HomeMy WebLinkAbout400131_Plan of Action_20200224PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD State UMVerSity ART State Unlvemity N%WCOOPERATPIE I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION 6ngawer ,q People PruvoogSolunons 1. Structure Name/Identifier (ID): Red Hill Date: 2/19/2020 40-131 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker b. Designed 25 yr/24 hr. storm & structural freeboard c. Line b - line a (inches in red zone) d. Top of dike surface area according to design (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft) 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural design g. Volume of waste produced according to design 18 inches 19 inches 1 inches 112125 Ift2 69891.3 gallons 180 days 121058 Ift3 h. Actual waste produced= current herd #/certified herd # x line g 108418.534 ft3 current herd:1 3860 certified herdF 4310 i. Volume of wash water according to structural design 01 ft3 j. Excess rainfall over evaporation according to design k. (line h + line i + line i) x 7.48 x (30 days/line f) = 4. Total PAN to be land applied during draw down period I. Current waste analysis dated MM/DD/YYYY 12/4/2019 m. (lines e + k)/1000 x (line 1) = REPEAT SECTION I FOR EACH WASTE STR UCTURE ON SITE 65406 ft3 216701.252 1 gallons 3.46 Ib/1000 gal 991.610057 Ib PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1+2+3+4+5+6 = line m= line m= line m= 991.610057 Ib PAN Ib PAN Ib PAN line m= Ilb PAN line m= Ilb PAN line m= I Ilb PAN 991.610057 1 total lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # a crop r. acres s. PAN balance t. total PAN u. application Ob/acre) column r x s window 3379 RHA 16.35 Oct -May 3379 RHD 4.7 Oct -May 3379 RHE 5.3 Oct -May Oct -May 3379 RHC wheat 17.81 124.13 2208 Oct -May 3379 RHB wheat 20.31 124.13 2518 Oct -May State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) Y. OVERALL PAN BALANCE (W-X) 4726 991.610057 4726 -3734.3899 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: There is more PAN available in fields A, D, E but for reporting purposes there is plenty in fields B and C. PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 2/27/2020 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD