HomeMy WebLinkAboutNCG520120_Compliance Evaluation Inspection_20200302ROY COOPER
Gov43'rror
MICHAEL S. REGAN
SrcrN-3ry
S. DANIEL SMITH
vhvc w
Ms. Keith Adams
Tarheel Sand & Stone Inc.
1108 Tuckda Way
Hamptonville, NC 27020
Dear Mr. Adams:
NORTH CAPOLINA
Emir+ronmemaf Qrsoltty
March 2, 2020
Subject: Compliance Inspection
Long Shoals Pit
NPDES Permit No. NCG520120
Lincoln County
Enclosed is a copy of the Compliance Evaluation Inspection conducted at the subject
facility on February 26, 2020, by Ori Tuvia. Your cooperation during the site visit was much
appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of
the enclosed report.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at
ori.tuviagncdenr. gov.
Sincerely,
cc: NPDES, MRO files (Laserfiche)
DocuSigned by:
X-o uw N Pam► for
F161 FB69A2D84A3...
W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Division of Water Resources
D-�3
State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations
Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
704 663 1699
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type
Inspector Fac Type
1 IN 1 2 15 I 3 I NCG520120 111 12 I 20/02/27 I17 18 I S i
19 i G i 201 I
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I
I II I I I I I f6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ----------------------
Reserved -------------------
67
1.0 70 IJ 71 [„ I 72 n 73 L_LJ74 751
u I I I I I I I80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES oermit Number)
09:35AM 20/02/27
17/07/28
Longshoals Pit
3240 Longshoals Rd
Exit Time/Date
Permit Expiration Date
Hamptonville INC 27020
10:10AM 20/02/27
20/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Jerry Keith Adams,1108 Tuckda Way Hamptonville NC
27020//336-468-4003/3362446840 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Operations & Maintenance 0 Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
DocuSigned by:
Ori A Tuvia DWR/MRO WQ/704-663-1699/
3/2/2020
BB057A2DE017498...
DocuSigned by:
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Num
Date
. H P+.Uft
[40
Andrew Pitner DWR/MRO WQ/704-663-1699 Ext.2180/
3. 2. 2020
F1611`969A21D84A3...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCG520120 I11 121 20/02/27 117 18 JCJ
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCG520120 Owner - Facility: Longshoals Pit
Inspection Date: 02/27/2020 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The site was permitted in July 2017, and was active for a few months in the beginning of
2018, before becoming inactive.
The permitee is in the process of either changing ownership (was instructed on how to
change ownership during the inspection) or rescind permit.
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ 0 ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: When active the dredging was done by dredge line pumping slurry of sand and water from
the river, sand is separated out and the wastewater pass through 2 settling ponds in series
prior to discharging back to the river. aA estimated volume of 65 GPM was estimated during
operation. Inspection confirms that the site appears not to have been in use for several
years.
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
❑
❑
0
❑
Are the receiving water free of foam other than trace amounts and other debris?
❑
❑
0
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: No discharge was observed at the time of the inspection.
Page# 3