Loading...
HomeMy WebLinkAbout20200323 Ver 1_PCN Form Submission_20200303DWR Dlrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200323 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: U-5794-Widening of Bloomery and Packhouse Roads 1a. Who is the Primary Contact?* Chad Coggins 1b. Primary Contact Email:* tccoggins@ncdot.gov Date Submitted 3/3/2020 Nearest Body of Water Bloomery Swamp and Toisnot Swamp Basin Neuse Water Classification NSW and WS-III and N Site Coordinates Latitude: Longitude: 35.78160-77.97366 A. Processing Information County (or Counties) where the project is located: Wilson Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: U-5794 WBS#M 44365.1.1 1a. Type (a) of approval sought from the Corps: Version#* 1 Reviewing Office* Central Office - (919) 707-9000 1c. Primary Contact Phone:* (252)717-8699 V W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 14 - Linear transportation NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express P Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: State of NC 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address PO Box3165 Address Line 2 city Wilson Fbstal / Zip Code 27895 2e. Telephone Number: (252)717-8699 2g. Email Address:* State / Rovince / Region NC Country USA 2f. Fax Number: r Yes r No r Yes r No tccoggins@ncdot.gov 3. Applicant Information (if different from owner) 3a. Name: Chad Coggins 3b. Business Name: NCDOT 3c.Address Street Address PO Box3165 Address Line 2 city Wilson Postal / Zip Code 27895 3d. Telephone Number: (252)717-8699 3f. Email Address:* tccoggins@ncdot.gov State / Rovince / Region NC Country USA 3e. Fax Number: C. Project Information and Prior Project History O [Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Wilson 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 city Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Bloomery Swamp and Toisnot Swamp 3b. Water Resources Classification of nearest receiving water:* NSW and WS-III and N 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202030402 and 030202030303 4. Project Description and History 2b. Property size: State / Province / Region Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Primarily rural with agriculture and silviculture are the primary land uses. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) U-5794 Topo.pdf 1.01 MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) soils.pdf 421.54KB 4f. List the total estimated acreage of all existing wetlands on the property: 0.10 4g. List the total estimated linear feet of all existing streams on the property: 200 4h. Explain the purpose of the proposed project:* The primary purpose of the project is to improve mobility on both Bloomery Road and Packhouse Road and increase storage capacity and walkability along Packhouse Road. Secondary purposes include improving motorist nobility and safety with the addition of a traffic roundabout, turning lanes and an improved shoulder. Other benefits include improving pedestrian and bicycle safety through the installation of sidewalks on Packhouse Road and 5' wide paved shoulders for bicycles on both roads. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project proposes to extend the three -lane portion of Packhouse Road west from New Hope Elementary School to Crepe Myrtle Road. At the intersection of Packhouse Road and Bloomery Road a roundabout would be constructed with a separate slip lane for turns from westbound Packhouse Road onto northbound Bloomery Road. On the north side of Packhouse Road a 5' wide sidewalk would be built from N.C. 58 and the Community Christian School. Curb -and -gutter that currently ends at New Hope Elementary School would also be extended to Community Christian School. On the south side of Packhouse Road a sidewalk would be constructed from N.C. 58 to Jamestown Drive. The remainder of Packhouse and Bloomery Roads in the project corridor would receive a 5' wide paved shoulder and improvements to the open ditches on either side of the roadway. The project will also involve the replacement of two culverts, both on Packhouse Road. 4j. Please upload project drawings for the proposed project. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No O Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Chad Coggins Agency/Consultant Company: NCDOT Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r' Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries rJ Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type * M 2c. Type of W.* 2d. W. name * 2e. Forested * 2f. Type of Jurisdicition*(?) 2g. Impact area* Site 1-2 Mechanized Clearing P fferine Swamp Forest WA/WB Yes Both 0.040 (acres) Site 1-2 Hand Clearing T fferine Swamp Forest WA/WB Yes Both 0.060 (acres) Site 6 Fill P fferine Swamp Forest �WC Yes Both 0.010 (acres) Site 6 Excavation P Riverine Swamp Forest �WC Yes Both 0.010 (acres) 2g. Total Temporary Wetland Impact 0.060 2g. Total Wetland Impact 0.120 2h. Comments: 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.060 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact F (?) Jurisdiction* length* S1 Site 3 Permanent Culvert SA\L1T to BloomerySwam p Perennial Both 12 15 Average (feet) (linearfeet) S2 Site 3 Permanent Bank Stabilization J SA\Ur to BloomerySwam P Perennial Both 12 62 Average (feet) (linearfeet) S3 Site 3 Temporary Dewatering SA\Ur to Bloomery Swamp Perennial Both 12 49 Average (feet) (linearfcet) � Site 4 Permanent Culvert SCUT to Toisnot Swam P Intermittent Both 5 28 Average (feet) (lir�rfeet) S5 Site 4 Permanent Bank Stabilization JCUT to Toisnot Swam P Intermittent Both 5 47 Average (feet) (linearfeet) S6 Site 4 Temporary Dewatering SC\Lrr to Toisnot Swamp Intermittent Both 5 19 Average (feet) (lir�rfeet) S7 Site 5 Permanent Culvert :TD\UT to Toisnot Swamp Intermittent Both 5 39 Average (feet) (linearfeet) SS Site 5 Permanent Bank Stabilization SD\Lrr to Toisnot Swam P Intermittent Both 5 61 Average (feet) (lir�rfeet) S9 Site 5 Temporary Dewatering SD\Lrr to Toisnot Swamp Intermittent Both 5 45 Average (feet) (linearfeet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 31. Total temporary stream impacts: 252 113 3i. Total stream and ditch impacts: 365 3j. Comments: Total Fill = 82' Total Stablization = 170' Temp Dewatering = 113' 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. V Neuse r Tar -Pamlico r Catawba r Randleman r Goose Creek r Jordan Lake r Other 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Site 3 P LIT to Bloomery Swamp No 8,105 3,300 Site 4 P LfT to Toisnot Swamp No 7,652 4,570 Site 5 P LIT to Toisnot Swamp No 9,160 5,334 6h. Total buffer impacts: Zone 1 Total Temporary impacts: 0.00 Zone 2 0.00 Zone 1 Zone 2 Total Permanent impacts: 24,917.00 13,204.00 Zone 1 Zone 2 Total combined buffer impacts: 24,917.00 13,204.00 61. Comments: Supporting Documentation t15794_Permit_Dravdngs_100319.pdf 7.25MB U-5794_Permit_Drawings_BUFFER _100319.pdf 3.6MB E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: This project consists of minor Widening improvements and minimal impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: All construction equipment Will be staged and operated from upland areas. DOT vdll also install silt fencing to protect the streams and Wetlands adjacent to the project. Safety fencing Wit be used to delineate jurisdictional and environmentally sensitive areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: under thresholds LFStormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader W Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen F Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation U-5794_SMP_20191003.pdf 309.25KB 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No Comments: MCDC available upon request 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes IT No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This project is not designed to increase traffic capacity. It is only addressing mobility and pedestrian needs therefore it should not induce additional development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes IT No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes IT No 5d. Is another Federal agency involved?* r Yes IT No 5e. Is this a DOT project located within Division's 1-8? r Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? An PAC species list from Feb 5th lists 6 species potentially occurring within this project. For the five aquatic species on this list, a MA-NLAA conclusion can be reached because this project consists of culvert replacements that are greater than .25 miles from an identified stream reach. For Red Cockaded Woodpecker (RCW), they are listed as "Historic" for Wilson County and therefore detail surveys are not required for this species due to its historic status within Wilson County. However during field surveys marginal foraging habitat was identified in the study area, but no nesting habitat was indentified in the project area or within a mile of the project study area. Also, NHP records review indicates no documented nest sites within 1 mile of the study project study area. Programmatic BO of MA/LTAA for NLEB Consultation Documentation Upload USFWS species list.pdf 215.65KB project_report _u_5794_0_23231_23231.pdf 852.76KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* EFH mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* HEU clearance 7c. Historic or Prehistoric Information Upload U-5794 Wilson No NRHP Archaeological Sites Present Form.pdf 9.91 MB WilsonU-5794NHPA.pdf 4.99MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-yearfloodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: MOA approved 8c. What source(s) did you use to make the floodplain determination?* NC FRIS Miscellaneous Comments Miscellaneous attachments not previously requested. Signature W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Chad Coggins Signature Date 3/3/2020 u