Loading...
HomeMy WebLinkAbout20200092 Ver 1_Revised Impact Table(s)_20200302of w a rFR o� qG Office Use Only: Corps action ID no. cm DWQ project no. Form Version 1.3 Dec 10 2008 TRAILWOOD APARTMENTS DWR Project No. 2020-0092.Versionl Table below to replace table in 15January2020 On-line PCN Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporary (T) Utility -Sanitary Sewer (dog house W1 ❑ P ®T manhole connection within Non -Tidal El Yes ®Corps 0.005 existing Freshwater Marsh ®No ®DWQ maintained easement) Utility -Sanitary W2 ®P ❑ T Sewer Bottomland ® Yes ® Corps 0.023 (Permanent -No Hardwood Forest ❑ No ® DWQ Permanent Loss) Utility -Sanitary W3 El P ®T Sewer (existing Non -Tidal El Yes ® Corps 0.038 maintained Freshwater Marsh ® No ® DWQ easement) W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 0.066 2h. Comments: