HomeMy WebLinkAbout400131_Plan of Action_20200224PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD State UMVerSity
ART State Unlvemity
N%WCOOPERATPIE
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION
6ngawer ,q People PruvoogSolunons
1. Structure Name/Identifier (ID): Red Hill Date: 2/19/2020
40-131
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker
b. Designed 25 yr/24 hr. storm & structural freeboard
c. Line b - line a (inches in red zone)
d. Top of dike surface area according to design
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft)
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural design
g. Volume of waste produced according to design
18 inches
19 inches
1 inches
112125 Ift2
69891.3 gallons
180 days
121058 Ift3
h. Actual waste produced=
current herd #/certified herd # x line g 108418.534 ft3
current herd:1 3860 certified herdF 4310
i. Volume of wash water according to structural design 01 ft3
j. Excess rainfall over evaporation according to design
k. (line h + line i + line i) x 7.48 x (30 days/line f) =
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated
MM/DD/YYYY 12/4/2019
m. (lines e + k)/1000 x (line 1) =
REPEAT SECTION I FOR EACH WASTE STR UCTURE ON SITE
65406 ft3
216701.252 1 gallons
3.46 Ib/1000 gal
991.610057 Ib PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. structure ID:
2. structure ID:
3. structure ID:
4. structure ID:
5. structure ID:
6. structure ID:
n. lines 1+2+3+4+5+6 =
line m=
line m=
line m=
991.610057 Ib PAN
Ib PAN
Ib PAN
line m= Ilb PAN
line m= Ilb PAN
line m= I Ilb PAN
991.610057 1 total lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract # p. field # a crop r. acres s. PAN balance t. total PAN u. application
Ob/acre) column r x s window
3379
RHA
16.35
Oct -May
3379
RHD
4.7
Oct -May
3379
RHE
5.3
Oct -May
Oct -May
3379
RHC
wheat
17.81
124.13
2208
Oct -May
3379
RHB
wheat
20.31
124.13
2518
Oct -May
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.)
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II)
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III)
Y. OVERALL PAN BALANCE (W-X)
4726
991.610057
4726
-3734.3899
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump
and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new
PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add
these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be
hauled to another permitted facility provide information regarding the herd population and lagoon
freeboard levels at the receiving facility.
NARRATIVE:
There is more PAN available in fields A, D, E but for reporting purposes there is plenty in fields B and C.
PERSON COMPLETING THIS DOCUMENT:
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 2/27/2020
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD