Loading...
HomeMy WebLinkAbout820330_Inspection_20181227/51v- I --"-/r (Type of Visit: (D-Compliance Inspection O Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ;;?;,2 /r Arrival Time: Departure Time: / ,' j(,7 County: Farm Name: C%GC`f1, �..r I�Owner Email: Owner Name:, iiY.rj hz� Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Phone: Integrator: Region,./�l Certification Number: cSflJ�� Certification Number: Longitude: , Desrgu Current- Design Current _ Design Current Swne� Capacety�'op WetPoultry s=Capacity Pop Caitle Capacity'olr Wean to Finish Layer Dairy Cow Wean to Feeder �'` Non -La er Dairy Calf Feeder to Finish - - Dai Heifer Farrow to Wean Desagn ; Current: Dry Cow Farrow to Feeder I3ry Poulfr F. Ca achy Po Non -Dairy Farrow to Finish Layers Beef Stocker Gilts _ Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys = Otk�er, Turkey Poults Other Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes LJ No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Ej No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes E j No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued t Facility Number: ;O�- -_2, Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes EfNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): A Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [] N ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ❑ No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑'1io ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYPe(s) 13. Soil Type(s): //7- 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [jNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? [:]Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E:J-o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes Mo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [,i]' o ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the a propriate box below. es Ero ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [] No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [D No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - �S Date of Inspection: —/ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWN P? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 No NA ❑ NE 0__Ko_ ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ! No ❑ NA ❑ NE ❑ Yes LJ No ❑ NA ❑ NE ❑ Yes []-I�o ❑ NA ❑ NE ❑ Yes [-No ❑ NA ❑ NE ❑ Yes ICJ 1`'o ❑ Yes ErNo ❑ Yes Ejl�o ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE Phone: Date: 21412015