Loading...
HomeMy WebLinkAbout20011373 Ver 1_COMPLETE FILE_20010911?OF WA TARO Michael F. Easley, Governor William G. Ross Jr., Secretary \+? ? North Carolina Department of Environment and Natural Resources co r Gregory J. Thorpe, Ph.D. -{ Acting Director U Y Division of Water Quality September 21, 2001 CERTIFIED MAIL: 7001 1940 0003 92913173 RETURN RECEIPT REQUESTED Mr. Bobby Edens 465 Belt Road Hampstead, NC 28443 SUBJECT: Approval of 401 Water Quality and Additional Conditions 922 Broadway Street DWQ Project # 011373 Onslow County Dear Mr. Edens: You have our approval, in accordance with the attached conditions (WQC # 3301) to conduct the following activity at the property located at 922 Broadway Street, Surf City, in Onslow County. This approval allows you to: 1) Construct a 12' X 36' boat ramp and extend 18' waterward of normal high water; 2) Construct a finger pier, covered dock and boat lift. This approval is only valid for the purpose and design that you described in your CAMA application dated August 22, 2001 received by the Division of Water Quality (DWQ). After reviewing your application, we have determined that General Water Quality Certification Number 3301 covers this activity. This Certification allows you to use your CAMA Permit when the NC Division of Coastal Management issues it. Please keep in mind that there may be additional Federal, State or Local regulations applicable to your project, such as (but not limited to) Sediment and Erosion Control, Non- Discharge and Water Supply Watershed regulations and Coastal Stormwater. In addition, this approval will expire when the accompanying CAMA Permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your CAMA application dated August 22, 2001. If you change or modify your project, you must notify the Division (DWQ) in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional condition listed below. 1). Turbidity controls must be maintained throughout construction, so that turbidity does not exceed 25 NTUs outside the project area. 2). The attached Certificate of Completion (COC) must be submitted to the Division upon final construction of the site. ,low A 26 Ex127 Cardinal Drive t., Wilmington, NC 28405-3845 Telephone (910) 395-3900 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer Page Two Mr. Bobby Edens September 21, 2001 If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the DWQ Permit # 011373 under Section 401 of the Clean Water Act. If you have any questions, please telephone Joanne Steenhuis or Rick Shiver at 910-395-3900. Sincerely, Gregory J. Thorpe, Ph.D. Acting Director, Division of Water Quality Attachments: GC # 3301 Certificate of Completion cc: Corps of Engineers Wilmington Field Office - Lillette Moore WiRO- Joanne Steenhuis 401/Wetland Unit, Central Office -Todd St. John CAMA - Jim Gregson James Cook Central Files CAMA PERMIT 401 WATER QUALITY CERTIFICATION AND WRITTEN DIVISION OF WATER QUALITY CONCURRENCE FOR SPECIFIED BOAT RAMPS, BULKHEADS, SHADING, PIERS, MAINTENANCE DREDGING, UTILITY LINES AND UPLAiV13 DEVELOPMENT GENERAL 401 WATER QUALITY CERTIFICATION FOR PROJECTS ELIGIBLE FOR CORPS OF ENGINEERS GENERAL PERNIIT NUMBER 198000291 (ISSUED TO THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT) AND NEUSE/TAR-PAMLICO BUFFER RULES This General Certification and written concurrence is issued in conformity with requirement of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North-Carolina Division of Water Quality Regulations in- 15 NCAC 2H, Section .0500 and 15 NCAC 2B .0200 for the discharge of fill material as described in General Permit 198000291 and for the Neuse and Tar-Pamlico Buffer Rules (15A NCAC 2B .0233 and .0259). This Water Quality Certification (WQC) is rescinded when the Corps of Engineers re-authorizes Regional General Permit 0291 or when deemed appropriate by the Director of the Division of Water Quality (DWQ). The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with conditions hereinafter set forth. Conditions of Certification: Activities covered by this General Certification do not require written concurrence from the Division of Water Quality as long as they comply with all conditions of this General Certification, the CAMA Permit and General Permit 198000291. If any condition in this Certification cannot be met, then the applicant is required to submit an application and receive written concurrence from DWQ prior to beginning work; 2. The following activities do not require written concurrence and do not require payment of the 401 Water Quality Certification fee - • Boat Ramps and associated access (i.e., roads and parking lots) that involve the excavation or filling of less than 500 square feet of wetland and open water area, with the exception that the excavation or filling of coastal wetlands may not exceed 100 square feet and except when associated with new marinas, subdivisions and commercial development); • Shoreline protection measures that tie into existing bulkheads, land or other shoreline protection measures or do not extend waterward of the water line more than 10 feet, provided that the activity will not involve the excavation or filling of any SAV or shellfish resources and impacts less than 500 square feet of vegetated wetlands or less than 100 square feet of coastal wetlands; • Piers and docks desiamned to accommodate fewer than 10 vessels and the water depth is greater than three feet; • Maintenance dredging of less than 0.5 acres of water or non-vegetated wetlands provided that the applicant can provide written documentation showing the historic dimensions of the dredged channel, and no Submerged Aquatic Vegetation or shellfish beds are excavated or filled; Projects that only involve shading of waters or wetlands; Utility lines, except wastewater lines and potable water discharge lines which are subject to an NPDES Permit, as long as wetland or water impacts are temporary; Upland development which involves no more than 1/10 of an acre of excavation or filling of non-coastal wetlands, with the exception that no more than 2,000 square feet of the non-coastal excavation or filling may take place within an Area of Environmental Concern. For the purposes of this area calculation, the excavation or filling impacts of boat ramps, bulkheads or other shoreline stabilization measures must be considered. The applicant must comply with all applicable coastal stormwater rules; Single family home construction that results in fill of 404 wetlands as long as written concurrence is not required from DWQ for the applicable Corps of Engineers Nationwide Permit. 3. Activities authorized by Coastal Area Management Act (LAMA) General permits do not require written concurrence from the Division of Water Quality as long as they comply with all other conditions of this General Certification; 4. In accordance with North Carolina General Statute Section 143-215.31)(e), any request for written concurrence for a 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, one payment to both agencies shall be submitted and will be the higher of the two fees. The fee shall be collected and distributed between the two agencies by the Division of Coastal Management; This certification does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. Specifically, the permitee shall contact the North Carolina Division of Water Quality to determine consistency with the Neuse or Tar-Pamlico Buffer Rules (15A NCAC 2B .0233 and 15A NCAC 213 .0259). New development activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse and Tar-Pamlico River Basins shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B.0233 and 15A NCAC 2B.0259. All new development shall be located. designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. Activities listed as "exempt" from these rules do not need to apply for written concurrence under this Certification; 6. Appropriate sediment and erosion control practices that equal or exceed those outlined in the most recent edition of the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" (available from the Division of Land Resources in the DENR Regional or Central Offices) shall be utilized to prevent exceedances of the appropriate turbidity water quality standard (50 NTU's in freshwater streams and rivers; 25 NTU's in all saltwater classes, and all lakes and reservoirs); 7. All sediment and erosion control measures placed in wetlands or waters shall be removed and the natural grade restored after the Division of Land Resources has released the project; 2 8. If an environmental document is required, this Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse; 9. Measures shall be taken to prevent live or fresh concrete from coming into contact with waters of the state until the concrete has hardened; 10. This General Certification is not applicable to a project where the Director of the Division of Water Quality or the Director of the Division of Coastal Management have determined, based on an initial review of the application, that written concurrence is needed because of concerns related to water quality or aquatic life. 11. Additional site-specific conditions may be added to projects which have applied for CAMA major permits which are proposed under this Certification in order to ensure compliance with all applicable water quality and effluent standards; 12. If written concurrence is required for this activity, DWQ shall be sent a written notification within 30 days of completion of the wetland or stream impact or upon expiration of the 404 Permit or 401 Certification. Such notification shall be sent to the Central Office of the Division of Water Quality on the form provided with the Certification, shall be accompanied by a map depicting the work completed, and shall be signed by the land owner or other responsible party. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this Certification for the project and may result in criminal and/or civil penalties. The Director of the North Carolina Division of Water Quality may require submission of a formal application for individual certification for any project in this category of activity, if it is determined that the project is likely to have a significant adverse effect upon water quality or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications-or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: 1 December 2000 By Kerr T..Stevens ` Director WQC# 3301 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: 1, . hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final 1, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Mail to: 401 Wetlands Contact NC Dept. of Environment and Natural Resources 127 Cardnal Drive Ext. Wilmington, NC 28405-2004 Registration No. MEMORANDUM TO: John Dorney Regional Contact: j Steenhuis Non-Discharge Branch WO Supervisor: S _,Shiver Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Bobby Edens County ONSLOW Project Number 01 ' 1373 County2 Recvd From DCM Region Wilmington Received Date 9/11/01 Recvd By Region Project Type boat ramp, dock Certificates Stream Stream Impacts (ft.) Permit Wetland' Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. ME CAMA Waters P _Y@) ? F 20-36 SA H>w 30,503. ? ?- F'-F -7- P7- _0N F-F_7__r-rte-F- F_- 1? 11 Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? O Y ON Did you request more info? O Y ON Have Project Changes/Conditions Been Discussed With Applicant? O Y O N Is Mitigation required? O Y O N Recommendation: O Issue O Issue/Coed O Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: This office has no objection to the eject as proposed, cc: Regional Office Central Office Page Number 1 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 011373 1. APPLICANT'S NAME: Bobby Edens 2. LOCATION OF PROJECT SITE: 922 Broadway Street, Surf City, Adjacent to a man-made canal, Onslow County Photo Index - 2000: 25-332 1995: 25-316 1989: 173-9 State Plane Coordinates - X: 2446171 Y: 255835 Rover File: S081419A 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 08/14/01 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - 08/02/01 Office - Wilmington 6. SITE DESCRIPTION: - (A) Local Land Use Plan - Surf City Land Classification From LUP - Developed / Conservation (B) AEC(s) Involved: ES EW PT OH (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - Town of Surf City Sewer System Planned - N/A (F) Type of Structures: Existing - Concrete drive, bulkhead Planned - Boat Ramp, pier (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands Coastal marsh (B) Non-Vegetated Wetlands 216 sq. ft. 360 sq. ft. (Open water incorporated (C) Other 216 sq. ft. (Hi h round) (D) Total Area Disturbed: 792 sq. ft. (E) Primary Nursery Area: No (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: The applicants propose to construct a private boat ramp, dock and boat lift on a man-made canal. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 0 Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer Bobby Edens Page Two 9. PROJECT DESCRIPTION The applicants property is located at 922 Broadway Street, within the Town of Surf City, in Onslow County. The property is located adjacent to a man-made canal off the Atlantic Intracoastal Waterway (Topsail Sound) and is in the area of Surf City known locally as Old Settler's Beach. This man-made canal is the southern most of a series of seven canals which start just north of the Pender/Onslow County line. The high ground property is a residential lot approximately 55' wide by 135' deep. The elevation of the property is approximately 3' above normal high water. Existing development on the lot includes a concrete drive and bulkhead. The applicant has an active letter of exemption and State Dredge and Fill Permit No. 28254-D for replacement of the bulkhead. The lot has approximately 55' of bulkheaded shoreline along the man-made canal. High ground vegetation includes lawn grasses and Southern Wax Myrtle (Myrica cerifera). There are no coastal wetlands present along the bulkhead. The man-made canal measures approximately 116' across at the applicant's property. The waters of the canal are classified "SA" by the Division of Water Quality. The area is not designated a Primary Nursery Area and is closed to the taking of shellfish. The lot also lies within the High Hazard Flood Area AEC which precludes the issuance of CAMA General Permits for docks, piers and boat ramps. The applicants are proposing to construct a boat ramp, dock and boat lift into the man-made canal. The boat ramp would be located at the western property line and would measure approximately 12' wide by approximately 36' long. The structure would extend approximately 10' waterward of outer edge of marsh or approximately 18' waterward of normal high water. Along the east side of the ramp the applicant is proposing to construct a 4' wide by 15' long finger pier. Approximately 17' from the pier, the applicant is proposing a 12' by 12' covered dock extending directly from the bulkhead. Adjacent to the dock, a 12' by 13' uncovered boat lift is proposed. Water depths at the end of the structures would be approximately -4.0' at low tide. 10. ANTICIPATED D"ACTS The proposed new boat ramp would result in the filling of approximately 216 sq. ft. of shallow bottom within the canal. Additional high ground disturbance of approximately 216 sq. ft. can be expected for installation of the landward end of the ramp. The proposed pier, dock and boat lift would incorporate approximately 360 sq. ft. of public trust area. Minor increases in turbidity can be expected during piling installation. Submitted by: Jim Gregson Date: August 22, 2001 Office: Wilmington 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 • Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer I. APPLlc-kNT "PLICATION (Ib be completed by all applicants) i b. CITY, tow , mmuni jy or landniZb U11V161U T t- r c. a. Landowner: CCAS IAL MANAGEMENT- Name O)D y -dt'hs Address 6 S S e l? Rd , City /?tt'n ps4e t Q 4 State C Zip g 3 Day Puone 3 9 7 6 y ,=ax A) 4 b. Author-- Agent: Name 7aK.-L P4 Coo ?-I Address 6 / d l e, k C/ . City awl S f- e q Sta•? A/ C Street address or se;:ondar-,, read number - 92Z t3 roatj , a y S? d- is proposed wort within city limits or planning }urisdiction? Yes No e. 1\ame of body of Dearest project (e Greet, sound, ba -i?- riven, Cona c+l??) /''t Qk N? ?td? Cana/ 3. DESCRjFnQh _ND LD LTSF OF PROPOSED PRQ?CT a. List all ci--, .,}opm-.-nt activi`?i YOU building a boz..t? propose (e.g. ez: -anon ?/or?' buIltaead, Pi`:, and k mg rcc Z - S y y3 Dav Phone 9/ Q S ys? 3??? i 2:- g - yg! 0 Qj-' mane L. f N -prof 'IF ,Qt+ _. I,OC IT 0- OF R;> . + -RR- 0ZH C- Coy*nr. Q n 0 W C Q. J tns- vrroz }os-j r,••ai-rte-a?-•= _ DrDi M VV - -? or.:, or botL? Q d '1 ` r'i Tw.'ili L'ee phi°? ce for pubii=, =a ;A t Give z briaf e??«ption of =tir'?se, zje, ?:?ri?: of " ). =a.?u-'IOI7 mgr r-, -more .•. ay o_t'a:ations a: pror s?^ t-1 10 d. W M ??•?F , f p Er ? ? n 4. D A- -D Wi .4 in Des ibe e _D i V i S i O N n; k'zsteu'ate: tr:annrat :acilltirs CH-ARACTERLSTI S i i e! `° t f °. I E u S E w MI ENT a. Size of entire ? ss ? X ? 3 S ? n• D-,= oe lacation and t}'P . e of dis.szrgts to uat b• Si- of individual lot(s) .SS ? k ? 3 .S- ? Of the rate. e;,ample, surace runoff ?+zsteu-ater , sani? industrial/- " =- lu° c. Appro;.imate el?-ation of t±aC1 ° down' and r?identi dischar? ?nt'z h?'L abov.. MI?'W or ?'?tti. m-f-{- 0 b ? ?-) S u r f a. F a .?y C*-W- wol talk d. Soil type(s) anD t-.?utr s) of tract D. D?Tlne e? S •1 "? and rrn° water supply sro?ur)ce. e• Vegetation on trac,- cPGiS S O 'v CC µ ?'vlvr 8 M ? h i. M"u--made f°aOlres nou, on Ce Of crP d e wti - d r ? a v ?. ADDIT.If ONAL Wrat is the CAMA Land Use plan 1 .. c.assiu.:atian of the site? cq. ? .?, t., b=z1;m,aurPlzr in -addition. to the compl ` • _ folloWina'- ° d: --ation form, the COnsen-ation >zr Ire m*• 1 be sub . . transitional : __ CZ Develoued ? -? Comm> A copy Or the Rural d? „T (With state annii only) DfDer zr-M-1mlent under YrIII=II he ?tlon ar 27 The . ° Y FI. aDDiIrant claims YIIlc +1- 'soli' is the _ ray I zoned by lo: aI gov??? ? ? prop=-?°s- If the ? _-aM is not • N. S, -aiMin? to be Ihe o annii -14 Ur ZOn p fo;zard ;`, ?? ail.said prop==?3',ben « ai the r deed or Oth 1`1- m'-° 1 iJ +i- IIRIDaJed Drolr 1 ca• r unI- a ozt'n.: n: unjjat ?aili?^? -Jt=II1 WItII the c"+7DII=DI_ tT7tT tII_ D 1?'? tItl?, plus r,-, ,--Iaolr- the -D n lxrtz=. L. LL3i WOE i, 13121 (Inci1IQILa p:.M YieS;' ?IrOfMsioral zz=haeOjDzi_ al J.^.Z a. sTin-s ZrSll;eIIt D Q, n.;mD Stele z done fGr the =? III on an i Yes b.a _ No r b?l 1x ?+'h*Ir ar - A ' I y.°s, by who.? I. Rzf= to :rGa;.al ?°-SJiIr^ ?' L11- °-7n n CL -Sion Pwt IT.Cr .3 7D 2 Is IL° prow= io_ate M hCliar_l g o - i-rork -D Di5?1: or o- ua a do= it involve a °?-al arawia?s .are_ hsL 0i eiigiD- 15 DrOD°^ =O ia- Pry-::ed and X 1t0` _ Uiz? lli be 2 z=. L-1 1 a c= ;°.^--+.abie 26=uate s'1ZITUDC: a1 clu only Ii c%i r,i? Ma i. Are . Irr c W°r,.,idnDS OLD IIS° SIr t TI)iZ. .i?. ([On'+3i1 ` MrOYIL-'.e6 by eczsml c;-n-- es No = sm? the L_S_ A--m; Colps of - 11iC.•Jll) _ ItIat Zen•'f ISM Or la °- Yes_. nzs a d-hn_ation De,°n Zondur`?? Gra:tlzlw-) !?`';Ie or 10=a%i Ii ?` - OIl zaaD IS 2 jai 1 O2 D: -jr uir; ? `- °°:: ?' T' .JDnP t - be suFL' eIltiy d alttd ID e, • Lu± IiiL with t:Z° - •L ID Ic_ R=riled [31?, tort.; DChi-KM site. in::lsde hiRh;.-av or secondary road (SP) nurnrers, landmarks, and the like. A Stormwater Ce?_fincation, if one is ne::=27, a A list Of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return 2eceipts as proof that such owners have received a copy of the applicafion and plats by Mined mail. Such landowners must be advised that they have 30 d2ys in which to submit comments. an the proposed prOJO-_1 to the Division Of Coastal Management. upon signing this form, the applicant further celzin"es that such notice has been provided.- Name 41rr, cc h Address C?3 Phone C, y 4,t h N t c -? & Natne A- ki ti c R. CD ! e a v Address 5-/ :3 Phone L.J a r,S q w c, Z 3 Q Narne Address Phone A list of areyioa state o- led p°.?-Iruts -rst?° I-()!- - work on tae roie.-t tr?L include pe_*mit numLt pernlltZ_-, and issuing dateS. p=,?c 2 2S?-/ '?d r Q K ? ?- ? , eQ? for S RMe 1° raj ec -for 5250 made ua obit of to the D?^ _?a:eu: of =1?viro=eu_, si°:Itr and (D= ?Np,) to cover the -rocs N).r P? sour= a_piI n at Dm::=ing the A - -?-ard police far proie?? in o-°?ont and m: F S`af-"n_°nt a;?IIIDLHn:? Tr?I`4 `1 ft 2e v_ronnl?I:aIraTi _t 17,,E (._?.C.C.S. iii ° -Ito =i the nroie_L invoiv-- the =Denditure of public flI16? a_ use O' Dilhll? lands atin^_I] a $', -rte doL*rer:?- ?ri:ance t;?e rioCaroii;.a =nviron.::_r,za? : oiic? z= . 6- CERTMCATION AND -PER_NffSSZO? TO EN'Z'ER ON LAND I unde=stand that anv pert issued in remorse aDPIicaion Kill allow only the develo me A ` tn; the anpii tion. p projeect P nt described n - and restri?iO main will be subje. t conditiotr PemiL I certify that to the best of my Imowled,ge activity complies with the State ° ' he prDP°se of approved Coastal M A North Carolina's conducted in Van?,-,em= Pr b°ram and will be manner co nsistent with such Dro°_ian1. I ce'tifv twat T am authorized to t°' t Passion to Mr=e tTa °nt, and do. in review zencies en onta?ves of state and fede;ai to t_._ On tZZe aforelnention? lands in conn;^t On with evaiu attn. Aroi° inforraa*ion related to this tr alit ap.Dhz2 ion and follow-ur) monitoring of the c?- app on e' that the imOrmation provided in` this rzrthfUI to tae L,= of II7Y inawledee, 7nis L th? 2 dom. of A-? 4S zoo C& 17 T pure t7r01e. _. .,atntn?'tp vaLl_ Drai'rZ_ D?hr I - J =L-nnatior X J CW up.and Dev=,? otr eu: Jy y_-UJr = 17110- Mbar, DChj I -5 ?Bridz-sIld truly D-W 1 xzEp X& i { `ipazr r it rne I v, U L a DGir t DIVIIS?ON OF BOAS TA! 11,4ANAGEIVIEN 4 Rerse? Q3!V rUFM LPk-JV1-lr1Y-1 EXCAVATION A ND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the puipose of proposed excavation or fill activities. All values to be given in feet. Average Fuss! Eld? Project Length Width Depth Depth Access channel (hII-V,r) or (NWL) Canal Boat basin Boat ramp Rock . groin Rock breakwater Dther (==iuding shor--iinr stabiljtion) ?1l /A G?„V AUr 0 2 2001 OF EXCAVATION ION a.- Amount of material to be excavated from below MHW or NWL in cubic yards Al b. Type of material to be excavated - 44 t 7- c. Does the area to be excavated include coastal weds (marsh), submerged aquatic vegetation (SAVs) or other wetlands? - yes No d. Highground excavation in cubic yards I_ 2 y?(j 2. DISPOSAL OF EXCAVATED XL&TERIAL a. Location of dip osal area L• .r p? ` -fo r b. Dimensions of disposal area c. Do you claim title to disposal area? --,Y- yes No If no, attach a letter grantin. b permission from the ,?. owner. d. Will a disposal area be available for future maintenance? Yes _Z( No If yes, where? ----------------- Revised d3!g Form 6CM-MP-2. \ e. Does the disposal area include any naaw "f a.q 2 V E y' TP (marsh), SAVs or other wetlands? Yes _•X - No AUGG 0 2 2001 1) - Amount of material to be placed in the water NIA f. Does the disposal include any area ,the, rater? `? J (2) Dimensions of fill area 2 T Yes _ X No ?' ?' r` ` lV ` itf A, G E_' M1 E T(3) Purpose of fill ete t r l Tm r r1?w Walt b. Will fill material be placed in coastal wetlands 3. SHORELINE STABILIZATION (marsh), SAVs or other wetlands? Yes No a. Type of shoreline stabiliizafion If yes, (1) Dimensions of fill area At? X Bulkhead Riprap (2) Purpose of fill _ WA b. Length 7 c. Average distance waterward of MHW or NWL 5. GENERAL d. Maximum distance watenvard of MHW or NWL 2-1 a. How will excavated or fill material be kept on site e. Shoreline erosion during preceding 12 months and erosion controlled? -f; (( w X 1"'t ?V one .' P La ,c e bec d me w?rl? (soar- .of inforn--ion) n ?=l 'Y a e r C O •?-+ p l e f ?? s n f. Type of bulkhead or riprap material ?n R e? P'K "o /P • . 4 ( b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic g. Amount of rill in cubic yards to be placed below dredge)? l T water level v v e cc c (1) Riprap (2) Bulkhead backfill 2 C'4 b,c V4.44 S ' Ci d c. Will wetlands be crassed in transporting equipment h. a n Type of fill material 9 to project site? Yes loo X -- - -for s r, d /tit , `X , _ If yes, explain steps that will be taken to lessen Wf ?e cr S'2 e environmental impact. Al / ? i. y t Source of fill material : A) - , C 4. OTHER FILL ACTTVITTES (Excluding Shoreline Stabiiizalion) cnA AppL' or Proje= Stnnaturr a. Will ill material be brought to site? ? ? ? S 2_0C1 J_( Yes No p v DSL Revised d 01,05 . Form DCM :MP-4 STRUCT URE S (Construction, within Public Trust Areas) Attach this form to Joint Application for LAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to ' this proposed project. a.. Dock(s) and/or Pier(s) (1) _ Commercial Community f private (2) Number /V lf}. (3) Length &Z.,4 (4) Width _ 2 (5) Finger Piers X Yes No (i) Number (ii) Length - ! S (iii) Width y (6) Platform(s) k Yes No (i) Number (ii) Length 2. (iii) Width I 7- (7) Number of slips proposed (8) Proximity of structure to adjacent riparian property lines 12 (9) Width of water body // 6 (10) Water depth at waterward end of pier at MLW or N'WL, V b. Boathouse (including covered lifts) (1) ____6,4 Commercial _ IAA Private (2) Length M ?-' (3) Width c- Groin (e.g. wood, sh ile etc.) - (1) Number /lJ %? (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands ?- e. Moorin buoys (1) commercial ommunity P 'Private (2) Number /Ir (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body ?(/ (5) Distance buoy(s) to -be placed beyond shoreline f Mooring structure oatlift mooring pilings, etc.) (1) Commercial -Community -Y- private (2) Number j (3) Length (4) Width g• Other (Give eolete description) 8d b b y e Cie 'e S. Fde 's &C ? /0'.0-V ??, Applicant or sect Name eat 1- 4 s -- - 2 ? 00/ Date j r `-? c 2001 J, ' :w iSi0N Revised 03195 Lid e% 4 ()rat k ?fOj eCf ,6o b6y E:dear s 922. 13r-d'd-'t'/ St- 4; '4 !?«y-f4 Z, 2661 pQ,c 1 of Z Scale o f 1 " .- 30' ci: i ? ? N 1 ? ? ?? 1 rya d wc?y m ? Lot ai ? 0#% 0491 p . yi Ntj Wo, a'tj,LPJ- mein. made- calla), ly tL V N,ff.w• -7 q' At,Aw. -7 s _ A j New w Ivor P, r, 4`D ZIN ?,( v Q. ad CL- f ?' # I ? ? d pla 1 '0 -F 2 q 9zo ti Q rdad tva T ?r yy 4? `' y? r i t ? a Ramp ?! li (6 l LA 927- Ari7qj W0-Y tl W L? ems 10a.1,r Pro f?4 922 ?gtxa '? S c a Ie 1 3Q ?j e.? 12,v 12' CQ r Qec?- ?t q 1,21 r deg,S Il??ck pfo? c 9,2-2 ??aQ a s4 Scale: /Q 41 ?Itpts pock Projecl. 22- 2 ,ro q4 w*-I S4- . C t - kl- Al t C h-u6jtC4 21 200 ? a p G7 C=5 G -. N G)O _ O m -n K t?Ji m z 91 4 jj? kS? 2, 2- 0 Pa9B Z o ? z