Loading...
HomeMy WebLinkAboutNCC200778_ESC Approval Submitted_20200303FLOY'COOPER Governor MICKAEL S. REGAN sari` BRIM WRENN fVOR:Tl�i 'CARQL[I*lf4. Envlranmentall=t�uotir February 22, 2020 LETTER OF APPROVAL Express_ Option Duke Energy Progress Attn: Thomas C. Williams Jr., Mngr. of Trans. Eng. Manager 410 Wilmington Street Raleigh, NC 27601 RE: Project Name: Erwin -Fayetteville East 230kV Update Project Acres Approved: 20.56 Project ID: CUMBE-2020-125 County: Cumberland, City: Eastover, Address: See Plans River Basin: Cape Fear Stream Classification: Other Submitted By: The John R. McAdams Co., Inc. Date Received by LQS: February 12, 2020 Plan Type: Express Dear Mr. Williams: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A NCAC 4B.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Aniiette.lucas@ncdenr.gov or Paul Clark at Pau l.clarkncdenr. ov. After you submit a complete and correctNOl Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Storinwatcr Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. North Carolina Department of Envl onmental Quality I. Divistowof Energy, MineraLand Landimsources, FayetteVtlle Pxglbnal Off Ce l 225 G►een Stt*et, $utte 7l4 l Eayettexllle, North Carolin'i28301 0ioA333300. Letter of Approval Duke Energy Progress February 22, 2020 This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. AIso, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NPDES NCGO 1 Fact Sheet cc: Mark Hamlet, The John R. McAdams Co., Inc. (electronic copy) David Steinmetz, Building Inspector (electronic copy) David Winstead, City of Fayetteville Permits (electronic copy) DEMLR - Fayetteville Regional Office File