Loading...
HomeMy WebLinkAboutNCC200852_NOI Application_20200303Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/2/2020 2:04:14 PM (NCG01 NOI Submission) Approve by McCoy, Suzanne 3/3/2020 7:25:44 AM (Review- Construction NOI 22650) • The task was assigned to McCoy, Suzanne by round robin distribution 3/2/2020 2:04 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 4, 2020 5:00 PM 3/2/2020 2:04 PM Submit by McCoy, Suzanne 3/3/2020 7:29:22 AM (Payment Verification for NCC200852) * Duke Energy • McCoy, Suzanne assigned the task to McCoy, Suzanne 3/3/2020 7:28 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 14, 2020 5:00 PM 3/3/2020 7:25 AM d� # NORTH CAROLINA Ernvlronmental qualily A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Buck Station, Beneficial Ash Project - Plan Amendment 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 2. County* Rowan 3. Highway or Street 1555 Dukeville Road Address* Street name only is acceptable if no address nunber assigned yet 4. City or Township* Salisbury 5. State * NC 6. Zip Code* 28146 7. Latitude* Enter the latitude in decimal degrees 35.7018 8. Longitude * Enter the longitude in decimal degrees (MJST be negative) -80.3745 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/16/2020 Estir ated Construction Project Start Rate 10. Date to End* 09/30/2020 Estinated Construction Project End Cate 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Development 12. Acres to be 1.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 24.00 (acres) * 14. Post- 12.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-ROWAN-2020-Buck Station, Beneficial Ash Project - Plan Tracking ID Amendment Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Yadkin River Waterbody* Narreof waterbody into which stormwater runoff will discharge 15b. Waterbody 12-(108.5) Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Duke Energy Carolinas, LLC Name * If pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name* John If Corporation, enter Plegistered Agent First Barre 3. Last Name* Smith If Corporation, enter Faegistered Agent Last Wre 3b. Title Project Director 4. Permitee E-mail bobby.smith@duke-energy.com Address * 5. Permittee 704-382-4738 Telephone No.* 6. Permittee Mailing Street Address Address* 400 South Tryon Street Address Line 2 ST28U City State / Ftovince / Faegion Charlotte NC Fbstal / Zip Code Country 28202 US Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 400 South Tryon Street Address Line 2 ST28U City State / Ffovince / Fbgion Charlotte NC Fbstal / Zip Code Country 28202 US 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Elizabeth Contact - First Name * 2. Primary Site Glenn Contact - Last Name * 3. Title Sr Environmental Professional 4. Site Contact E- elizabeth.glenn@duke-energy.com mail Address* 5. Site Contact 980-373-0530 Telephone No. 6. Organization Name 7. Site Contact Street Address Mailing Address* 526 South Church Street Address Line 2 ECI - 013 City Charlotte Postal / Zip Code 28202 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 02/17/2020 Approved * 2. E&SC Plan Project ROWAN-2020-003 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan ROWAN 2020-003 Permit.pdf 122.84KB Approval letter or Mast beRDFformat Grading Permit Site Map (Optional) Helpful for linear project review Mast be R7Fform3t Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies for linear projects if necessary. 6. NOI Certification BuckSepticESC2020-003eNOl.pdf 43.38KB Form Mast be FDFformat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ofr�r j�y�1rGi Type Name * John R Smith Jr Title Project Director Organization Duke Energy Carolinas, LLC Date * 03/02/2020 F. Tracking and COC Info NOI Tracking No. 22650 NC Reference No. NCG01-2020-0852 Uses 'count number' variable (incremrented by SP) Certificate of NCC200852 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 852 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)