Loading...
HomeMy WebLinkAboutWM0701223_Permit (Issuance)_20200303 March 3, 2020 Ms. Susan Rossi Jenkins Gas & Oil Company, Inc. 232 Craven Street New Bern, North Carolina 28560 SUBJECT: Well Construction Permit No. WM0701223 Two Offsite Monitoring Wells Jenkins Gas Company 205 South Breazeale Avenue Mt. Olive, Wayne County, North Carolina UST Incident No. 11834 Dear Ms. Rossi: In accordance with the application received March 2, 2020, we are forwarding herewith Well Construction Permit No. WM0701223, dated March 3, 2020, issued to Jenkins Gas & Oil Company, Inc. for the construction of two (2) monitoring wells offsite of the Jenkins Gas Company site at 205 South Breazeale Avenue, Mt. Olive, Wayne County, North Carolina (UST Incident No. 11834). One well will be located on property owned by the Mt. Olive Free Will Baptist Church (PIN:2572772223) and the other well will be located in the NCDOT right-of-way on the east side of Breazeale Avenue. This Permit will be effective from the date of its issuance until March 3, 2021 and shall be subject to the conditions and limitations as specified therein. If any parts, requirements, or limitations contained in this Permit are unacceptable to you, you have the right to an adjudicatory hearing before a hearing officer upon written demand to the Director within 30 days following receipt of this Permit, identifying the specified issues to be contended. Unless such demand is made, this Permit shall be final and binding. A Well Construction Record (GW-1) must be filled out by the driller and submitted to Division of Water Resources, Attn: Information Management, 1617 Mail Service Center, Raleigh, NC 27699-1617 within 30 days upon completion of the well construction. Ms. Susan Rossi March 3, 2020 Page 2 of 2 If additional information or clarification is required, please contact Randy Sipe at (252) 948-3849. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: Mt. Olive Free Will Baptist Church – 310 W. Williamston St., Mt. Olive, NC 28365-2044 Kevin G. Bowen, P.E. – NCDOT, PO Box 3165, Wilson, NC 27895-3165 Stephen L. Clark, P.G. - The Clark Group (electronic copy) WaRO UST (electronic copy) Laserfiche NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES – WATER QUALITY REGIONAL OPERATIONS SECTION PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Jenkins Gas & Oil Company, Inc. FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of two (2) monitoring wells owned by Jenkins Gas & Oil Company, Inc., 232 Craven Street, New Bern, North Carolina. The two (2) monitoring wells will be located offsite of the Jenkins Gas Company site at 205 South Breazeale Avenue, Mt. Olive, Wayne County, North Carolina (UST Incident No. 11834). One well will be located on property owned by the Mt. Olive Free Will Baptist Church (PIN:2572772223) and the other well will be located in the NCDOT right-of-way on the east side of Breazeale Avenue. This Permit is issued in accordance with the application received on March 2, 2020, and in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources’ Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued, or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources’ Information Processing Unit within 30 days of the well abandonment. 7. Wells constructed below grade shall be designed to prevent down-hole contamination caused by fluid build-up in the wellhead box. The wellhead shall be equipped with a water tight seal. Permit issued the 3rd day of March 2020 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION _______________________________________________ Robert Tankard, Assistant Regional Supervisor Division of Water Resources Water Quality Regional Operations Section Washington Regional Office By Authority of the Environmental Management Commission Permit No. # WM0701223