Loading...
HomeMy WebLinkAbout20011664 Ver 1_Site Plan_2001110869 9~~ O o~ ~ d ~lf~ ~llA V ~1.A 1111 ~ VV VVS ll ll 1l.ell~L ^llA V 1S.e !r~'~~, _ Oq~ U Z } Q m CITY OF ALISBUR ryo ELY, N C. 2001 r o NOT Ri_~:_ , iii;3Y z U W D o o a O w z I~~~~I~c~°~I° ~~o ~~~~~l~Y c~ ~~ll~1Vll~1~ W ~][B~II~[II'II'lE~'II'S AI~III~ 1E1~~II1~]E]E]B~ 1~ A. Q 3 5510 A~tU1~YFOItI~ IltOAD IldA1L~IGh~11, 1`J. 27612 3 a ~ z '4J Q e 11,.9 y I N ~00% uuu~ 157501000 Z a cu Q n. ~ ~ ~ N TS E N RAL NE E G H ¢ ~ z W a = Z ~ J H ¢ O 3 Q z Q a W O U W r as 22. The construction corrider for all creek crossings are limited to Coordinate all work with the City, the Enginee , g , i. ~ Z ~ f Hi hwa s and a maximum of 40 feet wide. telephone & power utilities, Division a g Y Q ~ Q Z ~ O hers as re uired. Sites are subject to inspection far of q p ~ O z 23. Where the raw water main crosses streams and are to be encased in U ~ W ~ _ erosion control by N.C. Department of Natural Resources. concrete, the contractor shall temporarily divert H (0 H H H stream around area where concrete is to be installed, = w 2. Install raw water main on secondary roads according such that wet concrete does not contaminate stream. Where W ~ a Q Q a 'vision of Hi hway "Policies and Procedures for raw water main crosses large steams and full diversion is not to Di 9 Hi hwa Ri hts of Way". possible, the contractor shall make provisions to install Accomodating Utilities on g Y 9 concrete in sections temporarily diverting stream away T NTS N F CO 0 ALE TB ' ns not to disturb existing property from each section until concrete has cured. Return streams 3. Take proper precautio 'r ns to normal running channel and remove all diversion material DESCRIPTION pWG. N0. corners. If necessary to remove 6 reset property i o , as soon as posible after concrete has cured. Include this SHEET ° this work shall be done by a Registered Land Surveyor. w work in price bid for concrete. TITLE SHEET 157501000 Fences lama ed during construction must be replaced. Use ~ 4. 9 N VICINITY MAP 157501001 i GENERAL NOTES, TABLE OF CONTENTS, A D p ~ tem ovary fencing to prevent escape of livestock. P a 0 2-18 PLAN/PROFILE - 42" RAW WATER LINE (DIVISION A-l1 157501002 } Ri ht of wa shall be graded, shaped, seeded and mulched w 5. g Y ~ after construction 19 STANDARD CONSTRUCTION DETAILS i5750iDTi 20 STANDARD CONSTRUCTION DETAILS 157501DT2 G1aEE~s, p.q, ' h of wa shall be graded in a manner to avoid ponding of 6. Rig t Y water. ROSION CONTROL DETAILS 157501SE1 o " i 21 SEDIMENTATION AND E F z p~j U t=7 SEDIMENTATION ANO EROSION CONTROL DETAILS i57501SE2 W i ~ ~ s H 22 Y ~ ~ ~ xcavated wood and all rocks 6" and larger shall be disposed of 7. All e ~ r ctor. Bur will not be permitted on site. J~ "d3151`1~ ~d off site by cont a Y 9 8. Reseed and mulch all disturbed areas outside of pavement. 11111111111111//I eedin is to be done within 30 days of completion of backfill. S g 111 A ~ ~,.~~,.S~b Trees cut during construction wll be cut into firewood len hts and provided to the property owners. If the wood 9 • ° 07 •d ~ ~ ` J ~ ~ I,J.. is not useable for firewood, or if the land owner does not desire i a ~ e Z= i wood it shall be round into mulch on site or removed and ground the 9 ~ ~e~~ N ys~ into mulch off side. 611/ ///lll NII 9. carrel trees-shall have the scars trimmed and asphalt painted. S z 0 H ~ Where benching of raw water main easement is required, contractor 1..1.. a l0 W L.L H shall construct a berm at the top of the slope. w Z F-- M H H W 3 Q Z ntrol measures not shown on plans may w ii. Additional erosion co (n Z ° be required, if stabilization is not achieved within 1~ YADKIN RIPER ~ ( H Y specified time limits or if undue sedimentation occurs. RAN WATER PUNP STATION ~ J w J 0 0 0 _ _ ~ m cn Q a Q ~ o not tie new raw water main into existing lines until approved 12. 0 RAN HATER RESERVOIRS ~ r n VJ 3 H U w H by the Owner and Engineers. O w ~ _ > ll.. Q ~ Cr i3. Use and storage of explosives to conform to State, Federal, BEFORE YOU DIG a~ Q Cr ~ W and Local Laws. ~ I Z Lt5 ~ - E~ I 9 W~- i4. Plug open end of pipe at end of day. N Hsu I ~ s Cr W ~ ~ ~ CALL 1-800-632-4949 m i5. All fences crossed during construction shall be replaced Wlth N.C. ONE-CALL CENTER I H US N I y ~ fence of like material. Include in replacement, i2' or wider 6O1 0 ~ U I ~ O I e ate of like material at each fence. Cost of replacing 9 I ° fences and providing gates shall be included in unit price I 7 h ST. EXT. ~ 'd er linear foot of raw water main. b~ p X31! us I SPENCER 601 I 50 I 16. At all locations where a pipe must be installed inside a ditch I 1912 ~ H T AD or at a creek crossing to allow access, said pipe shall be ( NAWKINS TOWN / AVE. 21ZP I U7 ~ " 'amete i6' wide Z left in place. Pipe shall be no less than i8 di T H II I Z (n a unless otherwise determined by the engineers.- RAW Z W W4 N W I ~ ~ a= 0 ~ z o N I a o z L TR WA I 85 ~ U J H U u- Q lz ~ 7. Raw water service must be maintained during construction. i SZ ~ ,IPy 191 ~ ~ O W w ~ ~"az~ ept~ EAST O W z a 1 d EAR U' ~ a~s~ SPENCER m tti 5 F- w ~s 2u4 EE i8. Contractor shall verify location and depth of existing gas lines s~. ,a w E o storm drains, underground cables and water and sewer lines SALISBURY in the field. Notify engineers immediately of any conflicts. 0~' ~ o`~ 3 The General Statutes of North Carolina (G.S. 87-100) requires w tic, ~ H HO t that all persons excavating on public rights-of-way and spaces ~ ~ VTCTNTTY MA r ~p5 FERRV RD NTS s JAN 2000 notif ULOCO (i-800-632-4949) at least two days and not more than Y DATE, 5 102 l0 working days prior to such excavation. Locations of existing utilities as shown on these drawings are nto guaranteed. The TECHNICIAN: GMF v all the existin utilities located in the Contractor shall ha e 9 field prior to excavation. Any utilities ruptured or broken by CHECKED BY: DSS nstruction shall be repaired to the extent the contractor during co required by the utility owner at the cotractor's expense. ONS V SI I RE WETLANDS AREA REDUIREMENTS TREAM BANK STABILIZATION. N0. DATE PROPERTY LINE STRUCTURAL S R R h in or alon a ublic street or nd areas shall be seeded in small annual grains !9. In no case shall a trenc 9 p i. Wetla -s~----ss--ss- EX. SANITARY SEWER ~EIP EXISTING IRON PIPE TEMPORARY STREAM CROSSING horou hfare be left open overnight, on weekends, or other such as wheat, millet and rye and mulched. Perennials t g X. WATER LINE ~ ~ TELEPHONE BOX E SILT FENCE times when work is not on-going. such as fescue are prohibited in wetlands areas. o Ea ELECTRIC BOX _ir-_o-.---c- EX. NATURAL GAS Include in price of pipe. -ur-u - NDERGROUND TELEPHONE FIRE HYDRANT TEMPORARY SEDIMENT TRAP -ur u~ ur- EX . U A. 20. Only those trees in the construction easements that must The construction corrider for all creek crossings and construction EX. OVERHEAD UTILITY LINE ® CATCH BASIN OR DROP INLET -WB... WATER BAR SCALES 2 w absolutely be removed to accomodate construction shall in wetlands is limited to a maximum of 40 feet wide. EX. WATER VALVE -Tp-•- TEMPORARY DIVERSION DITCH m -r ® MANHOLE AS SHOWN ~ be removed. The contractor shall restrict removal of seme is 3. Each stream or wetland crossing shall be stabilized immedidiate y n to the maximum z trees in the construction ea ~ POWER POLE RIP-RAP 5 S0. YDS. CLASS B DO M ,..,.-r . _ _ . co extent possible. upon comletion. Xj IHtt z 6 Lp PROS. NU. ulv, g LIGHT POLE TEMPORARY FABRIC PROTECTION 1575 A-1 4. The finish elevation contours shall be the same as preconstruction 3 c ~ ow WATER METER CONSTRUCTION FOR DROP INLET ? ? 21. All blocking shall meet or exceed the dimensions shown on elevations contours. The top 6 to 12 inches of trench, shall be back filled with original soil. 10 TEMPORARY GRAVEL SHEET NO. ENTRANCE, EXIT 1 WOODS LINE ~ drawing 1575010Ti. a DRAWING NO. H Q U N 157501001 Z z Q COPYRIGHT @ 1999 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a a I I I I Q a ~ ~ n HRH TR T N E" ~ H W ~ Z SEE TIE-IN DETAIL THIS SHEET FOR TIE-IN DETAILS AT w e N = z ¢ ~ PROPOSED PtIETREATMENT FACILITIES. 3 H o CONTRACTOR SHALL COORDINATE TIE-IN WITH 1662 CONTRACTOR. z ~ a W Q U 2 W Z Z F- Q ~ Q - - ~ o- - ----------I ~ r--------- Z o ~Y~im r~~wr~ 42"x 90• RJ ELL I I UTILITIES W/RESTRAINED JOINT PIPE EA ~ ELL O ~ a z a OFFICE 10INT PIPE EACH 5IDE OF FITTING (n U W ~ _ I I NEW 42" DI RAW WATER 0 F- L7 RAW WATER LINE ~ ~ = w ~ I I ~ . + • W ~ a o D ! MG ELEVATED ~AANf Q, a ~ Q I t0 FEET FROM EDGE of PAVEMENT ( • I ~ PROPOSEDf • I • I • ~ ~ PRETREATMEN „ ~ \n .NEW 42 BFV W/MH w/MH _FACILITIES 8Y OTHERS BY DIY. A-1 I 42" X 36" RJ TEE ~ IJ TEE W s s s 6ro~c W/RESTRAINED JDINT PIPE EA 1DINT PIPE EACH WAY W p .~~~s t I NEN 42' X 90' RJ ELL N ~ s ~ ~ ~ ` • fLASyI MIX ~ C1P ~ s I RJ PIPE EACH WAY ~ ~ p~N ~D NEN 42' OI INV. 733.25' ~ ~ + + O NN42' DIP ~ ~O E I TRANS I (BY OTHERS) ; • PAD • I ~ I NEW 36 BFV w/MH w/MH II ~ • ~ F- II ~ 1 ~ ~ ~ .I W II W ~ • NOTE: I I I W I I ~ I CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL A80VEGROUND AND UNDERGROUND a II W M NEW 42' DI PIPE. RJ I ~ I I UTILITIES AND SHALL FIELD ADJUST THE WATER LINE AS REOUIREO TO AVOID CONFLICT e~s`~ •A• I I k II I ~ m I~ WITH EXISTING UTILITIES. Z ~ ~ W ~ ~r acv i ~ II ~ ~ F m o• VERIFY t0WT1GM I I I I ~ I II u~ ~ ~ r 6 ~ e ~ Ex. Js• 6r:V Wig TER TREA TMENT PLANT I a r~RIFr tOW ttDN I U ao ~6y ~~1SI`~~ I I ~ ~ ;I w I I I I Y ~~y y ~ II ~ • " I II • NOTE: I I ~ I II CONTRACTOR SHALL PROVIDE SEDIMENTATION AND EROSION CONTROL PROTECTION ++++~"~~uu'~~i II I I ~ I " II ~ ~ II I NEW 42 DI RAW WATEF ~ A S AT ALL CURB INLETS AND DROP INLETS. INCLUDE COST IN PRICE OF PIPE. ti """"'~d~''~ RAW WATER LINE . .~a ya~i I( i NEW 42' BFV w/HH ~ I II • ~ • II I ~ I ~ ~ ~ . r II ~ No,h; 'e ''2 e' N ~'"a NEW 36' BFV w/MH I I NEW 42'x 36' RJ TEE ( ~ j • I !A' AGp RJ PIPE EACH MAY ® ( - . i~,~ b d evo Q,,,~ © - INV, 733.25 I I I • I GP`~~~ • ~ i / 121 36'x 90' ELLS • uN++~~ ~ 1 + ~ N I~I I I ~ ~ ~ ~ 1 ~ / I ~ ~ . ~_EX.36'RAYYATERM4IN ICI • ' \ • ICI ~ . y - - - g I Ex, s~ s~ro4 lyl x Iai ~ ~ ~ ~ I ~ 1 • ACK ON THE T J ~ ~ ICI I I ~ . I SS • NEW 36" BFY w/MH ~ ~ _ _ _ • - - - - w - - - z I~,I I I ~ _ H I~I I'~I T T 3' Y REMOVING lil • I IE 0 EX. 6 8 I • I Yy - 3 a EX. 90' ELL AND INSTALLING ICI I I ~ I • C~ z s~ H NEN 36' TEE w/BLOCKING Iff I ( I R U N a I a ~ O H ~ J I- _ c~ _ _ W J I I EX. e• Wv. SErD4 a . r - ~ ~ ~ Q to I r - - J I ~ I ~ I ~r s~ ~ Q Q ~ . SILT FENCING 3 W H ~ 42"x 90• RJ ELL W 42 x 90 RJ ELL ~ IJ ELL NEW 42" DI RAW WATER LINE W/!OD LF RJ PIPE EACH SIDE DF FITTING 1 0.75 I'Jr aEnA1~tL W/100 LF RJ PIPE EACH SIC oc > LL = PIPE EACH SIDE OF FITTING ~ Q ~ SCALE: i"= 20' o ~ I I (I. O o r!c aE~ECC \ • • • ~ (n i W • I I 07 - W Z CE C~ N i. THE TIE-IN TO THE EXISITING 36" CIP FROM THE FLASH MIXER SHALL BE I I W H MAOE ON A WEEKEND AND BE ACCOMPLISHED WITHIN 8 HOURS. ~ r THE CONTRACTOR SHALL GIVE THE OWNER 72 HOURS NOTICE PRIOR TO U H TAKING THE RAW WATER MAIN OUT OF SERVICE. J STA 13+00.00 0 0 0 0 m z a o H N H a o 770 - 770 ~ ~ U p N O W O p O O 760 c 760 F- 750 DATE: DEC. 2000 750 TECHNICIAN: GMF CHECKED BY; DSS 740 740 R VISIONS E N0. DATE 730 730 720 720 SCALES Rio 710 PROJ. NO. DIV. 1575 A-1 SHEET NO. 2 DRAWING NO. 9+00 10+00 1100 1200 13+00 157501002 0+00 1+00 2+00 3+00 4+00 5+00 6+00 700 8+00 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS ANU tNb1NttHb. V.A. Z a cv Q a ~ N H w ° z w o N i = z ¢ ~ ~ H o z ° a W p U li Z Z F=- a ~ Q Z o `N, O Z / NQ U) v O~ W ~ _ H CD / Z~ i 9~ H ~ ~ U J W a ~r i c2 ad ' ~ 42"x 45' ELL w/BLOCKIN w/BLOCKING / 7 M • ~ 42 x 22-i/2 ELL w/BLO ELL w/BLOCKING NOTE: o . ' i 42 x 45 RJ ELL & ~ rar. ~ 42 x 22-i/2 RJ ELL v ~ fX. YAIERLIIE ' , O T CON RACTOR SHALL PROVIDE SEDIMENTATION AND EROSION CONTROL PROTECTION w/100 LF RESTRAINED JOINT PIPE ~ N AT ALL CURB INLETS AND DROP INLETS. INCLUDE COST IN PRICE OF PIPE. EITHER SIDE OF FITTINGS m ~ ~ SEi61 ' sr et to ~ I ~ ~ I ~ / ~ ~ G~aEERS, P.A ' ' 12" BLOW-OFF i . W ~ INSTALL @ LOW POINT i Aq1~ ~ , ~ i¢ ~ ~ n 1 ~ ~ Py , ~ ~ o ~ $ n ~i piY fN ~ / ~ Q i r ~ a ~ Ww ~ i~ , PA ~ ~ ~ am cn ~ / r~ ~ ~ i ~ ~ ~o D / ` ~ ~ ~ ~ bb ~~31SI9~ BERTY S 5 , ~ ` N LI ~ r "'r(IFp~ g t~J`' m - / 0 ~ ~a ~ 42"x 45' ELL w/BLOCKING a ~ o ~F / un~ ~ 0 ,~~~~p uq~~i r / 0 S ~~~i op ~ ti . ~ ~.,,6~ / / o ~ ~ / a sw s~ ~ ~ / ' ~b ' ~ ' / i ¢ afar ~ ~ = N a v '~i8 EX a FFNCE , ~ W ~ He PERM. EASEMENT / i / i ~ Z N / / ` i ~ s ~_,p°~ i i / ? ~ ~ ~ • ,~I~ eeaNe°e PQ~~~ ~ ~ i G. ~ ~ / ~ \ ~ ~ i / i / Q ~ ~ / / ' , M • , ~ / 42 x 22-i/2 ELL w/BLOCKING a a ~ ~ ~ ~ aqv ~ / ~ ~ ' W ~ ~ / 42 x 45 ELL w/BLOCKING ~ ~ \ Z M ~ / ~ H ~ W 0 ~ am 3 Q \ .J 30 PERM EASEMENT U) Z ~ / 10' TEMP. CONST. EASEMENT ~ / O H ~ J ~ ~ AUTOMATIC / NOTE; ~ 10" AIR R A TIC 10' TEMP. CONST. EASEMENT i ~ F' w J 0 ELE SE ALL PIPE 6 FITTINGS WITHIN NORFOLK-SOUTHERN R-O-W 30' PERM. EASEMENT R RELEASE VALVE I- ~ Q SHALL 8E RESTRAINED JOINT DUCTILE IRON PIPE / i ~ Q Q ~ (n (SEE AL50 "SPECIAL REQUIREMENTS` SECTION OF SPECIFICATIONS) , NEW 42" BFV w/MH 3 U rrr • H ~ ~ 42"x 90' ELL w/BLOCKING Q ~ 3 = / 12' AUTOMATIC AIR RELEASE VALVE > LL. a ~ 0 ~ ~ NOTE: W ~ O ~ 42 x 90 ELL w/BLOCKING W Z CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL A IN OF ALL ABOVEGROUND AND UNDERGROUND N UTILITIES AND SHALL FIELO AOJUST THE WATER LINE AS ~ :R LINE AS REQUIRED TO AVOID CONFLICT ~ WITH EXISTING UTILITIES. H U 760 760 0 0 m v 750 750 Z a o ~ H ~ F- a o H ~ U O ~ O 740 W + 740 ° m N Q H 730 730 DATE: DEC. 2000 720 720 TECHNICIAN: GMF CHECKED BY: DSS 710 REVISIONS 710 N0. DATE M N 700 N 700 SCALES 690 9 VERT.: i" = 10' PROJ. NO. DIV. 1575 A-i 680 680 SHEET NO. 4 DRAWING NO. 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37 37+00 38+00 39+00 40+00 41+00 42+00 43+00 .1575010041 COPYRIGHT @2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a cv Q a ~ N 42"x 90' ELL w 90' ELL w/BLOCKING H w ~ z W ~ H = z ¢ ~ 3 H o z o a r~ W p U W I O z = Q ~ Q 1 Z ~o N O Z Vl U ~ W ~ _ / ' F- C7 H H H = w W ~ a n a Q LL CITY CEMETERY ~ ~ ~ ~ i ODDS • ~ sr r? ~ ~ ~ ~ ssNH ~ ~a.c / 0 ~ ~ ssrx ~ . "~+cr aRf~ ~ 2-10 TEMP CONST. EASEMANTS ~ ~ O ss ~ / 7 /i a sew s~?al . to / / ~ ~ ~ ` ~ r4? s~ Ex. oaf sou / / ~ ss / G1aEtiPS, p.A ~ \ A ~ ~ / N o ti Z NEW 42 OI RAW WATER LINE ~ / ~ /~o , z ~w n a=. / / ~ w Z (F[ ~ Z ~ r ~ II7 G7 Q / ~ S ~ ~Q Q by ~'b31SI9~ 5~ \ ~1~ 5 ~ ss~ SSy11 \ ~o ~ ~4.T / / 30' PERM. EASEMENT ~ `,111111111111111 ~ 11 i A S 1i tiC~.N.»,a y i., ~ p ooh ..6 a~~ ; O ~ ° ~i i ti J ~..~e ~ WETLAND AREA CA a Z8~-_ STABILIZE CREEK BANKS 6 BOTTOM 684 5F (.016 AC.) w o ' "e w 250 SY CLASS B RIP-RAP i N / ~ N ~~8 °e ~ ~ ~ 42 x 22-i/2 ELL w/BLOCKING o°o e°° ~ ~ JIiY PRrIS CITY CEMETERY / ~ ~ ~ W £X. Ff11CE' ~ ~ ~ ~ ~ Z ~ ~ rrYY11 H W 3 Q ~ ~ y Z ~ ~ (2) 10' TEMP. CONST. EASEMENTS H EX. SAM. S~YFR ~ ~ J ~ 30 PERM. W J ~ O EASEMENT ~ ~ EX. iGTER L1AE Q ~ NEW 42 DI RAW WATER LINE Q Q tr ~ 3 U r9 H 9~ x0 ~ 0 ~ _ 0 ~ . 00 Q ~ p ~ ~ ~ ~ W (n ~ Z W WETLAND AREA CB ~ ~ R1 1617 5F (.037 AC.) NOTE: ~ H 1~ ~ U CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL ABOVEGROUND AND UNDERGROUND ~ NEW 42" BFV w/MH ~ UTILITIES AND SHALL FIELD ADJUST THE WATER LINE AS REQUIRED TO AVOID CONFLICT i WITH EXISTING UTILITIES. j 0 O PQ1f0 ~ o ~O , + ~k m •J ~ V P' 5~ a z ~ o cn H F- d i a ~ H a o U O cn + w m 725 ° ~ 725 a 715 715 DATE: DEC. 2000 TECHNICIAN: GMF 705 705 CHECKED BY: DSS NS V IO R IS E 695 695 N0. DATE 685 685 SCALES N HORIZ.: i" = 50' 675 C'7~ ~rroT ~ " - ~ n' U/J VLfll 1 lv PROJ. NO. DIV. 1575 A-i 665 SHEET NO. 665 DRAWING NO. 157501005 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS, P.A. Z a a Q a co ~ r, N A'nT~ H W ~ Z W Q H = Z ~ J WHERE THE WATER MAIN CROSSES OVER AN EXISITING SEWER MAIN AND THE VERTICAL 3 ~ NOTE: z ~ a CLEARANCE IS LESS THAN 18 , THE CONTRACTOR SHALL REPLACE THE SEWER PIPE WITH W o ~ CONTRACTOR SHALL PROVIDE SEDIMENTATION AND EROSION CONTROL PROTECTION ROUS PIPE AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE ~ ~ FER Z = AT ALL CURB INLETS AND DROP N T N T P I LE S. I CLUDE COS IN RICE OF PIPE. OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE a ~ Z o SHALL BE CENTERED AT THE POINT OF CROSSING. INCLUDE COST IN PRICE BID FOR PIPE. ~ ~ o z U ~ W ~ I N ~ H ~ ~ U J W a a ~ I a ~ ~ a: sAN. ~ NEW 42" DI RAW WATER LINE fX. YAIER L1NF FX, SAN. SE6ER ~ 42"x 45' ELL & ~ I Y~ I 42 x 22-i/2 ELL w/BLOCKING ~ p a O ¦ • Q STABILIZE AREA PA~~1~ , I I 42 x ii-i/4 ELL w/BLOCKING o~,~, ~ Q p w/50 SY CLASS A RIP RAP ~ I i STABILIZE BANKS & BOTTOM W/25 SY CLASS GRIP-RAP ~ ~ D - ----..a.. . 1 S ~ ~ srrw cn ce - - - _ _ _ - - T ~ti~,EEas, P.q ATj o SS o _ ~ ~ ss - ~ ~ W m a S. I _ _ r.-- ~ ~ - - - - - o ~ 0 U 'V JrS W Z q V hZ H ~ ~ • NN pf. S£IOR OiF / iRA1~1 PAIN MI o ~ ~ Q Q4 1 + ~ ~J ~ p / Yi f8' AL7+ ~ ~ i ~ Q: Oif S~YEN - - - - - - If7 bb ~'b31SI6~ / cu 5~ I 4 30 P RM A M NT i~~ I ~ ~ E E SE E ~ ~ - + ~IHM g t10 ~ / ~ ~ - _ ~ / o ~ ~ S r. ~ ~ 4 ti < ~ ~ I ~ 42 x ii-i/4 ELL w/BLOCKING i ` Mp I ar. sMr. s~ N (2) 10 TE CONST . EASEMENTS I :mot ~ \ _J Q 0~~r\A S ~~i ~ I I 1 ~ V e°° p L '0eo~ ~~i 1 ~ / e ~ b elO~~ m I I ' m ~ _ _ _ I CITY P/IRK / / ~ e I ~ / W p ~ tie • ~ ~ / i 'y °e ee 1 ~ ` ~ i y pQ.~` ~ / ~ ~~p` _ ~ 42"x 22-i/2' ELL w/BLOCKING ~~~n~unn~~~ V ~I ' STABILIZE CREEK BANKS & BOTTOM I w/90 SY CLASS BRIP-RAP 42"X 90e ELL w/BLOCKING Fx. suv, spa EX. SAN. St1Eq ~ W ~ ~ ~ ~ Z I-- ~~YY11 H W 3 Q Cn z NOTE: ' ~ O H CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL ABOVEGROUND AND UNDERGROUND ~ J UTILITIES AND SHALL FIELD ADJUST THE WATER LINE AS REDUIRED TO AVOID CONFLICT w J 0 WITH EXISTING UTILITIES. ~ Q a a 3 U H O 3 I = > L.Le Q ~ O ~ ~ 7 ~0 720 W _ ~ O - LU Z CU ~ H 710 710 700 700 0 0 m 690 z c 690 0 H N ~ O o. ~ ~ o U O ~ + W ~ 680 ° 680 a 670 670 DATE: OEC . 2000 TECHNICIAN: GMF 660 660 CHECKED BY. DSS V IONS R IS 650 " 650 N0. DATE 640 640 SCALES 630 HORIZ.: 1" = 50' 630 ~irnt i u i n ~ YCHI.: 1 = 1V PROJ. NO. DIV. 1575 A-1 6~0 SHEET NO. 620 6 DRAWING NO. + 7 00 7200 3+00 1575 67+00 68+00 69+00 70+00 71+ 010061 58+00 59+00 60+00: 61+00 62+00 63+00 64+00 65+00 66+00 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS, P.A. ' Z a N Q a ~ ~ n N U) H ¢ ° z w a i =z H ¢ o 3 z ~ a I tx. r~rar items r'7xt w O U I 45"X 90' E n . W 11 45 X 90 ELL w/BLOCKING ° z ~ I a ~ Z ~ o O ° o z I I ssMV I I U ~ II t I I 10' W ~ _ 10 TEMP. CONST. EASEMENT ~ ~ ° I I I ~w i~ i fl - - _ _ _ _z.~-...~,.-----r- ~ H H = W 10' PERM. EASEMENT W ~ a - - ss~+ ~ ~ a a I ~ ~ ~ ~ I PARK ROAD W. I~ 4 ~ 4 STABILIZE CREEK BANKS 6 BOTTOM ~ w/65 5Y CLASS GRIP-RAP ~ - c ~ ii I - - - - - ~ U a` \ \ \ s 42"x 45 ELL w/BLOCKING I - - \ star ~I ~ - n ~ S \ ~ \ ~ - - - ~ o I ~ ~ \ I t" - ' ~ c II ~ ~ \ \ I w \ \ - I Dt ~ A ` \ \ 49 \ I - - I \ . \ H ~ ~ NEW 42 BFV w/M ~ y 90 \ \ \ ` EEgS, p '40 \ ~S~ A •4 i ~ ~ i I ~ .S51N \ n i tar. s~v. sty ~ I A ~ W Z F I Z H i I Dr. as s o.~ ss I v ti~ \ r ~ ~ QQ \ ~ \ 66~y~~,'~~315I9~ VEGETATED BUFFER ~ I I i ~ ss \ \ "'r(b~ 9 DO NOT DISTURB ~ I 45'x 45' ELL w/BLOCKING i I ~ ~ 45'x 22-i/2' ELL w/BLOCKING t ss~r \ / \ / ,11111111111111/~ I I ~ 0~~ ~ A y~S~ ~~~i _ I 3 - I D \ P • _ - ~ I = \ ~ ~ ~°a~Q i \ do • 9 f,~ ~ J ~o~i N I r I -I rn . / ~ Qg Q z8~. v I 8 ~ ' - I a NOTE: \ N b P . PROTECTIO ~ ~ ~ G~~. + NTRACTOR SHALL PROVIDE SEDIMENTATION AND EROSION CONTROL PROTEC CO ~ ~ I \ TENVIS COURTS ~~/n?nullt~~~ OF PIPE. \ a \ / N ROP INLETS. INCLUDE COST IN PRICE OF PIPE. 4 L w BLOCKING I AT ALL CURB I LETS AND D 42 x 5 EL / I r~ o I 0 ~l- \ \ ~ ~ ~ \ ~ W i ~ ~ ~ CL ~ \ \ ~ Z ~ 30' PERM. EASEMENT ~ F-I ~ MM i W \ Q 3 \ (n Z ' ASEMENTS (2) 10 TEMP. CONSTR. E ~ \ ~ H O H ~ J A ~ ~ I-- w J qq O 'F o° I- CC Q 9 ~ ~ . NOTE: ~ \ ~ h' Q Q . ~ ti ~ ~ F \ x 3 U \ ~ ~ H WHERE THE WATER MAIN CROSSES OVER AN EXISITING SEWER MAIN AND THE VERTICAL m O ~ _ 3 CLEARANCE IS LESS THAN 18", THE CONTRACTOR SHALL REPLACE THE SEWER PIPE WITH \ > LL FERROUS PIPE AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE ~Q Q ~ ~O Cr ~ OF 10 FEET ON EACH SIDE OF THE POINT OF CR05SING. A SECTION OF WATER MAIN PIPE W a~ wlEll urn ~ _ (n O SHALL BE CENTERED AT THE POINT OF CROSSING. INCLUDE COST IN PRICE BID FOR PIPE. W Z N ~ Cr d' f- H S9I1 U NOTE: 0 CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL ABOVEGROUND AND UNDERGROUND UTILITIES ANO SHALL FIELD ADJUST THE WATER LINE AS REQUIRED TO AVOID CONFLICT WITH EXISTING UTILITIES. CATAWBA ROAD 0 0 m m a 695 Z ~ o cn H 695 I- O a ~ H Q O U O (!1 + w rn 685 ° 685 a 675 675 DATE: DEC. 2000 TECHNICIAN: GMF 665 665 CHECKED BY: DSS ONS I R VIS E 655 N0. DATE r 655 645 645 SCALES 635 HORIZ.: i" = 50' PROJ. NO. DIV. 1575 A-1 625 SHEET NO. 7 625 DRAWING NO. ez+oo as+oo ea+oo e5+00 es+oo e7+00 ee+oo 157501007 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 : COPYRIGHT @ 2000 - ALL RIGHTS RESERVED PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS, P.A. COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON & WHIIMAN AHLHIItUl� Anu cnninc-. 1- Z Q N Q a ~ ~ n N N H °C ~ z W Q = Z ~ J H Q O 3 Z Q a W ~ U W ~ Z I=- Q = Q Z ~o Q N p Z V rY~ W ~ _ u. F- C7 H = w w V Q 1 0. a i~ / , / ~ 9 / , ~ / / ~ / / , / ~ / / / , / / o / ~ o / ~ / / o o / ~ o / / / / / NEW 42" BFV w/MH / ~ / ~ Ex. ~ / ~ / ~ / , ~ / / , 1 D AOV Q~ PIPE BaLARUS „ • / / / ~ / / w 42 x ii-i/4 ELL w i/4 ELL w/BLOCKING / , GS~EEAS, pq / / / ~ „ _ NEW 42 DI RAW WATER LINE o _ ~ ~ ~ / ~ / / 0 ,~spuci me~c + W / , / ~ ~ ~ ~ ti ~ t~ ~ / m ~I ' / / , w 7 ~ ~ t~ U ti ~ i / / Y ~ V Q / ~ b ~y3 g3d ' . ~ ~ ~ 1SI a~ ~,i / ~I~ 9 t~' - ~ 1 g1~ ~ i / 1 , ~ ~ ~5A punun ~ ~ A4P ~P ~ A.u..e 5'6 ~i~ ,i ~ ~ ~ tie ~ ~ ~ G ~ 0 u. ~ ~ , ag a r, Z8 ~ ~ OR 1 , g. ~ ~ N 8 ~ ~ / - , s ~ , , ~J ~ 111 , 1 ~ ~ 1 ~ (2) 10' TEMP. CONST. EASEMENTS , , 7 ~ W 30' PERM. EASEMENT Z , F" MM H W / 3 ~ ~ Z ~ MOCKSVILLE RD. O H / CONSTRUCTION ENTRANCE ~ ~ . I- w J o ~ Q a a 3 U H O 3 = > LL Q C~ ~ ~ 690 w ~ O = w Z 690 N ~ H 680 U 680 ~o 6 ~ 670 a z ~ 660 0 ~ H ~ F- ~ a 660 H ~ ~ O U N m w 650 ° a 650 640 640 DATE: DEC. 2000 TECHNICIAN: GMF 630 630 CHECKED BY: DSS N 0 V R 620 N0. DATE 620 610 610 SCALES 600 cnn ~ I'YT11 vvv F- I F'HUJ. NU. uav. 1575 A-i 590 SHEET N0. 9 590 OPAWjNG NO. 1 10+00 111+00 112 +0o its+oo iia+oo 115+00 116 +oo 157501009 103+00 104+00 105+00f 106+00 107+00 106+00 109+00 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a a Q a coo ~ ~ N Ex. sr sw. SEYfR N W ~ Z W Oa H = Z ¢ J H O Z ~ Q W p U 42"x 45' ELL w BLOCKING ~ W Y Z Z F=- a ~ Q Z a W O ~ o Z YOADS Q U YODDS U ~ W ~ _ i- U' 1 Z H H H a a U J ~ ' W a ~ ~ STABILIZE CREEK 8ANK5 AND BOTTOM ~ Q. a Q I D I WITH !65 50. YDS. CLA55 II RIP-RAP ~ \ TOiOP I ~ Q1 \ + 12" BLOW-OFF 0 o - '0 o ~ m ~ (A Fa: PATER LJAE 0 n , DELINEATED WETLAND AREA (DA) ~ 450 SF (0.10 AC .1 NEW 42" RAW WATER LINE ° ~ O I1000S o I S ss~w ~ ~ NEW 20' ADDL. PERM. EASEMENT m I ° 0 ANTI-SEEPAGE COLLAR pA~ ~o • + ~ ~S~EEas' '°a `y A ~ " ~,0 ~ z N ^ a y. ~ I~I/^~ u w ~ m U H ~ V . _ ~l ~ . _ _ ~ EX. 16` YAIER 1J1~ I by ~''b31STS~ ~ ~ ~a ~ ~ 9 ~ NEW 50' PERM. A M NT ESEE EJr. as L1AE ~ ~uu~~ui11 M ~ p~~~ p ~h~i ~ - - _ " _ _ _ ~ ~ EXISTING 30 PERM. EASEMENT pL - - ~ I ~ ~ ~ ~~O - - 1 ~ ~0 OLD MOCKSV - - - ILLE ROAD • r ~ Q ~ ZO U'= 6 EXCU ~ y oe ~ o SR 1910 c b pP~• - - _ _ i G,~p 42"x 45' ELL w/BLOCKING ` - - a~~o AOI~R 1••~- -`t.-~~ a:RiY - W Z I-I ~ M W ~ Q Z NOTE: O H ~ J CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL ABOVEGROUND AND UNDERGROUND iROUND ~ W O UTILITIES AND SHALL FIELD ADJUST THE WATER LINE AS REQUIRED TO AVOID CONFLICT IFLICT I- ~ Q WITH EXISTING UTILITIES. d Q 3 U F-I O ~ _ Q ~o ~ ~ 685 6B5 W _ ~ o W Z N ~ ~ H 675 675 U 665 665 0 0 m 655 z a 655 0 ~ H ~ H O a ~ H ~ O U O U1 ~ 645 W ~ 645 ° a 635 635 ~x. DATE: DEC. 2000 625 „ 625 TECHNICIAN: GMF CHECKED BY: DSS 9 R VIS ONS E 615 " 615 N0. DATE 605 605 N SCALES 595 595 HORIZ.: 1" = 50' PROD. NO. DIV. 1575 A-1 585 585 SHEET NO. 10 DRAWING NO. 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 1254 125+00 ize+oo 127+00 ize+oo ins+oo 130+00 131+00 157501010 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS, P.A. Z Q N Q a coo N (A ~ O Z H w a = z ° ~ H ¢ O 3 o: Z ~ a 1 w ° U W W O Z H Q ~ Q Z Z O ~ O (0 ~ Z 0 §y p U lCl MY O W ~ _ p ~ F~ (0 + H ~ ~ = w W" a 'PERM. EASEMENT a Q NEW 30 O. a ETATED STREAM BUFFER VEG ~ ~ ~r/ , i / ~ / 1 ,i i ~ NEW 42" DI RAW WATER LINE O / ~ / ~ ~ ~ / o~ ~ ~ 42" gFV w/MANHOLE / ~ FP / / ~ / ~ / f0' TEMP. CON51. E5M'T. I 4 TEE w BLOCKING 42" TEE w/BLOCKING 2 / 11 - - ~ 11 ' ~ -11-- _ 1~EEas~ P,a N - - _._L - - o a D ~ o Z r 11 ~ rw w a~" _ ~ uw f m ~H T W bd ~~b~ 3d u e 11 1sI9 42 x i i-i/4 ELL w/BLOCKING n U s~ ~ ~ $ O ~ 11°3 HOUSE u~ • w O EXIST. 16' PATER LINE 0 11 ~~~~~u ~n~~,~, ~ STUB-OUT ASSEMBLIES (2) , • HOLE NEW 50 PERM. EASEMENT 42 BFV w/MAN air. ~amr ct~ ~ H ~ a 6°•e ~i 20 LF 42" DI PIPE NEW 20' ADD L. F~ERM. EASEMENT z 1? . Q " a Z8~-c 42" MJ PLUG ~ r u W ~ r ' THRUST COLLAR 0 0 4 i °e~y ' ~e8 ~ 1 i y e°e ~ o°e~ EXISTING 30' PERM. EASEMENT 1 I~,~(a e°eo Q',\~ n 6 p. Q 1 G,~~~ • 1 ~~~~Uu~nN~` ll of W PATER ~ ~ Z PIN'P STATIpV ~ m H ~x. u• itNi NOTE: Z CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL 'ION OF ALL ABOVEGROUND AND UNDERGROUND H O H UTILITIES AND SHALL FIELFJ ADJUST THE WATER LINE I INE AS REOUIREO TO AVOID CONFLICT (r J 1TER L • WITH EXISTING UTILITIES. J w o p~~ ~ ~ Q Ln Q Q NBC kSV I~~ E A • ~ U F-I 0 3 = Q Cr O ~ ~ 700 W ~ O - Z W 700 N ~t' H 0 69 690 680 0 0 680 c 670 z a o H N F- 0. 0 670 H r U p N O W + 660 ° m 660 a N _ 650 650 DATE: DEC. 2000 TECHNICIAN: GMF 640 CHECKED 8Y: DSS 640 NS SIO VI RE 630 N N0. DATE 630 620 620 SCALES 610 HORIZ.: i" = 50' PROJ. NO. DIV. 610 1575 A-1 600 SHEET NO. 11 600 DRAWING NO. 14 o+oo iai+oo iaz+oo 143+00 iaa+oo iae+oo 146+00 157501011 + 138+00 139+00 133+00 134+00 135+00 136+00 137 00 131+00 132+00 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z Q a Q a ~ ~ ~ N (A H Q ° z w a 2 z ° ~ H ¢ o 3 ~ z ~ a W ° U O Z 1=- Q = Q Z ~ O fX L~E'rE 9RlOGf to p Z U ~ r 15' PERMANENT EASEMENT W ~ 2 H C7 20' TEMP. CONST. EASEMENT ~ = W W ~ a sAn?. s~r~ a 0 _ 5TA . 156+50 ~~ss sSrN ~ NEW 4~" BFV W/MH ~ / _ - ~ NEW 42" DI RAW WATER LINE ~ 4~'x 22-i/2' ELL w/BLOCKING ~ ~ o - a - _ _ 0 c ~ 42 x 45 ELL w/BLOCKING 20 TEMP. CONSTR. ESM'T. ~ ~ y • - _ • • • i 1 _ c - - O • 15' PERMANENT E5M' T . ~ ` . • • • ~ 1~ i 1 ~ ~ o o r ~ N AREA ~ TREE PROTECTIO ~ ~ o 7 -~i ® DO NOT DISTURB a d ~ - _ ~ vasr-Ma?vrm s~t~raaPs s~r~raaPS ~ / ° . ~ ~ ~ rrrPtc~~ ~ - . 7 ~ ~ PR TECTION AREA ~ ` ~ TREE 0 l ;CTION AREA 15' TEMP, CONST. ESM'T. ~ ~ A M NT ` ~ Eas, a AB RED DOGWOODS 20' PERMANENT E SE E ~yy ~ , _ t, Gsati ,q ~ STA. 149+00 . ~ ~ 6r,Oi • • DO NDT DISTURB RED DO W + ~ _ ~ _ ~ 0 o T ~ • • o • ~ ~S Q ~ o ~G " POST-AGr,M1TF0 SpP1NYLEAS o - - - - - - - - - - - y S 42"x 22-i/2 ELL w/BLOCKING 6 ~ ~ fa: SAM. S~YfR ~ m- n a r w 7~. ¢ ti S r W ~ 44444 44 444444 U ~ ~ 4 f9 4~9 4 ~ ~ 66 - 42 x ii-i/4 ELL w/BLOCKING 4 4 4 44 4 ~iste~ i ~ 30' PERM, EASEMENT STABILIZE CREEK BANKS 6 BOTTDM ~jl~{ 9 I f0' TEMP. CONSTR. EASEMENT MITH 40 SY CLA55 B RIP RAP NEW 4~" DI RAW WATER LINE ~ ,,~~U~unuigri 0`~ ~ A,«., S ~~~i . ti ~ °a6~'. ~ 42"x 22-i/2' ELL w/BLOCKING NOTE: N 6o~o~,Ii ~ ~r~ OO1i BETWEEN STA. 149+00 ANO STA. 156+50: 8 Q ~ . z8 ~-C i. CONTRACTOR SHALL MAINTAIN 36" COVER °~,y 2. CONTRACTOR SHALL REPLACE ALL TOPSOIL REMOVED WITH LIKE TOPSOIL. X SITING SEWER MAIN AND THE VERTICAL ~r G~O~ WHERE THE WATER MAIN CROSSES OVER AN E I qh~ " H CONTRACTOR SHALL REPLACE THE SEWER PIPE WITH CLEARANCE IS LESS THAN 18 , T E FERROUS PIPE AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN PIPE N INCLUDE COST IN PRICE BID FOR PIPE. SHALL BE CENTERED AT THE POINT OF CROSSI G. W C~ ~ Z H MM F-I W a 3 U1 z O H NOTE: ~ J N ANO UNDERGROUND ~ ATION OF ALL ABOVEGROU D W J CONTRACTOR SHALL FIELD VERIFY THE LOC Q AND SHALL FIELD ADJUST THE WATER LINE AS REQUIRED TO AVOID CONFLICT E- ~ ITIES UTIL (n Q Q WITH EXISTING UTILITIES. ~ (n 3 U I-I 0 ~ f' I LJ.. Q C~ ~ 705 W ~ O = W Z 705 N H 695 695 685 0 685 ° a z ~ 675 o N H ~ ~ ~ 675 a H ~ ~ Q U ~ ~ W ~ 665 ° 665 a r r 655 655 DATE: DEC. 2000 TECHNICIAN: GMF 645 645 CHECKED BY; DSS N U R 635 N0. DATE 635 625 6~5 SCALES 615 HORIZ,: i" = 50' CAC 071:1 PflOJ. NO. DIV. 1575 A-1 605 SHEET NO. 12 605 DRAWING NO. 155+00 156+00 157+00 158+00 159+00 160+00 161+00 1157501012 146+00 147+00 148+00 149+00 150+00 151+00 152+00 153+00 154+00 IT COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a a Q a ~ ~ N I... H w ° z W ~ H = z Q ~ 3 H o z ° a W p U W Z Z H 1 7 Q ~ Q Z o N O Z U ~ W ~ _ n F- (7 ~ 3 ~ H H ~ U J pr, sew. s~ W a ~ VEGETATED .STREAM BUFFER 42"x - 4' a ~ ii i/ ELL w/BLOCKING 0. ~ a ~ 9 STABILIZE CREEK BANKS 6 BDTTDM L WITH 50 SY CLASS B RIP RAP m ~ 1 NEW 42" DI RAW WATER LINE ' r N RR O ~ _ _ S D S \ - n ~ s~+ ~ ~ ° - ~ RIVE w ~ o - POLO D „ \ \ \ ~ ~ _ ` \ ~ ~ ~ O ~EEAS, P \ \ \ ~ O A 4 NEW 30' PERM. EASEMENT \ . ~ a ° a i - I I ~ O ~ z ~ ~ AiY IJ S9M1 J C I ar. wt~ uN< ~ o ~ 1 I t m I { I ~ ~ , u - NEW 20' PERM. EASEMENT o e 20' TEMP. CONST. EASEMENT ''T , ~ I I D O ~ ~ 1 Fx. sew, s~ ,~~~puuu~~~~~ ~I 1 1 ~ Aeaee S ~~~~i a tie'°~ a,,6~ 4 ~ e e°~ P 6°00'1 i o ""d e • ' ~ti J ~'pv~o,: NOTE: I I g Q Wit,'„ z8~-~ EX. UM?CRD. PFT fFAIClM: W ~ ti8 CONTRACTOR SHALL PROVIDE SEDIMENTATION AND EROSION CONTROL PROTECTION i ~I r~e~~ ON 8 • AT ALL CURB INLETS AND DROP INLETS. ONCLUDE COST IN PRICE OF PIPE. ee veep -a d e° PP,,, I i ~~~~iinn~t~~~ W CL ~ Z NOTE: H ~ M W 3 Q J U7 z CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL ABOVEGROUND AND UNDERGROUND d H UTILITIES AND SHALL FIELD ADJUST THE WATER LINE AS REQUIRED TO AVOID CONFLICT ~ J WITH EXISTING UTILITIES. w J O C~ Q Q Q ~ U H 0 ~ _ Q ~ CC O 715 ~ ~ 715 W ~ O W Z N d' 705 H 705 U 695 695 0 0 co ti 685 z a 685 0 ~ H N F- ° a ~ a a U O N W 675 675 ° ~ a - cn r 665 665 DATE: DEC. 2000 655 655 TECHNICIAN: GMF M CHECKED BY. DSS M R V SION 645 645 N0. DATE 635 635 625 SCALES 625 HORIZ.: 1" = 50' vroT ~ _ ~ n PROJ. NO. DIV. 1575 A-1 615 615 SHEET NO. 13 DRAWING N0. 161+00 162+00 163+00 164+00 165+00 166+00 167+00 168+00 169+00 170+ COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. 170+00 ni+oo ire+oo 173+00 174+00 175+00 ns+oo 157501013 Z a a Q a coo ~ n ~ 00' 00+58I ' N (n b1S ~ 'bjS ~ o a H w a • = Z p J 10" AUTOMATIC AIR I H Q O 3 II I RELEASE VALVE ~ z ~ a W p U W I I Z Z F- I I a ~ EX. f8- wlpl LlAE Z O O N o z I II U ~ W ~ _ I 1 ~ I- (7 H ~ ~ = w 1 II I ' P RMANENT EASEMENT W U Ja NEW ADD L. 20 E a a to I I ~ I EXIST. 30' P£RXiUV£NT EASEMENT NEW 30' PERMANENT EASEMENT I II 1 ~ NEW 50' PERMANENT EASEMENT 42"x 90' ELL w/BLOCKING 20' TEMP. CONSTR. EASEMENT 1 II ST l4 1 ~ O - 42°~ 42"x 90' ELL w/BLOCKING I I ----------------J I I sn'Z TD TDB I - - - - - - - - - - - - - - - I Gt~EERS, P.Q ~ o ti ~G - - - • EX. ffMCE I 1 I z F n < z. Ear. Pa~rE Ww Q 'i T~ U ti Y l~ U QQ' Q ~ ~ by ~b31SI`~~ I i I ~IFI~ g t~'a WOiTQ PET fFMCII~ I I I ,,~~p1111U11/~~ NEW 30' PERMANENT EASEMENT eoN~ohd~ II I 20' TEMP. CONSTR. EASEMENT ~ o°~ P 6°°$~l ,~i ~Q mq~aO„~i 1 I I J ~o r ~Q Q ~S„zgLL.• • do VEGETATED BUFFER ~ o ~oe° DO NOT DISTURB i 42"x 11-i/4' ELL w/BLOCKING I 1 P o ~ ,,.•GP~,~ 1 u~~~~~ 1 II luau ~ I I II 1 1 II I I 1 I 1 1 Glace. IE1 FtMalNC ~ W ~ ~ I I I I Z F- rrYY11 STq. NW4"BFVwMH 17 E 2 / I--I W ~ d 6+00 •DO ~ ~ STERLING COU (n Z ERLING COURT O H ~ J W J ~ O ~ ~ ~ i 1 Q Q d ~ I n ~ ~ 3 ~ H O ~ ff'' _ ~ LJ~ Q ~ O ~ ~ W 740 740 p _ ~ W Z N Cr d' H 730 730 V 720 720 0 0 w m a z r 710 o N H 710 ~ ~ a H (r ~ U O + ? ~ 700 700 Q F- 690 690 GATE: DEC. 2000 TECHNICIAN: GMF 680 680 CHECKED BY: DSS V ONS R SI EI 670 670 N0. DATE 660 660 SCALES 650 650 , VERT.: 1 = 10 PROJ. NO. DIV. 1575 A-i 640 1640 SHEET NO. 4 DRAWING NO. 157501014 176+00 177+00 178+00 179+00 180+00 181+00 182+00 183+00 i84+00 185 185+00 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a a a n. co ~ ~ N H ~ ~ z w a = z ° ~ H ~ O 3 ~ z ~ a W O U U. Z Z H a ~ (r Z p ONO z (1) v W ~ _ F- U' H ~ ~ = w W ~ a (I Q, a Q i2" AUTOMATIC AIR NEW 42" BFV w/MH 12" BLOW-OFF NEW 4 I RAW WATER LINE RELEASE VALVE „ 2 D INSTALL @ LOW POINT 12 BLOW-OFF MOODS IN5TALL @ LOW POINT O STABILIZE CREEK 8ANK5 & BOTTOM W/20 SY CLASS 8 RIP RAP 0 ST/7 _ I O .N.~I ST f5 ST f6 D _ ___r...____..__----- - ' - TD TD ~ S TD ~ TD ' TD TD S O _ _ ~ ~~EEPS, p. q m - - - - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - cn T ' ~ sT ?e TD N ~ a ~i + ~ 0 z N ^ a z. 0 _ _ _ _ _ _ a W 2 a ~j /z ~ _ _ _ _r. _ _ _ ..rte, f" rl U Q' N ?o o - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 STABILIZE CREEK BANKS 6 BOTTOM mot, dy ~~b315~~ tir WITH 115 5Y CLA55 B RIP RAP I 5 ~yd I NEW 20' ADD L . PERM . EASEMENT °C f~ fX. 16 YATER L11~ * IIO~S ~ I ,`,~IIIIItlg1/~,I I NEW 50' PERM. EASEMENT ti eee ~ Po~d~ c~ P 6eeo~,~~ EXISTING 30' PERM. EASEMENT I = 8 a ~~Z8~-S I I I I I ~ ~ W • I ~ cv --08 e° I '.ti~;o a eeeee Q,,,. I ARN I I 6 I I ~ Gp.~~~ I I I ii~4 1,~0~ //1111111 I I W Z H ~ M W 3 Q Z O H ~ J F- w J 0 ~ ~ Q Q Q 3 U H O 3 = > LL Q ~ O ~ ~ 750 W 750 ~ O - Z W N d' H 74o U 740 730 0 730 0 0 0 z a 720 0 ~ H (n 720 a o H U O O ? 1I7 710 m 710 a U7 Tao 700 DATE: DEC. 2000 TECHNICIAN: GMF 690 690 CHECKED BY: OSS ONS V SI R I E 680 680 N0. DATE 670 670 SCALES 660 HORIZ.: i" = 50' ~Fn PROD. NO. DIV. 1575 A-1 650 SHEET NO. 650 15 DRAWING NO. 194+00 195+00 196+00 197+00 198+00 199+00 200+00 157501015 185+00 186+00 187+00 188+00 189+00 190+00 191+00 192+00 193+00 194+1 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 9 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a cv Q a ~ ~ n N Ul H w ~ z ~jJ Q N = Z J N ¢ O 3 z Q a W O U W Z Z H a ~ Z p O N o z U) U ~ W ~ _ F- C7 F,,,I ~ ~ U J W Q Q a NEW 42" OI RAW WATER LINE YES I MOODS ~ ¢ IQ ~ o w 1 ~ U W ~ a D ST 110 ~ - sr~i~ I . TD TD ~ TD ~ TD-~ TD o o TD ST 19 TDB TD-~ ~ AS ~ G1aEE P.q o TD + ~ . ~ 0 y v O o ~ - - N ~ i ay ~ n o r- O Q Y~ W V P ~ V F- ~ ~ ~ ~ EXISTING 16 PATER LINE I ° s,, ~e~ist~~ I 9 r~ I ~ ~ Q ~ NEW 20 A -NEW 20' ADD' P R EMENT I L. E M. EAS ~~~uu~u~~i~~ ~ ~ 0~~, A S~~~~i I P L °0°0~ ~i ~ ° ~ "-'b e~~ i " J mq J NEW 50' P -NEW 50 PERM. EASEMENT g a ~r z8~-t w o . ~e Ir00DS g~' ~~o ~ ~ . ,~~6 ° Q EXISTING -EXISTING 30 PERM. EASEMENT ~uu~u~ W ~ ~ Z NOTE: H ~ CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL ABOVEGROUND AND UNDERGROUND 3 Q CIS Z O H H UTILITIES AND SHALL FIELD ADJUST THE WATER LINE AS REQUIRED TO AVOID CONFLICT ~ J I- WITH EXISTING UTILITIES. W J O Lr Q Q Q 3 U H O 3 = > V.. Q ~ 785 O ~ ~ 785 W _ ~ O - W Z N c1 775 H 775 765 765 0 0 u~ 755 N 755 z Q o ~ H ~ F a 0 o= ~ U ~ N O 74 5 W + 745 ° o 0 N a 735 735 DATE: OEC. 2000 725 725 TECHNICIAN: GMF CHECKED BY: DSS 715 R EVISIONS 715 N0, OATE 705 705 695 SCALES nnr Ul111T7 I cn ~ 4~~ n~ntc.. 1 = ;ju VERT.: 1° = 10' PROJ. NO. DIV. 685 1575 A-1 685 SHEET NO. 16 200+00 201+00 202+00 203+00 204+00 205+00 DRAWING NO. 206+00 207+00 208+00 209+0( COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS, P.A. 209+00 210+00 211+00 212+00 213+00 214+00 215+00 115750101 - .r Z Q cu Q a. ~ ~ ~ N ~ H w ° z W p ~ = z ¢ ~ 3? H ° Z O a W p U lt. Z Z ~ Q ~ Q z o oNOZ U) v W ~ _ H H H I H S W W~ Q a a ~ MOODS I NEW 42" BFV w/MH NEW 42" DI RAW WATER LINE ?l~S 1 I i0" AUTOMATIC AIR i2" BLOW-OFF ~ RELEASE VALVE iNSra~~ @ pow PoiNT O I STABILIZE CREEK BANKS 6 BOTTOM p MITH 40 SY CLASS B RIP RAP p cn ~ g T S T ~xrsr, urn ~x, o D TD TD ¦ TD ¦ TD~ T O D N - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - N pA --STD TD TD T sr az Ut D • ~ 6 0 0 _ N ~ n ax' o - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - o~ u pP ~ ~ ar wro~ wuu~ wr 66 ~'~b~lSl`~~ YOOOS I "`rll~ g ~A`' YDODS ~ EX. !6• v~TER [IAE NEW 20' ADD' L . PERM . EASEMENT E £X. YAIER YK4E MI v000S I ,,`I~Illlllll/l/j!, ~ , \ ~OhSd,,~~I ti •A L ye~ NEW 50' PERM. EASEMENT Q' ti CO+~$~,% I J • ~o ~ 1 ~ Q ei~ Zg il. ~ i W • tit .i EXISTING 30 PERM. EASEMENT • ~~8 • yon i G,t~P !!l/unm?1~~ W ~ ~ Z H ~ 7^.s Q U1 z O H ~ J w J 0 ~ ~ Q on a a 3 U H O ~ II11 _ ~ LJ~ Q ~ 810 ~ Q ~ ~ 810 w ~ O ` w Z N ~1' 800 H 60o U 790 790 0 0 0 7B0 m N 760 Z O O H F- H a o H O ~ ~ ~ ~ W N 770 770 ~ Q 760 760 DATE; DEC. 2000 750 750 TECHNICIAN: GMF CHECKED BY: DSS REVIS N 740 IO S 740 N0. DATE 730 730 720 SCALES 720 HOAIZ.: i" = 50' PFOJ. NO. DIV. 1575 A-1 710 710 SHEET NO. 17 DRAWING N0. 215+00 216+00 217+00 218+00 219+00 220+00 221+00 222+00 223+00 224+1 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. zza+oo 225+00 226+00 227+00 22e+00 zze+oo 230+00 157501017 Z a N Q a N ~ ~ N F... N H w ° z W a0 H = z ¢ ~ ~ H o I z o a W p U <L I ~ H Z Z ~ a ~ Q z O ONO Z ~ I I m U ~ W ~ _ H p 0 v I H N O U J w a Q a Q REMOVE PLUG AND TIE TO ~ " I EXIST. 42 STUB-OUT _ _ II 42"x 45' ELL w/BLOCKING II II I q II ~ ~ NEW 42" RAW WATER LINE II D II ~ lD I • ~ II ~ N II W + ~ - I ~ - - - - - - - - - - - - - - - - - - - - - - - - - I p II - - - ti i p Ex. ~ a~u ~ti~EERS, P. A nqy . e N z ~ O1 U C7 u W f. ~ H - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I r ~ W V Q I q ~v ~ U 6b ~b31S193d N W P M . EASEM NT EX1sr. 16~ YArER LIME q ' E 20 ADD L. ER E q • ' I a IHM9~' ~ q N `,It1111111111/j~I NEW 50' PERM. EASEMENT q I 1 ~ A aeee `S ~~~i ti~ee"~ ••,6,~ EXISTING 30' PERM, EASEMENT (I)~Gl~eoO~i I J e de :Qg Q ~s?z8~-. i ti$ ~ o° iy~e ~ • ~j ° ~e°°e I e PPS. i G,~~~ ~l~illnul~l~~ W ~ ~ Z H ~ M W 3 Q (~l z O H H ~ J w J 0 ~ d Q d 3 U I-I O 3 f' = ~ LJ~ Q ~ ~ O 825 ~ ~ W _ ~ O - Z W ~ N d' F- H 815 U 805 Z H I W 795 H 0 H ~ a M O ~ O U + (n O 785 w m p N Q F- 775 DATE: DEC. 2000 765 TECHNICIAN: GMF CHECKED BY: DSS REVIS ON 755 N0. DATE 745 SCALES 735 VERT.: 1" = 10' PROJ. NO. DIV. 1575 A-1 725 SHEET NO, 8 DRAWING NO. 228+00 229+00 230+00 231+00 232+00 + 233+00 234 00 235+00 236+00 237+00 237+00 .1575010181 COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a a Q a coo ABOVEGROUND VENT TO BE USED FOR ~ ~ N OFF-ROAD LOCATIONS ONLY A O.D.PIPE A H W ° z uJ 0 H X BAR = Z Q ~ 3 ~ o PRECAST FLAT TOP M.H, z o a STANDARD M.H. FRAME 6 COVER ~ Z ~ I- ' Z a g C{ Q MH. RIM ELEV. 8" ' , ~ ~ w I I 12° DUCTILE " a Q N p Z + IRON PIPE ~ o (1) v u~ ANCHOR ~ = w i+ Q W U Q RING CLASS 52 D.I. FLANGED VENT a WELDED „ z MH STEPS WITH S.S. INSECT SCREEN I 3 MIN CLEAR a VENT SHALL BE THE SAME I J @ 12 O.C. a SIZE AS THE C.A.V. \ UNDISTURBED SOIL S.S. PIPE CLAMP I z 0 10 OR 12` COMBINATION WATER AIR I o VALVE AS REDUIRED ON THE PLANS - - - - - - O H I ° l0" OR 12" GATE VALVE w ROTATED 90' FOR CLARITY - - q CONCRETE COLLAR a q G~~EEFlS, p.A I 42"x12" RESTRAINED JOINT BY UNDISTURBED EARTH (TYP.) / ~ A FLANGE TEE WITH OR WITHOUT A I ° ~ o y Z 3 MIN CLEAR ~ Z „ & 10"X12" REDUCER AS REQUIRED. _ _ ~ 9 ~ w v w H m u ti PLAN V I W N DS P AN V W T ~ ~ W ~ h2 T <L S y U 7' DIA. PRECAST 6 ~ 6 ~~15I~~ M,H. RISER " ~11~1 9 42 WATER MAIN 18' MIN. - 10' AND LESS GRAVEL BEDDING 24' MIN. - 12" AND GREATER ++++111111i11f1/~~, i6" B" NTS ~ ~ S6~I~~ FILL TO TOP OF PIPE. MIN. N ti~~np~ ~ °00ee ~ ~~I 45' ° d$e O 8 J Grp urn,. - 8`~ a ~,r- Z8~-- m 2,0~~ - ANCHOR RING CONCRETE COLLER :o{ w o: N - U O ~ - N ~O 00 i~'o~0 0 N cn PIPE I.D. DIAMETER THICKNESS FILLET A B REBAR m WELD SIZE ~ G+++ (IN) (IN) (IN) ~ (IN) X /llul 12" MIN. ' ~ 14 19.50 0.75 0.25 i'-4" i'-4" #6 u u T SEC I N X P AN VATION PI B1 P L 6 3000 SI CONCRETE FOOTING ~N _ P i6 21.75 0.75 0.25 i'-4" i'-4" #5 UGS Cr BENDS 6 TEES 20 25.75 ~ _ ~ _ #5 LU 0.75 0.25 1 4 1 4 ~ Z W 24 30.25 0.75 0.25 1 4 1 6 #5 Q 3 T U) z 30 36.50 1.0 0.25 i'-4" i'-6" #5 E..a O H ~ J NTS 36 43.00 !.0 0.25 i'-B" i'-9" #5 w J 0 42 49.50 ~ ~ ~ (Y 1.25 0.25 - - #5 Q 1 8 1 9 Q Q 3 U H PIPE 90' BEND 45' BEND 22 i/2' BEND 11 i/4' BEND TEE PLUI PLUG SIZE A B A 8 A 8 A 6 A B C ~ ff'' _ ~ L1. B C D Q ~ O 4" 8' 12' 8' 8' 6' 6' 6" 6' 8' 9' !0' ~ !0 16 W 6" 10" 12' B` 10' 8" 8" 8' 8" 10" 10" i2` Y " ¦ r - • O 0 1z 16 W Z FILL ANNULAR SPACE CU 8" 15" 13" 10" 10" 8" 8" B` 8" !0' ]2' 12" z' 12' z4' Cr TRENCH 10' 16' f4' f0" 12' 6' f0` 6" 10' 11' i4' i4" W/BRICK & MORTAR 4' 14" z5" AT EACH END . H DEPTH i2' 20' i6' i2' 14' B' 12" 8" " 4" SPIDER SUPPORT - -----------------GROUND iz i is i6 6" 16` 30' U AND SPACER SURFACE 14" 22' i6" i4' 16' SO" 14" 10' 14" 16" 16" i6" COMPACTED B" 16" 34' BACKFILL COMPACTED is" 2s' 20" is' !B' i2" is' 12" is" i6' 20" 20' gp% BACKFILL M " " " " " ~ " 0" 20' 36" „ 20 50 24 3! 22 21 16 12 15 36 24 24 4" 24" 58' 1 112 90% 12' MIN. 24' 60" 2B" 38` 26` 25' 20' 14" 17" 36' 28' 28' B" 28' 70' N J I STONE TRENCH SEWER PIPE 30' so' 30" ' " " • " H SB" M N. BEDDING 44 26 28 20 18 !6 50 30 0" a DEPTH I 42" 84' 42` 63' 32' 40" 24" 24" 20" 70' 36' w 6" ~ SLOPE TO DRAIN z z DUCTILE IRON o 0 CARRIER PIPE ~ ~ a ~ DRAINAGE GRAVEL ~ ¢ STEEL ENCASEMENT PIPE 10 CF #5 STONE ~ N 18" NOTES: ELEVATION W z 0 0 U i. CONCRETE SHALL BE CLASS A 3000 PSI MIN. UNDISTURBED UNDISTURBED D SOIL SOIL ANTI-SEEPAGE COLLAR 2. NO CONCRETE SHALL COVER ANY BOLTS OR GLANDS. a NT a 0 ES. 3. WRAP ALL FITTINGS ANO ACCESSORIES WITH 10 MIL POLYETHYLENE NOTES :NE N i. CASING PIPE SHALL BE STEEL WITH PRIOR TO POURING BLOCKING. MIN. YIELD STRENGTH OF 35,000 PSI. SPIDER SUPPORT AND SPACER DATE: JAN. 2000 i. ANTI-SEEPAGE COLLARS SHALL BE PROVIDED ON 36" FORCE MAIN STA. 16+10, 16+90, AND 18+Op 4. SOIL BEARING STRENGTH 3000 LB. SO. FT P „ / @ 150 SI. ANO ON 60 OUTFALLAT STA. 55+00, 56+00 AND 57+00. 2. INSTALLATION OF CASING PIPE SHALL BE BY 2. ANTI-SEEPAGE COLLARS SHALL BE CONSTRUCTED OF A PRIMARILY CLAY MATERIAL DRY BORING & JACKING DRAWN BY: GMF CARRIER PIPE CHECKED BY: (PLASTICITY INDEX ANO LI~UIO LIMIT PLOTTING ABOVE "A-LINE" ON USCS PLASTICITY 3. INSTALLATION OF CASING AND CARRIER PIPE DSS CHART) WITH A MINIMUM OF 100% BY WEIGHT PASSING THE i/2" SIEVE AND A MINIMUM OF INSIDE RAILROAD RIGHTS-OF-WAY SHALL CONFORM - - - 50% BY WEIGHT PASSING THE NO. 200 SIEVE. TO A.R.E.A. SPECS. -PART 5- "PIPELINES". ~ REVISIONS F R TAN AR F _ TT N 3. ANTI SEEPAGE COLLAR MATERIAL SHALL BE COMPACTED TO A MINIMUM OF 95% OF THE 4. INSTALLATION OF CASING AND CARRIER PIPE NO. DATE STANDARD PROCTOR MAXIMUM DRY N NTS DE SITY AT A MOISTURE CONTENT NO LESS THAN 2% DRY INSIDE NCDOT RIGHTS-OF-WAY SHALL CONFORM ~ OF THE OPTIMUM COMPACTION MOISTURE CONTENT. TO NCDOT "POL AN PR STEEL ENCASEMENT PIPE ICIES D OCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS OF WAY". 4. ANTI-SEEPAGE COLLARS SHALL EXTEND TO THE BASE OF THE EXCAVATION THE FULL WIDTH SECTION OF THE EXCAVATION, A MINIMUM OF 18" INCHES ABOVE THE CROWN OF THE SEWER, AND A MINIMUM OF 12' ALONG THE LENGTH OF THE SEWER. 5. CONSTRUCTION SHALL BE MONITEREO BY OWNER. COLLARS SHALL 8E TESTED FOR DENSITY, GRAIN SIZE DISTRIBUTION, AND PLASTICITY INDEX BY OWNER. ANY COLLARS FAILING TO crni rc nc cunwni MEET.THE REQUIRED SPECIFICATIONS SHALL BE REMOVED AND REBUILT AT THE J1.lML.LJ MJ JI IJ111\ CONTRACTOR'S EXPENSE, PROJ. NO. DIV. 1575 A-i SHEET NO. ANTI-SEEPAGE COLLAR DETAIL 19 NTS STANDARD BOREENCASEMENT DRAWING NO. NTS 115750IDTI COPYRIGHT @ 2000 - ALL RIGHTS RESERVED - PEIRSON G WHITMAN ARCHITECTS AND ENGINEERS. P.A. Z a a Q a c`o ~ ~ N H Q ~ z w a "X"- #5 BARS = z ° ~ N ¢ o 3 Q z ~ a LONGITUDINAL W p U W Z Z F=- a ~ Q Z p (n p Z ~ PRECAST CONCRETE MANHOLE U) v RESTRAINED JOINT FLANGE ADAPTER - _ + _ _ N W ~ _ F- C7 \ _ a H ~ ~ = w PIP DIAMETER # W a SHEET & BRACE TRENCH E FLANGED BUTTERFLY VALVE ~ MANHOLE RING 6 COVER II a a Q AS RE~UIREO BY LESS THAN 14 12 c~ a a 14" TO 36" 18" 2-#4 TIES @ 12" EXIST. SOIL CONDITIONS I MORE THAN 36" 24" BACKFILL IN 6" LAYERS # PIPE # LAP 10" O N W \ Ul Q & COMPACT TO 95X STANDARD MAX. DIA. MAX. ~ ~ "D"- WATER OR DENSITY AS DETERMINED BY PIPE LINE ~ RUBBER COATED CAST IRON ~ MANHOLE STEPS @ i2" O.C. SEWER PIPE AASHTO TEST METHOD T-99 ~ ~ a o - SEE NOTE i ~ ~ ~ w ~ ~ ~ ~ A A ~ /2 /2 ~a o ~d a a ti ?.so A SEE NOTE 2 'o ` ~P`` 'o ` Asa' SEE NOTE 3 O d~ a e~ a d y a aEEas, a ~aGl 4 NOTES ~o i ^ i i. SHAPE BOTTOM OF TRENCH TO FIT BOTTOM QUARTER ON SIDES OF AND BENEATH PIPE. ~ ww ~ m z~ I FOR SEWER PIPE BED BOTTOM QUARTER ON SIDES OF AND BENEATH PIPE WITH #467 ~ " e ~ y~b~ FLANGED COUPLING ADAPTER _ _ - SITUATE MANHOLE RING AND COVER N M NA C N R T LONGITUDINAL O I L O C E E STONE. EXCAVATE UNDER EACH BELL SUFFICIENTLY TO PREVENT ANY LOAD ON .BELL. dN~b3~sr3~ - - OVER VALVE OPERATING NUT A5 DIAMETER ENCASEMENT STEEL s~ ~u~s~ 2. FOR TRENCH DEPTHS UP TO f6 WHERE ROCK OR NON-CUSHIONING MATERIAL IS DIRECTED BY ENGINEERS AND OWNER "D" "A" "X" ENCOUNTERED IN TRENCH BOTTOM, A CUSHION AT LEAST 8" THICK OF #67 STONE 6" 20" @ B" FOR SEWER LINES OR #5 STONE FOR WATER LINES SHALL BE PLACED BETWEEN ++++~~~~~~~~l~~~i, THE ROCK AND THE BOTTOM OF THE PIPE. SEE SPECIFICATIONS FOR TRENCH ti.~~ •~63 °°°°a P ~ 8" 24" @ 8" DEPTHS GREATER THAN i6 ° o ? o,; 12" 36" @ 12" WHERE UNSTABLE SOIL IS ENCOUNTERED EXCAVATE THE SOIL AS J v a ~°u-% 3 . ~ Qg Q r, z8 RED D SIZE DI PIPE DIRECTED BY THE ENGINEER ANO BACKFILL WITH AT LEAST 8" OF "s W o N ~o 24" 48" @ 12" #467 STONE. THE BACKFILL SHALL BE COMPACTED AND SHAPED TO ti°° 30" 54" @ l2" FORM A BED FOR THE PIPE. 'i «°a PP0 i, z ~~n~~iuu++++ ° 36" 60" @ i2" Q n a " TR N H EDDING ~ BACKFILL D TAIL EC B E ~ NOTES 42 66 @ i2 H NTS w i. MANHOLE COVER SHALL BE BOLTED H W ~ TO MANHOLE RING WITH SALISBURY'S z LL Z ~Y~1 o PATTERNED LOCKING BOLT HEADS. H ~ W H 3 Q Z Y BFV SIZE "A" "8" o NTS NOTE: ALL WATER LINES SHALL BE INSTALLED FOR LAYING CONDITION TYPE 3, MINIMUM H O (IN (IN.) FT. O H ~ J I- 0 14 30.5 5 w J O w i6 25.75 5 H ~ Cr Q w 18 36 6 Q a 20 34.0 6 3 U H 24 42 7 3 Z 30 42 7 > LL Q E... 36 48 8 ~ ~ " 11 42 48 8 2 MIN. BITUMINOUS 8 COMPACTED ABC COARSE W ~ O _ NOTES PLANT MIX (I-2) AGGREGATE - W Z CU CC d' 1. DO NOT SUPPORT VALVE BOX DIRECTLY ON VALVE. EXISTING PAVING 2. COAT TIE RODS AND NUTS WITH COAL TAR EPOXY. CUT PAVING HERE 3. ALL 12" PIPE SHALL BE CLASS 350 DIP, MJ. FOR TRENCH 4. RESTRAINED JOINTS SHALL BE FAST-GRIP BY AMERICAN, N, MANHOLE RING & COVER FIELD-LOK BY US PIPE OR APPROVED EQUAL. ? GROUT(TYP.) SALISBURY STANDARD 5. ALL MJ FITTINGS SHALL USE TIE BOOS OR RESTRAINED p ~ o PRECAST FLAT TOP JOINT RETAINER GLANDS. " ~ z ~ MANHOLE COVERS SHALL READ 12 x 4, RE-CUT PAVING HERE ~ - 12"x 45' ELl (FLANGED) PIPE DIAMETER # ~ 3 H-20 LOAD RATING "WATER VALVE" " " " " FOR REPAVING W LESS THAN 14 f2 ? a MANHOLE 12 x 90 ELLS (FLANGED) 14" TO 36" 16" ~ " z o NOP i- NON-FERROUS f -0 # PIPE # f -0 0 MORE THAN 36 24 z H N IN; INSECT ANO MAX. DIA. MAX. ° = RO[ RODENT SCREEN u ~ / - MA) w v MAX. f/4 MESH ~ ~ ~ N BACKFILL WITH LOW ~ ~ ? z a 18" x 6"CONC. PAD AROUND BOX o w ~ T ~ ~ CONCRE ONCRETE PAD 5' X 5'X f' ORGANIC MATERIAL o ~ C ~ PLACE i PLACE 10 SY CLASS B RIP RAP ? MANHOLE STEPS @ 12 O.C. m o Z ~ AROUND AROUND CONC. PAD 6 DITCH - - a ~ H B 0 z ~ ~ 3 a W f2" ? > w TELESCOPIC I A ~ VALVE BOX w ~ 6X6X00 > ~ " WELDED WIRE DATE; DEC. 2000 ° H 2-3/4" TIE 3/4 TIE RODS z „ " H i. NEW PAVEMENT SHALL HAVE 8" COMPACTED ABC COARSE AGGREGATE AND 2" TECHNICIAN: GMF B OIA. MONOLITHIC BASE a ~ I ~ 7 CU 7 CU. FT. TOPPING OR MATCH EXISTING CONSTRUCTION, WHICHEVER IS GREATER. 6" MIN. MANHOLE CRUST -1 CRUSHED CHECKED BY; DSS STONI STONE 2. TRENCH IS TO BE BACKFILLED IN 6" LAYERS AND COMPACTED TO 95X STANDARD DENSITY AS DETERMINED BY AASHTO TEST METHOD T-99 BEFORE PAVEMENT ~/9 ~ o REVISION REPAIRS ARE MADE. r P ~ / _ - oo Nor e . - 00 NOT BLOCK L. ~ DRAIN HC RA N HOLE N0. DATE 0 I 3. COMPACTION TEST REQUIRED AT REQUEST OF INSPECTOR. B" MIN. 12' RS GATE VALVE POURED IN PI OUREO IN PLACE 4. ALL PAVED STREETS AND SECONDARY ROADS WHICH ARE OPEN CUT TO INSTALL „ CONC. BLOCK ONC. BLOCK 2-3/4 TIE RODS 8 MIN. WATER PIPE MUST BE REPAIRED ACCORDING TO THIS DETAIL. GROUT UNDER PIPE BOTH SIDES OF PIPE (TYP.) #67 STONE NOTE: w m DO NOT GROUT UNDER VALVE. " ~ 12 WELDED ON TANGENTIAL RJ OR MJ OUTLET SCALES z ON 24" DIP Z STREET REPAIR DETAIL 3 a PROJ. NO. DIV. 0 NTS 1575 A-i BUTTERFLY VALVE & MANHOLE SHEET NO. 12 BLOW-OFF ASSEMBLY v NTS 20 ~ NTS DRAWING N0. z a 157501DT f n 0 w U) D Q 0 } w cc 7) in z 0 H Q U H U- H z w a H Y 0 0 in 0 J w H LL 6 Z H 3 Q (r 0 Lo H Lu Q w cc u 0 3 w H LEGEND: ® RIP RAP ON CREEK ENBANKMENTS JM JUTE MATTING -•-+- SILT FENCE a z W z Z -►- STONE CHECK DAM C) SEDIMENT BASIN also OUTLET STABILIZATION Cz DIVERSION DITCH 0 TEMPORARY STREAM CROSSING RR RIP -RAP 5 SQ. YDS. CLASS B MORE OR LESS AS REQUIRED BY ENGINEER RD TEMPORARY SEDIMENT TRAP I TEMPORARY GRAVEL CONSTRUCTION FP TEMPORARY FABRIC PROTECTION O ENTRANCE/EXIT o FOR DROP INLETS - STRUCTURAL STREAM BANK STABILIZATION iTD— TEMPORARY DIVERSION DITCH SEDIMENTATION & EROSION CONTROL NOTES: i. IN ADDITION TO ALL OTHER SEDIMENTATION AND EROSION CONTROL MEASURES SPECIFIED THE CONTRACTOR SHALL COMPLY WITH ANY ADDITIONAL MEASURES DEEMED NECESSARY BY THE INSPECTOR PRIOR TO AND/OR DURING THE COURSE OF CONSTRUCTION. 2. EROSION CONTROL MEASURES AS INDICATED ON PLANS OR IN THE SPECIFICATIONS SHALL BE INSTALLED PRIOR TO DISTURBING ANY SOIL. CONTRACTOR SHALL MAINTAIN ALL SEDIMENT CONTROL DEVICES AND SHALL REMOVE SEDIMENT FROM FENCES AS REQUIRED BY THE INSPECTOR. ANY COLLECTED SEDIMENT LEFT AT THE END OF THE JOB SHALL BE REMOVED. 3. CONTRACTOR SHALL SEED 6 MULCH WITHIN 5 DAYS OF INITIAL DISTURBANCE AND IN NO CASE SHALL OVER 500 FEET BE LEFT UNSEEDED AND UNMULCHED AT ANY ONE TIME. 4. SEDIMENT FENCES SHALL BE REMOVED FROM THE SITE WHEN GRASSING IS ACCEPTED AND STABILIZATION IS COMPLETE. 5. ANY EXCAVATED MATERIAL WHICH IS NOT USED FOR FILL SHALL BE REMOVED FROM THE SITE UNLESS OTHERWISE DIRECTED BY THE OWNER OR ENGINEER. 6. CONTRACTOR SHALL MAINTAIN ALL STREETSIDE DRAINAGE SWALES AND DITCHES. ALL DISTURBED VEGETATION IN LAWNS SHALL BE REPLACED IN KIND AND ALL DITCHES AND DRAINAGE STRUCTURES MAINTAINED FREE FROM SEDIMENT. 7. WHEN A LINE IS TO BE INSTALLED ALONG A SHOULDER WITH A SLOPE FROM THE ROAD, DIRT (FILL) REMOVED FROM THE CUT SHALL BE STOCKPILED ON THE PAVEMENT SIDE OF THE CUT. THE CONTRACTOR SHALL REMOVE ALL WASTE MATERIAL FROM THE SITE PER THE JOB SPECIFICATIONS. B. WHEN INSTALLING RIP RAP ON DISTURBED STREAM BANKS, CONTRACTOR SHALL PLAN WORK IN SUCH MANNER THAN STOCKPILES OF EARTH ARE NOT SUBJECT TO WASHING INTO STREAM OR DRAINAGE AREA. 9. CONSTRACTOR SHALL INSTALL SILT FENCES OR OTHER SEDIMENT COLLECTION STRUCTURES IN STREETSIDE DITCHES WHEN SO DIRECTED BY THE ENGINEERS, EVEN THOUGH NOT SHOWN ON THE CONTRACT DRAWINGS, WHEN. IN THE OPINION OF THE ENGINEERS. SUFFICIENT CARE IS NOT BEING TAKEN BY THE CONTRACTOR TO PREVENT ENTRANCE OF SEDIMENT INTO DITCHES. SAID STRUCTURES SHALL BE INSTALLED AT THE CONTRACTOR'S EXPENSE, AT NO ADDITIONAL COST TO THE OWNER. 10. ALL COSTS ASSOCIATED WITH INSTALLATION, MAINTENANCE, AND REMOVAL OF TEMPORARY STREAM CROSSINGS AND STRUCTURAL STREAM BOTTOM STABILIZATION SHALL BE INCLUDED IN UNIT PRICE BID FOR THOSE ITEMS. RIP RAP SHALL BE PAID BASED ON UNIT PRICE IN PROPOSAL. li. WHERE SEWERS ARE TO BE INSTALLED IN THE CENTERS OF EXISTING ROADWAYS. ALL TRENCHES SHALL BE FILLED AT THE CLOSE OF EACH WORK DAY AND WHEN RAIN IS IMMINENT. AT NO TIME SHALL TRENCHES BE LEFT OPEN OVERNIGHT, OVER WEEKENDS, OR DURING INCLEMENT WEATHER. OPEN END OF PIPE SHALL BE PLUGGED BEFORE CLOSING TRENCH. CONSTRUCTION SEQUENCE 1. UPON CONSTRUCTION AREA ACCESS, STABILIZE ALL BARE AREAS IMMEDIATELY WITH GRAVEL AND TEMPORARY VEGETATION. 2. AFTER CONSTRUCTION SITE IS ACCESSED, INSTALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES NECESSARY. INCORPORATE INTERIM MEASURES AS DIRECTED BY THE ENGINEER AND AS REQUIRED BY THE PLANS TO MINIMIZE SEDIMENTATION AND EROSION AS CONSTRUCTION PROGRESSES. 3. APPLY TEMPORARY OR PERMANENT STABILZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE WORK IS DELAYED OR COMPLETE. L 4 AT GRADING COMPLETION, STABILIZE ALL GROUND COVER, INCLUDING BORROW AND SPOIL AREAS, AND INSTALL PERMANENT SEDIMENTATION AND z EROSION CONTROL STRUCTURES SUCH AS CONCRETE LINE DITCHES, ETC. 0 z H 5, REMOVE AND STABILIZE ALL TEMPORARY CONTROL MEASURES SUCH AS Cl o DIVERSION DITCHES, SEDIMENT TRAPS AND SILT FENCES. a u 6. MAINTAIN GROUND COVER AND OTHER MEASURES AND RESEED AS REQUIRED Cn TO ENSURE PERMANENT SEDIMENTATION AND EROSION CONTROL. z Q COPYRIGHT @ 1984 - ALL RIGHTS RESERVED - PEIRSON & WHITMAN, INC. T 1.5' MAX. 2'X4" WOODEN FRAME FIN. G GATHER EXCESS 2" X 4" X 5' HARDWOOD OR 2" (MIN.) X 5'-0" METAL STAKE DRIVEN 2'-0" INTO GROUND. MAXIMUM SPACING OF STAKES - 6'-0" O.C. WRAP TOP END OF FABRIC AROUND SLAT AND STAPLE SECURELY. SECURE ENDS OF SLATS TO STAKES. SECURE FABRIC TO STAKES AND WIRE MESH WITH STAPLES OR HEAVY WIRE AND MAINTAIN. STANDARD STRENGTH SYNTHETIC FABRIC. MINIMUM 2'-0" OF FABRIC ABOVE GROUND. BACK WITH "HOG" WIRE OR OTHER APPROVED WIRE MESH. BURY TOE OF FABRIC IN GROUND A MINIMUM OF B". MAINTAIN 8" DEEP DITCH 2'-0" IN FRONT OF FENCE. i�-- DIRECTION OF RUNOFF FLOW I ( NOTE: SEDIMENT IS TO BE REMOVED FROM DITCH AND FENCE REPAIRED AFTER EACH RAINFALL. I I 1 I I I I I I I V TIC FABRIC CONSTRUCTION SPECIFICATIONS: 1. AS SYNTHETIC FABRIC, USE A PERVIOUS SHEET OF NYLON, POLYESTER, OR ETHYLENE YARN --EXTRA STRENGTH(501b./i" MINIMUM) --THAT CONTAINS ULTRAVIOLET RAY INHIBITORS AND STABILIZERS. FABRIC SHOULD BE SUFFICIENTLY POROUS TO PROVIDE ADEQUATE DRAINAGE OF THE TEMPORARY SEDIMENT POOL. 2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. 3. FOR STAKES, USE 2"X4" WOOD (PREFERRED) OR EQUIVALENT METAL WITH A MINIMUM LENGTH OF 3'. 4. SPACE STAKES EVENLY AROUND THE PERIMETER OF THE INLET A MAXIMUM OF 3' APART, AND SECURELY DRIVE THEM INTO THE GROUND, APPROXIMATELY 18" DEEP. 5. TO PROVIDE NEEDED STABILITY TO THE INSTALLATION, FRAME WITH 2"X4" WOOD STRIPS AROUND THE CREST OF THE OVERFLOW AREA AT A MAXIMUM OF 1.5' ABOVE THE DROP INLET CREST. 6. PLACE THE BOTTOM 12" OF THE FABRIC IN A TRENCH AND BACKFILL THE TRENCH WITH AT LEAST 4" OF CRUSHED STONE OR 12" OF COMPACTED SOIL. 7. FASTEN FABRIC SECURELY TO THE STAKES AND FRAME. JOINTS MUST BE OVERLAPPED TO THE NEXT STAKE. TEMPORARY FABRIC PROTECTION FOR DROP INLETS FP NTS SILT FENCE DETAIL NTS A41 z a cv < n. (D GSNEERS, p INS. �� a Ttcyy Lu � � 2 lh U F W WZ� Jb V COQ Q by O�b315193d \ e� L —A. �1 i gti J 'q q ilo%L Q " e ALI-_ 8 w 0 C—; 's ozd moo 0 0 A Cu H (A Cr. a z W z Z Q J 3 ►-� co o o CC Cz W 0 U < C3 z o Er z a o O N o z °C IL-u- Ln inLo Cu Cn � >. O z W Q. Q a I.._ a cc GSNEERS, p INS. �� a Ttcyy Lu � � 2 lh U F W WZ� Jb V COQ Q by O�b315193d \ e� L —A. �1 i gti J 'q q ilo%L Q " e ALI-_ 8 w 0 C—; 's ozd moo 0 0 A J 0 Crz A 0 J ZH Q U 0 H Cr w F_ w o a o H o Ef Q Q U U7 ZN w o w (] H 0 �. o Q z z CLASS i OR B RIP -RAP ui 2~O 2A" max w f @ center "' DIRECTION OF FLOW DATE: DEC. 2000 llimillp:711, TECHNICIAN: GMF 1.5' CHECKED BY: DSS FILTER FABRIC 4.0' REVISIONS SECTION A -A NO. DATE ►-- STONE CHECK DAM NTS i. KEEP THE CENTER SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 2. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANKS. SCALES AS SHOWN 3. THE CONTRACTOR SHALL INSPECT THE CHECK DAMS AND CHANNELS FOR DAMAGE AFTER EACH RUNOFF EVENT AND CORRECT ALL DAMAGE IMMEDIATELY. PROD. NO. DIV. 1575 A-1 4. THE CONTRACTOR SHALL REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS SHEET NO. AS NEEDED TO PRREVENT DAMAGE TO CHANNEL VEGETATION. 21 DRAWING NO. LAST UPDATED: 1157501SEI � W z a— ---� Cn z Cr Lu O H J < Cf) U) o Er 3: O _ °C w O Cu Cn � >. O z Iq I.._ H U J 0 Crz A 0 J ZH Q U 0 H Cr w F_ w o a o H o Ef Q Q U U7 ZN w o w (] H 0 �. o Q z z CLASS i OR B RIP -RAP ui 2~O 2A" max w f @ center "' DIRECTION OF FLOW DATE: DEC. 2000 llimillp:711, TECHNICIAN: GMF 1.5' CHECKED BY: DSS FILTER FABRIC 4.0' REVISIONS SECTION A -A NO. DATE ►-- STONE CHECK DAM NTS i. KEEP THE CENTER SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 2. EXTEND STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANKS. SCALES AS SHOWN 3. THE CONTRACTOR SHALL INSPECT THE CHECK DAMS AND CHANNELS FOR DAMAGE AFTER EACH RUNOFF EVENT AND CORRECT ALL DAMAGE IMMEDIATELY. PROD. NO. DIV. 1575 A-1 4. THE CONTRACTOR SHALL REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS SHEET NO. AS NEEDED TO PRREVENT DAMAGE TO CHANNEL VEGETATION. 21 DRAWING NO. LAST UPDATED: 1157501SEI Z a cv 12" THICK #57 WASHED STONE 5'-0" Q a ~ ~ n P A ON INSIDE FACE MIN. m L CEO N N O H w ° z w o H 2 z Q r z ~ ~ 1, 800 CU FT/ACRE 1~-- -11 ~ 4 ~ 1-1 O ~ 1 ~ X 3 V, Q OF DISTURBED .AREA . a 6 MIN, z o a II7 ~ W ~ W 2 MIN. o z ~ CLASS B RIPRAP FII a ~ Q FILTER FABRIC COMPACTED S L Z ~ o OI FLOW o z 9 MIN. O o CROSS SECTION U) v 18" w ~ _ 1- / ~ N M ~ ~ OVERFILL 6" =RFI L 6" H = w L 6 TYPICAL ~ r . 1 FOR SETTLEMEI MIN " 4- M T w a a SETTLE EN ~ Q, a MN ~ I. ~ J MIN. 9" OF CLASS A RIP-RAP FILTER FABRIC H EI w 6' EMERGENCY BY-PASS 6" BELOW SETTLED 0 2: i SIDE SLOPE TI TOP OF DAM TMPRARY VR N TH-STN NE w x MAX. N d 0 I ~ ~ CLASS B RIPRAP ~ - is i SIDE SLOPE ~ ~ MAX. a FILTER FABRIC 6' MIN. O 0 2' MIN. 3'-0" w NOTES: MIN. COMPACTED SOIL FLOW ~ TEMPORARY STREAM CROSSINGS ARE TO BE USED NHERE ~ i. 9 MIN. ~ N TR CTION VEHICLES WILL BE DRIVEN ACROSS STREAM STONE SECTION COS U 18" AND CREEK BEDS ON A TEMPORARY BASIS AS A PART OF ~1~~ERS~ p'q. A7Igt, CONSTRUCTION OPERATIONS. 6' TYPICAL ~ a ~ H FIELD IS TO BE NOTES: 2. AN ADEQUATE PIPE, SIZED IN T E , Z ~ . F ^ a = A 0 IN THE STREAM BED AND COVERED KITH CLASS i N P T P R F N F ANT RAINFALL. REMOVE SEDII PL CE i. I S EC BASINS AFTER EACH E I00 0 SIG I IC :MOVE SEDIMENT w ~ ~ ~ ~ / r ~ ~ RIP-RAP TO AN ELEVATION EQUAL TO THE TOP OF CREEK AND RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS IMENT HAS BANKS BUT NOT LESS THAN 12 INCHES. ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. REPLACE CONTAMII ~E CONTAMINATED sb °~"31sts~ ~INM 9 3. THE RIP-AAP MUST BE 20 FEET MINIMUM MOTH AND NITM PART OF GRAVEL FACE. T MP RARY U R N T H I A LENGTH SUFFICIENT TO REACH FROM BANK TO BANK. 2. REPLACE ANY RIPRAP DISPLACED FROM THE SPILLWAY IMMEDIATELY. TD 3. AFTER THE SEDIMENT PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED BIL IZEO ,~~~umi~ui~~~i REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLI N R I RAMC ST AREA TO BLEND 1 °.N° °oe~b~ i. THE SLOPE OF THE DITCH SHALL BE AS SHOWN ON THE PLANS. °°~N b°°,~i~•, RARY T MPO E T WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. 4. DIRECT EMERGENCY BYPASS TO NATURAL, STABLE AREAS. LOCATE BYPASS OUTLE PASS OUTLET 3 a v ° Zg~.: SO THAT FLOW WILL NOT DAMAGE THE EMBANKMENT. 2. ALL DITCHES WITH SLOPES GREATER THAN 3X SHALL BE LINED WITH 9 OF CLASS A ~ 8N • o... ~ RIP-RAP UNLESS OTHERWISE STATED ON THE PLANS. e~ ~a DIMENSIONS ~ o e°°ooQ` 3. THE COMPACTED SOIL RIDGE SHALL 8E SEEDED IMMEDIATELY AFTER CONSTRUCTION, ~ °°GP~~~ z TRAP N0. MIN. CAPACITY DEPTH LENGTH WIDTH WEIR LENGTH ~~hUuiu~ ~ LENGTH UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. 0 H (CU. FT.) (FT.) (FT.) (FT (FT.) (FT .1 Q RIP-RAP 1 B47 3.5 22 11 4 4. THE CONTRACTOR SHALL INSPECT THE DITCHES ONCE A WEEK AND AFTER EVERY 4 v 22 MIN. CLASS B H OR 30 CLA55 I RIP-RAP 2 700 3.5 20 10 4 4 SIGNIFICANT RAINFALL AND SHALL REMOVE SEDIMENT FROM THE FLOW AREA AND MAKE H 3 735 3.5 20 10.5 4 4 ANY REPAIRS NEEDED. w z 4 2!0 3.5 10 6 4 0.. ~ Z 4 H F- 0 448 3.5 16 B 4 W 4 5. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND FILL 3 Q 6 448 3.5 i6 8 4 IN THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND SEED IT. U) Z 4 H 0 7 448 3.5 6 8 4 ~ H 4 ~ J o ~ 1 m 6 A 4 6. DIMENSION AS SHOWN ON THE CONTRACT DRAWINGS OR SPECIFIED BY ENGINEER. I- w J p (OR FILTER CLOTH) B 448 3.5 16 8 4 Q J SEWER PIPE SHALL 8E w 9 770 3.5 22 l0 4 H LONG SPAN DIP @ CREEK CROSSING 4 ~ ~ Q Q w 10 567 3.5 18 9 4 4 ~ 3 U ii 700 3.5 20 10 4 4 I-I !2 770 3.5 22 10 4 O 4 3 = 13 882 3.5 2i i2 4 > ~.1.. Q 4 ~ PRO_ Q ~ ~ w NTS Ln ~ - w z (1J 22' MIN. CLASS B RIP-RAP d' OR 30' CLASS ]RIP-RAP T TRAP ARY M N TMPR H NTS U 6' GRAVEL FILTER 0 PIPE LINE (OR FILTER CLOTHI z 0 U c!i Z Z H 3 O ~ H r Q L = THE DISTANCE SUCH THAT POINTS POINTS o H z a p A ANO B ARE OF EQUAL ELEVATION. ITION. o W ~ H N ~ o _ H ~ NTS a o H Q O w ~ ~ l a= ~ IN CHANNELS, ROLL OUT STRIPS OF NETTING PARALLEL TO THE U a DIRECTION OF FLON AND OVER THE PROTECTIVE MULCH. U7 ZO O W Z W WIDTH OF DISTURBED AREA STREAM ~ A B O ~ a U (12' MINIMUM) L a ~ H ~ 0 z w H 3 w / ~ ANCHOR NETTING IN W H ~ 1' 1 A 6-INCH TRENCH > ~ ~ - RIP-RAP 18-INCH OVERLAP u• JOIN STRIPS BY ANCHORING t~ 1 ~UU•• ll AND OVERLAPPING DATE: DEC , 2000 1~1 ~ ~1 TECHNICIAN: GMF i. APPLY LIME, FERTILIZER AND SEED BEFORE LAYING THE NET DR MAT, CHECKED BY: OSS 2. START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY 100SELY ON THE SOIL 8UT WITHOUT WRINKLES--DO NOTES: NOT STRETCH. R V SION EI Space check dam in a channel so that the crest 3. TD SECURE THE NET, BURY THE UPSLDPE END IN A SLOT OR TRENCH NO LESS THAN 6 of downstream dam is at elevation of the toe of SECTION upstream dam INCHES DEEP, COYER WITH SOIL, AND TAMP FIRMLY. STAPLE THE NET EVERY f2 INCHES N0. DATE NTS ACROSS THE TOP AND EVERY 3 FT. AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE BY SIDE, THE ADJACENT EDGES SHOULD BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF NETTING SHOULD ALSO BE STAPLED DOWN THE CENTER, EVERY 3 FEET. DO NDT STRETCH THE NET WHEN APPLYING STAPLES. T RA TR M ANK STA ILIZATI N S RUCTU L S A B S 4. TD JOIN TWD STRIPS, CUT A TRENCH TD ANCHOR THE END OF THE NEW NET. OVERLAP THE END OF THE PREVIOUS ROLL iB INCHES, A5 SHOWN, AND STAPLE EVERY ]2 INCHES JUST BELOW THE ANCHOR SLOT. w s ~ m SCALES 5. INSPECT ALL MULCHES PERIODICALLY, AND AFTER RAINSTORMS TO CHECK FOR RILL z i. ALL RIP-RAP TREATMENTS MUST BE UNDERCUT SO THAT STONE SURFACES EROSION, DISLOCATION, DR FAILURE. WHERE EROSION I5 OBSERVED, APPLY ADDITIONAL HORIZ.: i° = 50' to WTI I RF FI IISN WTTH ~IIR[]f111AInTNf; FARTH MULCH. IF WASHOUT OCCURS. REPAIR THE SLOPE GRADE, RESEED, AND REINSTALL MULCH. VFGT ~ 1" = 1f1' z CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. H 3 2.THE STREAMBANK PROTECTION SHALL EXTEND BETWEEN STABILIZED PROJ. NO. DIV, a cc POINTS ALONG THE STREAM. J M 1575 A-1 0 a 3.CHECK STABILIZED STREAMBANK SECTIONS AFTER EVERY RAINFALL OF SHEET NO. H cr SPACING H K AM U TAI FOR STABILIZING HA NN S WITH T N TTN 2 DRAWING NO. 1 OR MORE IN 24 HOURS, AND MAKE ANY NEEDED REPAIRS IMMEDIATELY TO PREVENT FURTHER DAMAGE. z a 157501SE21 COPYRIGHT @ 1993 - ALL RIGHTS RESERVED - PEIRSON 6 WHITMAN ARCHITECTS AND ENGINEERS. P.A.