach JN3. In general, all or portions of JN2-B, JN2-C, JN2-D, JN3-A, JN3-B, MC1-A, MC1-B, MC1-C, BS1- A, BS1-B, BS1-C, BS1-D, BS1-E, MC3-B, MC3-C, and MC3-D do not function to their full potential. Current conditions demonstrate significant habitat degradation as a result of impacts from agriculture, livestock production, and lack of riparian buffer. Being heavily eroded and incised, some of the streams do not access their floodplains as frequently as they naturally would have prior to agricultural operations. In many cases in the lower elevations, the riparian buffer is in poor condition where much of the riparian buffer is devoid of trees or shrubs and row crops are present up to the edge of the existing channel. In some of the higher elevation reaches, trees are present, but understory riparian buffer has been heavily impacted by cattle. Habitat along the PCN Supplemental Information-Little Sebastian Mitigation Project much of the restoration reaches is poor in that there is little woody debris or overhanging vegetation for fish cover or protection for other aquatic species. 3d. Explain the purpose of the proposed project: The objective for this restoration project is to restore and design natural waterways with the appropriate cross-sectional dimension and slope that will provide function and meet the appropriate success criteria for the existing streams. Accomplishing this objective entails the restoration of natural stream characteristics, such as stable cross sections, planform, and in- stream habitat. The floodplain areas will be hydrologically reconnected to the channel to provide natural exchange and storage during flooding events. The design will be based on reference conditions, USACE guidance (USACE, 2005), and criteria that are developed during this project to achieve success. Additional project objectives, such as restoring the riparian buffer with native vegetation, ensuring hydraulic stability, and treating invasive species. 3e. Describe the overall project in detail, including the type of equipment to be used: The design approach for the Little Sebastian Mitigation Site is to combine the analog method of natural channel design with analytical methods to evaluate stream flows and hydraulic performance of the channel and floodplain. The analog method involves the use of a “template” stream adjacent to, nearby, or previously in the same location as the design reach. The template parameters of the analog reach are replicated to create the features of the design reach. The analog approach is useful when watershed and boundary conditions are similar between the design and analog reaches. Hydraulic geometry was developed using analytical methods in an effort to identify the design discharge. The Little Sebastian Mitigation Site will include priority I stream restoration, enhancement I, enhancement II, and preservation. Priority I stream restoration will incorporate the design of a single-thread meandering channel, with parameters based on data taken from reference sites, published empirical relationships, regional curves developed from existing project streams, and NC Regional Curves. Analytical design techniques were a crucial element of the project and were used to determine the design discharge and to verify the design as a whole. Engineering analysis was performed using various hydrologic and hydraulic models to verify the reference reach based design. A combination of methods was used to estimate bankfull flows, and flows corresponding to other significant storm events. A HEC-RAS model was used to simulate water surface elevations of flows generated by the hydrologic analysis. The development of the HEC-RAS model is an important component to the design; therefore, model input parameters are field verified when possible. Through this hydrologic analysis, the design discharge (typically referenced as bankfull or dominant discharge) was determined. The subsequent design is based on this calculated discharge. As part of the design process, a qualitative analysis of sediment supply was performed by characterizing watershed conditions. A combination of windshield surveys, existing land use data, and historical aerial photography, followed up by ground truthing, was analyzed to assess existing and past watershed conditions and to determine if any changes occurred that would significantly impact sediment supply. Design parameters developed through the analyses of reference reach data, watershed characterizations, and hydrologic and hydraulic modeling was confirmed using the Sediment PCN Supplemental Information-Little Sebastian Mitigation Project Transport Analysis components within HEC-RAS in conjunction with shear stress and velocity analyses. Geomorphic and habitat studies were performed concurrently with the engineering analyses. While stream design was verified by simulations of hydrology and fluvial processes, analogs of desirable habitat features were derived from reference sites and integrated into the project design. Both in-stream and riparian habitat features were designed. In-stream structures will be used throughout the project to act as grade control and for bank stabilization by dissipating and redirecting the stream’s energy. Bank stability may further be enhanced through the installation of brush mattresses, live stakes and cuttings bundles. Sections of abandoned stream channel will be backfilled with material excavated from onsite to the elevation of the floodplain in areas adjacent to the new channel, installing channel plugs where necessary. The floodplain will be planted with native species creating a vegetated buffer, which will provide numerous water quality and ecological benefits. Stream banks will be stabilized using a combination of grading, erosion control matting, bare-root plantings, native material revetment techniques (i.e., bioengineering), structure placement, and sod transplants where possible. The stream and adjacent riparian areas will be protected by a minimum 30-foot conservation easement which will be fenced to exclude livestock as needed. In conjunction with the stream restoration, adjacent wetland hydrology will be enhanced through raising the channel bed. No wetland mitigation credits will be generated from the enhancement of these wetland areas; however, the enhancement and protection of these currently degraded wetlands will store excess water during flood events, prevent erosion of stream banks, and reduce in-stream sedimentation and nutrients. The Project has been broken into the following design reaches: Reach JN2-A - This reach begins on the northwest end of the project, and flows south to JN2- B. This reach totals 418 linear feet of Preservation. Mature forest is located on both sides of the reach. Preservation activities will include improving the existing livestock exclusion fencing and buffers greater than 30 feet. The easement will be extended to provide preservation beyond the origin point of the stream as per the PJD. Reach JN2-B - This reach begins on the northwest end of the project, from JN2-A, and flows south to JN2-C. This reach totals 187 linear feet of Enhancement I. Sparse woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. Minimal bank grading and buffer re-establishment is also proposed along the downstream end. In-stream structures such as log sills and one log cross vane will be installed for stability and to improve habitat. The restoration of the riparian areas at the downstream end will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the Project area. Reach JN2-C - This reach begins on the northwest end of the project, from JN2-B, and flows south to JN2-D. The reach is divided into two sections by an existing farm crossing and totals 1,144 linear feet of Enhancement II. Sparse woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. Minimal bank grading and buffer re-establishment is also proposed along the downstream end. The restoration of the riparian PCN Supplemental Information-Little Sebastian Mitigation Project areas at the downstream end will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the Project area. Reach JN2-D - This reach begins on the northwest end of the project, from JN2-C, and flows south to MC1-B. The reach is divided into two sections by an existing farm crossing and totals 196 linear feet of Enhancement I. Actively managed pasture is located adjacent to the reach. Enhancement activities will include some channel relocation, bed and bank stabilization, removing an existing ford crossing and access road, improving habitat through supplemental buffer plantings, and livestock exclusion fencing. The restoration of the riparian areas at the downstream end will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the Project area. Reach JN3-A – This reach begins on the northwest end of the project, and flows south to JN3- B. This reach totals 350 linear feet of Enhancement II. Sparse woodland and actively managed pasture is on the right bank and the left bank has a more mature forest. Enhancement II activities at a 7.5:1 ratio will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the right bank will filter runoff from adjacent pasture and reduce sediment loads. Reach JN3-B - This reach begins on the northwest end of the project, from JN3-A, and flows south to MC1-C. The reach is divided into two sections by an existing farm crossing and totals 1,043 linear feet of Restoration along a gravel/cobble channel (proposed D50 of 50-60 mm). Sparse woodland and actively managed pasture is located adjacent to the reach. Restoration activities will include constructing a new channel within the natural valley to the north with appropriate dimensions and pattern and backfilling the abandoned channel. In-stream structures such as log sills, brush toes, and log vanes will be installed for stability and to improve habitat. Habitat will further be improved through buffer plantings and livestock exclusion. Proposed buffer activities will improve riparian areas that will filter runoff from adjacent pastures, thereby reducing nutrient and sediment loads to the channel. Also, the reach will be built through two small jurisdictional wetlands that are currently on the right bank floodplain and degraded from cattle access and pasture-use. While this project is not claiming any wetland credit, the raised channel bed should enhance the wetlands’ hydrology by reconnecting the floodplain wetlands to the stream. Two gauges will be installed on the right floodplain to monitor the wetland hydrology and will be reported in the yearly monitoring reports. Reach MC1-A - This reach begins on the west end of the project, and flows west to MC1-B. This reach totals 469 linear feet of Enhancement II at a 7.5:1 ratio. Sparse woodland and actively managed pasture is located on the left bank. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the right bank will filter runoff from adjacent pasture and reduce sediment loads. Reach MC1-B - This reach begins on the west end of the project, from MC1-A, and flows west to MC1-C. The reach is divided into two sections by an existing farm crossing and totals 977 linear feet of Enhancement II. Sparse woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of PCN Supplemental Information-Little Sebastian Mitigation Project the riparian areas along the left bank will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the Project area. Reach MC1-C - This reach begins on the west end of the project, from MC1-B, and flows west to the Gideon Mitigation Site where the restoration continues for another 1,030 LF. This reach totals 555 linear feet of Restoration along a gravel/cobble channel (proposed D50 of 50-60 mm). Actively managed pasture is located adjacent to the reach. Restoration activities will include using log structures to provide vertical stability, assist in maintaining riffle, run and pool features and to provide habitat features. Cut and fill will be balanced in an effort to raise the channel bed to provide regular inundation of the adjacent floodplain. Habitat will further be improved through supplemental buffer plantings and livestock exclusion fencing. Reach MC3-A - This reach begins on the east end of the project, continuous from the Gideon Mitigation Site, and flows west to MC3-B. This reach totals 243 linear feet of Enhancement II at a 10:1 ratio. Dense woodland is located adjacent to the reach. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the right bank will filter runoff from adjacent pasture and reduce sediment loads. Reach MC3-B - This reach begins on the east end of the project, from the MC3-A, and flows west to MC3-C. This reach totals 402 linear feet of Enhancement II. Sparse woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include reshaping the left bank, install coir matting and livestakes, and improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the left bank will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the Project area. A ford crossing will be installed on this reach. Reach MC3-C - This reach begins on the east end of the project, from the MC3-B, and flows west to MC3-D. This reach totals 214 linear feet of Enhancement I. Sparse woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include reshaping the left bank, install coir matting and livestakes, and improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the left bank will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the project area. Reach MC3-D - This reach begins on the east end of the project, from the MC3-C, and flows west out of the easement. This reach totals 395 linear feet of Enhancement II. Dense woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the left bank will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the Project area. Reach BS1-A - T This reach begins on the northeast end of the project, and flows south to BS1-B. This reach totals 214 linear feet of Restoration. Sparse woodland and actively managed pasture is located adjacent to the reach. Restoration activities will include using log and rock structures to provide vertical stability, assist in maintaining riffle, run and pool features and to provide habitat features. Cut and fill will be balanced in an effort to raise the channel bed to provide small floodplain benches where topography allows. Habitat will further be improved PCN Supplemental Information-Little Sebastian Mitigation Project through supplemental buffer plantings and livestock exclusion fencing. A flood attenuation structure in the form of a dry detention basin will be installed at the top of this reach. Reach BS1-B - This reach begins on the northeast end of the project, from BS1-A, and flows south to BS1-C. This reach totals 175 linear feet of Enhancement II. Sparse woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the left bank will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the project area. Reach BS1-C - This reach begins on the northeast end of the project, from BS1-B, and flows south to BS1-D. This reach totals 541 linear feet of Restoration. Sparse woodland and actively managed pasture is located adjacent to the reach. Restoration activities will include using log and rock structures to provide vertical stability, assist in maintaining riffle, run and pool features and to provide habitat features. Cut and fill will be balanced in an effort to raise the channel bed to provide small floodplain benches where topography allows. Habitat will further be improved through supplemental buffer plantings and livestock exclusion fencing. Reach BS1-D - This reach begins on the southeast end of the project, from BS1-C, and flows south to BS1-E. This reach totals 177 linear feet of Enhancement II. Sparse woodland and actively managed pasture is located adjacent to the reach. Enhancement activities will include improving habitat through supplemental buffer plantings and livestock exclusion fencing. The widening and restoration of the riparian areas along the left bank will filter runoff from adjacent pasture, reduce sediment loads, and provide wildlife corridors throughout the Project area. Reach BS1-E - This reach begins on the southeast end of the project, from BS1-D, and flows south to MC3-D. The reach is divided into two sections by an existing farm crossing and totals 368 linear feet of Restoration. Sparse woodland and actively managed pasture is located adjacent to the reach. Restoration activities will include using log structures to provide vertical stability, assist in maintaining riffle, run and pool features and to provide habitat features. Cut and fill will be balanced in an effort to raise the channel bed to provide small floodplain benches where topography allows. Habitat will further be improved through supplemental buffer plantings and livestock exclusion fencing. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation: Site Proposal ID Proposal Treatment Post IRT Site Visit Update ID Post IRT Site Visit Update Treatment JD Final Design ID Final Treatment Little Sebastian West JN2-A Preservation JN2 JN2-A Preservation Little Sebastian West JN2-A Restoration JN2-A Enhancement I JN2 JN2-B Enhancement I Little Sebastian West JN2-B Enhancement II JN2-A/JN2-B Enhancement II JN2 JN2-C Enhancement II Little Sebastian West JN2-B Enhancement II JN2-B Enhancement I JN2 JN2-D Enhancement I Little Sebastian West JN3-A Enhancement II JN3-A Preservation JN3 JN3-A Enhancement II 7.5:1 Little Sebastian West JN3-B Restoration JN3-B Restoration JN3 JN3-B Restoration Little Sebastian West JN1-A Enhancement II JN1-A Preservation Mill Creek MC1-A Enhancement II 7.5:1 Little Sebastian West JN1-A Enhancement II JN1-A Enhancement II 5:1 Mill Creek MC1-B Enhancement II 5:1 Little Sebastian West JN1-B Restoration JN1-B Restoration Mill Creek MC1-C Restoration Little Sebastian East BS1 Restoration BS1 Restoration BS1 BS1-A Restoration Little Sebastian East BS1 Enhancement II BS1 Enhancement II BS1 BS1-B Enhancement II Little Sebastian East BS1 Restoration BS1 Restoration BS1 BS1-C Restoration Little Sebastian East BS1 Enhancement II BS1 Enhancement II BS1 BS1-D Enhancement II Little Sebastian East BS1 Restoration BS1 Restoration BS1 BS1-E Restoration Little Sebastian East MC1 Enhancement II MC1 Preservation Mill Creek MC3-A Enhancement II 10:1 Little Sebastian East MC1 Enhancement II MC1 Enhancement II Mill Creek MC3-B Enhancement II Little Sebastian East MC1 Enhancement II MC1 Enhancement I Mill Creek MC3-C Enhancement I Little Sebastian East MC1 Enhancement II MC1 Enhancement II 5:1 Mill Creek MC3-D Enhancement II 5:1 Gideon JN6-A Preservation JN6-A Preservation JN6 JN6-A Preservation Gideon JN6-B Enhancement II JN6-B Enhancement III JN6 JN6-B Enhancement III Gideon JN6-C Restoration JN6-C Restoration JN6 JN6-C Restoration Gideon N/A N/A N/A N/A JN7 JN7 Realignment of JN6-C Gideon JN4-A Enhancement II JN4-A Enhancement III JN4 JN4-A Enhancement III Gideon JN4-A Enhancement II JN4-B Enhancement I JN4 JN4-B Enhancement I Gideon JN5 Enhancement II JN5 Enhancement I JN5 JN5 Enhancement I Gideon MC3-A Restoration MC3-A Restoration Mill Creek MC2-A Restoration Gideon MC3-B Enhancement II MC3-B Enhancement III Mill Creek MC2-B Enhancement III C. Proposed Impacts Inventory 3. Stream Impacts 3a. Stream Impact Number Permanent (P) of Temporary (T) 3b. Type of Impact 3c. Stream Name 3d. Perennial (PER) of Intermittent (INT) 3e. Type of Jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 Perm Culvert JN2-C Per Corps 8.7 24 S2 Temp Culvert JN2-C Per Corps 8.7 10 S3 Perm Culvert JN2-D Per Corps 4.9 24 S4 Temp Culvert JN2-D Per Corps 4.9 10 S5 Perm Stream Relocation JN3-B Per Corps 17.9 1,124 S6 Perm Culvert JN3-B Per Corps 17.9 24 S7 Temp Culvert JN3-B Per Corps 17.9 28 S8 Perm Stream Relocation MC1-C (Mill Creek) Per Corps 17.4 545 S9 Perm Stream Relocation BS1 Per Corps 3.2 1,202 S10 Temp Crossing BS1 Per Corps 3.2 10 S11 Perm Ford Crossing MC3-C (Mill Creek) Per Corps 35 41 3h. Total Stream and tributary impacts 3,042 3i. Comments Impacts due to the relocation of the stream to natural valley will provide a net gain in ecological function to the stream and wetland system. Wooded active pasture is located adjacent to these reach. Restoration is proposed along these reaches to address channel degradation and bank erosion caused by cattle access. For stream relocation and impacts: Stream Impact 5, the existing length is 1,124 linear feet (LF), and the new length will be 1,043 LF; Stream Impact 8, the existing stream length is 545 LF and the new length will be 555 LF; Stream Impact 9, the existing stream length for the entire reach is 1,547, the new length will be 1,475 LF, however only 1,202 will be impacted due to stream relocation. Impacts that are due to the installation of culverts (S1, S2, S3, S4, S6, and S7), where the permanent impacts include the installation of a 24-inch pipe, and the temporary impacts include PCN Supplemental Information-Little Sebastian Mitigation Project a minimum of ten-foot area adjacent to where the culvert will be installed. BS1 will improve a current culvert (S10). The impact due to the ford crossing (S11) will include 41 linear feet of a ford crossing installation. D. Impact Justification and Mitigation 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project: Due to the nature of this project, complete avoidance is not possible. Both stream and wetland impacts were considered when designing the Little Sebastian Mitigation project. This project should uplift the ecological quality of streams and wetlands on site. The existing project channel length is 8,189 LF. The proposed project will result in 8,068 LF of stream (see table below). Stream Mitigation Proposed Reach Mitigation Type Existing Length (LF) Proposed Length (LF) JN2-A Preservation 418 418 JN2-B Enhancement I 187 187 JN2-C Enhancement II 307 307 - Enhancement II 837 837 JN2-D Enhancement I 39 43 - Enhancement I 150 153 JN3-A Enhancement II (7.5) 350 350 JN3-B Restoration 900 781 - Restoration 224 262 MC1-A Enhancement II (7.5) 469 469 MC1-B Enhancement II (5) 717 717 - Enhancement II (5) 260 260 MC1-C Restoration 545 555 MC3-A Enhancement II (10) 243 243 MC3-B Enhancement II 402 402 MC3-C Enhancement I 214 214 MC3-D Enhancement II (5) 395 395 BS1-A Restoration 205 214 BS1-B Enhancement II 190 175 BS1-C Restoration 580 541 BS1-D Enhancement II 185 177 BS1-E Restoration 278 274 - Restoration 94 94 Total 8,189 8,068 PCN Supplemental Information-Little Sebastian Mitigation Project 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Impacts are minimized using a staged construction approach. Where possible the channel will be constructed prior to turning stream flow into a segment. This approach allows minimization of the impact of each stage during the project construction. Additionally, all work in wetlands and streams will be conducted during dry conditions and/or with mats to protect soil structure. Efforts will be made to preserve individual high value trees located within the stream restoration area. F. Supplementary Information 8b. If yes, explain how project meets FEMA requirements According to the North Carolina Floodplain Mapping Information System, the Project includes a portion of Mill Creek within the FEMA 100-year flood zone (Zone AE). No regulated floodway is mapped. Hydraulic modeling will be required to determine whether restoration activities will have an effect on 100-year flood elevations downstream. The design and permitting of the mitigation will include coordination with the Surry County Floodplain Administrator and a No-Rise Certification or CLOMR/LOMR will be secured. No hydrologic trespass will be permitted to adjacent properties upstream or downstream of the project. The Project can be found on Flood Insurance Rate Map (FIRM) Panel 4946 (map number 3710494600J), effective date August 18, 2009. Site Reach/Wetland ID Revised ID Latitude Longitude Length (LF) /Area (ac) Little Sebastian WA ----80.859778 36.398586 0.42 Little Sebastian WB ----80.859642 36.397907 0.48 Gideon WC ----80.855978 36.398336 0.01 Gideon WD ----80.856767 36.396847 0.04 Gideon WE ----80.856836 36.396359 0.36 Gideon WF ----80.856058 36.394861 0.42 Gideon WG ----80.855611 36.398111 0.01 Little Sebastian BS-1 BS1 -80.851484 36.396111 1,520 * Little Sebastian JN-2 JN2 -80.863542 36.399251 2,038 * Little Sebastian JN-3 JN3 -80.859211 36.398372 1,436 * Gideon JN-4 JN4 -80.858733 36.395122 477 * Gideon JN-5 JN5 -80.857693 36.394568 270 * Gideon JN-6 JN6 -80.856718 36.396846 2,517 * Gideon JN-7 JN7 -80.855351 36.394343 55 * Gideon Mill Creek MC2 -80.857033 36.394489 1,920 * Little Sebastian Mill Creek MC3 -80.861609 36.397017 3,012 * Revised Post-Survey * Lengths have been updated to reflect the length of the surveyed length of the streams ``a ``a ``a M M M DP-6 DP-4 DP-2 DP-5 DP-3 DP-1 JN-6JN-2BS-1J N -3 M ill C reekJN-4 JN-5JN-7Mill Creek J N -4 WB WF WA WE WD WG WC Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\JD\LittleSebastian_WOUS_11x17.mxd - Date Saved: 5/22/2018 PROJECT MANAGER: DRAWN: ATP JOB NUMBER: ###### DATE: 10/27/2017 REVISIONS: NONE 0 400200 Feet ©Legend M Wetland Data Point ``a Upland Data Point Potential Non-Wetland Waters of the US Potential Wetland Waters of the US Little Sebastian Study Area Gideon Study Area Potential Wetland or Non-Wetland Waters of the U.S. Map Little Sebastian and Gideon Water Quality Improvement Sites Surry County, North Carolina U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2017=01507 County: Surry U.S.G.S. Quad: NC- Bottom 'NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: RES Jeremv Schmid Address: 302 Jefferson Street. Suite 110 Ralei2 h. NC 28605 Telephone Number: 919-926-1473 E-mail: ischmidAres.us Size (acres) 51.4 Nearest Waterway Mill Creek USGS HUC 03040101 Nearest Town Dodson River Basin Upper Yadkin Coordinates Latitude:36.39654 Longitude:-80.8584 Location description: The jroiect site Little Sebastian Mitigation site is located on Ed Nixon Road,near Thurmond North Carolina and is adjacent to and associated with SAW-2017- 01462 Gideon Mitigation site. Indicate Which of the Following Ap pl : A. Preliminary Determination ® There appear to be waters, including wetlands on the above described project area/property, that maybe subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 10/27/2017. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC §. 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination. may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters, including wetlands on the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-2017-01507 ❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps. Regulatory Official identified below on DATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact William Elliott at 828-271-7980 ext 4224 or William. a. elliottra; usace.armv. mil. C. Basis For Determination: See the PJD iurisdictional determination form dated 5/22/2018. D. Remarks: None. E. Attention USDAProgram Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1085. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form: If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal. under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by DATE. **It is not necessary to submit an RFA form to the Division office if you do not o}}ecX Ole d munation in this correspondence.** Corps Regulatory Official: _William Elliott Date of JD: 5/22/2018 Expiration Date of JD: NONE SAW-2017-01507 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm.apex/f?p-136:4:0 Copy furnished: Byron Thomas Shaw II, Mary Beth Shaw, 227 Hawthorne Road, Elkin, NC 28621 Christopher Edward Nixon & Gwyn Dobbins Nixon, Jimmy Edward Nixon & Vivian J. Life Estate, 611 Ed Nixon Road, Thurmond, NC 28683 Stephen & Amy Shore, 433 Ed Nixon Road, Thurmond, NC 28683 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND RE(i ,ST FOR APPEAL Applicant: ES, Jerem Schmid File Number: SAW-2017-01507 Date: 5/22/2018 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT (Standard Permit or Letter ofpermission) A _ PROFFERED PERMIT (Standard Permit or Letter of permission)PERMIT DENIAL C LF] APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or bit ?1Liv vw. sa .ary.r illMs i t slOiv Works/RegulatoryProgr zmdPermits.a or the Cams regulations at 33 CFR Part 331. _ A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may reques that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therei you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 1 this form and sending the form to the division engineer. This form must be received by the division engineer within 60 d, of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Proces completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of 1 date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This f must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may -be appealec by contacting the Corps district for further instruction. Also you may provide new information for further consideration by th Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an ini proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reason objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for record of the appeal conference or meeting, and any supplemental information that the review officer has determined is neede clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you mal appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Attn: William Elliott CESAD-PDO Asheville Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1OM15 151 Patton Avenue, Room 208 Atlanta, Georgia 30303-8801 Asheville, North Carolina 28801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 dz notice of any site investigation, and will have the opportunity to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: William Elliott, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 5/22/2018 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: RES, Jeremy Schmid, 302 Jefferson Street, Suite 110 Rale' h NC 28605 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, NCDMS OLF- Little Sebastian Mitigation Site, SAW-2017-01507 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project site Little Sebastian Mitigation site is located on Ed Nixon Road, near Thurmond, North Carolina and is adjacent to and associated with SAW-2017- 01462 Gideon Mitigation site. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Surry City: Dodson Center coordinates of site (lat/long in degree decimal format): Latitude: 36.39654 Longitude:-80.8584 Universal Transverse Mercator: Name of nearest water body: Mill Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): February 27, 2018 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount of Type of aquatic Geographic authority to Latitude (decimal Longitude (decimal aquatic resources in resources (i.e., which the aquatic resource "may Site Number degrees) degrees) review area (acreage wetland vs. non - be" subject (i.e., and linear feet, if wetland waters) Section 404 or Section applicable 10/404) See Attached Table 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting "NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map:Vicinity, USGS, NWI Soil, Existing Conditions,WOUS ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: ❑ Natural Resources Conservation Service Soil Survey. Citation: ® National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): UNK or ❑Other (Name & Date ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. illiam Elliott Signature and date of Regulatory staff member completing PJD 5/22/2018 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Site Little Sebastian Little Sebastian Gideon Gideon Gideon Gideon Little Sebastian Little Sebastian Little Sebastian Gideon Gideon Gideon Gideon Gideon Little Sebastian Reach/Wetland ID WA WB WC WD WE WF BS-1 JN-2 JN-3 J N-4 J N-5 JN-6 J N-7 Mill Creek Mill Creek Latitude Longitude -80.859778 36.398586 -80.859642 36,397907 -80.855978 36.398336 -80.856767 36.396847 -80.856836 36.396359 -80.856058 36.394861 -80.851484 36.396111 -80.863542 36.399251 -80.859211 36.398372 -80.858733 36.395122 -80.857693 36.394568 -80.856718 36.396846 -80.855351 36.394343 -80.857033 36.394489 -80.861609 36.397017 Length (LF) /Area (ac) D.42 0.48 0.01 0.04 0.36 0.42 1424 1792 1363 634 78 2024 55 1855 3146 0 1,000500 Feet Figure 1 - Vicinity Map Little Sebastian Mitigation Site Surry County, North Carolina ©Date: 11/2/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\PCN\Figure 1 - Vicinity Map.mxdLegend Proposed Easement Proposed Gideon Site Service Area - 03040101 TLW - 03040101080020 Checked by: CSC Gideon Mitigation Site Little Sebastian Mitigation Site Little SebastianMitigation SiteLittle SebastianMitigation Site TTTTTTTTTTTTM C 3 -C JN2-D BS1-ABS1-DJN2-B BS1-BMC3-A BS1-EJN3 -AMC3-B JN2-A M C 1 -A M C 3 -DBS1-CMC1-C M C 1 -B J N 3- B J N2 -CWA WB WE WD WF WC WG ©0 400200 Feet Date: 11/2/2018 Drawn by: MDE Checked by: CSC Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\PCN\Figure 2 - Existing Conditions Map 11X17.mxdLegend !CExisting Telephone Line T T Existing P ow erline Existing S tream s Existing Wetlands Proposed Easem ent Proposed Gideon Site Project Parcels Figure 2 - Existing Conditions Map Little SebastianMitigation Site Surry County, North C arolina 1 in = 400 feet !C!CTelephone LineTelephone Line Private RoadCrossing PUBHh PUBHh 0 600300 Feet Figure 3 - National Wetland Inventory Map Little Sebastian Mitigation Site Surry County, North Carolina ©Date: 11/2/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\PCN\Figure 3 - NWI Map.mxdLegend Proposed Easement Proposed Gideon Site NWI Wetlands - None (06/25/2018) Checked by: CSC 0 1,000500 Feet Figure 4 - Soils Map Little Sebastian Mitigation Site Surry County, North Carolina ©Date: 11/6/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\PCN\Figure 4 - Soils Map.mxdChecked by: CSC Legend Proposed Easement Proposed Gideon Site 0 2,0001,000 Feet Figure 5 - USGS Map Bottom (1973) Little Sebastian Mitigation Site Surry County, North Carolina ©Date: 11/6/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\PCN\Figure 5 - USGS Map.mxdLegend Proposed Easement Drainage Area Checked by: CSC 0 600300 Feet Figure 6 - FEMA MapPanel: 4946 Map No: 3710494600J Effective Date: Aug.18.2009 Little Sebastian Mitigation Site Surry County, North Carolina ©Date: 11/6/2018 Drawn by: MDE Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\PCN\Figure 6 - FEMA Map.mxdLegend Proposed Easement Proposed Gideon Site FEMA Zone AE Checked by: CSC S9S9S9S8 W1-W2 W3-W4 S5 S6-S7S3-S4 S1-S2 S10S11 M C 3 -C JN2-D BS1-ABS1-DJN2-B BS1-BMC3-A BS1-EJN3 -AMC3-B M C 3 -D JN2-A M C 1 -A BS1-CMC1-C M C 1 -B JN3-BJ N2 -CWA WB WE WD WF WC WG ©0 400200 Feet REFERENCE 1) Horizontal Datum is NAD83 UTM Z15N. 2) Map Projection is NAD_1983_StatePlane_North_Carolina_FIPS_3200_Feet Date: 11/7/2018 Drawn by: MDE Checked by: CSC Document Path: S:\@RES GIS\Projects\NC\Little Sebastian\MXD\PCN\Figure 7 - Impacts Map - Little Sebastian.mxdLegend Proposed Easement Proposed Gideon Site Existing Wetlands Existing Top of Bank Proposed Top of Bank Permanent Wetland Impact Temporary Wetland Impact Figure 7 - Impacts Map Little SebastianMitigation Site Surry County, North Carolina 1 in = 400 feet W1-W2 W3-W4 S5 S6 WB WA WE WDJN3-BMC1-C J N3 -AMC1-B 1 inch = 300 feet 0 300150 Feet Impact ID Temp/Perm Aquatic Resource Area/LengthS1PermJN2-C 24 ftS2TempJN2-C 10 ftS3PermJN2-D 24 ftS4TempJN2-D 10 ftS5PermJN3-B 1,124 ftS6PermJN3-B 24 ftS7TempJN3-B 28 ftS8PermMC1-C 545 ftS9PermBS11,202 ftS10TempBS110 ftS11PermMC3-C 41 ft W1 Perm WA 0.08 acW2TempWA0.21 acW3PermWB0.07 acW4TempWB0.25 ac © 2017 HERE © 2017 Microsoft Corporation OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOH E WOODBUILDINGWOODSHEDWOODBUILDINGWOODSHEDROCKROCKROCKROCKOHE OHE OH E XXXX X XX X X X XXXXXXXXXX XX X X XXX XX XXXXXXXX X300600300PROJECT LOCATIONSITE MAPNTSS1S2S3S4S5S6S7S8S9S10S11S11S12S13S13DMS PROJECT #:CONTRACT #:USACE ACTION ID #:RFP #:1000277187SAW-2017-0150716-006993FILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_COVER.dwg SAVED BY: Tswartzfager SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.usRESOURCE ENVIRONMENTAL SOLUTIONS, LLC302 JEFFERSON ST, SUITE 110RALEIGH, NC 27605VICINITY MAPNTS0FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEOCTOBER 2018YADKIN RIVER BASIN: HUC 03040101080020SURRY COUNTY, NORTH CAROLINALITTLE SEBASTIAN STREAM MITIGATION SITEDPITRSAFMCSC0335-PRELIMINARY - NOT FOR CONSTRUCTION 10/31/2018REACH JN2REACH JN3REACH MC1REACH MC3REACH BS1Sheet List TableSheet NumberSheet Title-COVERE1GENERAL NOTES & LEGENDE2EXISTING CONDITIONSS1REACH JN2S2REACH JN2S3REACH JN2S4REACH JN2S5REACH JN3S6REACH JN3S7REACH JN3S8REACH BS1S9REACH BS1S10REACH BS1S11REACH MC1S12REACH MC1S13REACH MC3F1FENCING PLANP1PLANTING PLANP2EROSION CONTROL NOTESM1MONITORING PLAND1DETAILSD2DETAILSD3DETAILSD4DETAILSD5DETAILSD6DETAILSD7DETAILS SCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_SITE.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIONE10335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE GENERAL NOTES & LEGEND SURRY COUNTY, NORTH CAROLINA LEGENDTBTBBBBBOHEOHEXXEXISTING TREELINELCELIMITS OF PROPOSEDCONSERVATION EASEMENT50465042EXISTING OVERHEAD ELECTRIC UTILITY LINEPROPOSED TOP OF BANKEXISTING FENCELINEEXISTING BOTTOM OF BANKEXISTING TOP OF BANKPROPOSED CONTOUR MINORPROPOSED CONTOUR MAJOREXISTING CONTOUR MINOREXISTING CONTOUR MAJOREXISTING WETLANDPROPOSED CHANNEL PLUG(SEE DETAIL DWG D2)LOG SILL(SEE DETAIL D4)LOG SILL(PROFILE)PROPOSED FILL AREALOG CROSS VANE(SEE DETAIL D7)LOG CROSS VANE(PROFILE)DOUBLE LOG DROP(SEE DETAIL D4)PROPERTY LINEPROPOSED CENTERLINE OF CHANNELEXISTING TREEEXISTING STREAMTBTBTBTBBBBBBBBBCONSTRUCTION NOTES:1.INSTALL EROSION CONTROL MEASURES AS DESCRIBED IN THE EROSION CONTROL PLAN ANDNOTES. EROSION CONTROL MEASURES MAY BE PHASED-IN TO THOSE AREAS OF THE PROJECTCURRENTLY BEING WORKED ON. THE CONTRACTOR MAY MODIFY OR RELOCATE EROSIONCONTROL MEASURES TO MAKE ADJUSTMENTS FOR UNFORESEEN FIELD CONDITIONS SO LONGAS PROPER CONSTRUCTION IS MAINTAINED TO ENSURE THE INTEGRITY AND USEFULNESS OF THEPROPOSED MEASURES. ALL DISTURBED AREAS ALONG CHANNEL BANKS SHALL BE STABILIZEDWITH TEMPORARY SEED AND MULCH AT THE END OF EACH DAY.2.IN GENERAL, STREAM CONSTRUCTION SHALL PROCEED FROM AN UPSTREAM TO DOWNSTREAMDIRECTION.3.EXISTING WETLANDS CANNOT BE ENCROACHED UPON UNDER ANY CIRCUMSTANCES IF NOTAPPROVED AS DESIGNATED IMPACT AREAS. HIGH VISIBILITY FENCING MUST BE PLACED AROUNDALL EXISTING WETLANDS THAT ARE LOCATED ADJACENT TO CONSTRUCTION ACTIVITIES AND/ORARE LOCATED WITHIN THE PROPOSED CONSERVATION EASEMENT.4.DURING STREAM CONSTRUCTION ACTIVITIES, THE WORK AREA SHALL BE STABILIZED AT THE ENDOF EACH WORKING DAY.5.UNLESS NOTED OTHERWISE, FILL MATERIAL GENERATED FROM CHANNEL EXCAVATION ANDSTABILIZATION SHALL BE PLACED INSIDE THE EXISTING CHANNEL TO BE ABANDONED AT ANELEVATION THAT PROVIDES POSITIVE DRAINAGE TOWARDS THE PROPOSED CHANNEL.6.STOCKPILE AREAS MAY BE RELOCATED UPON THE APPROVAL OF THE ENGINEER. SILT FENCINGMUST BE INSTALLED AROUND ALL STOCKPILE AREAS.7.CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OR TREES TO REMAIN, AND SHALLNOT DAMAGE SUCH TREES IN ANY WAY. EXCAVATED OR OTHER MATERIAL SHALL NOT BE PLACED,PILED OR STORED WITHIN THE CRITICAL ROOT ZONE AREA OF THE TREES TO BE SAVED. ANYCOMPROMISED TREES NOT USED IN CONSTRUCTION ARE TO BE REMOVED AND DISPOSED OFOFF SITE.8.REMOVE AND STOCKPILE GRAVEL/COBBLE SUBSTRATE LOCATED WITHIN EXISTING CHANNELS TOBE ABANDONED. THIS MATERIAL SHALL BE INSTALLED ON THE PROPOSED BED OF SHALLOWCHANNEL SECTIONS.9.IN-STREAM STRUCTURES PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS (BRUSH TOES,LOG VANES, AND LOG TOES) MAY BE USED INTERCHANGEABLY THROUGHOUT THE PROJECT PERAPPROVAL FROM DESIGNER.10.THE WORK TO RESHAPE THE CHANNEL BANKS WILL BE PERFORMED USING EQUIPMENT WORKINGFROM THE TOP OF THE EXISTING STREAM BANK, WHERE POSSIBLE.11.CONSTRUCTION EQUIPMENT WILL NOT BE PLACED WITHIN THE ACTIVE CHANNEL TO PERFORMWORK IF POSSIBLE. PLATFORMS SHOULD BE USED TO CROSS CHANNEL WHERE ACCESS IS NOTPOSSIBLE.12.NO MORE CHANNEL SHALL BE DISTURBED THAN CAN BE STABILIZED BY THE END OF THE WORKDAY OR PRIOR TO RESTORING FLOW TO NEWLY CONSTRUCTED CHANNEL SEGMENTS.13.CONTRACTOR SHALL REMOVE ALL TEMPORARY CONTROL DEVICES ONCE CONSTRUCTION ISCOMPLETE AND THE SITE IS STABILIZED. A MAXIMUM OF 200 LINEAR FEET OF STREAM MAY BEDISTURBED AT ANY ONE TIME.14.ALL EXCAVATED MATERIAL MUST BE PLACED WITHIN DESIGNATED STOCKPILE AREAS.15.AT LOCATIONS IN WHICH THE EXISTING CHANNEL IS BEING MAINTAINED, TEMPORARY PUMPAROUND DAMS AND BYPASS PUMPING WILL BE USED TO DE-WATER THE WORK AREA ASDESCRIBED IN THE DETAILS.16.WHEN THE PROPOSED CHANNEL HAS BEEN SUFFICIENTLY STABILIZED TO PREVENT EROSION, ALLTEMPORARY PUMP AROUND DAMS WILL BE REMOVED FROM THE ACTIVE STREAM CHANNEL ANDNORMAL FLOW RESTORED. ACCUMULATED SEDIMENT SHALL BE DISPOSED OF IN DESIGNATEDSPOILS AREAS PRIOR TO REMOVAL OF TEMPORARY PUMP AROUND DAM.17.AT LOCATIONS IN WHICH ROCK STRUCTURES, BOULDER TOE STABILIZATION, AND LOG TOESTABILIZATION ARE CALLED FOR ON THE PLANS, TEMPORARY COFFER DAMS AND BYPASSPUMPING WILL BE USED TO DE-WATER THE WORK AREA, EXCEPT AT LOCATIONS IN WHICH THENORMAL FLOW CAN BE DIVERTED AROUND THE WORK AREA WITH THE USE OF AN EXISTINGCHANNEL. WHEN THE TOE HAS BEEN SUFFICIENTLY STABILIZED TO RESTRAIN EROSION ALLTEMPORARY COFFER DAMS WILL BE REMOVED FROM THE ACTIVE STREAM CHANNEL ANDNORMAL FLOW RESTORED. ACCUMULATED SEDIMENT SHALL BE DISPOSED OF IN DESIGNATEDSPOILS AREA PRIOR TO REMOVAL OF TEMPORARY COFFER DAM.18.MATERIAL THAT IS REMOVED FROM THE STREAM WILL BE RE-DEPOSITED OUTSIDE OF THE ACTIVECHANNEL AND ITS FLOODPLAIN.19.TEMPORARY AND PERMANENT STABILIZATION OF ALL DISTURBED GRASSED AREAS AT THE TOP OFTHE CHANNEL BANKS WILL BE IN ACCORDANCE WITH THE SEEDING AND MULCHING SPECIFICATIONAS SHOWN ON PLANS.20.RE-FERTILIZE AND RE-SEED DISTURBED AREAS IF NECESSARY.21.TEMPORARY AND/OR PERMANENT IMPACTS TO EXISTING WETLANDS SHALL BE AVOIDED TO THEEXTENT POSSIBLE. HIGH VISIBILITY FENCING SHALL BE INSTALLED AROUND ALL EXISTINGWETLANDS LOCATED WITHIN THE PROJECT AREA AND/OR ADJACENT TO ANY CONSTRUCTIONACTIVITIES.STREAM CONSTRUCTION SEQUENCE:1.CONDUCT PRE-CONSTRUCTION MEETING INCLUDING OWNER, ENGINEER, ASSOCIATEDCONTRACTORS, NCDEQ EROSION CONTROL PERSONNEL, AND OTHER AFFECTED PARTIES.CONTACT NCDEQ EROSION CONTROL PERSONNEL AT 919-791-4200.2.OBTAIN EROSION CONTROL PERMIT FROM NCDENR - LAND QUALITY SECTION AND ALL OTHERAPPROVALS NECESSARY TO BEGIN AND COMPLETE THE PROJECT.3.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES ANDASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.CALL NC ONE-CALL (PREVIOUSLY ULOCO) AT 1-800-632-4949 FOR UTILITY LOCATING SERVICES48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATIONAND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION.4.PRIOR TO CONSTRUCTION, STABILIZED GRAVEL ENTRANCE/EXIT AND ROUTES OF INGRESS ANDEGRESS SHALL BE ESTABLISHED AS SHOWN ON THE PLANS AND DETAILS. MAINTAIN EXISTINGDRIVEWAY OVERTOPPING ELEVATION / PROFILE.5.PREPARE STAGING AND STOCKPILING AREAS IN LOCATIONS AS SHOWN ON THE CONSTRUCTIONPLANS OR AS APPROVED BY THE ENGINEER. ANY EXCESS SPOIL FROM STREAM CONSTRUCTIONSHALL BE USED TO CONSTRUCT CHANNEL PLUGS AS SHOWN ON PLANS.6.INSTALL PUMP AROUND APPARATUS AND IMPERVIOUS DIKES AT UPSTREAM END OF PROJECT.AS CONSTRUCTION PROGRESSES, MOVE PUMP AROUND OPERATION DOWNSTREAM. (SEEDETAILS ON SHEET D1)7.INSTALL SILT FENCE, TEMPORARY CROSSINGS AND ALL OTHER EROSION CONTROL MEASURES ASSHOWN ON PLANS.8.CONSTRUCT UPSTREAM PORTION OF THE CHANNEL FIRST, WORKING IN AN UPSTREAM TODOWNSTREAM DIRECTION.9.ROUGH GRADING OF CHANNEL SHALL BE PERFORMED PRIOR TO INSTALLATION OF STRUCTURES.10.INSTALL STRUCTURES AS SHOWN ON PLANS AND DETAILS. PRIOR TO FINE GRADING, OBTAINAPPROVAL OF THE ENGINEER ON INSTALLATION OF STRUCTURES.11.UPON COMPLETION OF FINE GRADING, INSTALL EROSION CONTROL MATTING OR SOD MATSALONG CHANNEL BANKS.12.FILL AND STABILIZE ABANDONED SEGMENTS OF THE EXISTING CHANNEL PER DIRECTION OF THEENGINEER.13.ALL IMPERVIOUS DIKES AND PUMPING APPARATUS SHALL BE REMOVED FROM THE STREAM ATTHE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL.14.DURING STREAM CONSTRUCTION ACTIVITIES, THE WORK AREA SHALL BE STABILIZED AT THE ENDOF EACH WORKING DAY.15.INSTALL LIVE STAKE, BARE ROOT, AND CONTAINERIZED PLANTINGS AS SPECIFIED ON PLANTINGPLANS.DOUBLE LOG DROP(PROFILE)ROCK CROSS VANE(SEE DETAIL D5)ROCK A-VANE(SEE DETAIL D7)ROCK CROSS VANE/A-VANE(PROFILE)RIFFLE GRADE CONTROL(SEE DETAIL D6)ANGLED LOG STEP POOL(SEE DETAIL D6)BRUSH TOE PROTECTION(SEE DETAIL D3)DRY DETENTION BASIN(SEE DETAIL D2) OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE WOODBUILDINGWOODSHEDWOODBUILDINGWOODSHEDROCKROCKROCKROCKOHEOHEOHEOHEOHEOHEOHEBBBB BBBB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TB TB TB TBTB TBTB TBTBTB TB TB TB TB TBTB TB TBTBTB TB TB TBTBTBTBTBTBTB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BBBB BB BB BBBBBB BBBBBBBBBBBBBBBBBBBBB B BB BBBBBBBBB B B B B B BB BBBB BB BB BBBBBBBBBBBBBBBBBBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTB TB TB TB TBTBTB TBT B T B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TBTBT B TB TBTB TBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BB BBBB BBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBB B BBBBBBBBBBBBBBBBBBBB BBBBBBBB B B B B BB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BBBB BB BBBB BB BB BBBBBB BBBB BBBBBB BBBBBB BBBBBBBBB B BB BBBB BBBB BB BB BB BB BBB B BBBB BBBB BBBB BBBB BB BBBB BB BB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TBTB TBTB TB TB T B TBTB TB TB TBTBTB TBTBTB TBTBTBTBTB TBTB TB TBTB TBTB TBTB TBT B TB TBTBTBTB TB TBTBTBTB TB TBTBTB TB TB TB BBBBBBBBBBBBBBBBBBBBTBTBTB TB TB TB TB TBTB TBTBTB TBTB TB TB TB TB TB TB TB TB TB TBTBTB TBTBTB TB TBTB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBT B TBTBTBTBTBTB T B TB T B TBTB TB TBTBTB TB TB TB TB TB TB TBT B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTB TB T B TB TB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTB T B TBTBTB TB TB TB TB TB TB TB TB TB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBB BBBB BB BB BBBB BB BB BB B B BB BB BBBB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BBBBBB BB BBBB BB BB BBBB BB BB BBBBBB BB BB BB BB BB BBBB BBBBBBBBBB BBBBBBBBBBBBBBBBBB BBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBTBTBTBTBTBLCE LCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCELCELCE LCELCELCELCELCELCELCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCE LCE LCELCELCELCELCE LCE LCE LCE LCE LCE LCE LCE LCE L C E LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCE 1503001500FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_SITE.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.usSURRY COUNTY, NORTH CAROLINA EXISTING CONDITIONS LITTLE SEBASTIAN STREAM MITIGATION SITE BRCTRSAFMCSC0335E2PRELIMINARY - NOT FOR CONSTRUCTION 10/30/2018 REACH JN2REACH MC1REACH JN3REACH BS1REACH MC3 BBBBBBBBBBBBBBBBBBBBB B BBBBBBBBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBXXX0+000+501+001+502+002+503+003+504+004+505+005 + 5 0 6+006+50S34S35S360+000+501+001+502+002+503+003+504+004+505+005 + 5 0 6+006+50LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_JN2.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS10335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH JN2 SURRY COUNTY, NORTH CAROLINA REACH JN2-APRESERVATIONSTA 0+20 TO 4+38REACH JN2-BENHANCEMENT ISTA 4+38 TO 6+25M A T C H L I N E 6 + 0 0 S2 INTERMITTENT/EPHEMERAL BREAK BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB5+005+506+006+507+007+508+008+509+009+5010+0010+5011+0011+5012+00 12+5013+00S35S365+005+506+006+507+007+508+008+509+009+5010+0010+5011+0011+5012+00 12+5013+00LCELCELCELCELCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCESCALE: HOR 1"=30'; VERT 1"=6'11901200121012201230119012001210122012306+006+507+007+508+008+509+009+5010+0010+5011+0011+5012+00S36EXISTING GRADE ALONGSTREAM CENTERLINE(STA 9+32) (STA 9+63)CONSERVATIONEASEMENTBREAKPROP 24 LFOF 36" RCP0FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_JN2.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us6/15/2018PRELIMINARY - NOT FOR CONSTRUCTIONS20335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH JN2 SURRY COUNTY, NORTH CAROLINA 306030REACH JN2-CENHANCEMENT IISTA 6+25 TO 9+32PROPOSED 24 LFOF 36" RCPM A T C H L I N E 1 2 + 0 0 S3 S1MATCH LINE 6+00 REACH JN2-CENHANCEMENT IISTA 9+63 TO 18+00 OH E OH E OH E OH E OH E SOIL ROADWO O D SHE D WO O D SHE D BBBBBBBBBBBB BBBBBBBBBBBB BBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBB B TBTBTBTBTBTB TBTBTBTBTB TB TBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTB TBTBTBTBTBTBTBTBTBTBTBT B TBTBXXXXXXX XXX11+0011+5012+0012+5013+00 13+5014+0014+50 15+0015+5016+0016+5017+0017+5018+0018+5019+0019+50S51S5211+0011+5012+0012+5013+00 13+5014+0014+50 15+0015+5016+0016+5017+0017+5018+0018+5019+0019+50LCELCE LCELCELCELCELCELCELCELCE LCELCELCELCELCELCELCE LCELCELCELCE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_JN2.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS30335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH JN2 SURRY COUNTY, NORTH CAROLINA REACH JN2-CENHANCEMENT IISTA 9+63 TO 18+00S2MATCH LINE 12+00 MAT C H L I N E 1 8 + 0 0 S4 O H E O H E O H E O H E O H E OHE SOIL ROADWOODSHED WOODSHED T B T B TB TBTB TBTBTBTBTBTBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBTBTBTBTBTBTBTBTB TBTB TBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TBTBTBTBT B T B TBTBXXXXX XXXXX15+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5020+62S51S5215+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5020+66LC E LCEL C E L C E LCE LCE LCELCELCELCELCELCELCELCELCELCELCESCALE: HOR 1"=30'; VERT 1"=6'115011601170118011901150116011701180119018+0018+5019+0019+5020+0020+5021+00S52S51S52S52-2.50%-2.50%-2.00%EXISTING GRADE ALONGSTREAM CENTERLINE(STA 18+39)(STA 19+08)CONSERVATIONEASEMENTBREAKPROP 24 LFOF 36" RCPPROPOSEDCHANNEL BED3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_JN2.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS40335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH JN2 SURRY COUNTY, NORTH CAROLINA REMOVE EXISTING FORDCROSSING AND REMOVEACCESS ROADREACH MC1PROPOSED 24 LFOF 36" RCPS3MATCH LINE 18+00 REACH JN2-DENHANCEMENT ISTA 18+00 TO 18+39,STA 19+08 TO 20+58 OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEN. INV. = BURIEDS. INV. = 1158.90'TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBBB BBBBBBBBBBBBBB B B B B BBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBTBTB TBTB TBTBTB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBXXXXXXXXXXXXXXXXXX0+000+50 1+001+502+002+50 3 + 0 0 3+504+004+505+005+506+006+507 + 0 0 7+50OHEOHEOHEOHEOHEOHEOHEOHEOHEOHES1S2S3S4S5LCELCELCELCELCELCELCELCELCE LCELCE LCE LCELCELCELCELCESCALE: HOR 1"=30'; VERT 1"=3'11551160116511701175115511601165117011750+000+501+001+502+002+503+003+504+004+505+005+506+00-1.10%S1S2S3PROPOSEDTOP OF BANKPROPOSED CHANNELBED SLOPEEXISTING GRADE ALONGSTREAM CENTERLINE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_JN3.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS50335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH JN3 SURRY COUNTY, NORTH CAROLINA REACH JN3-AENHANCEMENT IISTA 0+00 TO 3+50TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION2.9'5.1'16.0'1.9'7.5'5.5'16.0'3.4'3.4'5.5'7.5'16.0'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH JN3 STA 3+50 TO STA 14+362.3' M A T C H L I N E 6 + 0 0 S 6 REACH JN3-BRESTORATIONSTA 3+50 TO 11+31EXISTING POWER POLETO BE REMOVED BYSURRY-YADKIN EMCPROPOSED POWER POLE TO BEINSTALLED BY SURRY-YADKIN EMCPOWER LINE TO BE RELOCATEDBY SURRY-YADKIN EMC OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHE OHE OHE OHE OHE TB TB TBTBTBTBTBTBTB TBTBTBTB TBTBTBTBTBTB TB TBTB TBTBTBTBTBTBTBTBTBTBBBBB BBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BBBBBBBBBBB B BBBBBBBBBBBBBBBBBB BBBBBBBB BB BBBBBB BBBBBB BB BBBBBBBBBBBBBBBBBBBBBBTBTBTBTBTBTB TB TB TBTBTB TBTBTB TB TBTB TBTBTBTBTBTBTBTBTBTBTBTBXX XX X X X XXX5+005+506+006+50 7+00 7+508+008+509+009+5010+0010+5011 + 0 0 11+5012+001 2 + 5 0 13+00OHEOHEOHEOHEOHEOHEOHEOHEOHEOHES2S3S4S5S6S7S8S9S10S11LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCE LCESCALE: HOR 1"=30'; VERT 1"=3'11501155116011651170115011551160116511706+006+507+007+508+008+509+009+5010+0010+5011+0011+5012+00-1.10%-1.10%-1.10%S9S4S5S6S7S8(STA 11+31) (STA 11+74)CONSERVATIONEASEMENTBREAKPROP 24 LF OFDBL 48" RCPPROPOSEDTOP OF BANKPROPOSED CHANNELBED SLOPEEXISTING GRADE ALONGSTREAM CENTERLINE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_JN3.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS60335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH JN3 SURRY COUNTY, NORTH CAROLINA REACH JN3-BRESTORATIONSTA 3+50 TO 11+31TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION2.9'5.1'16.0'1.9'7.5'5.5'16.0'3.4'3.4'5.5'7.5'16.0'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH JN3 STA 3+50 TO STA 14+362.3' S5MATCH LINE 6+00 MATCH LINE 12+00 S7 PROPOSED 24 LFOF DBL 48" RCPEXISTING POWER POLETO BE REMOVED BYSURRY-YADKIN EMCPOWER LINE TO BERELOCATED BYSURRY-YADKIN EMCPROPOSED POWER POLETO BE INSTALLED BYSURRY-YADKIN EMC OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE ED NIXON ROAD50' RIGHT OF WAYTB TB TB TB TBTBTBTBTBTBTBTB TBTBTBTB TBTBTBTBTBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBB BBBBBBBB BB BBBBBB BBBB TBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TBTBTB TB TBTB TB TBBBBBBBBBBBBBBBBBBBBBTB TB TB TBT B TB TB TB TB TB TB XXXXXXXXX X X X X XXXXX 14+609+5010+0010+5011+00 11+5012+0012+5013+001 3 + 5 0 14+0014+50OHES7S8S9S10S11S26LCELCELCELCELCELCELCELCELCELCELCELCELCE LCE LCELCELCELCE LCE LCELC ESCALE: HOR 1"=30'; VERT 1"=3'114511501155116011651145115011551160116512+0012+5013+0013+5014+0014+5015+00-1.10%-1.10%-1.10%S10S11PROPOSEDTOP OF BANKPROPOSED CHANNELBED SLOPEEXISTING GRADE ALONGSTREAM CENTERLINE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_JN3.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us11/06/2018PRELIMINARY - NOT FOR CONSTRUCTIONS70335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH JN3 SURRY COUNTY, NORTH CAROLINA REACH JN3-BRESTORATIONSTA 11+74 TO 14+36TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION2.9'5.1'16.0'1.9'7.5'5.5'16.0'3.4'3.4'5.5'7.5'16.0'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH JN3 STA 3+50 TO STA 14+362.3'REACH MC1S6MATCH LINE 12+00 TBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT B BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBX X X0+000+501+001+502+002+503+003+504+004+505+005+506+006+50S39S40S41S42S43LCELCELCELCELCELCELCELCELCE LCELCELCELCELCELCELCELCELCESCALE: HOR 1"=30'; VERT 1"=6'11701180119012001210117011801190120012100+000+501+001+502+002+503+003+504+004+505+005+506+00S40S41S39S42-5.00%-3.00%-3.00%-3.00%EXISTING GRADE ALONGSTREAM CENTERLINEPROPOSED TOPOF BANKPROPOSED CHANNELBED SLOPE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_BS1.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS80335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH BS1 SURRY COUNTY, NORTH CAROLINA REACH BS1-ARESTORATIONSTA 1+05 TO 3+19REACH BS1-CRESTORATIONSTA 4+94 TO 10+35TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION0.6'1.65'4.5'0.7'3.4'1.3'5.3'1.3'1.3'1.3'3.4'5.3'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH BS1 RESTORATION AREAS (TYP.)MATCH L I N E 6 + 0 0 S9 REACH BS1-BENHANCEMENT IISTA 3+19 TO 4+94PROPOSED DRYDETENTION BASINSEE DETAIL SHEET D2INTERMITTENT/EPHEMERAL BREAK TBTBTBTBTBTBTBTB TBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTB TBTBTBTBTB TBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB BBBBBBBBBBBBBBBB BBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB5+005+506+006+507+007+508+008+509+009+5010+001 0 + 5 0 11+0011+5012+0012+50S43S44S47S45S46LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCESCALE: HOR 1"=30'; VERT 1"=6'11401150116011701180114011501160117011806+006+507+007+508+008+509+009+5010+0010+5011+0011+5012+00S43S44S45-3.00%-3.00%-3.00%-3.00%S46EXISTING GRADE ALONGSTREAM CENTERLINEPROPOSED TOPOF BANKPROPOSED CHANNELBED SLOPE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_BS1.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS90335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH BS1 SURRY COUNTY, NORTH CAROLINA REACH BS1-CRESTORATIONSTA 4+94 TO 10+35REACH BS1-DENHANCEMENT IISTA 10+35 TO 12+12TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION0.6'1.65'4.5'0.7'3.4'1.3'5.3'1.3'1.3'1.3'3.4'5.3'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH BS1 RESTORATION AREAS (TYP.)MATCH LINE 6+00S8MATCH LI N E 1 2 + 0 0 S10 36" CMPINV. IN = 1124.22'INV. OUT = 1123.54'TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TB TB TB TBTBTBTBTBTBTBTBTB TBTBTBTBBBBBBBB B BBBB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBB BBBBBBBBBBBBBBBBBBBBBBX X X X XXXXX X 10+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+46S47S48S45S49S46S50LCELCELCELCELCELCELCELCELCELCELCELCEL C E LCE LCELC E LCELCELCELCELCESCALE: HOR 1"=30'; VERT 1"=6'112011301140115011601120113011401150116012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+00S47S48-3.00%-3.00%-3.00%S49S50-4.70%-3.00%EXISTING GRADE ALONGSTREAM CENTERLINE(STA 14+86) (STA 15+31)CONSERVATIONEASEMENTBREAKPROP 24 LFOF 36" RCPPROPOSED TOPOF BANKPROPOSED CHANNELBED SLOPE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_BS1.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/31/2018PRELIMINARY - NOT FOR CONSTRUCTIONS100335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH BS1 SURRY COUNTY, NORTH CAROLINA REACH BS1-ERESTORATIONSTA 12+12 TO 14+86REACH MC3TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION0.6'1.65'4.5'0.7'3.4'1.3'5.3'1.3'1.3'1.3'3.4'5.3'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH BS1 RESTORATION AREAS (TYP.)MATCH LINE 12+00S9PROPOSED 24 LFOF 36" RCPREACH BS1-ERESTORATIONSTA 15+31 TO 16+25 OHETBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTB TB TBTBTBTBTBTBTBTB TBTBBBBB BB BBBB BBBBBBBBTB TB TB TBTB TBTBTBTBTBTBTBT B TBTBTBTBTBTBX XXX0+000+501+00 1+50 2+002+503+003+504+004+505+005+506+006+507+007+508+008+50S52LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELC E LC E LCELCELCE LCELCELCELCELCELCELCELCEOHEOHEOHEROCKO H E O H E O H E O H E O H E O H E O H E O H E O H ETBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTB TBTBTBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBTBTBTBBBBBBBBBBBBBBBBBBBBBBBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT B TBTBT B TBXXXX8+008+509+009+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015 + 0 0 15+50LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCEL C E L C E LCELCE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_MC1.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us09/18/2018PRELIMINARY - NOT FOR CONSTRUCTIONS110335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE REACH MC1 SURRY COUNTY, NORTH CAROLINA REACH MC1-AENHANCEMENT IISTA 0+00 TO 4+69REACH MC1-BENHANCEMENT IISTA 4+99 TO 12+16MATCH LINE 8+00REACH MC1-BENHANCEMENT IISTA 4+99 TO 12+16MATCH LINE 8+00MATCH LIN E 1 4 + 7 5 S12 CONSERVATION EASEMENT BREAKEXISTING ACCESS ROAD TO REMAINREACH MC1-BENHANCEMENT IISTA 12+57 TO 15+17CONSERVATIONEASEMENT BREAK GRAVEL ROAD ED N I X O N R O A D 50' R I G H T O F W A Y ROCKTBTBTBTBTBTBTBTBTBTBTBTB TB TBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BBBBBBBBBBBBBBBB B B BB BBBBBB TBTB TB TB TBTBTBTBTBTBTBTB TB TB TBTBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBXX X X XXXXXXXX X XXXXXX XXX14+0014+5015+00 15+5016+0016+5017+0017+5018+0018+5019 + 0 0 19+5020+0020+5021+0021+50S11S24S26S27LCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCESCALE: HOR 1"=30'; VERT 1"=3'114011451150115511601140114511501155116015+0015+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5021+0021+50-0.85%-0.85%S24S26S27(STA 20+72) (STA 21+20)CONSERVATIONEASEMENTBREAKPROPOSEDTOP OF BANKPROPOSED CHANNELBED SLOPEEXISTING GRADE ALONGSTREAM CENTERLINE3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_MC1.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us09/18/2018PRELIMINARY - NOT FOR CONSTRUCTIONS120335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE REACH MC1 SURRY COUNTY, NORTH CAROLINA REACH MC1-BENHANCEMENT IISTA 12+57 TO 15+17REACH MC1-CRESTORATIONSTA 15+17 TO 20+72TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION3.8'6.7'21.0'2.5'9.9'7.2'21.0'4.3'4.3'7.2'9.9'21.0'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH MC1 STA 15+17 TO STA 19+702.9' S11MATCH LINE 14+75 GIDEON STREAM MITIGATION SITEREACH JN3TYPICAL RIGHT MEANDER CROSS SECTION℄℄TYPICAL SHALLOW CROSS SECTION℄TYPICAL LEFT MEANDER CROSS SECTION4.2'7.3'23.0'2.7'10.8'7.9'23.0'4.7'4.7'7.9'10.8'23.0'BANKFULL STAGEBANKFULL STAGEBANKFULL STAGEREACH MC1 STA 19+70 TO STA 20+723.3'PROPOSED BRIDGE 40+0040+5041+0041+5042+0042+5043+0043+5044+0044+5045+0045+5046+0046+5047+0012" CMPN. INV. = BURIEDS. INV. = 1126.63'ROCKROCKTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBXXXXXXXXXXXXXXXXXXXLCELCELCELCELCELCELCELCE LCELCELCELCE LCELCELCELCELCELCELCE46+0046+5047+0047+5048+00 48+5049+0049+5050+0050+5051+0051+5052 + 0 0 5 2 + 5 0 53+005 3+ 5 0 5 3+ 8 3 36" CMPINV. IN = 1124.22'INV. OUT = 1123.54'ROCKTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBT B TB TBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBB BBBB BBBBBBBBBBBBBBBBBBBBBBX X XX X XXXXXXXXXXXXXXXXLCELCELCELCELCELCELCELCELCEL C E LCE LCELCELCELCELCELCELCELCELCELCE LCE LCE 3060300FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_MC3.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/30/2018PRELIMINARY - NOT FOR CONSTRUCTIONS130335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE REACH MC3 SURRY COUNTY, NORTH CAROLINA REACH MC3-AENHANCEMENT IISTA 40+42 TO 42+85REACH MC3-BENHANCEMENT IISTA 42+85 TO 46+87GIDEON STREAMMITIGATION SITEREACH MC3-BENHANCEMENT IISTA 42+85 TO 46+87REACH MC3-CENHANCEMENT ISTA 47+28 TO 49+42REACH MC3-DENHANCEMENT IISTA 49+42 TO 53+37REACH BS1MATCH LINE 46+50 MAT C H L I N E 4 6 + 5 0PROPOSED FORD CROSSINGSEE DETAIL SHT D3RESHAPE LEFT BANK, INSTALLCOIR MATTING & LIVE STAKESSTA 42+85 TO 43+78REMOVE EXISTING PIPE ANDDISPOSE OF OFF SITERESHAPE LEFT BANK, INSTALLCOIR MATTING & LIVE STAKESSTA 47+78 TO 49+42 OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEWOODBUILDINGWOODSHEDWOODBUILDINGWOODSHEDROCKROCKROCKROCKOHEOHEOHEOHEOHEOHEOHEBBBB BBBB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TB TB TB TBTB TBTB TBTBTB TB TB TB TB TBTB TB TBTBTB TB TB TBTBTBTBTBTBTB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BBBB BB BB BBBBBB BBBBBBBBBBBBBBBBBBBBB B BB BBBBBBBBB B B B B B BB BBBB BB BBBBBBBBBBBBBBBBBBBBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTB TB TB TB TBTBTB TBT B T B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TBTBT B T B TBTB TBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BB BBBB BBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BBBBBBBBBBBBBBBBBBBB BBBBBBBB B B B B BB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BBBB BB BBBB BB BB BBBBBB BBBB BBBBBB BBBBBB BBBBBBBBB B BB BBBB BBBB BB BB BB BB BBB B BBBB BBBB BBBB BBBB BB BBBB BB BB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TBTB TBTB TB TB T B TBTB TB TB TBTBTB TBTBTB TBTBTBTBTB TBTB TB TBTB TBTB TBTB TBT B TB TBTBTBTB TB TBTBTBTB TB TBTBTB TB TB TB BBBBBBBBBBBBBBBBBBBBTBTBTB TB TB TB TB TBTB TBTBTB TBTB TB TB TB TB TB TB TB TB TB TBTBTB TBTBTB TB TBTB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBTBTBTBTBTBTBTB T B TB T B TBTB TB TBTBTB TB TB TB TB TB TB TBT B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTB TB T B TB TB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTB T B TBTBTB TB TB TB TB TB TB TB TB TB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBB BBBB BB BB BBBB BB BB BB B B BB BB BBBB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BBBBBB BB BBBB BB BBBBBB BB B B BBBBBB BB BB BB BB BB BBBB BBBBBBBBBB BBBBBBBBBBBBBBBBBB BBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBTBTBTBTBTBLCE LCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCELCELCE LCELCELCELCELCELCELCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCE LCE LCELCELCELCELCE LCE LCE LCE LCE LCE LCE LCE LCE L C E LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCE 1503001500FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_SITE.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.usSURRY COUNTY, NORTH CAROLINA FENCING PLAN LITTLE SEBASTIAN STREAM MITIGATION SITE BRCTRSAFMCSC0335F1PRELIMINARY - NOT FOR CONSTRUCTION 10/30/2018 REACH JN2REACH MC1REACH JN3REACH BS1REACH MC3FENCING LEGENDLIMITS OF CONSERVATIONEASEMENTLCEEXISTING FENCELINEPROPOSED FENCELINEINSTALL 2480 LF OFWOVEN WIRE FENCE(SEE DETAIL SHT D5)INSTALL 2205 LF OFWOVEN WIRE FENCE(SEE DETAIL SHT D5)INSTALL 1807 LF OFWOVEN WIRE FENCE(SEE DETAIL SHT D5)INSTALL 2290 LF OFWOVEN WIRE FENCE (NOTE 1)(SEE DETAIL SHT D5)INSTALL 3129 LF OFWOVEN WIRE FENCE(SEE DETAIL SHT D5)INSTALL 744 LF OFWOVEN WIRE FENCE(SEE DETAIL SHT D5)INSTALL 775 LF OFWOVEN WIRE FENCE(SEE DETAIL SHT D5)FENCING NOTES:1.CONTRACTOR TO TIE PROPOSED FENCEINTO EXISTING FENCE WHERE APPLICABLETO MAINTAIN CATTLE EXCLUSION.2.CONTRACTOR SHALL REMOVE ALL FENCINGLOCATED WITHIN LIMITS OF CONSERVATIONEASEMENT.NOTE 2 OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE WOODBUILDINGWOODSHEDWOODBUILDINGWOODSHEDROCKROCKROCKROCKOHEOHEOHEOHEOHEOHE OHEBBBB BBBB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TB TB TB TBTB TBTB TBTBTB TB TB TB TB TBTB TB TBTBTB TB TB TBTBTBTBTBTBTB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BBBB BB BB BBBBBB BBBBBBBBBBBBBBBBBBBBB B BB BBBBBBBBB B B B B B BB BBBB BB B B BBBBBBBBBBBBBBBBBBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TB TBTBTB TBT B T B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TBTBT B T B TBTB TBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BB BBBB BBBB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BBBBBBBBBBBBBBBBBBBB BBBBBBBB B B BB BB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BBBB BB BBBB BB BB BBBBBB BBBB BBBB BB BBBBBB BBBBBBBBB B BB BBBB BBBB BB BB BB BB BBB B BBBB BBBB BBBB BBBB BB BBBB BB BB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TBTB TBTB TB TB T B TBTB TB TB TBTBTB TBTBTB TBTBTBTBTB TBTB TB TBTB TBTB TBTB TBT B TB TBTBTBTB TB TBTBTBTB TB TBTBTB TB TB TB BBBBBBBBBBBBBBBBBBBBTBTB TB TB TB TB TB TBTB TBTBTB TBTB TB TB TB TB TB TB TB TB TB TBTBTB TBTBTB TB TBTB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBT B TBTBTBTBTBTB T B TB T B TBTB TB TBTBTB TB TB TB TB TB TB TBT B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTB TB T B TB TB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTB T B TBTBTB TB TB TB TB TB TB TB TB TB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBB BBBB BB BB BBBB BB BB BB B B BB BB BBBB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BBBBBB BB BBBB BB BBBBBB BB BB BBBBBB BB BB BB BB BB BBBB BBBBBBBBBB BBBBBBBBBBBBBBBBBB BBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBTBTBTBTBTBLCE LCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCELCELCE LCELCELCELCELCELCELCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCE LCE LCELCELCELCELCE LCE LCE LCE LCE LCE LCE LCE LCE L C E LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCE 1503001500FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_SITE.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/30/2018PRELIMINARY - NOT FOR CONSTRUCTIONP10335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE PLANTING PLAN SURRY COUNTY, NORTH CAROLINAPLANTING NOTESALL PLANTING AREAS1.EROSION CONTROL MEASURES SHALL BE PROPERLY MAINTAINED UNTIL PERMANENT VEGETATIONIS ESTABLISHED AND FINAL APPROVAL HAS BEEN ISSUED. THE CONTRACTOR SHALL INSPECTEROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES AREFUNCTIONING PROPERLY.2.DISTURBED AREAS NOT AT FINAL GRADE SHALL BE TEMPORARILY VEGETATED WITHIN 10WORKING DAYS. UPON COMPLETION OF FINAL GRADING, PERMANENT VEGETATION SHALL BEESTABLISHED FOR ALL DISTURBED AREAS WITHIN 10 WORKING DAYS. SEEDING SHALL BE INACCORDANCE WITH EROSION CONTROL PLAN.3.ALL DISTURBED AREAS SHALL BE PREPARED PRIOR TO PLANTING BY DISC OR SPRING-TOOTHCHISEL PLOW TO MINIMUM DEPTH OF 12 INCHES. MULTIPLE PASSES SHALL BE MADE ACROSSPLANTING AREAS WITH THE IMPLEMENT AND THE FINAL PASS SHALL FOLLOW TOPOGRAPHICCONTOURS.4.BARE ROOT PLANTINGS SHALL BE PLANTED ACCORDING TO DETAIL SHOWN ON SHEET D2. LIVESTAKES SHALL BE PLANTED ACCORDING TO DETAIL SHOWN ON SHEET D2.5.TREATMENT/REMOVAL OF INVASIVE SPECIES, PINES AND SWEET GUMS LESS THAN 6" DBH SHALLBE PERFORMED THROUGHOUT THE PLANTED AREA.6.SPECIES SHALL BE DISTRIBUTED SUCH THAT 3 TO 6 PLANTS OF THE SAME SPECIES AREGROUPED TOGETHER.7.BARE ROOT PLANTING DENSITY IS APPROXIMATELY 800 STEMS PER ACRE (IN SUPPLEMENTALPLANTING AREAS 400 STEMS PER ACRE).8.LIVE STAKES ARE PROPOSED ALONG THE OUTSIDE OF MEANDER BENDS AND ALONG BOTHBANKS OF STRAIGHT REACHES ADJACENT TO POOLS.9.TEMPORARY SEED MIX SHALL BE APPLIED AT A RATE OF 150 LBS/ACRE TO ALL DISTURBED AREASWITH SLOPES EQUAL TO OR STEEPER THAN 3:1.10.PERMANENT RIPARIAN SEED MIX SHALL BE APPLIED TO ALL DISTURBED AREAS WITHIN THECONSERVATION EASEMENT AT A RATE OF 15 LBS/ACRE.11.PERMANENT HERB SEED MIX SHALL BE APPLIED TO ALL DISTURBED AREAS WITHIN THECONSERVATION EASEMENT BREAKS AT A RATE OF 15 LBS/ACRE. RIPARIAN PLANTING(TOTAL AREA: 10.7 AC)PLANTING LEGENDLive Staking and Live Cuttings Bundle Tree SpeciesCommon NameScientific NamePercentCompositionSilky dogwoodCornus amomum40%Black willowSali[ nigra60%PLANTING TABLEPermanent Riparian Seed Mi[Common NameScientific NamePercentCompositionVirginia WildryeElymus virginicus25%Indian GrassSorghastrum nutans25%Little Blue StemSchi]achyrium scoparium10%Soft RushJuncus effusus10%Blackeyed susanRudbeckia hirta10%DeertongueDichanthelium clandestinum10%Common MilkweedAsclepias syriaca5%Showy GoldenrodSolidago erecta5%LIMITS OF CONSERVATIONEASEMENTLCEREACH JN2REACH MC1REACH JN3REACH BS1REACH MC3Bare Root Planting Tree SpeciesCommon NameScientific NamePercentCompositionWater OakQuercus nigra15%Willow OakQuercus phellos15%River BirchBetula nigra15%American SycamorePlatanas occidentalis10%Northern Red OakQuercus rubra10%Green AshFra[inus pennsylvanica10%Yellow PoplarLiriodendron tulipifera10%PersimmonDiospyros virginiana5%ElderberrySambucus canadensis5%Black GumNyssa biflora5%EXISTING TREELINESUPPLEMENTAL RIPARIAN PLANTING(TOTAL AREA: 0.3 AC) OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEWOODBUILDINGWOODSHEDWOODBUILDINGWOODSHEDROCKROCKROCKROCKOHEOHEOHEOHEOHEOHEOHEBBBB BBBB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TB TB TB TBTB TBTB TBTBTB TB TB TB TB TBTB TB TBTBTB TB TB TBTBTBTBTBTBTB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BBBB BB BB BBBBBB BBBBBBBBBBBBBBBBBBBBB B BB BBBBBBBBB B B B B B BB BBBB BB BBBBBBBBBBBBBBBBBBBBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTB TB TB TB TBTBTB TBT B T B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TBTBT B T B TBTB TBTBTBTBTBTBTBTBTBTBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BB BB BBBB BBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBB B BBBBBBBBBBBBBBBBBBBB BBBBBBBB B B B B BB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BB BB BB BB BBBB BB BBBB BB BB BBBBBB BBBB BBBBBB BBBBBB BBBBBBBBB B BB BBBB BBBB BB BB BB BB BBB B BB BB BBBB BBBB BBBB BB BBBB BB BB BB BB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TB TB TB TB TBTB TBTB TB TB T B TBTB TB TB TBTBTB TBTBTB TBTBTBTBTB TBTB TB TBTB TBTB TBTB TBT B TB TBTBTBTB TB T B TBTBTB TB TBTBTB TB TB TB BBBBBBBBBBBBBBBBBBBBTBTBTB TB TB TB TB TBTB TBTBTB TBTB TB TB TB TB TB TB TB TB TB TBTBTB TBTBTB TB TBTB TB TB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBT B TBTBTBTBTBTB T B TB T B TBTB TB TBTBTB TB TB TB TB TB TB TBT B TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TB TBTB TB T B TB TB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTB T B TBTBTB TB TB TB TB TB TB TB TB TB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBBBBBBBBBBBBBBBBB BBBB BB BB BBBB BB BB B B B B BB BB BBBB BB BB BB BB BB BB BB BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB B BBBBBB BB BBBB BB BB BBBB BB BB BBBBBB BB BB BB BB BB BBBB BBBBBBBBBB BBBBBBBBBBBBBBBBBB BBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTB TBTB TBTBTBTBTBTBTBLCE LCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCELCELCE LCELCELCELCELCELCELCE LCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCELCE LCELCELCELCE LCE LCELCELCELCELCE LCE LCE LCE LCE LCE LCE LCE LCE L C E LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCE LCE LCELCELCELCELCELCELCELCELCELCELCELCE LCE LCE LCELCELCELCELCELCELCELCELCELCEL C E LCELCELCELCELCELCELCE LCE 1503001500FULL SCALE: 1"= 2" = FULL SCALE1" = HALF SCALEFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_SITE.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us10/30/2018PRELIMINARY - NOT FOR CONSTRUCTIONM10335CSCAFMTRSBRCLITTLE SEBASTIAN STREAM MITIGATION SITE MONITORING PLAN SURRY COUNTY, NORTH CAROLINALEGENDVPPROPOSED VEGETATION PLOT(AREA: 0.02 AC)PROPOSED CREST GAUGERIPARIAN PLANTINGLIMITS OF CONSERVATIONEASEMENTPROPOSED CROSS SECTIONLOCATIONSLCEREACH JN2REACH MC1REACH JN3REACH BS1REACH MC3VPVPVPVPVPVPVPVPPROPOSED FLOW GAUGEPROPOSED GROUNDWATERMONITORING GAUGEVP WHEN AND WHERE TO USE ITSILT FENCE IS APPLICABLE IN AREAS:WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100-FEET.WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1V.THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS.DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP.CONSTRUCTION SPECIFICATIONS:1.USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH ISCERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461.SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE AMINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0° TO 120°F.2.ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET.MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC.CONSTRUCTION:1.CONSTRUCT THE SEDIMENT BARRIER OF EXTRA STRENGTH SYNTHETIC FILTER FABRICS.2.ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUNDSURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THESTRUCTURE.)3.CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOIDJOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4FEET MINIMUM OVERLAP TO THE NEXT POST.4.EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE.SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM50 POUND TENSILE STRENGTH.5.EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OFPOSTS AND UPSLOPE FROM THE BARRIER.6.PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.7.BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTIONOF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE.8.DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.MAINTENANCE:INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRSIMMEDIATELY.SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE ITPROMPTLY.REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TOREDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZEIT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.8"4"24" MIN 24" MIN 8"RUNOFFRUNOFF18" TO 24"FLAT-BOTTOM TRENCH DETAILV-SHAPED TRENCH DETAILSILT FENCE INSTALLATION18" TO 24"TEMPORARY SILT FENCENTSCOIR MATTINGNTSINSTALLATION NOTES:SITE PREPARATION1.GRADE AND COMPACT AREA.2.REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILLHAVE DIRECT CONTACT WITH THE SOIL.3.PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE.4.TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THEENGINEER. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED.SEEDING1.SEE PLANTING SHEETS FOR SEEDING REQUIREMENTS.2.APPLY SEED TO SOIL BEFORE PLACING MATTING.INSTALLATION - STREAM BANK1.SEE GRADING NOTES ON PLAN AND PROFILE SHEETS AND DETAIL SHEETS FORINFORMATION REGARDING WHAT AREAS ARE TO RECEIVE COIR MATTING.2.OVERLAP ADJACENT MATS 3" (IN DIRECTION PARALLEL TO FLOW) AND ANCHOR EVERY 12"ACROSS THE OVERLAP. THE UPSTREAM MAT SHOULD BE PLACED OVER THE DOWNSTREAMMAT.3.EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER.4.LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. DO NOT STRETCH TIGHT.5.ANCHOR MAT USING BIODEGRADABLE STAKES OR PINS.6.CUT 8" x 8" TRENCH ALONG TOP OF BANK FOR MAT TERMINATION AS SHOWN IN FIGURES 1& 2. EXTEND MAT 2 TO 3 FEET PAST TOP OF BANK.7.PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 4" OVERLAP.SECURE WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, ANDCOMPACT SOIL.8.STAPLE AT 12" INTERVALS ALONG OVERLAP.9.STREAM BANK MATTING TO BE INSTALLED FROM TOE OF BANK TO A MINIMUM OF 2.0'PAST TOP OF BANK. SEE FIGURE 3 FOR TERMINATION AT TOP OF BANK.10.IF MORE THAN ROLL IS REQUIRED TO COVER THE CHANNEL FROM THE TOP OF BANK DOWNTO THE TOE, THEN OVERLAP MATTING BY A MINIMUM OF 1'.EROSION CONTROL MATTING MUST MEET OR EXCEED THEFOLLOWING REQUIREMENTS:·100 % COCONUT FIBER (COIR) TWINE WOVEN INTO AHIGH STRENGTH MATRIX.·THICKNESS - 0.35 IN. MINIMUM.·SHEAR STRESS – 5 LBS/SQFT·FLOW VELOCITY- OBSERVED 16 FT/SEC·WEIGHT - 29 OZ/SY·OPEN AREA - 38%·SLOPES – UP TO A MAXIMUM OF 1:1SEE S ITE P LAN EXIST ING ROAD50' MIN.VARIES COARSE AGGREGATE -STONE SIZE = 2"-3"PURPOSE:STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL BE LEAVING ACONSTRUCTION SITE AND MOVING DIRECTLY ONTO A PUBLIC ROAD.CONSTRUCTION SPECIFICATIONS:1.CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL ANDPROPERLY GRADE IT.2.PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE DETAIL, AND SMOOTH IT.3.PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET.4.USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TOSEEPAGE OR HIGH WATER TABLE.MAINTENANCE:MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE.THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTUREUSED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALSSPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS, OR AIRFIELD PAVEMENTS.TEMPORARY GRAVEL CONSTRUCTION ENTRANCENTSNOTE: HOSE SHOULD BEKEPT OUTSIDE OF WORKAREANOTES:1.EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OFCHANNEL.2.IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAMFLOW.3.THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED INONE WORKING DAY. A MAXIMUM OF 200 FEET MAY BE DISTURBED AT ANY ONETIME.4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING PUMP SIZESUFFICIENT TO PUMP BASE FLOW.5.DIKE MUST BE CONSTRUCTED OF NON-ERODIBLE MATERIALS SUCH AS SANDBAGS.SEQUENCE OF CONSTRUCTION:1.INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THEDOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA.2.THE CONTRACTOR SHALL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARYPIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREATO THE STABILIZED OUTFALL.3.INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FORSTREAM DIVERSION.4.INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPINGAPPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSEFOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA.THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIPRAP.5.THE CONTRACTOR SHALL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFOREREMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATERMUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS,AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKEFIRST.6.ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUSDIKES AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH.7.ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE.SILT BAG PROFILE15' TO 20'FLOWINTAKE HOSEPUMP AROUNDPUMPCLASS ASTONEWORKAREADE-WATERINGPUMPIMPERVIOUSDIKESILT BAGLOCATIONSTABILIZED OUTFALLCLASS A STONEFILTER FABRICEXISTINGGROUNDDISCHARGEHOSE8" OF CLASS ASTONEFILTER FABRICSTABILIZEDOUTFALL CLASS ASTONEEXISTINGCHANNELDISCHARGE HOSEIMPERVIOUS DIKECLASS ASTONEPUMP AROUND & DEWATERING DETAILNTSSECTION B-BFLOWSECTION A-APLANFLOWCLASS I AND II RIPRAPSPILLWAY CREST1' MIN OF # 5WASHED STONECLASS I AND IIRIP RAPFILTER FABRICGENERAL NOTES:1.CONSTRUCT DAM ACCORDING TO NCDENR EROSION CONTROLMANUAL.2.ROCK DAM RIPRAP SHALL BE 50/50 MIX OF CLASS I AND II.3.PLACE ROCK DAM AS SHOWN ON PLANS. EXTEND CLASS B RIPRAP ROCK APRON 5 FEET DOWNSTREAM FROM TOE OF ROCKDAM.1.5' THICK CLASSB ROCK APRON1.5' THICK CLASSB ROCK APRONCUTOFF TRENCHFILTERFABRIC# 5 WASHED STONETEMPORARY ROCK CHECK DAMNTSFLOWSECTION A-ANOTE: END OF DIKE AT GROUND LEVEL TO BEHIGHER THAN THE LOWEST POINT OF FLOW CHECK.SUFFICIENT SANDBAGS ARE TO BE PLACED TOPREVENT SCOURING.SECTION B-BBBAAPLAN VIEWSANDBAG BARRIERS SHALL BE CONSTRUCTED OF THREE LAYERS OF SANDBAGS.THE BOTTOM LAYER SHALL CONSIST OF 3 ROWS OF BAGS, THE MIDDLE LAYERSHALL CONSIST OF 2 ROWS OF BAGS AND THE TOP LAYER SHALL CONSIST OF 1ROW OF BAGS. THE RECOMMENDED DIMENSION OF A FILLED SANDBAG SHALL BEAPPROXIMATELY 0.5 FT X 0.5 FT X 1.5 FT.SANDBAG IMPERVIOUS DIKENTS1 . 0 'MIN.KEY-IN MATTING PERFIG. 1 OR FIG. 2FLOW18"FLOWSTEP 1STEP 2FLOWSTEP 1STEP 2FLOW1 ROW OF STAPLES ORSTAKES, MIN. OF 18"O.C1 ROW OF STAPLES ORSTAKES, MIN. OF 12"O.C1 ROW OF STAPLES ORSTAKES, MIN. OF 24"O.CFIGURE 1FIGURE 2SOIL PILEFROM TRENCHTRENCH APPROX.8" WIDE X 8" DEEP1 ROW OF STAPLES ORSTAKES, MIN. OF 24"O.CKEY-IN AND/ORSTAKE MATTINGJUST ABOVECHANNEL TOE2.0'MIN.EROSION CONTROL WATTLENTSEXISTINGGRADEMINIMUM 9" EROSIONCONTROL STRAW WATTLEOR COIR WATTLE/LOGNOTE:EROSION CONTROL WATTLES OR COIR LOGS/WATTLES MAY BE USED IN PLACE OFSILT FENCE.SLOPEINSTALL WATTLE IN 3" TO5" TRENCH2" x 1" OR 2" x 2"WOODEN STAKEBACKFILL TRENCH WITHCOMPACTED EARTH1.25 LB./LINEAR FT. STEEL POSTSEXTRA STRENGTHFILTER FABRICUSE EITHER FLAT-BOTTOMOR V-BOTTOM TRENCHSHOWN BELOWBURY FABRICHEAVY DUTY PLASTIC TIEFOR STEEL POSTS6' MAX WITH STANDARD FABRICFILTER FABRICCOMPACTEDEARTHFILTER FABRICFILTER FABRICCOMPACTEDEARTHRUNOFFFILTERFABRICTRENCH APPROX.8" WIDE x 8" DEEPSOIL PILEFROM TRENCHSOIL FILLEDFROM SOIL PILE,COMPACT WITH FOOTSOIL FILLEDFROM SOIL PILE,COMPACT WITHFOOTBBAA3: 1 2:12'5' MIN.W (SPILLWAY)MIN. 23 STREAM WIDTH6" MIN.MIDDLE LAYERBOTTOM LAYERTOP LAYEREARTH SURFACETRENCH 0.25' DEEPONLY WHENPLACED ON EARTHSURFACEENDS OF BAGS INADJACENT ROWSBUTTED SLIGHTLYTOGETHERSEE NOTELOWEST POINTGROUND LEVELEARTH SURFACE2'2' MIN. BELOWLOWEST BANKLEVELSCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_DETAILS.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIOND10335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE DETAILS SURRY COUNTY, NORTH CAROLINA NOTES:1.LOGS SHOULD BE AT LEAST 12 INCHES IN DIAMETER, 6-9 FEET LONG, RELATIVELY STRAIGHT, ANDHARDWOOD.2.CABLE ANCHORS SHOULD BE PLACED 1' TO 3' FROM EACH END OF LOG. REBAR (5/8" MINIMUM DIAMETER3' MIN. LENGTH TYPICAL) MAY BE USED AS A SUBSTITUTION FOR CABLE ANCHORS PER DIRECTION OFENGINEER.3.IF REBAR IS USED, PRE-DRILL HOLES WITH 5/8" DRILL BIT.FINISHED GRADE30'FLOWTYPICAL SECTIONLOG TOE PROTECTIONNTSCHANNEL PLUGNTSNOTES1.INSTALL STAKES ON 3' CENTERS ON EACH SIDE OF ROLL. TOP OF STAKE SHOULDNOT EXTEND ABOVE ROLL.2.EXCAVATE A SMALL TRENCH (DEPTH APPROX 1/2 TO 2/3 OF LOG DIAM) FORPLACEMENT OF ROLL.3.COIR LOGS SHALL BE 10 FT LONG AND HAVE A DIAMETER OF 12 IN.COIR LOG (TOE PROTECTION)NTSWOODSTAKESNOTE:1.ACCEPTABLE SPECIES INCLUDE BLACK WILLOW (SALIX NIGRA), SILKY WILLOW(SALIX SERICEA) AND SILKY DOGWOOD (CORNUS AMMOMUM).2.LIVE STAKES SHALL BE PLANTED IN AN AREA EXTENDING 3 FEET OUT FROM TOPOF BANK TO JUST BELOW BANKFULL.3.LIVE STAKES SHALL BE SPACED 3 FEET APART, ALTERNATE SPACING.41DETAILLIVE STAKES SHOULD BE LONG ENOUGHTO REACH BELOW THE GROUNDWATERTABLE. (GENERALLY, A LENGTH OF 2 TO 3FEET IS SUFFICIENT.) ADDITIONALLY, THESTAKES SHOULD HAVE A DIAMETER INTHE RANGE OF 0.75 TO 2 INCHES.WATER TABLELIVE STAKENTSDIBBLE PLANTING METHODUSING THE KBC PLANTING BAR1. INSERTPLANTING BAR ASSHOWN AND PULLHANDLE TOWARDPLANTER.4. PULL HANDLE OFBAR TOWARDPLANTER, FIRMINGSOIL AT BOTTOM.2. REMOVEPLANTING BARAND PLACESEEDING ATCORRECT DEPTH.3. INSERTPLANTING BAR 2INCHES TOWARDPLANTER FROMSEEDING.5. PUSHHANDLEFORWARDFIRMING SOILAT TOP.6. LEAVECOMPACTIONHOLE OPEN.WATERTHOROUGHLY.PLANTING NOTES:PLANTING BAGDURING PLANTING, SEEDLINGS SHALLBE KEPT IN A MOIST CANVAS BAG ORSIMILAR CONTAINER TO PREVENT THEROOT SYSTEMS FROM DRYING.KBC PLANTING BARPLANTING BAR SHALL HAVE A BLADEWITH A TRIANGULAR CROSS SECTION,AND SHALL BE 12 INCHES LONG, 4INCHES WIDE AND 1 INCH THICK ATCENTER.ROOT PRUNINGALL SEEDLINGS SHALL BE ROOTPRUNED, IF NECESSARY, SO THAT NOROOTS EXTEND MORE THAN 10INCHES BELOW THE ROOT COLLAR.NOTES:BARE ROOTS SHALL BE PLANTED 6FT. TO 10 FT. ON CENTER,RANDOM SPACING, AVERAGING 8FT. ON CENTER, APPROXIMATELY680 PLANTS PER ACRE.BARE ROOT PLANTINGNTSMAX. 75'EXISTINGCHANNELMIN. 25'FILL TO TOP OFBANKFILL AT LEAST70% OF CHANNELMAX. 75'MIN. 25'NOTES:1.FILL EXISTING CHANNEL TO BANKFULL ELEVATION WHEN POSSIBLE.2.CHANNEL MUST BE FILLED IN 12" TO 18" LIFTS,3.IF CHANNEL CANNOT BE COMPLETELY FILLED TO TOP OF BANK, FILL TO TOP OFBANK FOR 25' OUT OF EVERY 100' SEGMENT.CHANNEL BACKFILLNTSOLD CHANNEL TO BEDIVERTED ORABANDONEDNEW CHANNEL TO BECONSTRUCTEDCOMPACTED BACKFILL(12" LIFTS)IMPERVIOUS SELECT MATERIAL(PER DIRECTION OF ENGINEER)10' MINUNCOMPACTED BACKFILL1.5' MINIMUM1111BANKFULL ELEVATION1/4 TO 1/3 OF LOGDIAMETER CAN BE EXPOSEDPRIOR TO FINAL GRADINGPROPOSED BEDMINIMUM OF 2/3 OF LOGDIAMETER BEDDED BELOWEXISTING CHANNEL INVERT12" MINIMUM LOG DIAMETER (TYP.)INSTALL CABLE ANCHOR AS SHOWN. DRILL (ORSAW CUT) PILOT HOLE THROUGH LOG 1/3 TO1/4 OF THE WAY DOWN SO THAT ANCHORCABLE IS NOT EXPOSED.BANKFULL ELEVATION1/4 TO 1/3 OF LOGDIAMETER CAN BE EXPOSEDPRIOR TO FINAL GRADINGPROPOSED BEDMINIMUM OF 1/2 TO 2/3 OFLOG DIAMETER BEDDEDBELOW CHANNEL INVERT12" LOG DIAMETER (TYP.)CHANNEL PLUG30' MIN.BANKFULL ELEVATIONNEW CHANNEL BANK SHALLBE TREATED AS SPECIFIEDIN PLANSPROPOSEDCHANNEL INVERTLOG TOE OR COIR LOGEXISTINGCHANNELBOTTOMTOP OF BANKCOMPACTED BACKFILL(12" TO 18" LIFTS)COIR FIBERMATTINGFLAT TOP ENDLATERAL BUDSIDE BRANCHREMOVED ATSLIGHT ANGLE45 DEGREETAPERED BUTTEND0.5' TO 1.5'18" MIN.0.75" TO 2"3' MIN.COIR FIBERMATTING2"PLAN VIEWSCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_DETAILS.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIOND20335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE DETAILS SURRY COUNTY, NORTH CAROLINA XBCATZWZOUTLET ELEV: EPOOL ELEV: DPLAN VIEW6" #57 STONE ONGEOTEXTILE FABRICEVEN MIX OF NCDOT CLASS 1AND CLASS 2 RIPRAP 30" DEEPUNDISTURBED SOILSECTION A-A' YTYPICAL DRY DISSIPATER BASINNTSNOTE:BASINS WILL BE SIZED BASED ONCONTRIBUTING DRAINAGE AREATO THE EXTENT PRACTICABLE.AA'FLOW LOG VANENTSBANKFULL STAGEBASEFLOWPLAN VIEW - TRENCHING METHODFLOWPLAN VIEW - DRIVE POINT METHODFLOWDRIVE POINT METHOD:SHARPEN THE END OF THE LOG WITH A CHAINSAW BEFORE "DRIVING" IT INTOTHE BANK. ORIENT ROOT WADS UPSTREAM SO THAT THE STREAM FLOWMEETS THE ROOT WAD AT A 90-DEGREE ANGLE, DEFLECTING THE WATERAWAY FROM THE BANK. A TRANSPLANT OR BOULDER SHOULD BE PLACEDON THE DOWNSTREAM SIDE OF THE ROOT WAD IF A BACK EDDY IS FORMEDBY THE ROOT WAD. THE BOULDER SHALL BE APPROXIMATELY 3' X 2' X 2'.TRENCHING METHOD:IF THE ROOT WAD CANNOT BE DRIVEN INTO THE BANK OR THE BANK NEEDSTO BE RECONSTRUCTED, THE TRENCHING METHOD SHOULD BE USED. THISMETHOD REQUIRES THAT A TRENCH BE EXCAVATED FOR THE LOG PORTIONOF THE ROOT WAD. IN THIS CASE, A FOOTER LOG SHOULD BE INSTALLEDUNDERNEATH THE ROOT WAD IN A TRENCH EXCAVATED PARALLEL TO THEBANK AND WELL BELOW THE STREAMBED. ONE-THIRD OF THE ROOT WADSHOULD REMAIN BELOW NORMAL BASE FLOW CONDITIONS.ROOTWADNTSBOULDER(AS DIRECTED BYENGINEER)ROOT WADFOOTER LOGBOULDER(AS DIRECTED BYENGINEER)ROOT WADIF ROOT WAD DOES NOT COVERENTIRE BANK & CONSTRUCTIONIS BETWEEN MID OCTOBER TOMID MARCH, PROTECT BANKWITH BRUSH LAYER.FOOTER LOGLEFT OR RIGHT VANE ARM BANK INTERCEPTCONTROL POINTBALLAST BOULDEROR DUCKBILL ANCHORSPOOLHEADER LOGBANKFULLVARIES 0' TO 0.8'3% TO 6%BANKFULLHEADER LOGFOOTER LOGSTREAM BEDIN POOLVARIES0' TO 12 WIDTHFLOWSTREAM BANKTOE OF BANKBALLAST BOULDEROR DUCK BILL ANCHORSFLOWLOG VANENON-WOVEN GEOTEXTILEFABRIC (NCDOT TYPE II)STREAM BANKTOE OF BANKBANKFULL1/2 WIDTHFLOWCOARSE AGGREGATEBACKFILL (1" TO 5")COARSE AGGREGATEBACKFILL (1" TO 5")MIN 4.0'LEFT OR RIGHT VANEARM BANK INTERCEPTCONTROL POINT1.LOG VANES SHALL BE CONSTRUCTED OF ONE OR MORE LOGS HELD IN PLACE BY EITHER BALLAST BOULDERS, DUCKBILLANCHORS, OR REBAR. LOGS SHALL BE A MIN. LENGTH OF 30' AND DIAMETER OF 12" AND BE RELATIVELY STRAIGHT HARDWOOD,RECENTLY HARVESTED. THE LENGTH SHALL BE SUCH THAT THE LOG IS BURIED INTO THE SOIL OF THE STREAM BANK (ON ONEEND) AND STREAM BED (ON THE OTHER END) A MINIMUM DISTANCE OF 4.0'. FLAT-SIDED BALLAST BOULDERS SHALL BE OF SIZE2' X 2' X 1.5' OR AS SPECIFIED BY THE DESIGNER.2.THE VANE SHALL INTERCEPT THE STREAM BANK AT A HEIGHT EQUAL TO BETWEEN ½ BANKFULL STAGE AND BANKFULL STAGE. ANELEVATION CONTROL POINT MAY BE ESTABLISHED AT THE LEFT OR RIGHT STREAM BANK/VANE INTERCEPT POINT. THE VANEINTERCEPT LOCATION MAY BE OTHERWISE DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BY THE LENGTH AND SLOPEOF THE VANE ARM. BANKFULL IS NOT NECESSARILY THE TOP OF THE STREAM BANK SLOPE.3.FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOGS AND UNDER THE COARSE BACKFILL MATERIAL OF THEVANE. THERE SHALL BE NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED TUCKED, OR TRIMMED ASNEEDED.4.LOG VANES SHALL BE BUILT TYPICALLY AS FOLLOWS:A.OVER-EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS OF THE HEADER (AND FOOTER IF SPECIFIED)LOGS.B.PLACE FOOTER LOG OF THE VANE ARM IF SPECIFIED. THE SLOPE OF THE VANE ARM IS MEASURED ALONG THE VANE ARMWHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE.C.INSTALL HEADER LOG OF THE VANE ARM ON TOP OF AND SLIGHTLY FORWARD OR BACK FROM THE FOOTER LOG.D.NAIL FILTER FABRIC TO THE HEADER LOG USING A GALVANIZED NAIL WITH A PLASTIC CAP. THE SIZE AND GAGE OF NAILAND NAIL SPACING SHALL BE SPECIFIED BY THE DESIGNER.E.PLACE BALLAST BOULDERS OR DUCKBILL ANCHOR ON THE VANE.F.PLACE COARSE BACKFILL BEHIND LOGS ENSURING THAT ANY VOIDS BETWEEN THE LOGS ARE FILLED.G.BACKFILL REMAINDER OF VANE WITH PREVIOUSLY EXCAVATED MATERIAL.5.IF ANY EROSION CONTROL MATTING IS SPECIFIED FOR USE IN THE VICINITY OF THE STREAM BANK/VANE INTERCEPT POINT THEMATTING EDGES SHALL BE NEATLY SECURED AROUND THE LOGS.SECTION A-A PLAN VIEWPROFILE VIEW20° TO 30°NOTES:1.TREES NOT INDICATED TO BE REMOVED SHALL BEPROTECTED DURING CONSTRUCTION INACCORDANCE WITH PLANS.2.SEED AND MULCH ALL BANKS PRIOR TO INSTALLINGCOIR MATTING.INSTALL COIR MATTING PER DETAILSEE DETAIL D1EXCAVATE / GRADE UPPER BANKINSTALL LIVE STAKES (SEE PLANTING PLAN)EXISTING CHANNEL BANKTIE TO EXISTING GRADEMIN SLOPE 2.5H:1VEXISTINGCHANNEL BEDTYPICAL BANK GRADINGNTSVARIES(DESIGNER TO MARK IN FIELDPRIOR TO CONSTRUCTION)10' TO 15'BENCHTYPICAL PLAN VIEWCHANNEL TOPOF BANKCHANNEL BOTTOMOF BANKCOIR MATTINGF LOW BRUSH TOENTSSECTION A-ASMALL LOGS AND/ORLARGE BRANCHES WITH AMIN DIAMETER OF 4".SMALL BRANCHESAND BRUSHCOMPACTED SOILTOP OF BANKLIVE STAKES1.OVER EXCAVATE THE OUTSIDE BEND OF THE CHANNEL. PLACELARGER BRANCHES AND LOGS IN A CRISS-CROSS PATTERN.LOCK IN PLACE WITH FILL COVERING 6 IN TO 18 IN OF THELARGER BRANCHES/SMALL LOGS.2.PLACE SMALLER BRANCHES AND BRUSH OVER THE LARGERBRANCHES/SMALL LOGS (HARDWOOD SPECIES ONLY) ANDCOMPACT LIGHTLY TOGETHER. BACKFILL AND COMPACT TOLOCK IN PLACE.3.ACCEPTABLE LIVE CUTTINGS SPECIES A INCLUDE BLACK WILLOW(SALIX NIGRA) AND SILKY WILLOW (SALIX SERICEA). WILLOWCUTTINGS SHOULD BE RINSED AT CUTTING POINT TO ALLOWBETTER ROOTING.4.INSTALL EROSION CONTROL (COIR) MATTING OVER COMPACTEDSOIL PER DIRECTION OF ENGINEER.5.INSTALL 1 TO 3 ROWS OF LIVE STAKES ABOVE THE LIVECUTTINGS LAYER PER DIRECTION OF ENGINEER.1/4 MAX POOL DEPTH1/4 MAX POOL DEPTHLIVE CUTTINGSNON-WOVEN GEOTEXTILEFABRIC (NCDOT TYPE II)INSTALL COIR MATTING PER DETAILSEE DWG D1MIN 2.0'3' MAXIMUMBANK HEIGHTSTREAM CHANNELSURFACE FLOWDIVERSIONNOTES:1.CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW.2.HAVE ALL NECESSARY MATERIALS AND EQUIPMENT ON-SITE BEFORE WORK BEGINS.3.MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATECHANNEL BOTTOM. COMPLETE ONE SIDE BEFORE STARTING ON THE OTHER SIDE.4.INSTALL STREAM CROSSING PERPENDICULAR TO FLOW.5.GRADE SLOPES TO A MINIMUM OF 2:1 SLOPE, MAXIMUM6.MAINTAIN CROSSING SO THAT RUNOFF IN THE CONSTRUCTION ROAD DOES NOTENTER EXISTING CHANNEL.7.A STABILIZED PAD OF NATURAL CLASS A STONE, 6 TO 9 INCHES THICK, LINED WITHFILTER FABRIC SHALL BE USED OVER THE BERM AND ACCESS SLOPES.8.FILTER FABRIC USED SHALL BE NCDOT TYPE 2 ENGINEERING FABRIC OR EQUIVALENT.9.WIDTH OF THE CROSSING SHALL BE SUFFICIENT (8' MIN.) TO ACCOMMODATE THELARGEST VEHICLE CROSSING THE CHANNEL.10.CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP ANGLE ACCORDING TOEQUIPMENT UTILIZED.11.TEMPORARY CROSSINGS ARE TO BE ABANDONED IN PLACE.CLASS A STONE OVERFILTER FABRICSTONE APPROACHSECTION: 2:1 MIN., 5:1MAX. SLOPE ON ROADSURFACE FLOWDIVERSIONFORD CROSSINGNTSCLASS A STONEEXISTING STREAMBANKFILTER FABRICSOD MATSFLOOD PLAINBOULDER(AS DIRECTEDBY ENGINEER)24" MIN.DIAMETER BOULDER10-15 FEET LONG>10" DIAMETERFOOTER LOG > 12" DIAMETERMINIMUM OF 1/2 OF DIAMETERINSTALLED BELOW STREAM BEDTOP OF BANKAAAACROSS SECTION VIEWSCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_DETAILS.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIOND30335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE DETAILS SURRY COUNTY, NORTH CAROLINA CHANNEL TOPOF BANKA'APLAN VIEWSECTIONAL VIEW A - A'NOTES:REBAR (1/2" MINIMUM DIAMETER 3' MIN. LENGTHTYPICAL) SHOULD BE PLACED 1' TO 3' FROM END OFLOG. ADDITIONAL REBAR TO BE PLACED AT 6'OFFSETS. LAST REBAR SHOULD BE PLACED 1' TO 3'FROM END OF LOG. DUCK BILL ANCHORS MAY BEUSED AS A SUBSTITUTION FOR REBAR, 2 PER LOG.FLOODPLAIN SILLNTSNTSLOG SILLSECTION A-ASECTION B-B (OPT 1)FLOWCOARSE BACKFILLCHANNEL BOTTOMOF BANKTYPICAL PLAN VIEW (OPT 1)AABBFLOWREBAR OR DUCKBILLANCHORREBAR (5/8" MIN. DIAMETER, 4' MIN. LENGTH) ORDUCKBILL ANCHORS INSTALLED PERMANUFACTURERS INSTRUCTIONS (TYP.)COIR MATTINGPROPOSEDSTREAM BEDTACK FABRICTO LOGMIN. 5.0'HEADER LOGFOOTER LOG5.0'MINCOARSE AGGREGATEBACKFILL (1" TO 5")POOLPOOL APPROX.0.75' TO 1.5' DEEPCOARSE AGGREGATEBACKFILL (1" TO 5")DOUBLE LOG DROPNTSNON-WOVENGEOTEXTILE FABRIC(NCDOT TYPE II)FOOTERLOGPROFILE A-A'HEADER LOGINVERT ELEVATIONMAX ALLOWABLEDROP OF 0.5 FTFLOWPLAN VIEWBANKFULLFOOTER LOGHEADER LOGHIGHLOWLOG BURIED INBANK MIN 5FTLOG BURIED INBANKMIN 5FTBB'AA'CMAX DEPTH 12 OFLOG DIAMETER(TYP)4% TO 6%4% TO 6%MIN. 2.5' OFCOVERMIN 5FTMIN 5FTMIN 5FTMIN 5FTPROFILE B-B'PROFILE C-C'OVERLAP OFUPSTREAM LOGOVERLAP OFDOWNSTREAM LOGHIGHHIGHLOWLOWNOTES:1.LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED.2.LOG DIMENSIONS:MIN DIAM. = 10", MIN LENGTH = 14'3.NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG.COARSE AGGREGATEBACKFILL (2" TO 6")COARSE AGGREGATEBACKFILL (2" TO 6")COARSE AGGREGATEBACKFILL (2" TO 6")COARSE AGGREGATEBACKFILL (2" TO 6")HIGHLOW4' TO 8'POINT REFERENCED INSTRUCTURE TABLEPOINT REFERENCED INSTRUCTURE TABLEHEADER LOGINVERT ELEVATIONDIFFUSE FLOW STRUCTURENTSSECTION A-A0.5% SLOPE(MAX)AAFLOW VARIES (TYPICALLY 20' TO 40')VARIES (TYPICALLY 20' TO 40')NOTES:1.NO FLOODPLAIN GRADING IS ALLOWED WITHIN 10 FT OFTHE PROPOSED CHANNEL TOP OF BANK.2.LOGS SHOULD BE AT LEAST 10'-20' LONG AND AT LEAST 8INCHES IN DIAMETER, AND HARDWOOD.PLAN VIEWFLOWLOG STRUCTURE(SEE DETAIL)PROPOSEDLIMITSOF GRADINGGRADE AREA SUCH THATMAX SLOPE BELOW LOGSTRUCTURE IS 1%FILL DITCH SUCH THATTHE DOWNSTREAMELEVATION TIES INTOEXISTING GRADE OF THEFLOODPLAINPROPOSED CONSERVATIONEASEMENT LIMITSEXISTING DITCHBANKEXISTING DITCHTOP OF BANKEXISTINGDITCH INVERTLOG SILL(SEE DETAIL)PROPOSED GRADEEXISTING GRADETIE-IN TOEXISTINGFLOODPLAINELEVATIONFILL DITCH ANDINSTALL COIRMATTINGSECTION B-BEXISTINGGROUND3:1 MAX SLOPE3:1 MAXSLOPEFILL DITCHCUTBBCONSTRUCTPOOLINSTALL COIR MATTING PERMANUFACTURER'SINSTRUCTIONS1% TO 3%HIGHLOWROOTWAD ORBRUSHTOE1% TO 3%HIGHLOWNOTES:1.LOGS SHOULD BE RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED.2.NAIL FILTER FABRIC USING 3" 10D GALVANIZED COMMON NAIL EVERY 1.5' ALONG THE LOG.3.DUCKBILL ANCHORS MAY BE USED IN PLACE OF REBAR.CHANNEL TOPOF BANKTYPICAL PLAN VIEW (OPT 2)AABBFLOW5.0'MINPOOL1% TO 3%HIGHLOWROOTWAD ORBRUSHTOEHIGH LOW SECTION B-B (OPT 2)PROPOSED STREAM BANKHEADER LOGFOOTER LOG1% TO 3%HIGHLOWOVERLAP OFDOWNSTREAM LOGREBAR (5/8" MIN. DIAMETER, 4' MIN. LENGTH) ORDUCKBILL ANCHORS INSTALLED PERMANUFACTURERS INSTRUCTIONS (TYP.)COARSE BACKFILLCHANNEL BOTTOMOF BANKFILTER FABRICMIN 5.0'MIN 3.0'MIN. 4.0'NON-WOVENGEOTEXTILE FABRIC(NCDOT TYPE II)NON-WOVENGEOTEXTILE FABRIC(NCDOT TYPE II)MINIMUMDIAMETER12"6'REBARLOGS5'LENGTH VARIESDOWNVALLEY5/8" REBARPROPOSEDFLOODPLAINSURFACE5'6" (TYP.)BANKFULL LIMITS OFPROPOSED CHANNELCSCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_DETAILS.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIOND40335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE DETAILS SURRY COUNTY, NORTH CAROLINAREACH IDMIN. LENGTHMIN. DIAMETERMC123'12"JN212'10"JN320'12"BS112'10"LOG DIMENSIONS: LINE PANELWOVEN WIRE:ASTM CLASS 3 GALVANIZED.TOP AND BOTTOM WIRES MIN. 12 GAUGE.INTERMEDIATE AND STAY WIRES MIN.12 1/2 GAUGE.NOTES:1.LINE POSTS (WOODEN): MIN. 4 IN. DIAM. OR 4 IN. SQUARE.2.LINE POSTS (STEEL): STUDDED OR PUNCHED T, U, OR Y SHAPED, WITH ANCHOR PLATES.3.MIN. WEIGHT 1.3 LBS./FT. (EXCLUDING ANCHOR PLATE). POSTS SHALL BE DRIVEN A MINIMUMOF 18" DEEP AND MUST BE AT LEAST 5.5 FT IN LENGTH4.SPECIES AND TREATMENT FOR ALL WOOD: USE UNTREATED DURABLE POSTS OF SPECIESSUCH AS RED CEDAR, BLACK LOCUST OR OSAGE-ORANGE WITH BARK REMOVED, ORNON-DURABLE WOOD THAT IS PRESERVATIVE PRESSURE TREATED (0.40 LBS./CUBIC FOOTCCA, OR EQUIVALENT NON-CCA TREATMENT). DO NOT USE RED PINE.WOVEN WIRE FENCE (NRCS DETAIL 382A)NTSWOVEN WIRE WITH ONE BARB DETAILTIMBER MAT CROSSINGTIMBER MAT APPROACHTOP OF BANKCLASS B RIP RAPTIMBER MAT INSTALLEDPERPENDICULARTIMBER MAT INSTALLEDPARALLELTIMBER MAT(TYP)CARRIAGE BOLTFLOWTOE OF BANK(TYP)TIMBER MAT INSTALLEDPERPENDICULARTOP OF BANKCLASS B RIP RAPCARRIAGE BOLT(TYP)FILTER FABRICAPPROXIMATE BASE FLOWWATER SURFACE(5' MIN)RIP RAP APPROACHTIMBER MATINSTALLED PARALLELTOE OF BANKPLAN VIEWSECTION VIEWTIMBER MAT TEMPORARY CROSSINGNTSNOTES:1.TIMBER MATS SHALL BE USED FOR TEMPORARYCONSTRUCTION ACCESS TO TRAVERSE WET AND/OR MUDDYARES ADJACENT TO THE STREAM AND TO CROSS THESTREAM AND OTHER CONCENTRATED FLOW AREAS.2.THE STREAM CROSSING SHALL BE INSTALLED WHEN FLOW ISLOW. THERE SHALL BE MINIMAL TO NO DISTURBANCE OF THECHANNEL BED AND BANKS AS A RESULT OF INSTALLING THEAPPROACHES OR CROSSING.3.THE LENGTH OF TIMBER MAT REQUIRED TO CROSS THESTREAM OR CONCENTRATED FLOW AREAS SHALL BE SUCHTHAT THE TIMBER MAT EXTENDS PAST THE TOP OF BANK ONEACH SIDE OF THE CROSSING A SUFFICIENT DISTANCE TOSUPPORT THE MAXIMUM EQUIPMENT SIZE USING THECROSSING.4.STREAM CROSSINGS SHALL BE INSTALLED WITH THE TIMBERMAT LENGTHS ORIENTED PERPENDICULAR TO THE TOPS OFTHE STREAM BANKS. TIMBER MAT STREAM APPROACHESSHALL BE INSTALLED WITH THE TIMBER MAT LENGTHSORIENTED PARALLEL TO THE TOPS OF THE STREAM BANKS.5.STREAM CROSSING APPROACHES FROM DRY AREAS SHALLBE CONSTRUCTED USING CLASS B RIP RAP PLACED OVERFILTER FABRIC.6.ALL TIMBER MATS, FILTER FABRIC, AND RIP RAP SHALL BECOMPLETELY REMOVED FROM THE SITE WHEN THE CROSSINGIS REMOVED.NOTES:1.CONSTRUCT STREAM CROSSING WHEN FLOW IS LOW.2.INSTALL STREAM CROSSING PERPENDICULAR TO FLOW.3.CONTRACTOR TO COORDINATE APPROPRIATE BEDDING MATERIAL WITH MANUFACTURER.4.FILTER FABRIC USED SHALL BE NCDOT TYPE 2 ENGINEERING FABRIC OR EQUIVALENT.5.WIDTH OF TYPICAL FARM CROSSINGS SHALL BE PER PLAN OR A MINIMUM OF 12'.6.WHEN REQUIRED, CONTRACTOR TO ENSURE PIPE MATERIAL AND COVER MEET H-20 LOADINGREQUIREMENTS.PROPOSED CULVERT CROSSINGNTSSTREAM CHANNELFLOW MIN 3'MIN 3'PLAN VIEWSECTION VIEW2" - 3"LINE POSTWOVEN WIREBARBED ORELECTRIC WIRELINE POST16' MAX.BARBED ORELECTRICWIREWOVEN WIREGROUND LINE4" TO 6"LINE POST3" MIN.32" TO 42"6"6' MIN.2' MIN.MIN. 18"FILTER FABRICCOARSE AGGREGATE(#5 WASHED STONE) 6"DEEPEARTH FILL COVERED BYLARGE ANGULAR ROCKPIPE SIZE PER PLANINVERT PER PLAN BURYCULVERT 0.6' UNLESSNOTED OTHERWISE BYENGINEERINSTALL CLAY PLUG 2FEET BELOW CULVERTINVERTCOARSE AGGREGATEEARTH FILL COVEREDBY LARGE ANGULARROCKLOG OR ROCK SILL SET TOPOF LOG 1FOOT ABOVECULVERT INVERTTOP OF BANKLOG OR ROCK SILL;SET TOP A MINIMUM OF0.6' ABOVE CULVERTINVERT10' MIN.10' MIN.SCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_DETAILS.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIOND50335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE DETAILS SURRY COUNTY, NORTH CAROLINALOG OR ROCK SILLHEADER AND FOOTERBOULDERSPOOLFLOWCROSS VANE INVERTCONTROL POINTFILTER FABRICSTREAM BANKTOE OF BANKBANKFULLFOOTER ROCKLEFT OR RIGHT VANE ARMBANK INTERCEPTCONTROL POINTPOOLHEADER ROCKBANKFULLVARIES0' TO 0.8'3% TO 5%BANKFULLHEADER BOULDERFOOTER BOULDERSTREAM BEDIN POOLFILTER FABRICVARIES0' TO 13 WIDTHFLOWSTREAM BANKTOE OF BANKFLOWCOARSE AGGREGATEBACKFILL (1" TO 5")SECTION A-A'PROFILE VIEWCOARSE AGGREGATEBACKFILL (1" TO 5")MIN5.0'COARSE AGGREGATEBACKFILL (1" TO 5")RIGHT VANE ARMBANK INTERCEPTCONTROL POINTLEFT VANE ARMBANK INTERCEPTCONTROL POINT13 CHANNELWIDTH13 CHANNELWIDTH13 CHANNELWIDTHMIN5.0'20° TO 30°PLAN VIEWFILTERFABRICFOOTER BOULDERHEADER BOULDER13 CHANNELWIDTH13 CHANNELWIDTH13 CHANNELWIDTHVANE ARM BANKINTERCEPT CONTROLPOINTVANE ARM BANKINTERCEPT CONTROLPOINTSECTION B-B'BBAAROCK CROSS VANENTSXZYMATERIALS NOTES:1.ROCKS MUST HAVE AN INTERMEDIATE DIAMETER (Z) OF AT LEAST 24" FOR HEADERSAND 24-30" FOR FOOTERS. SILL ROCKS SHALL HAVE AN INTERMEDIATE DIAMETER OF ATLEAST 18". ALL ROCKS SHALL BE APPROVED BY ENGINEER PRIOR TO INSTALLATION2.WIDTH OF HEADER AND FOOTER ROCKS (X) MUST BE AT LEAST 30". DEPTH OF HEADERAND FOOTER ROCKS (Y) MUST BE AT LEAST 24"3 PRIMARY ROCK DIMENSIONS:X.LONGEST DIMENSIONY.SHORTEST DIMENSIONZ.INTERMEDIATE DIMENSION PLAN VIEWPROFILECROSS SECTION A-A'FLOWVARIESEND RIFFLE CONTROL POINTPROPOSED TOPOF BANKBEGIN RIFFLECONTROL POINTVARIES CHANNELBOTTOM WIDTHBEGIN RIFFLEEND RIFFLERIFFLE MATERIALFLOWTOP OF BANKTOE OF BANK4' MIN 4' MIN4'MIN4'MINRIFFLERUNGLIDESMALL POOLLARGE COBBLE/SMALL BOULDERSLOGS/WOODYDEBRISLOGS/WOODYDEBRISTOP OF BANK4.0' (TYP)RIFFLE MATERIAL1.25' MIN0.75' MINTOP OF BANKPROPOSED TOE OF BANKGRADE CONTROL ROCK50/50 MIX OF CLASS A ANDB RIPRAPLOGS/WOODY DEBRISSMALL POOL, TYP4.0'TYPLARGE COBBLE/SMALLBOULDERS, TYPRIFFLE MATERIAL;EQUAL MIX OF SURGESTONE AND NATIVESUBSTRATE MATERIALFLOWTHALWEGTHALWEGCHANNELBOTTOM WIDTH4.0' (TYP)4.0'TYPNOTES:1.CONSTRUCTED RIFFLES SHALL BE INSTALLED IN NEWLY GRADED CHANNEL SECTIONS, AS SPECIFIED BY THE DESIGNER.2.ELEVATION CONTROL POINTS SHALL BE DESIGNATED AT THE BEGINNING AND END OF RIFFLE POINTS TO ESTABLISH PART OF THE PROFILE OF THE CHANNEL. SURVEY OF CONTROL POINTS SHALL BEREQUIRED TO ESTABLISH ACCURATE RIFFLE INSTALLATION WITHIN A TOLERANCE OF ±0.2'.3.GRADE CONTROL ROCK SHALL BE COMPRISED OF A 50/50 MIX OF CLASS A AND B RIPRAP. GRADE CONTROL ROCK SHALL BE PLACED SUCH THAT THE ADDITION OF THE SPECIFIED THICKNESS OF RIFFLEMATERIAL SHALL ACHIEVE THE DESIGNATED GRADES.4.RIFFLE MATERIAL SHALL BE COMPRISED OF ROCKS AND WOOD. THE ROCK MATERIAL SHALL CONSIST OF AN EQUAL MIX OF SURGE STONE AND NATIVE SUBSTRATE MATERIAL. RIFFLE MATERIAL SHALL BEEXCAVATED, STOCKPILED, AND RE-USED FROM ABANDONED CHANNEL SECTIONS. OTHERWISE ROCK RIFFLE MATERIAL SHALL BE SLIGHTLY ROUNDED, “RIVER-TYPE” ROCK, UNLESS OTHER ROCKCHARACTERISTICS ARE APPROPRIATE FOR THE CHANNEL. IN ADDITION, LOGS AND WOODY DEBRIS SHALL BE INCLUDED WITH THE ROCK MATERIAL AS SPECIFIED BY THE DESIGNER.5.THE PLACEMENT OF GRADE CONTROL ROCK AND/OR RIFFLE MATERIAL SHALL BE DONE IN A MANNER TO CREATE A SMOOTH PROFILE, WITH NO ABRUPT “JUMP” (TRANSITION) BETWEEN THE UPSTREAMPOOL-GLIDE AND THE RIFFLE, AND LIKEWISE NO ABRUPT “DROP” (TRANSITION) BETWEEN THE RIFFLE AND THE DOWNSTREAM RUN-POOL. THE FINISHED CROSS SECTION OF THE RIFFLE MATERIAL SHALLGENERALLY MATCH THE SHAPE AND DIMENSIONS SHOWN ON THE RIFFLE TYPICAL SECTION WITH SOME VARIABILITY OF THE THALWEG LOCATION AS A RESULT OF THE SMALL POOLS AND LOGS.6.THE END OF RIFFLE CONTROL POINT MAY TIE IN TO ANOTHER IN-STREAM STRUCTURE (LOG SILL OR J-HOOK).7.THE CONSTRUCTED RIFFLE SHALL BE KEYED IN TO THE STREAM BANKS AND/OR BED AS DESIGNATED BY THE DESIGNER. THE "KEY" SHALL EXTEND BEYOND THE TOP OF BANK AT THE BEGINNING (CREST) OFTHE RIFFLE. WHERE PRESERVATION OF EXISTING STREAM BANK VEGETATION IS A PRIORITY A "KEY" MAY NOT BE USED (OR THE DIMENSIONS MAY BE ADJUSTED) TO LIMIT DISTURBANCE.RIFFLE MATERIAL;EQUAL MIX OF SURGESTONE AND NATIVESUBSTRATE MATERIALGRADE CONTROL ROCK50/50 MIX OF CLASS A ANDB RIPRAPRIFFLE GRADE CONTROLNTSAASCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_DETAILS.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIOND60335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE DETAILS SURRY COUNTY, NORTH CAROLINA POOLPOOLFLOWTOP OF BANKSTEP ELEVATIONCONTROL POINTPOOLPOOLPOOLBALLAST BOULDERPOOL ELEVATIONCONTROL POINTTIE-IN TO STREAMBANK (TYP.)FLOWHEADER LOGTIE-IN TO STREAMBED (TYP.)A'ASTREAM BANKPROTECTIONANGLED LOG STEP POOLNTSTOP OF BANKBALLAST BOULDERFOOTER LOGHEADER LOGSTEP ELEVATIONCONTROL POINTUPSTREAM POOL ELEVATIONCONTROL POINTCOARSE AGGREGATEBACKFILL (1" TO 5")STEP ELEVATIONCONTROL POINTPOOL ELEVATIONCONTROL POINTBANKFULLHEADER LOGFOOTER LOGFILTER FABRICNOTES:1.LOGS SHALL BE OF A MINIMUM OF 15' IN LENGTH AND 10" IN DIAMETER AND RELATIVELYSTRAIGHT HARDWOOD, RECENTLY HARVESTED.2.A SINGLE LOG MAY BE USED IN LIEU OF A HEADER/FOOTER LOG COMBINATION, PERDIRECTION OF DESIGNER.3.FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOG(S) AND THE STREAMBED, UNDER THE COARSE BACKFILL MATERIAL. THERE SHALL BE NO FILTER FABRIC VISIBLEIN THE FINISHED WORK; EDGES SHALL BE FOLDED, TUCKED, OR TRIMMED AS NEEDED.4.COARSE BACKFILL SHALL BE PLACED TO A THICKNESS EQUAL TO THE DEPTH OF THEHEADER (AND ANY FOOTER) LOGS AND SHALL EXTEND OUT FROM THE VANE ARMS TO THESTREAM BANK AND UPSTREAM.5.AS AN OPTION, FLAT-SIDED BOULDERS MAY BE PLACED AS BALLAST ON TOP OF THESTREAM BANK SIDE OF THE EMBEDDED VANE ARMS. DUCK BILL ANCHORS MAY BE USED INLIEU OF BALLAST BOULDERS.6.DUCKBILL ANCHORS WITH GALVANIZED CABLE ATTACHED MAY BE USED TO SECURE LOGSINTO THE STREAM BED AND/OR BANKS. FLAT SIDED BOULDERS CAN BE USED IN LIEU OFTHE LOG INVERT/DUCKBILL ANCHOR SYSTEM.PLAN VIEWPROFILESECTION VIEW SCALE: AS SHOWNFILE NAME:S:\@RES GIS\Projects\NC\Little Sebastian\CAD\DWG\675700_SHT_DETAILS.dwg SAVED BY: Tswartzfager DRAWING TITLE: PROJECT NAME:SHEET NUMBER:DESCRIPTIONMARKDATE REVISIONS: RELEASED FOR:PLOT DATE:PROJECT NUMBER:PROJECT MANAGER:DESIGNED:DRAWN:CHECKED:SEAL302 Jefferson Street, Suite 110Raleigh, NC 27605Main: 919.829.9909Fax: 919.829.9913www.res.us9/18/2018PRELIMINARY - NOT FOR CONSTRUCTIOND70335CSCAFMTRSDPILITTLE SEBASTIAN STREAM MITIGATION SITE DETAILS SURRY COUNTY, NORTH CAROLINA POOLFLOWFOOTER LOGINVERT LOGPOOLA'ASTREAM BED13 W13 W20°-30°FILTER FABRICSTREAM BANK, TYPICALCROSS VANE INVERTINVERT LOGHEADER LOGBANKFULLDUCKBILL ANCHORMIN5'BANKFULLHEADER LOGFOOTER LOG, IFSPECIFIEDSTREAM BED IN POOLFILTER FABRIC0' TO 13 WSTREAM BANKFILTER FABRICFLOWFLOWFOOTER LOGBANKFULL, TYPICALTOE OF BANK, TYPICAL13 W3% TO 6%COARSE AGGREGATEBACKFILL (2" TO 6")COARSE AGGREGATEBACKFILL (2" TO 6")PROFILE VIEWPLAN VIEWSECTION A-A'COARSE AGGREGATEBACKFILL (2" TO 6")LOG CROSS VANENTSNOTES:1.LOGS SHALL BE OF A MINIMUM OF 15' IN LENGTH AND 10" IN DIAMETER AND RELATIVELY STRAIGHT HARDWOOD,RECENTLY HARVESTED.2.A SINGLE LOG MAY BE USED IN LIEU OF A HEADER/FOOTER LOG COMBINATION, PER DIRECTION OF DESIGNER.3.FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOG(S) AND THE STREAM BED, UNDER THE COARSEBACKFILL MATERIAL. THERE SHALL BE NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED,TUCKED, OR TRIMMED AS NEEDED.4.COARSE BACKFILL SHALL BE PLACED TO A THICKNESS EQUAL TO THE DEPTH OF THE HEADER (AND ANY FOOTER)LOGS AND SHALL EXTEND OUT FROM THE VANE ARMS TO THE STREAM BANK AND UPSTREAM.5.AS AN OPTION, FLAT-SIDED BOULDERS MAY BE PLACED AS BALLAST ON TOP OF THE STREAM BANK SIDE OF THEEMBEDDED VANE ARMS. DUCK BILL ANCHORS MAY BE USED IN LIEU OF BALLAST BOULDERS.6.DUCKBILL ANCHORS WITH GALVANIZED CABLE ATTACHED MAY BE USED TO SECURE LOGS INTO THE STREAM BEDAND/OR BANKS. FLAT SIDED BOULDERS CAN BE USED IN LIEU OF THE LOG INVERT/DUCKBILL ANCHOR SYSTEM.VANE ARM LOG, TYPICALOPTIONAL BALLAST BOULDERHEADER LOGHEADER AND FOOTERBOULDERSPOOLFLOWCROSS VANE INVERTCONTROL POINTFILTER FABRICSTREAM BANK, TYPICALTOE OF BANK, TYPICALBANKFULL, TYPICALFOOTER ROCKSLEFT OR RIGHT VANE ARMBANK INTERCEPTCONTROL POINTPOOLHEADER ROCKSBANKFULLVARIES0' TO 0.8'3% TO 5%BANKFULLHEADER BOULDERFOOTER BOULDERSTREAM BEDIN POOLFILTER FABRICVARIES0' TO 13 WIDTHFLOWSTREAM BANKTOE OF BANKFLOWCOARSE AGGREGATEBACKFILL (1" TO 5")SECTION A-A'PROFILE VIEWCOARSE AGGREGATEBACKFILL (1" TO 5")MIN5.0'COARSE AGGREGATEBACKFILL (1" TO 5")RIGHT VANE ARMBANK INTERCEPTCONTROL POINTLEFT VANE ARMBANK INTERCEPTCONTROL POINT13 CHANNELWIDTH13 CHANNELWIDTH13 CHANNELWIDTHMIN5.0'20° TO 30°PLAN VIEWFILTERFABRICFOOTER BOULDERHEADER BOULDER13 CHANNELWIDTH13 CHANNELWIDTH13 CHANNELWIDTHVANE ARM BANKINTERCEPT CONTROLPOINTVANE ARM BANKINTERCEPT CONTROLPOINTSECTION B-B'BBAAROCK A-VANENTSPOOLFILTER FABRICPOOLSTEP INVERTCONTROL POINTXZYMATERIALS NOTES:1.ROCKS MUST HAVE AN INTERMEDIATE DIAMETER (Z) OF AT LEAST 24"FOR HEADERS AND 24-30" FOR FOOTERS. SILL ROCKS SHALL HAVE ANINTERMEDIATE DIAMETER OF AT LEAST 18". ALL ROCKS SHALL BEAPPROVED BY ENGINEER PRIOR TO INSTALLATION2.WIDTH OF HEADER AND FOOTER ROCKS (X) MUST BE AT LEAST 30".DEPTH OF HEADER AND FOOTER ROCKS (Y) MUST BE AT LEAST 24"3 PRIMARY ROCK DIMENSIONS:X.LONGEST DIMENSIONY.SHORTEST DIMENSIONZ.INTERMEDIATE DIMENSION