Loading...
HomeMy WebLinkAbout820049_Inspection_20181220(Type of Visit: (D'Compliance Inspection O Operation Review O Structure Evaluation 0 Technical Assistance I Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access pI Date of Visit: 11'-A�5—jz Arrival Time: ,' Departure Time: ; `fit County:Region:% Farm Name: Owner Name:��- Mailing Address: Physical Address: Owner Email: Phone: Facility Contact: �, %' - � dl) t_117, Title: , Phone: Integrator: , 7 ,;, J, Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Certification Number: 1.2 Certification Number: Longitude: Desigfl. Current Design Current' Des>Igu Current ~'Swine Capacity Pop WetiPoultry -:Capacity Pop.° Cattle Capacity Pojn ,..r ;., .. _.-:.:. Wean to Finish Layer Dairy Cow Wean to Feeder INon-Layer DairyCalf 5-4 Feeder611 to Finish L ©0 � = Dairy Heifer Farrow to Wean "Design. Current Dry Cow Farrow to Feeder DryePoultr t C a .pact , Pap on Farrow to Finish Layers Ar Beef Stocker rt` Gilts Non -Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other T urkey Poults .r= Other Other`' Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? ❑ Yes E No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑ NA ❑ NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Q No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Ej'fVo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: - / Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) E3- o ❑ NA ❑ NE ❑No ❑NA ❑NE Structure 6 ❑ Yes [3 1V 0❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes D-No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes []-No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 0-N-o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0-No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes L_I No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYPe(s)• cJ"�12� ! fir/-/J�'� ��✓ l'l �2 cc����'�i — �/�elur3 13. Soil Type(s):VV 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes EaNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Q-I�o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 0 Yes [ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes D No ❑ NA ❑ NE Reuuired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes D—No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Ea —No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes allo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0-go- ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [-To ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: jDate of Inspectiou: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes EKo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [] No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes EV N-OE] NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes E] No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? [:]Yes [i] No ❑ Yes En'N-o ❑ Yes dNo ❑ Yes [ No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes [l"No ❑ NA ❑ NE [:]Yes �No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE ���,—ri%ram �ou• lt��1d��r�iu- s� /;' in Reviewer/Inspector Name: Reviewer/Inspector Signatui Phone: 2z2 7�5,'�-s Date: 21412015 Page 3 of 3