Loading...
HomeMy WebLinkAbout20200321 Ver 1_COPART FAIRVIEW DRIVE - EC PHASE 1 REV - 122019_20200228b r i d geZone XZone X (Shaded)Zone X (Shaded)Zone AEZone X (Shaded )Zone XZone XZone X (Shaded)Zone AEGast o n C o u n t y City o f G a s t o n i aWWWWWWW WGASGASGASCOMMCOMMCOMMCOMMCOMMCOMMG A S G A S G A S G A S E N G I N E E R SThese drawings and design intent are thesole property of LBYD Inc. which may notbe reproduced without written permission.Ccopyright 2018Birmingham, AlabamaHuntsville, AlabamaAuburn, Alabamawww.lbyd.comLBYD, Inc.E N G I N E E R STampa Bay, FloridaCivil and StructuralEngineers880 Montclair RoadBirmingham, AL 35213Phone (205) 251-4500Suite 60012/20/2019REVISED PER COUNTY COMMENTS 4-11-19 EROSION CONTROL NOTES:1.SITE EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH ALLFEDERAL, STATE, AND LOCAL LAWS, CODES, AND REGULATIONS.2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A "NOTICE OFINTENT"(NOI) FROM GASTON COUNTY NATURAL RESOURCES. THECONTRACTOR SHALL BE RESPONSIBLE FOR ALL MONITORING, INSPECTIONS,ETC. TO ENSURE THE OWNER THAT THE SITE IS AT ALL TIMES IN ACCORDANCEWITH GASTON COUNTY RULES & REGULATIONS. DOCUMENTATION OFINSPECTIONS BY A Q.C.I. OR Q.C.P. SHALL BE MAINTAINED BY THECONTRACTOR AND PROVIDED TO THE OWNER AT HIS/HER REQUEST. ANY ANDALL FEES, FINES, ETC., SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.3.ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURINGTHE CONSTRUCTION PROCESS AND UNTIL ALL DISTURBED AREAS HAVE BEENPERMANENTLY STABILIZED. ALL EROSION CONTROL INSTALLATION ANDMAINTENANCE SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTORAND SHALL BE AT NO ADDITIONAL COST TO THE OWNER4.EROSION CONTROL DEVICES SHOWN ON THESE PLANS ARE A MINIMUM.ADDITIONAL DEVICES SHALL BE INSTALLED AS REQUIRED TO PREVENTSILTATION, EROSION AND OTHER DEGRADATION OR POLLUTION TO THE SITEOR ADJACENT PROPERTIES, STREAMS, DITCHES, AND PUBLIC ROADWAYS.5.EROSION CONTROL DEVICES SHALL INCLUDE, BUT NOT LIMITED, TO THEFOLLOWING DEVICES: SILT FENCING, BRUSH BERMS, SEDIMENT BASINS,DETENTION PONDS, STRAW WATTLES , CHECK DAMS, FILTER BERMS, JUTEMATTING, VEGETATIVE FILTER STRIPS, TURF REINFORCEMENT MAT, DIVERSIONBERMS, ETC.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSIONCONTROL DEVICES IN GOOD OPERATING CONDITION DURING ALL LANDDISTURBING ACTIVITIES. THIS RESPONSIBILITY SHALL INCLUDE THE CLEANUPAND/OR REPAIRS TO THE DEVICES AT NO ADDITIONAL COST TO THE OWNER.7.EROSION CONTROL DEVICES SHALL BE MONITORED AND MAINTAINED UNTILTHE SITE HAS BEEN PERMANENTLY STABILIZED AND AFTER EACH RAINFALLGREATER THAN 0.75 INCHES IN A 24 HOUR PERIOD, ANY WIND GUSTS GREATERTHAN 25 MPH, AND ANY SUSTAINED WINDS GREATER THAN 20 MPH IN A 24HOUR PERIOD.8.AFTER ALL LAND DISTURBANCE ACTIVITIES HAVE CEASED AND AFTER ALLDISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED, THE EROSIONCONTROL DEVICES SHALL BE REMOVED BY THE CONTRACTOR AND THE AREACLEANED AND DRESSED.9.DEWATERING OPERATIONS MAY NOT BE DISCHARGED IN A MANNER THATCAUSES EROSION OF THE SITE OR POLLUTION TO ADJACENT PROPERTIES,STREAMS, DITCHES, OR PUBLIC ROADWAYS.10.A GRAVELED ACCESS DRIVE OF SUFFICIENT SIZE SHALL BE AT EACH SITEENTRANCE/EXIT TO PREVENT TRACKING OF DIRT AND SEDIMENT ONTO PUBLICOR PRIVATE ROADWAYS. IF SEDIMENT REACHES THE ROADWAY, THEN IT MUSTBE CLEANED AT THE END OF EACH WORKDAY.11.ALL LAND DISTURBANCE ACTIVITIES SHALL BE CONDUCTED IN A LOGICALSEQUENCE TO MINIMIZE THE EXPOSURE OF BARE AREAS AT ANY ONE TIME.12.ALL DISTURBED AREAS LEFT INACTIVE FOR MORE THAN 13 DAYS SHALL BESEEDED AND MULCHED IN ACCORDANCE WITH NORTH CAROLINA EROSIONCONTROL REGULATIONS.13.ALL PREVIOUSLY GRADED AREAS SHALL RECEIVE 4 INCHES OF TOPSOIL ANDPERMANENT GRASSING UNLESS OTHERWISE INDICATED ON THE LANDSCAPEPLAN.14.PRIOR TO SITE CLEARING, ALL PERIMETER SILT FENCING, BRUSH BERMS, ETC.AND GRAVELED ACCESS DRIVES SHALL BE INSTALLED.15. ALL EXISTING STREAMS, DITCHES, ETC. SHALL BE PROTECTED FROMSEDIMENTS AND SILTS BY SILT FENCING, WATTLES, BRUSH BERMS, ETC.16.WATTLES OR SILT FENCING SHALL BE INSTALLED AT ALL INLETS UPON THECOMPLETION OF EACH INLET AS INSTALLED.17.RIP RAP SHALL BE PLACED AT EACH HEADWALL IMMEDIATELY FOLLOWINGCONSTRUCTION OF EACH HEADWALL.18.GEOTEXTILE SHALL BE PLACED ON ALL 2:1 SIDE SLOPES. GEOTEXTILE SHALLBE NORTH AMERICAN GREEN [SC150] OR APPROVED EQUAL UNLESSOTHERWISE NOTED ON PLANS. ALL GEOTEXTILES SHALL BE INSTALLED PERTHE MANUFACTURER'S RECOMMENDATIONS.19. GEOTEXTILE SHALL BE PLACED ON ALL 3:1 SIDE SLOPES. GEOTEXTILE SHALLBE NORTH AMERICAN GREEN C150 OR APPROVED EQUAL UNLESS OTHERWISENOTED ON PLANS. ALL GEOTEXTILES SHALL BE INSTALLED PER THEMANUFACTURER'S RECOMMENDATIONS.20.GEOTEXTILE SHALL BE PLACED ON ALL DITCH BOTTOMS & 1' UP EACH SIDE.GEOTEXTILE SHALL BE NORTH AMERICAN GREEN SC150 OR APPROVED EQUALUNLESS OTHERWISE NOTED ON PLANS. ALL GEOTEXTILES SHALL BE INSTALLEDPER THE MANUFACTURER'S RECOMMENDATIONS.N0SCALE: 1"=200'200400100300TEMPORARY SEEDINGPERMANENT SEEDINGDVPSTSDIVERSION CHANNELWATTLE INLET PROTECTIONRIP RAP CHECK DAMOPWIPCdROUTLET PROTECTIONCONSTRUCTION EXIT PADCDWSBCEPSEDIMENT FENCETOPSOILTSGSODDINGSODSURFACE ROUGHENINGSUIP1INLET PROTECTIONTSTMULCHINGMUECBEROSION CONTROLBLANKETSBNSKIMMER BASINDVDIVERSION DITCH/BERMAREA WITHIN LAND DISTURBANCE: 64.49 ACWATTLE CHECK DAM@ 50' O.C.BASIN DESIGN TABLEBASINQAREAWLSIDEDEPTHTOPBOTTOMSPILLWAYSKIMMERORIFICEDEWATERBAFFLEBASINID(CFS)(AC.)(FT)(FT)SLOPE(FT)ELEV.ELEV.WIDTHSIZE(IN.)(IN.)TIME (DAY)SPACINGVOLUME (CF)129.513.54741504:137427393032.53.3837.525,6262A10.44.75601204:14746742102.51.53.613018,6452B7.83.59501104:147137091221.53.0427.511,316358.526.8724804:1371371038534.024584,384427.815.95752004:1372071730532.395535,6765A52.87441204:137817781021.52.433010,5125B2.41.3850804:13753750101.513.04107,89667.14.07501304:13747744102.51.53.0932.513,5964A11.16.34551374:137517481131.54.391518,5754B2.71.55601004:13760757101.513.421512,816DITCH DESIGN TABLEDITCHQLSSHAPEMATERIALSIDEBOTTOMDEPTHID(CFS)(FT)(FT/FT)SLOPEWIDTH(FT)(FT)1A19.476000.05TRAPEZOIDALSYNTHETIC4:160.51B8.853000.09TRAPEZOIDALGRASSED4:12.50.52A-A10.45000.06TRAPEZOIDALGRASSED4:120.72A-B5.25000.01TRAPEZOIDALGRASSED4:130.672B-A*7.84000.06TRAPEZOIDALGRASSED4:130.52B-B*3.93500.07TRAPEZOIDALGRASSED4:110.53A42.7916000.01TRAPEZOIDALSYNTHETIC4:1813B18.257000.06TRAPEZOIDALSYNTHETIC4:150.53C4.062000.04TRAPEZOIDALGRASSED4:140.53D12.66000.01TRAPEZOIDALGRASSED4:130.674A2.253000.03TRAPEZOIDALGRASSED4:140.54B2.253500.07TRAPEZOIDALGRASSED4:140.54C1.52500.06TRAPEZOIDALGRASSED4:140.54D1.22000.03TRAPEZOIDALGRASSED4:140.54E*13.966000.08TRAPEZOIDALSYNTHETIC4:140.44F10.585000.01TRAPEZOIDALGRASSED4:180.674G*5.292500.06TRAPEZOIDALGRASSED4:120.54H*5.292000.03TRAPEZOIDALGRASSED4:120.54I10.583000.02TRAPEZOIDALGRASSED4:180.54J13.965000.08TRAPEZOIDALGRASSED4:180.54K5.295000.05TRAPEZOIDALGRASSED4:120.55A-A2.52250.02TRAPEZOIDALGRASSED4:110.55A-B2.51500.01TRAPEZOIDALGRASSED4:110.55B-A3.31000.08TRAPEZOIDALGRASSED4:110.55B-B3.31000.08TRAPEZOIDALGRASSED4:110.56A10.55500.05TRAPEZOIDALGRASSED4:140.676B9.256500.05TRAPEZOIDALGRASSED4:140.56C3.551500.07TRAPEZOIDALGRASSED4:110.5DVDVDVDVDVDVDVDVDVDVDVDVDVBASIN 1BASIN 2BASIN 4BASIN 3BASIN 6SBSB150'X150' CONSTRUCTIONLAYDOWN YARDCONSTRUCTIONENTRANCECEPBASIN 5ASBSKIMMER BASIN #6 W/OUTLET PROTECTIONSBFLOODWAYWETLANDZONELONG CREEKBESSEMER DA LLAS HWYFAIRV IEW DROPTSBASIN LINE (TYP.)TSTSABAB2B-ACBCDWATSTS4ACDW4F4HATSCDW5B5A6C6ATSTS6BSUB-BASIN LINE(TYP.)OPSKIMMER BASIN #3 W/RISER& OUTLET 24" HDPE DISCHARGEPIPE & OUTLET PROTECTIONPHASE I SEQUENCE OF CONSTRUCTION1. INSTALL CONSTRUCTION ENTRANCE2. SET LIMITS OF DISTURBANCE & INSTALL PERIMETER SEDIMENT CONTROLS (SEDIMENT BARRIER).3. PRIOR TO CLEARING ACTIVITIES, INSTALL SEDIMENT TRAP/BASINS IN AREAS TO BE CLEARED. LIMIT ACTIVITY WHERE PRACTICABLE TO ONE BASIN AT A TIME.4. AS CLEARING PROGRESSES, INSTALL DIVERSION DITCHES TO DIRECT RUNOFF TO SEDIMENT TRAP/BASIN. ADJUST DIVERSION DITCHES FOR DISCREPANCIES BETWEEN SURVEY & SITE CONDITIONS.5. IMMEDIATELY STABILIZE AREAS OF CLEARING, ONCE ACTIVITY HAS CEASED50' BUFFER20' BUFFERSTREAM CHANNEL20' BUFFEROFF WETLANDS10' BUFFEROFF FLOOD ZONELINE20' BUFFEROFF WETLANDSTEMPORARY SEDIMENTTRAPLODLIMITS OF DISTURBANCELODLODLODLODLODSBNSBNCITY LIMITS LINEDRAWING INDEXEC.1 PHASE 1 EROSION CONTROLEC.1A PHASE 1 EROSION CONTROLEC.1B PHASE 1 EROSION CONTROLEC.2 SITE SOILS & BUFFERSEC.5 EROSION CONTROL DETAILSSURVEYSKIMMER BASIN #2AW/ OUTLET PROTECTIONSBNOPSBNTSTSSBNSBNSKIMMER BASIN #5B W/OUTLET PROTECTION20' PROPERTY BUFFER/ LIMITS OF DISTURBANCEBASIN 5BREVISED PER COUNTY COMMENTS 7-11-19SKIMMER BASIN #1 W/RISER& OUTLET 24" HDPE DISCHARGEPIPE & OUTLET PROTECTIONNOTE:ENSURE OUTLET CONFIGURATIONS DISCHARGE OVER STABILIZEDGROUND & THROUGH SILT FENCE OUTLET OR OFF-SITE.* DIVERTED TO BASIN 3D2B-B2B-ASKIMMER BASIN #4A W/OUTLET PROTECTION4D4BREVISION FOR UNMAPPED WATER 11-21-19 FEATUREPHASE 1EROSION CONTROLPLAN(CLEARING)LWIEC.111/21/2019102-18-503TJR1332COPART - FAIRVIEW DRIVE YARD COPART, INC GASTONIA, NORTH CAROLINA 6RSBROCK SEDIMENT FENCERSBSPILLWAYSPILLWAY55REVISED PER COUNTY COMMENTS 12-3-19555CdRCdRCdRCdR REVISED PER COUNTY COMMENTS 12-20-19 C-2887 Zone XZone X (Shaded)Zone X (Shaded)Zone AEZone X (Shaded)Zone XZone XZone X (Shaded)Zone AEGast o n C o u n t y City o f G a s t o n i a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hese drawings and design intent are thesole property of LBYD Inc. which may notbe reproduced without written permission.Ccopyright 2018Birmingham, AlabamaHuntsville, AlabamaAuburn, Alabamawww.lbyd.comLBYD, Inc.E N G I N E E R STampa Bay, FloridaCivil and StructuralEngineers880 Montclair RoadBirmingham, AL 35213Phone (205) 251-4500Suite 60012/20/2019REVISED PER COUNTY COMMENTS 4-11-19SEE SHEET EC.1BDVDVDVDVDVDVDVDVBASIN 1BASIN 2BASIN 3SBSBSBSBTSBASIN LINE (TYP.)TSTSABABDCBCDWATSOPLODLODLODSBNSBNSKIMMER BASIN #2AW/ OUTLET PROTECTIONOPSBNTSOPSBSPILLWAYSPILLWAY150'X150' CONSTRUCTIONLAYDOWN YARDN0SCALE: 1"=100'10020050150PHASE I SEQUENCE OF CONSTRUCTION1. INSTALL CONSTRUCTION ENTRANCE2. SET LIMITS OF DISTURBANCE & INSTALL PERIMETER SEDIMENT CONTROLS (SEDIMENT BARRIER).3. PRIOR TO CLEARING ACTIVITIES, INSTALL SEDIMENT TRAP/BASINS IN AREAS TO BE CLEARED. LIMIT ACTIVITY WHERE PRACTICABLE TO ONE BASIN AT A TIME.4. AS CLEARING PROGRESSES, INSTALL DIVERSION DITCHES TO DIRECT RUNOFF TO SEDIMENT TRAP/BASIN. ADJUST DIVERSION DITCHES FOR DISCREPANCIES BETWEEN SURVEY & SITE CONDITIONS.5. IMMEDIATELY STABILIZE AREAS OF CLEARING, ONCE ACTIVITY HAS CEASEDDRAWING INDEXEC.1 PHASE 1 EROSION CONTROLEC.1A PHASE 1 EROSION CONTROLEC.1B PHASE 1 EROSION CONTROLEC.2 SITE SOILS & BUFFERSEC.5 EROSION CONTROL DETAILSSURVEYREVISED PER COUNTY COMMENTS 7-11-19 SKIMMER BASIN #3 W/RISER& OUTLET 24" HDPE DISCHARGEPIPE & OUTLET PROTECTIONSKIMMER BASIN #1 W/RISER& OUTLET 24" HDPE DISCHARGEPIPE & OUTLET PROTECTIONDV4FTSCDW4E4HDVDV2B-B2B-A2A-A4GREVISION FOR UNMAPPED WATER 11-21-19 FEATUREPHASE 1EROSION CONTROLPLAN(CLEARING)LWIEC.1A10/30/2019102-18-503TJR1432COPART - FAIRVIEW DRIVE YARD COPART, INC GASTONIA, NORTH CAROLINA SPILLWAYTEMPORARY SEEDINGPERMANENT SEEDINGDVPSTSDIVERSION CHANNELWATTLE INLET PROTECTIONRIP RAP CHECK DAMOPWIPCdROUTLET PROTECTIONCONSTRUCTION EXIT PADCDWSBCEPSEDIMENT FENCETOPSOILTSGSODDINGSODSURFACE ROUGHENINGSUIP1INLET PROTECTIONTSTMULCHINGMUECBEROSION CONTROLBLANKETSBNSKIMMER BASINDVDIVERSION DITCH/BERMAREA WITHIN LAND DISTURBANCE: 64.49 ACWATTLE CHECK DAM@ 50' O.C.TEMPORARY SEDIMENTTRAPLODLIMITS OF DISTURBANCERSBROCK SEDIMENT FENCERSBRSBREVISED PER COUNTY COMMENTS 12-3-195 5C-2887REVISED PER COUNTY COMMENTS 12-20-19 Zone X (Shaded )Zone X Gast o n C o u n t y City o f G a s t o n i aWWWWWWW WGASGASGASCOMMCOMMCOMMCOMMCOMMCOMMG A S G A S G A S G A S 74074 0 740 745750755760 74 5 75 0 75575575 5755755 76 0 76 5 770 77 5 7 8 0 78 5 7 8 5 785785 785 79 0 710715720725730735740745750755760765770775780785790715 72 0725730735740745750755760765770775780785 71572072572572573073574074 0 7 4 0745750755760765770775780785 740 7 4 0740745750755760765770 775 780 785 750750750750 75575575575576076076576577077077577578078078578579071071572072573073 5 7407457 5 0 755760 76 5 7707757807857 2 0 7 2 5 7 3 0 73 5 740 74 5 7 5 0 755 76 0 765 770 77579574 5 7 4 5 74 5 75 0 7 5 5 760 7 6 5770775780785790795 760760765765770770 775775 7807807857457507557 6 0 7 6 5 770775 73 5 7 3 5 74074074074074575075 0 75075575 5 75576076076076573574074575075576 0760760765770775780785790 750 755 760 76577077578072072573073573 57357407457507507507557607657 7 0775 E N G I N E E R SThese drawings and design intent are thesole property of LBYD Inc. which may notbe reproduced without written permission.Ccopyright 2018Birmingham, AlabamaHuntsville, AlabamaAuburn, Alabamawww.lbyd.comLBYD, Inc.E N G I N E E R STampa Bay, FloridaCivil and StructuralEngineers880 Montclair RoadBirmingham, AL 35213Phone (205) 251-4500Suite 60012/20/2019REVISED PER COUNTY COMMENTS 4-11-19SEE SHEET EC.1ADVDVBASIN 4BASIN 6CONSTRUCTIONENTRANCECEPBASIN 5ASBFAIRV IEW DR6B6A6C6ATSTS6BSUB-BASIN LINE(TYP.)50' BUFFER20' BUFFERSTREAM CHANNELLODLODN0SCALE: 1"=100'10020050150PHASE I SEQUENCE OF CONSTRUCTION1. INSTALL CONSTRUCTION ENTRANCE2. SET LIMITS OF DISTURBANCE & INSTALL PERIMETER SEDIMENT CONTROLS (SEDIMENT BARRIER).3. PRIOR TO CLEARING ACTIVITIES, INSTALL SEDIMENT TRAP/BASINS IN AREAS TO BE CLEARED. LIMIT ACTIVITY WHERE PRACTICABLE TO ONE BASIN AT A TIME.4. AS CLEARING PROGRESSES, INSTALL DIVERSION DITCHES TO DIRECT RUNOFF TO SEDIMENT TRAP/BASIN. ADJUST DIVERSION DITCHES FOR DISCREPANCIES BETWEEN SURVEY & SITE CONDITIONS.5. IMMEDIATELY STABILIZE AREAS OF CLEARING, ONCE ACTIVITY HAS CEASEDSBNSBOPOPTEMPORARY SEEDINGPERMANENT SEEDINGDVPSTSDIVERSION CHANNELWATTLE INLET PROTECTIONRIP RAP CHECK DAMOPWIPCdROUTLET PROTECTIONCONSTRUCTION EXIT PADCDWSBCEPSEDIMENT FENCETOPSOILTSGSODDINGSODSURFACE ROUGHENINGSUIP1INLET PROTECTIONTSTMULCHINGMUECBEROSION CONTROLBLANKETSBNSKIMMER BASINDVDIVERSION DITCH/BERMAREA WITHIN LAND DISTURBANCE: 64.49 ACWATTLE CHECK DAM@ 50' O.C.TEMPORARY SEDIMENTTRAPLODLIMITS OF DISTURBANCEDRAWING INDEXEC.1 PHASE 1 EROSION CONTROLEC.1A PHASE 1 EROSION CONTROLEC.1B PHASE 1 EROSION CONTROLEC.2 SITE SOILS & BUFFERSEC.5 EROSION CONTROL DETAILSSURVEYSKIMMER BASIN #6 W/OUTLET PROTECTIONSPILLWAYREVISED PER COUNTY COMMENTS 7-11-19BASIN 5BOP4A4BSBN4A4D20' BUFFER (TYP.)50' BUFFER (TYP.)APPROXIMATE LOCATION OF UNMAPPED WATERFEATURE. FINAL LOCATION TO BE FIELDVERIFIED. ADJUST BUFFERS AND SEDIMENTBARRIERS AS REQUIRED.SBSBAPPROXIMATE LOCATION OF UNMAPPED WATERFEATURE. FINAL LOCATION TO BE FIELDVERIFIED. ADJUST BUFFERS AND SEDIMENTBARRIERS AS REQUIRED.REVISION FOR UNMAPPED WATER 11-21-19 FEATURESKIMMER BASIN #5B WITHOUTLET PROTECTIONSKIMMER BASIN #4A WITHOUTLET PROTECTIONSBNPHASE 1EROSION CONTROLPLAN(CLEARING)LWIEC.1B10/30/2019102-18-503TJR1532COPART - FAIRVIEW DRIVE YARD COPART, INC GASTONIA, NORTH CAROLINA RSBROCK SEDIMENT FENCEREVISED PER COUNTY COMMENTS 12-3-19TSTS IF VEGETATION FAILS TO ESTABLISH INTHIS AREA, THEN WATTLES SHALL BEUTILIZED AT 100' SPACING ALONGCONTOUR LINES.PSPSCdRCdRCdRUTILIZE ROCK CHECKS IN AREAS OFCONCENTRATED FLOW. (TYP.)CdRCdRPSPSUTILIZE SEDIMENT BARRIER AND/ORWATTLES ALONG CONTOUR LINESTO PREVENT EROSION FROMENTERING STREAM BED.C-2887REVISED PER COUNTY COMMENTS 12-20-19 NCG01 GROUND STABILIZATION AND MATERIALS HANDLINGEFFECTIVE: 04/01/19GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITHTHE NCG01 CONSTRUCTION GENERAL PERMITImplementing the details and specifications on this plan sheet will result in the constructionactivity being considered compliant with the Ground Stabilization and Materials Handlingsections of the NCG01 Construction General Permit (Sections E and F, respectively). Thepermittee shall comply with the Erosion and Sediment Control plan approved by thedelegated authority having jurisdiction. All details and specifications shown on this sheetmay not apply depending on site conditions and the delegated authority having jurisdiction.GROUND STABILIZATION SPECIFICATIONStabilize the ground sufficiently so that rain will not dislodge the soil. Use one of thetechniques in the table below:POLYACRYLAMIDES (PAMS) AND FLOCCULANTS1.Select flocculants that are appropriate for the soils being exposed duringconstruction, selecting from the NC DWR List of Approved PAMS/Flocculants.2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures.3.Apply flocculants at the concentrations specified in the NC DWR List of ApprovedPAMS/Flocculants and in accordance with the manufacturer's instructions.4.Provide ponding area for containment of treated Stormwater before dischargingoffsite.5.Store flocculants in leak-proof containers that are kept under storm-resistant coveror surrounded by secondary containment structures.HAZARDOUS AND TOXIC WASTE1.Create designated hazardous waste collection areas on-site.2.Place hazardous waste containers under cover or in secondary containment.3.Do not store hazardous chemicals, drums or bagged materials directly on the ground.EQUIPMENT AND VEHICLE MAINTENANCE1.Maintain vehicles and equipment to prevent discharge of fluids.2.Provide drip pans under any stored equipment.3.Identify leaks and repair as soon as feasible, or remove leaking equipment from theproject.4.Collect all spent fluids, store in separate containers and properly dispose ashazardous waste (recycle when possible).5.Remove leaking vehicles and construction equipment from service until the problemhas been corrected.6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum productsto a recycling or disposal center that handles these materials.LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE1.Never bury or burn waste. Place litter and debris in approved waste containers.2.Provide a sufficient number and size of waste containers (e.g dumpster, trashreceptacle) on site to contain construction and domestic wastes.3.Locate waste containers at least 50 feet away from storm drain inlets and surfacewaters unless no other alternatives are reasonably available.4.Locate waste containers on areas that do not receive substantial amounts of runofffrom upland areas and does not drain directly to a storm drain, stream or wetland.5.Cover waste containers at the end of each workday and before storm events orprovide secondary containment. Repair or replace damaged waste containers.6.Anchor all lightweight items in waste containers during times of high winds.7.Empty waste containers as needed to prevent overflow. Clean up immediately ifcontainers overflow.8.Dispose waste off-site at an approved disposal facility.9.On business days, clean up and dispose of waste in designated waste containers.PAINT AND OTHER LIQUID WASTE1.Do not dump paint and other liquid waste into storm drains, streams or wetlands.2.Locate paint washouts at least 50 feet away from storm drain inlets and surfacewaters unless no other alternatives are reasonably available.3.Contain liquid wastes in a controlled area.4.Containment must be labeled, sized and placed appropriately for the needs of site.5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes fromconstruction sites.PORTABLE TOILETS1.Install portable toilets on level ground, at least 50 feet away from storm drains,streams or wetlands unless there is no alternative reasonably available. If 50 footoffset is not attainable, provide relocation of portable toilet behind silt fence or placeon a gravel pad and surround with sand bags.2.Provide staking or anchoring of portable toilets during periods of high winds or in highfoot traffic areas.3.Monitor portable toilets for leaking and properly dispose of any leaked material.Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replacewith properly operating unit.HERBICIDES, PESTICIDES AND RODENTICIDES1.Store and apply herbicides, pesticides and rodenticides in accordance with labelrestrictions.2.Store herbicides, pesticides and rodenticides in their original containers with thelabel, which lists directions for use, ingredients and first aid steps in case ofaccidental poisoning.3.Do not store herbicides, pesticides and rodenticides in areas where flooding ispossible or where they may spill or leak into wells, stormwater drains, ground wateror surface water. If a spill occurs, clean area immediately.4.Do not stockpile these materials onsite.CONCRETE WASHOUTS1.Do not discharge concrete or cement slurry from the site.2.Dispose of, or recycle settled, hardened concrete residue in accordance with localand state solid waste regulations and at an approved facility.3.Manage washout from mortar mixers in accordance with the above item and inaddition place the mixer and associated materials on impervious barrier and withinlot perimeter silt fence.4.Install temporary concrete washouts per local requirements, where applicable. If analternate method or product is to be used, contact your approval authority forreview and approval. If local standard details are not available, use one of the twotypes of temporary concrete washouts provided on this detail.5.Do not use concrete washouts for dewatering or storing defective curb or sidewalksections. Stormwater accumulated within the washout may not be pumped into ordischarged to the storm drain system or receiving surface waters. Liquid waste mustbe pumped out and removed from project.6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless itcan be shown that no other alternatives are reasonably available. At a minimum,install protection of storm drain inlet(s) closest to the washout which could receivespills or overflow.7.Locate washouts in an easily accessible area, on level ground and install a stoneentrance pad in front of the washout. Additional controls may be required by theapproving authority.8.Install at least one sign directing concrete trucks to the washout within the projectlimits. Post signage on the washout itself to identify this location.9.Remove leavings from the washout when at approximately 75% capacity to limitoverflow events. Replace the tarp, sand bags or other temporary structuralcomponents when no longer functional. When utilizing alternative or proprietaryproducts, follow manufacturer's instructions.10.At the completion of the concrete work, remove remaining leavings and dispose ofin an approved disposal facility. Fill pit, if applicable, and stabilize any disturbancecaused by removal of washout.EARTHEN STOCKPILE MANAGEMENT1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least50 feet away from storm drain inlets, sediment basins, perimeter sediment controlsand surface waters unless it can be shown no other alternatives are reasonablyavailable.2.Protect stockpile with silt fence installed along toe of slope with a minimum offset offive feet from the toe of stockpile.3.Provide stable stone access point when feasible.4.Stabilize stockpile within the timeframes provided on this sheet and in accordancewith the approved plan and any additional requirements. Soil stabilization is definedas vegetative, physical or chemical coverage techniques that will restrain acceleratederosion on disturbed soils for temporary or permanent control needs.SECTION E: GROUND STABILIZATIONRequired Ground Stabilization TimeframesNote: After the permanent cessation of construction activities, any areas with temporaryground stabilization shall be converted to permanent ground stabilization as soon aspracticable but in no case longer than 90 calendar days after the last land disturbingactivity. Temporary ground stabilization shall be maintained in a manner to render thesurface stable against accelerated erosion until permanent ground stabilization is achieved.Site Area DescriptionTimeframe variations-7 days for perimeter dikes, swales,ditches, perimeter slopes and HQW Zones-10 days for Falls Lake Watershed unlessthere is zero slopeStabilize within thismany calendardays after ceasingland disturbance77714NoneNone(a)Perimeter dikes,swales, ditches, andperimeter slopes(b)High Quality Water(HQW) Zones(c)Slopes steeper than3:1If slopes are 10' or less in length and arenot steeper than 2:1, 14 days areallowed(d)Slopes 3:1 to 4:1(e)Areas with slopesflatter than 4:114-7 days for slopes greater than 50' inlength and with slopes steeper than 4:1-7 days for perimeter dikes, swales,ditches, perimeter slopes and HQWZones-10 days for Falls Lake Watershed