HomeMy WebLinkAbout20011401 Ver 1_COMPLETE FILE_20010924F WATF Michael F. Easley, Governor
`OHO 9QG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
r Gregory J. Thorpe, Ph.D.
Acting Director
> Division of W
ater Quality
o -c
Avery A. Barrier
7454 Dogwood Knob
Newland, NC 28657
APPROVAL of 401 Water Quality Certification
Dear Mr. Barrier:
October 8, 2001
DWQ # 01-1401
Burke County
You have our approval, in accordance with the attached conditions, to fill 150 square feet of waters of Rhodhiss Lake
for the purpose of constructing a seawall on Lot 8 Harbor Ridge subdivision in Burke County, as described in your
application received September 24, 2001. After reviewing your application, we have decided that this fill is covered by
General Water Quality Certification Number 3280, which can be downloaded from our web site at
hfp://h2o.enr.state.nc.us/ncwetlands. This Certification allows you to use Regional Permit Number 198200030 when the US
Army Corps of Engineers (USACE) issues it. In addition, you should get any other federal, state or local permits before you
go ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply
Watershed regulations. Also this approval will expire when the accompanying 404 permit expires unless otherwise
specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your
project, you must notify us in writing and you may be required to send us a new application for a new certification. If the
property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for
complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory
mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the
conditions listed in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone Mike Parker in the Asheville Regional Office at 828-251-6208 or Dave Penrose in Raleigh
at 919-733-1786.
Sincerely,
regory J. Thorpe, Ph. .
Acting Director
Attachment
cc: USACE Asheville Regulatory Field Office
Asheville DWQ Regional Office
Central Files
File Copy
Sue Harmon; Permits, Etc.; 112 Lindsey Lee Lane, Shelby, NC 28152
N. C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 (919) 733-7015
01-14
Customer Service
1 800 623-7748
A
D W G? CcpV
'401 Office Use Only: Form Version April 2001
11 :1
4 Q
USACE Action ID No. DWQ No. O
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit
? Section 10 Permit
401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s)
Requested:_30
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?N/A
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?N/A
II. Applicant Information
1. Owner/Applicant Information
Name: Avery A. Barrier
Mailing Address: 7454 Dogwood Knob
Newland, C 28657
Telephone Number: 828-733-5335 Fax Number:
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Sue Harmon
Company Affiliation: Permits Etc.
Mailing Address: 112 Lindsey Lee Lane
Shelby, NC 28152
Telephone Number: 704-434-0706 Fax Number: 704-434-7100T
E-mail Address:
Page 3 of 13 PAYMENT
RECEIVED
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distpu#on purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Avery A. Barrier
2. T.I.P. Project Number (NCDOT Only):
3. Property Identification Number (Tax PIN):
N/A
4. Location
County: Burke Nearest Town: Rutherford College-, NC
Subdivision name (include phase/lot number): Harbor Ridge L'tr%_
Directions to site (include road numbers, landmarks, etc.): From I-49 take Rutherford
College exit Rutherford College Rd.) Turn right into Harbor Ridge subdivision. Turn left at
first road. Go to lot #8.
5. Site coordinates, if available (UTM or Lat/Long): Lat. 35.778175 Long. -81.522548
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Vacant residential lake lot
7. Property size (acres): 1.449 acres
8. Nearest body of water (stream/river/sound/ocean/lake): Lake Rhodhiss
9. River Basin: Catawba
Page 4 of 13
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
10. Describe the purpose of the proposed work: Wooden seawall to be constructed to stabilize
and help stop erosion on shoreline.
11. List the type of equipment to be used to construct the project: Bobcat and hand tools
12. Describe the land use in the vicinity of this project: Private land, singe-family residential
lots
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USAGE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: No
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
Page 5 of 13
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
acres) Located within
100-year Floodplain**
es/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at http://www.fema.gov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
Total area of wetland impact proposed:
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(pleasespecify)
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching1straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
Page 6 of 13
www.uses.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.igpozone.com,
www.mMuest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site:
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
(acres)
Wat)
(if Name of applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
42' Wooden seawall 84 sq ` Lake Rhodhiss Lake
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): NIA
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
This application is for a 42 foot wooden seawall to be placed approximately two feet from the
existing shoreline. The lot is wooded. A. pathway to the lake will be established to get
equipment and material there. This pathway should be approximately 6 to 8 feet wide. There
will have to be some trees removed at the shoreline to put the seawall in. According to Burke
County ordinance. M trees removed over 6 inches in diameter within 65 feet of the shoreline
will have to be replaced with the same diameter count. (Expmple: One 8 inch tree removed,
Page 7 of 13
eight one inch diameter trees will be planted in its place in the same area.) The area will be left
MUnL Mulch will be laced in aff cted a of construction alo with the trees. This will
be
done immediately after finishing the shoreline stabilization.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.nc.us/ncwetlands/stnngide.ht .
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offske), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
Page 8 of 13
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at hiW://h2o.enr.state.nc.uslwM/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): NIA
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes El No
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No ?
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
Page 9 of 13
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify Catawba River Basin Buffer
Yes
See above
Identify the
mitigation is
multipliers.
® No ? If you answered "yes", provide the following information:
square feet and acreage of impact to each zone of the riparian buffers. If buffer
required calculate the required amount of mitigation by applying the buffer
Zone* Impact
(square ?) Multiplier Required
Mitigation
1 324 approx. 3
2 160 approx. 1.5
Total 484 approx.
* Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
In zone 1 there will be a nathwav that is approximately 6-8 feet wide that will cross the 30 foot
area. Also, there will be about 2 feet of land affected along the shoreline where the seawall is
being _placed. There will be a pathway going; across zone 2 that will be approximately 6-8 feet
wide. AM area disturbed by the construction will be replanted in trees and mulch will be
applied. This will be done as soon as all work is completed.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
Page 10 of 13
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
X1H. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes [] No
Is this an after-the-fact permit application?
Yes ? No 0
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent Signature ' Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
US Army Corps Of Engineers Field Offices and County Coverage
Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell Union
US Army Corps of Engineers Avery Clay Jackson Polk Watauga
151 Patton Avenue Buncombe Cleveland Lincoln Rowan Yancey
Room 208 Burke Gaston Macon Rutherford
Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley
Telephone: (828) 2714854 Caldwell Haywood McDowell Swain
Fax: (828) 2714858 Catawba Henderson Mecklenburg Transylvania
Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham Wilson
US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes Yadkin
Page 11 of 13
Sue Harmon has my permission to sign my name on permits to obtain said
permits.
In order to build seawall and dock at Harbor Ridge Development.
?Al
ve Barrier
Sept. 10,2001
n
Ier
Page 1 of 1
file://C:\WINDOWS\TEMP\KODAK.TMP\DCP00076.JPG 9/18/01
MAPBLAST!
Everyone needs o little direction in life
Page 1 of 1
AVe r y barrs -cr
Morganton, NC 28655
?? Fence
- r
Al -0 '
'o? y
6?
U'
114 _- ---
w
w
2'
c Deb's I
r
G DT
f
a ?
0 29
0
E tEAPBLAST:
r.....m_- --
;reek
119
a.
t}
rn
[loon Latitude: 35.778175, Longitude: -81.5225481
../mPrint.mb?CT=35.77785 8%3A-81.522157%3A20000&LV=3&GAD3=Morganton%2C+NC++9/3/01
?# p
SJ
LA
?i
In
' 4 *.
? C1
C` G
fi
A
4
?j
r?
j ? 1?
J S
0
e
e`
Ver5 )3a rrkr
$AS- 733 - 5335
t
I
? vy
? f
v
! ca 7L Z/z
! U ?s f
fi
f f f??,r!
/ 9P
0000
s '" !
s / r
i
f ?' t
R? Cc _ i
+ r
f f
1 t
1 f
rte, ' -?
1
f
f
1
r€?
V
b ?
'ice
S
Rr ?i
rtr
S
G
.very "
^'u ,r927'? P r a
• ?O `? ,. ^ :
/ \ ? \ • ' S2g•13,06, X53,02 ? ? ?C201.
/? MS
4 (j 52g0?306*w
/l - 10603
117.50 ` l
L167
/ f
0MS
11??1?Gf f: 0 f?, j f f f f l ??
/
177 f /? f Q- f f /h
/ O CO 0,
l? ti
CID /
L59
\ / / /?° a M nom/ O / /
1.50E
L55
L53 IrS
.p. .?OA?: ?j \.. 3r G ? <s < L ; ? l \ s
A9?. L40
v n 'ZQ(1 / \ S
L4 L41
8 <46 v LA2
L45
L44
L43 L37
L36 1.249 AC.
? 1172 ?z? , ;? 1
LAKE RHODHISS
L30 / 1.215 AC.
L29 L- -- -?
L28 L171 S16'19'38'W
L27 349.70
--------------- -------
A
LENOIR
LAKE RHODHISS `
LAKE RHODHISS
i}"
Q- .
OJv Ny?`
Q RUTHERFORD
COLLEGE
W o o VICINITY MAP
W Q NO SCALE
J \
f \.
( \N o 1.374 AC. 2 $ .
N ` / Slg 2i, /
N /
IN?
X20 ? a232E / !!
SAS ' / r2
L19 L??? ?j8?
L18 r- 1
L17 n m
I
w
11
IC>
-o
Ob
S?l
co
s
m ?
? d
? s
r ?
jqver? 8arr;ev
-t??
N