Loading...
HomeMy WebLinkAbout20200297 Ver 1_Shoreline Stabilization_20200225�r G D A ti 0- State of North Carolina Department of Environment and Natural Resources Division of Water Resources 1SA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization, FORM: SSGP 02-201 VV Shoreline Stabilization Application Form Three copies of the application (including attachments) and the - should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [._ i',!C;6,C 02H .0 .02(a,j 1. Owner Information Name: —Ct 0 �� Mailing Address: I o 1 R Dn )AD Telephone Number: _Wy -sol — n_,3 V Fax Number: E-mail Address: 2. Agent/ Contact person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: �6ocs�Pe� r 1 s; Sx.IdrPi C `,r��,� ! Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [_S, i,r ,r -i .C!507 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: 5SGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) L ' I County: r' _ `-s(a.5� N T Nearest Town: _M Lake/ river/ ocean adjacent to property: Chi sIp.t� j [ n xp Property size (acres): O , 015 Subdivision name or site address (include phase/lot number): Directions to site - please include road names and numbers, landmarks, etc.: Latitude (in decimal degrees) S l 54n35 Longitude (decimal degrees) " 8U , q $ 6 a 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): , a S i AP- ` [. 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): -LQ,c L i 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level ent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): nrr; SS V r—iced 11. Signature / G Owner/A ent's Si ature' [i -, i rw0?:' C? ;;:i' Da e Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) BE full Pond/ Normal Water ev Shoreline I I V Plan View Lake (At Pull POW Normal Water I-d) Existing Dock Full Pond/ Normal Water L Shoreline 2 fc x 150 f:. a�iccnat clearing :` necesury i Plan View FORM: SSGP 02-2017 3h.lwft Beta•, NO Ppn<u rrtan A It K 150h Ah— full po:d/ tAVL Page 3 of 4 La ke (At Full Pond/ Normal Water Level) I � L 0 C- Side View 3 ft. below full pond water level 10 ft. bank height Side View 4 ft. above full pond water level 2 ft. additional clearing 'if necessary FORM: SSGP 02-2017 Page 4 of 4 V binq .. A Mooresville, NC 705 Island Point Rd, Mount Holly, NC 28120 A Mooresville, NC 'I" 1 Head southeast on W McLelland Ave toward S Broad St 't 2 Keep straight onto NC-115 / W McLelland Ave 3. Turn right to stay on NC-115 / S Main St 4 Turn right onto Langtree Rd Take ramp left and follow signs for 1-77 South / US-21 South 5 s Minor Congestion 39 min, 26.7 miles Light traffic (6 min delay) Via 1-77 S, 1-485 S Unpaved roads 246 ft 82 ft 3.6 mi 1.1 mi 11.3 mi, 11 min 6 At exit 19B-A, take ramp right for 1-485 South toward Pineville 6.6 mi 7 At exit 16, take ramp right for NC-16 toward Newton 0.4 mi f 8. Turn right onto NC-16 N / Brookshire Blvd 3.0 mi 9• Turn left onto Horseshoe Bend Beach Rd, and then immediately turn left onto Nivens Cove Rd 0.5 mi j 10. Turn left onto Island View Rd 495 ft Turn left onto Island Point Rd 427 ft 11. . Unpaved Road Arrive at Island Point Rd 12. The last intersection is Island View Rd B 705 Island Point Rd, Mount Holly, NC 28120 These directions are subject to the Microsoi't a Service Agreement and are (or informational purposes only. No guarantee is made regarding their completeness or accuracy. Construction projects, traffic, or other events may cause actual conditions to differ from these results. Map and traffic data © 2020 HERE'. �...... .............. ... Notary County .A �=UHTY OF I, .....,�"?�.. , a Nota Public �n and for the Coun and State afore- said, do hereby certify that Carroll G. Wright V; personally appeared before me this day and acknowledged the due execution of the foregoing (or annexed) Fti, instrument. WITNESS my hand and Notarial Seal, this the day of ....�f �L .............. 196.. ... .... yak Notary Public My Commission Expires: y , ou A Wright Printed On: 1/17/2020 Disclaimer: The information provided is not to be considered as a Legal Document or Dec - The Map 8 Parcel Data is believed to be accurate, but Gaston County does not guarantee its accuracy. Values sh Wright Printed On: 1/17/2020 Disclaimer: The information provided is not to be considered as a Legal Document or Description. The Map It Parcel Data is believed to be accurate, but Gaston County does not guarantee its accuracy. Values shown are as of January 1, 2019. CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: County: Owner: —A 4- nt Contractor/agent: Print Signature The approval is for the purpose and design described in your application. impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCA 02H .0506 and 15A NCAC 02B .0243(8)] C Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 028 .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Aclrno wledgement of ivotifictation U Q� --__, hereby state that I have been informed of the Catawba Riparian Buffer ule. Any wok conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence willbe taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: 40 _442� — State oFburt ma 512 Nsatisbur,Strret : Enirenmentat Qualitt VVaer esources1611 S1ai[ScriceCenter ga1eig11NC37699-1611 ,119 i079000