Loading...
HomeMy WebLinkAboutNCG520120_Compliance Evaluation Inspection_20200302ROY COOPER Gov43'rror MICHAEL S. REGAN SrcrN-3ry S. DANIEL SMITH vhvc w Ms. Keith Adams Tarheel Sand & Stone Inc. 1108 Tuckda Way Hamptonville, NC 27020 Dear Mr. Adams: NORTH CAPOLINA Emir+ronmemaf Qrsoltty March 2, 2020 Subject: Compliance Inspection Long Shoals Pit NPDES Permit No. NCG520120 Lincoln County Enclosed is a copy of the Compliance Evaluation Inspection conducted at the subject facility on February 26, 2020, by Ori Tuvia. Your cooperation during the site visit was much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed report. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuviagncdenr. gov. Sincerely, cc: NPDES, MRO files (Laserfiche) DocuSigned by: X-o uw N Pam► for F161 FB69A2D84A3... W. Corey Basinger Regional Supervisor Mooresville Regional Office Division of Water Resources D-�3 State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 15 I 3 I NCG520120 111 12 I 20/02/27 I17 18 I S i 19 i G i 201 I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I f6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 1.0 70 IJ 71 [„ I 72 n 73 L_LJ74 751 u I I I I I I I80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 09:35AM 20/02/27 17/07/28 Longshoals Pit 3240 Longshoals Rd Exit Time/Date Permit Expiration Date Hamptonville INC 27020 10:10AM 20/02/27 20/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Jerry Keith Adams,1108 Tuckda Way Hamptonville NC 27020//336-468-4003/3362446840 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Operations & Maintenance 0 Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Ori A Tuvia DWR/MRO WQ/704-663-1699/ 3/2/2020 BB057A2DE017498... DocuSigned by: Signature of Management Q A Reviewer Agency/Office/Phone and Fax Num Date . H P+.Uft [40 Andrew Pitner DWR/MRO WQ/704-663-1699 Ext.2180/ 3. 2. 2020 F1611`969A21D84A3... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCG520120 I11 121 20/02/27 117 18 JCJ Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NCG520120 Owner - Facility: Longshoals Pit Inspection Date: 02/27/2020 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ 0 ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The site was permitted in July 2017, and was active for a few months in the beginning of 2018, before becoming inactive. The permitee is in the process of either changing ownership (was instructed on how to change ownership during the inspection) or rescind permit. Operations & Maintenance Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ 0 ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: When active the dredging was done by dredge line pumping slurry of sand and water from the river, sand is separated out and the wastewater pass through 2 settling ponds in series prior to discharging back to the river. aA estimated volume of 65 GPM was estimated during operation. Inspection confirms that the site appears not to have been in use for several years. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ 0 ❑ Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ 0 ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: No discharge was observed at the time of the inspection. Page# 3