Loading...
HomeMy WebLinkAboutNC0024252_Pretreatment_Annual_Report_20200227CITY OF CONOVER P.O. BOX 549 CONOVER, NC 28613-0549 February 27, 2020 NC Division of Water Resources PERCS Unit 1617 Mail Service Center Raleigh, NC 27699-1617 PUBLIC WORKS DEPARTMENT Phone 8284644808 Attached is City of Conover's (NPDES NC0024252) Pretreatment Annual Report (PAR) for the period of January 1, 2019 through December 31, 2019. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. If you have any questions concerning the material, please contact me, Brian Bradshaw, at 828-464-4808. Sincerely, z&/Y�/ &04X�5 Brian Bradshaw City of Conover Public Utilities Director City of Conover (NPDES #NC0024252) 2019 PAR Narrative GENERAL INFORMATION: GENERAL PROGRAM INFORMATION: e HWA, LTMP, IWS, SUO and ERP are up to date o All Dates on the Divisions Database Program Info Sheet are correct • A copy of our Program Info sheet is enclosed with corrections due to the sudden passing or Mr. Rubins who was the acting Pretreatment Coordinator. Brian Bradshaw, Conover Public Utilities Director, will serve as Pretreatment Coordinator until a suitable candidate is found. GENERAL PERMIT INFORMATION: • No permits lapsed or expired prior to renewal • Engineered Controls International had a name change to REGO Engineered Controls International. • No new SIUs were added in 2019 IU INFORMATION, listed alphabetically • Hickory Springs Manufacturing (IUP: lO1HS) SNC INFORMATION: o Hickory Springs Manufacturing had no SNCs for 2019 • REGO Engineered Controls International (]UP: 1 O1J) o This SIU was in SNC for TRC limit violations for Chromium during the monitoring period of January 2019 to June 2019. o A copy of the Public Notice is enclosed. o IU determined they had an issue with polishing columns and purchased new resin to exchange out the columns. o As part of the Corrective Action the IU was required to sample a minimum of once per month for metals for the rest of 2019. o The SIU has since returned to compliance during the second monitoring period of July 2019 to December 2019. ORDERS AND SCHEDULE INFORMATION: None A to C and CONSTRUCTION INFORMATION: None CITY OF CONOVER P.O. BOX 549 CONOVER, NC 28613-0549 February 24, 2020 NC Division of Water Resources-PERCS Unit 1617 Mail Service Center Raleigh, NC 28699-1617 PUBLIC WORKS DEPARTMENT Subject: Delegation of Pretreatment Program Signatory Authority City of Conover (NPDES Permit NC0024252) Catawba County Dear PERCS: Phone 8284644808 Section 22-41 of the City of Conover's Sewer Use Ordinance designates our Public Utilities Director as the POTW Director and delegates responsibility for overall operation of the City of Conover's Pretreatment Program. Our current Public Utilities Director is Brian Bradshaw. This designation will provide Mr. Bradshaw with the authority to sign all required documents under the Pretreatment Program, including the authority to sign the Pretreatment Annual Report (PAR) and submit it to NC DWR PERCS. If you have any questions, please contact me at 828-464-1191 or Brian Bradshaw at 828-464-4808. Ce: Donald E. Duncan, City Manager Brian Bradshaw, Public Utilities Director Pretreatment Program Info Database printed on: 12/20/2019 foI Program Name Conover VAAJTP Name Northeast <. Stream ltll0/!f)di100 _ IWC % at 7Q10 31.71 Program Approval Date 03/26/1985 7010 Flow cis / mgd 5 / 3.23 Pretreatment Status Modified 1Q10 Flow cis / mgd 4.17 / 2.69 Stream Classification C Region MRO Basin Number CTB32 County Catawba Receiving Stream Name LYLE CREEK NPDES Number NCO024252 NPDES Effective Date 12/01l2016 Last PAR Rec 02/07/2019 PAR Due Date 03/01/2020 mercury 1631 NPDES Expire Date 11/30/2021 Current Fiscal required Year PCI Done POTW is Primary WWTP TRUE Last Audit on 09/12/2019 Audit Year Next23/24 es Design Flow mgd 1.5000 / Design mgd is SIU permitted 3.13 Permitted SIU flow (mgd) [Pt_SIU) .047 VWVTP SIU's 2 Program SIUs 2 -. WWTP CIU's 2 Program cl UsHWA LTMP IWS SUO ERP date Inactive Date Next Due 01/01l2999 i�10/01/2022 Date Received by DWR 111/23/1993 1 12/11/2000 01/24/2018 01/15/2013 07/02/2015 Date Approved 12/20/1993 11/28/2001 03/09/2018 04/02/2013 1 08/19/2015 Adopt Date Required Date Adopted 07/0212013 Info in this Box from Pt Contacts Date Dete Date PT Pro Attended Attended Attended Formal Name e.Prime Phonel ext Fax uwe wtre.. Mr.Evant2etYms- Prim ($2B}-488227L!� 92446E6106- 2124I2009 4118I2014 112912019 l/29/2020 evan.rubl9sQcanoverns�ovI Pretreatment Coordinator PO Box 549 28813 Brian Bradshaw 828-464-4808 Utilities Director Fax: 828-464-5299 email: brian.bradshaw@conovernc.guv CORRECTIONS ARE NEEDED DWR Central Office Contact Iv7en Zhong DWR Regional Contact es Bell Chapter 9, IF Guidance Pretreatment Performance Summary (PPS) 3. 4. 5. 6, 7, 8. 9. 10, 11, 12. 13. 14. 15 16, 17, 18. 19, 20, Pretreatment Town Name: City of Conover "Primary" NPDES Number NC00 24252 or Non —Discharge Permit # if applicable => PAR Begin Date, please enter 01/O1/yyyy PAR End Date, please enter 12/31/yyyy Total number of SIUs, includes CIUs Number of CIUs Number of SIUs with no IUP, or with an expired IUP Number of SIUs not inspected by POTW Number of SIUs not sampled by POTW Number of SIUs in SNC due to IUP Limit violations Number of SIUs in SNC due to Reporting violations Number of SIUs in SNC due to violation of a Compliance Schedule, CO, AO or similar Number of CIUs in SNC Number of SIUs included in Public Notice Total number of SIUs on a compliance schedule, CO, AO or similar Number ofNOVs, NNCs or similar assesed to SIUs Number of Civil Penalties assessed to SIUs Number of Criminal Penalties assessed to SIUs Total Amount of Civil Penalties Collected 19. _> Number of IUs from which penalties collected Foot Notes: AO Administrative Order CIU Categorical Industrial User CO Consent Order IU Industrial User IUP Industrial User Pretreatment Permit NNC Notice ofNon-Compliance NOV Notice of Violation PAR Pretreatment Annual Report 14. POTW Publicly Owned Treatment Works SIU Significant Industrial User SNC Significant Non -Compliance revised I/2018: PAR PPS ?O18 N U O N E" N ° � N w 3 0 U II n II n II w Q L{. U �U) a It �- o a a� c Q. c a o �U d C E Z L L mi IL N Ef U 0 z u z U GJ �• z zap G O � w ti d O R sy F a:42 O z � w d a � of a # o Public Notice Notice of Signifi• cant Noncompli- ance for 2019 Notice is hereby given that pur- ' suant to the fed- eral regulations contained in 40 < CFR 403.9f (2) ), City of Can- ` over Is required to publish the names of all In- dustrial . Users (IU) of the City of Conover's public sewer system thaI were deter- mined to be in significant non- compliance {SNC) with appil- cable pretreat- ment standards or other pretreat- ment require- ments during the 2019 calendar year. Federal regulations estab- Ilsh objective cri- teria for the City of Conover to use to determine If an IU is in SNC. Discharge Quality Violations industrial User - GO Engi- neered Controls International, 911 Industrial Drive SW, Conover, NO Nalure of Viola- tion- In the moni- toring period of January- June - 2019 the Industri- al User exceeded the monthly aver- age Technical Review Criteria (TRC) limit of 2.052 mg1I for Chromium. Since Then the Industrial User has re- turned to compll- ance during the second monitor - period of July 2019 — December 2019, Publish: February ; 27, 2020 Brian Bradshaw From: Joy Heller Sent: Thursday, February 27, 2020 1:32 PM To: Brian Bradshaw Subject: Public Notice Publication - City of Conover Attachments: Public Notice - City of Conover.pdf Brian, Attached is the Public Notice for the City of Conover that was published in the Observer News Enterprise dated February 27, 2020. Thank you. Joy Joy L. 3-CeCCer, C911C, NCC.7vlC Deputy City CCerk City of Conover P. O. Box 549 Conover, NC 28613 Ph. (828)-695-2909 Fax (828)-465-5177 iou.heCCer@conovernc.gov � .� ® You Q �i.rb •� cmac"ue`o�+ "This institution is an equaC opportunity provider and emytoyer" A L a C N � w o m N s N N C N O N N L N ■ M N ■ N X C o o n `a E N c � C L U N c O � c Q ' U o 3 m c � W O 3 � x N E X O � C c a U A N N � = � c C o � N IL - - Y Pretreatment Annual Report (PAR) Industrial Data Summary Form (IDSF) Use separate forms for each industry/pipe Enter BDL values as < (value) Total # of samples => * daily max MGD * monthly average MGD * or _ Average (mg/1) => * or Average Loading (lb/d) => % violations,(chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => A %violations,(chronic SNC is >= 660) a) _> % TRC violations, (SNC is >= 33 %) => Total # of samples => * Maximum (mg/1) => * or Maximum (lb/d) _> * or _ Average (mg/1) => * or Average Loading (lb/d) _> % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) % violations,(chronic SNC is >= 66%) _> r % TRC violations, (SNC is >= 33 %) => Total # of samples => * Maximum (mg/1) => * or Maximum (lb/d) _> * or Average (mg/1) => * or Average Loading (lb/d) => % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >— 33 %) % violations,(chronic SNC is >= 66%) _> = % TRC violations, (SNC is >= 33 %) => Control Authority, Industry Town Name => Conover Name Hickory Springs MFG Wire W WTP Name => NEW WTP IUP # 1 O1HS NPDES # => Pipe # NCO024252 001 Ist6months, dates => 1/l/2019 to 6/30/2019 2nd 6 months, dates => 7/1/2019 to 12/31/2019 ow, mg Ammonia s mon s n mon s s mon s n mon s s mon s n mon s st mon s n mon s 74 84 0.00070 0.00065 0.00035 0.00032 0 0 0 0 0 0 0 0 rsemc Cadmium romaum st mont s n mon s st mon s n mont s st mon s n mont s st mont s n mont s 4 3 8 7 0,0005 <0.0002 0.01 0.006 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 opperCyanide ea ercury st months n months st mon s n mon s st mont s n mon s st mont s n mon s 8 7 4 3 3 3 0.108 0,010 0.008 0.006 <0.01 <0.01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 BDL => Below Detection Limit ma/l => milligrams per liter * POTW must enter at least one of these IUP => Industrial User Permit Ib/d => pounds per day or rows, Please indicate now averages were calculated SNC => Significant Non -Compliance mad => million gallons per day Avo period could be month tr, or 6-month & if BDL . 1/2BDL or zero values used. TRC => Technical Review Criteria W WTP => wastewater treatment plant Chapter: PAR Guidance File name: PF�rhdS>t}re��es('reiu�Q�ta(ingiBts�ctBARB, pages 12, 13, 14 Blank IDSF Fonn, Copy and use in your PAR Number each set for each IUP pipe -Page _ of Pretreatment Annual Report (PAR) Industrial Data Summary Form (IDSF) Use separate forms for each industry/pipe Enter BDL values as < (value) Total # of samples => * Maximum (mg/1) _> * or Maximum (lb/d) _> * or _ Average (mg/1) _> * or Average Loading (lb/d) _> _ • violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> o" • violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> Total # of samples => * Maximum (mg/1) _> * or Maximum (lb/d) _> * or _ Average (mg/1) _> * or Average Loading (lb/d) _> _ % violations, (chronic SNC is >- 66%) _> % TRC violations, (SNC is >= 33 %) _> .Q % violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> Total # of samples => * Maximum (mg/1) _> * or Maximum (lb/d) _> * or Average (mg/1) _> * or Average Loading (lb/d) _> _ • violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> o • violations, (chronic SNC is >= 66%) _> z % TRC violations, (SNC is >= 33 %) _> 2' Industry Name Hickory Springs MFG Wire IUP# IO1HS Pipe # 001 rease p st 6 months 2nd 6 months st wont It s 2nd 6 mont s st mon s n onts M sT coon s m n ont s 4 3 8 7 0.054 0.033 10.1 11.1 0 0 0 0 0 0 N/A N/A 0 0 N/A N/A 0 0 N/A N/A o y enum st 6 months 2nd6months Ist6months n ont s m st mont s n months I st mon s n mon s 8 7 34 3 0.665 0.702 0.015 0.002 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 st 6 months n on s m st 6 months 2nd 6 months I st 6 months n mont s I st 6 months 2na 0 months BDL => Below Detection Limit mgll => milligrams per liter * POTW must enter at least one of these IUP => Industrial User Permit Ib/d => pounds per day four rows, Please indicate how averages were calculated SNC => Significant Non -Compliance mgd => million gallons per day Avg period could be month, Qtr. or 6-month & if BDL , 1/2BDL, or zero values used. TRC => Technical Review Criteria W WTP => wastewater treatment plant Chapter: PAR Guidance File name: PFffiodidSs�rsi2s�e�iideQ�ta¢tegtBt s�ct§BdB, pages 12, 13, 14 Blank IDSF Forrn, Copy and use in your PAR Number each set for each IUP pipe -Page of Pretreatment Annual Report (PAR) Industrial Data Summary Form (IDSF) Use separate forms for each industry/pipe Enter BDL values as < (value) Total # of samples => * daily max MGD * monthly ave MGD * or Average (mg/1) => * or Average Loading (lb/d) => _ % violations,(chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> .o % violations,(chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) => Total # of samples => * Maximum (mg/1) => * or Maximum (lb/d) => * or Average (mg/1) => * or Average Loading (lb/d) _> _ % violations, (chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => o % violations,(chronic SNC is >= 66%) => % TRC violations, (SNC is >= 33 %) => E Total # of samples => * Maximum (mg/1) => * or Maximum (lb/d) => * or _ Average (mg/1) => * or Average Loading (lb/d) => _ % violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> A % violations,(chronic SNC is >— 66%) _> r % TRC violations, (SNC is Control Authority, Industry Town Name => Conover Name Eng Controls Int (REGO) WWTPName => NEWWTP IUP# 101J NPDES # => NCO024252 Pipe # 001 1st 6 months, dates => 1/1/2019 6/30/2019 2nd 6 months, dates => 7/1/2019 12/31/2019 BDL oW, mga 1JUV Ammonia st monnis 2.nd 6 mon s I st 0 months 2nd 0 montlis I st 0 montfis 2nd 0 months I St months 2nd 6 7077177 126 120 0.0040 0.0040 0.0022 0,0022 0 0 0 0 0 0 0 0 rsemc Uadmium rommm st mon s n on s m st n mos n mon s st Monts n mont s Ist6months n on s m 8 9 8 6 <0.002 <0.002 5.88 0.142 0 0 25 11.1 0 0 12.5 11.1 0 0 40 33.3 0 0 40 16.7 opper Uyanicle Lean JiViercury st 6 months nd 6 month s I st 6 month s 2 nd 6 months I st s mon n mon s st on s m 2 n moot s 8 9 8 9 8 9 <0.005 0.016 0.07 0 <0.005 <0.005 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 => Below Detection Limit mg/I => milligrams per liter * POTW must enter at least one of these IUP => Industrial User Permit 16/d => pounds per day four rows, Please indicate how averages were calculated SNC => Significant Non -Compliance mgd => million gallons per day Avs period could be month, Orr, or 6-month & if BDL , 1/2BDL, or zero values used TRC => Technical Review Criteria W WTP => wastewater treatment plant Chapter: PAR Guidance File name: PP6�nriidfidfi��e�inok¢dtdtaQta�$tsiscti?�AB, pages 12, 13, 14 BIanA IDSF Form, Copy and use in your PAR Number each set for each IIIP pipe -Page of Pretreatment Annual Report (PAR) Industrial Data Summary Form (IDSF) Use separate forms for each industry/pipe Enter BDL values as < (value) Total # of samples => * Maximum (mg/1) _> * or Minimum (lb/d)=> * or _ Average (mg/1) _> * or Average Loading (lb/d) _> _ % violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> o % violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> Total # of samples => * Maximum (mg/1) _> * or Maximum (lb/d) _> * or Average (mg/1) _> * or Average Loading (lb/d) _> _ % violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> A % violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> Total # of samples => * Maximum (mg/1) _> * or Maximum (lb/d) _> * or _ Average (mg/1) _> * or Average Loading (lb/d) _> _ • violations, (chronic SNC is >= 66%) _> % TRC violations, (SNC is >= 33 %) _> o • violations, (chronic SNC is >= 66%) _> r % TRC violations, (SNC is >= 33 %) _> Industry Name Engineered Controls Int (REGO) IUP# IO1J Pipe # 001 rease P11 st6months 2nd6months Ist6months n on s m st mont s 777mmmon=s st mon s n mont s 8 9 9 9 <0.005 0,022 9.8 11.6 0 0 0 11.1 0 0 0 0 0 0 1 1 N/A I N/A INC NILVER st 6 months 2nd 6 months I st 6 months n s mont st mont s n mont s st mon s n mont s 8 9 8 9 1.08 29.0 <0.005 <0.005 0 22.2 0 0 0 22.2 0 0 0 16.7 0 1 0 0 1 16.7 0 0 st months n months st mon s n mont s st mont s 2nd6mont 1 st 6 months 2nd 6 mont s BDL => Below Detection Limit mg/I => milligrams per liter * POTW must enter at least one of these IUP => Industrial User Permit Ib/d => pounds per day four rows, Please indicate how averages were calculated SNC => Significant Non -Compliance mad => million gallons per day Avg period could be month, Qtr. or 6-month & if BDL 1/2BDL, or zero values used TRC => Technical Review Criteria W WTP => wastewater treatment plant Chapter: PAR Guidance File name: PFIBo�didf6ftmha�e�iitkd�ta¢1�f31 s�ct9BAB, pages 12, l3, t4 Blank IDSF Form, Copy and use in your PAR Number each set for each I[JP pipe -Page _ of Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E (Jae separate sheets for each Pollutant SIU Name: REGO Engineered Controls international IUP Number: IOU Pipe Number: 001 Parameter: Chromium Six Month SNC Determination Period: I/l/2019 to 6/30/2019 Average Limit Compliance MonthlyAvg. Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliancejudgment not required for pH: Monthly Avg. Limit: 1.710 * Q'.% or 1.4 = TRC Avg. Limit: 2.052 mg or lbs/day Column 1: I -Industry self P-I'O'tW Column 5: Use only if IUP has (monthly, or other) average limit. Average values of all sampling events collected wtihin the "average" period (for example, for a monthly average limit, use all values collected within a calendar month) and enter this average in column 5. "treat this average as a count. Compare this average to the appropriate average IUP limit or TRC limit. Column 7: Use only if IUP has average limits in Ibs/day. Use ( mgd * mg/I * 8.34 = Ibs/day ). Colman 8: Put "I" for each average value, tally up at bottom as "D." Column 9: Compare average values to IUP limits above,put "0" if at or below limit, "1" if above, tally at bottom as "E." Column 10: Compare average values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "F." Col. l: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Avg Cone. mg/I Avg. Load Ibs/day Count Regular Violation 9 TRC Violation 9 A January 2019 0.102 1 0 0 A February 2019 5.88 1 I 1 1 A March 2019 2 263 1 1 1 A April 2019 0.0312 1 0 0 A June 2019 0.507 1 0 0 List these Totals on next page => D = E = F= 5 2 2 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION I Calculate % and Circle Answers %of Regular violations: 2/8 B/A= 25% Title: SNC With Limits Compliance Judgment Worksheet Filename: Compliance�udgment_Worksheet_ for _SNC _With _Limits _Form_Mar _2013.docx Revision date: 1/5/Ol Compliance Judgment Worksheet For SNC With Limits Use se orate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REGO Engineered Controls International IUP Number: 101J Pipe Number: 001 Parameter: Chromium Six Month SNC Determination Period: I/l/2019 to 6/30/2019 any Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Daily Maximum Limit: 2.770 * / 1.2 %or 1.4 = TRC Daily Limit: 3.324 mg/1 , or lbs/day Column 1: I -Industry self P-PllTW Column 6: Use only if IUP has daily limits in Ibs/day. Formula to use is (mgd * mg/I * 8.34 = Ibs/day ). Column 8: Put "7" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to ]UP limits above,put "0" if at or below limit, "1" if above, tally at bottom as'B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. I: From IDMRs From IDMRs From IDMRs Col. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Cone. mg/1 Daily Load lbs/day Count Regular Violation ? TRC Violation ? 1 1/28/19 0,102 I 0 0 1 2/27/19 5.88 1 1 1 1 3/6/19 2.78 1 1 1 0 1 3/25/19 1,63 I 0 0 1 3/27/19 2,38 1 0 0 I 4/24/19 0,0312 1 0 0 I 6/10/19 0,052 1 0 P 6/24/19 0,961 1 0 0 List these Totals on next page => A— 8 B = 2 C= I Titte: SNC With Limits Compliance Judgment Worksheet File name ComplianceJudgment_Worksheet_far_SNC_With_Limits_Form_Mar_2013.docx Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REGO Engineered Controls International IUP Number: 101J Pipe Number: 001 Parameter: Chromium Six Month SNC Determination Period: I/I/2019 to 1/6/30/2019 2) Is B/A greater than or equal to 0.66 (or 66 %) ? Daily Chronic violator? Yes / No) 3) Average: Calculate the % of Regular violations: 2/5 E/D = 40% 4) Is E/D greater than or equal to 0.66 (or 66 %) ? Average Chronic violator? Yes 5) Daily: Calculate the %of TRC Violations: 1/8 C/A = 12.5% 6) Is C/A greater than or equal to 0.33 (or 33 %) ? Daily TRC Violator? Yes /CN 6) Average: Calculate the % of TRC Violations: 2/5 F/D = 40% 7) Is F/D greater than or equal to 0.33 (or 33 %) ? Average TRC Violator? Yes - / No 8) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes / No 9) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / No 10) If the answer to any of these questions is yes, the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAME PARAMETER in the previous six month compliance eu riod? CIRCLE ONE: YES NO If YES to EITHER question, DESCRIBE IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number VA ;T y sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria =1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet Filename: Compliancejudgment_Worksheet_ for _SNC _ With_Lindts_Form_Mar_2013.docx Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Indus" SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REGO Engineered Controls International IUP Number: 10IJ I Pipe Number: 001 ::::] Parameter: Chromium I Six Month SNC Determination Period: 7/1/2019 to 12/31/2019 Average Limit Compliance Monthly Avg, Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for pH: Monthly Avg, Limit: 1.710 * 1.2 or 1.4 = TRC Avg. Limit: 2.052 mg/1) or lbs/day Column t: I -Industry self P-PO'FW Column 5: Use only if IUP has (monthly, or other) average limit. Average values of all sampling events collected wtihin the "average" period (for example, for a monthly average limit, use all values collected within a calendar month) and enter this average in column 5. Treat this average as a count. Compare this average to the appropriate average IUP limit or TRC limit. Column 7: Use only if IUP has average limits in Ibs/day. Use ( mgd * mg/I * 9.34 = Ibs/day ). Column 8: Put "I" for each average value, tally up at bottom as "D." Column 9: Compare average values to IUP limits above,put "0" if at or below limit, "1" if above, tally at bottom as "E." Column 10: Compare average values to TRC limits above,put "0" if below limit, "I" if at or above, tally at bottom as "F." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Co] 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Avg Cone. mg/t Avg. Load Ibs/day Count Regular Violation TRC Violation A July 2019 1.94 1 1 0 A August 2019 1.38 1 0 0 A September 2019 0.295 l 0 0 A October 2019 0.039 l 0 0 A November 2019 0.0091 1 0 0 A December 2019 4.30 1 1 1 List these Totals on next page => D = 5 E = 2 F= 1 SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION I Calculate % and Circle Answers I/9 B/A= lLl% Title: SNC With Limits Compliance Judgment Worksheet Filename: Compliance_Iudgmen[_Worksheet_for_SNC_With_Limits_Form_Mar _2013.docx Revision date: 1/5/Ol Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REGO Engineered Controls International IUPNumber: 10 IJ Pi eNumber: 00t Parameter: Chromium Six Month SNC Determination Period: 7/1/2019 to 12/31/2019 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for pH: Daily Maximum Limit: 2.77 * 1.2, or 1.4 =TRC Daily Limit: 3.324 Qmg9 or Ibs/day Column l: I -Industry self P-POTW Column 6: Use only if IUP has daily limits in Ibs/day. Formula to use is ( mgd * mg/I * 8.34 = Ibs/day ). Colmnn 8: Put "I" for each daily maximum value, tally up at bottom as "A." Colmnn 9: Compare daily values to IUP limits above,put "0" if at or below limit, "1" if above, tally at bottom as'B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "1" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: Co] 6: Col 7: Co] 8: Col 9: Col I0: Sample Type Sample Date Daily Flow, mgd Daily Cone. mg/I Daily Load Ibs/day Count Regular Violation ? TRC Violation ? 1 7/22/19 0.002 1.94 1 0 0 1 8/22/19 1 0.0025 L38 1 0 0 1 9/4/19 0.0026 0.71 1 0 0 I 9/16/19 0.0023 0.144 1 0 0 1 9/18/19 0.00245 0.031 1 0 0 1 10/28/19 0,00209 0.039 1 0 0 I 11/25/19 0.0016 0.0091 1 0 0 P 12/12/19 0.0058 7.61 1 1 1 I 12/19/19 0.0020 0.989 1 0 0 List these Totals on next page => I A= 9 I B = l I C= Title: SNC With Limits Compliance Judgment Worksheet Pile name: ComplianceJudgment_Worksheet_for_SNC_With_Limits_Form_Mar_2013.docx Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REGO Engineered Controls International IUP Number: 1011 I Pipe Number: 001 Parameter: Chromium I Six Month SNC Determination Period: 7/1/2019 to 12/31/2019 2) Is B/A greater than or equal to 0.66 (or 66 %)? Daily Chronic violator? Yes / CM�I 3) Average: Calculate the % of Regular violations: 2/6 E/D = 33.3 % 4) Is E/D greater than or equal to 0.66 (or 66 %) ? Average Chronic violator? Yes / o� 5) Daily: Calculate the % of TRC Violations: 1/9 C/A = 11.1 % 6) Is C/A greater than or equal to 0.33 (or 33 %) ? Daily TRC Violator? Yes / (N7o.j 6) Average: Calculate the %of TRC Violations: 1/6 F/D = 16.7% 7) Is F/D greater than or equal to 0.33 (or 33 %) ? Average TRC Violator? Yes / No ) 8) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? Yes / cod 9) Did any violation cause imminent endangerment to human health / welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes /) 10) If the answer to any of these questions is ", the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Responce Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAME PARAMETER in the previous six month compliance ep riod? CIRCLE ONE: YE) NO If YES to EITHER question, DESCRIBE IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must betaken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number I'd it y sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria =l.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet Filename: Compliance -Judgment _Worksheet_for_SNC_With_Limits_Form_Mar_2013.docx Revision date: 1/5/01 Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REDO Engineered Controls International IUP Number: IOIJ Pipe Number: cot Parameter: zinc Six Month SNC Determination Period: 7/1/2019 to 12/31/2015 Daily Limit Compliance Daily Max Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for pH: Daily Maximum Limit: 2.61 * 1.2 or 1.4 = TRC Daily Limit: 3.132 mg/I or Ibs/day Column 1: I -Industry self P-POTW Column 6: Use only if IUP has daily limits in Ibs/day. Formula to use is (mgd * mg/I * 8.34 = Ibs/day ). Column 8: Put "I" for each daily maximum value, tally up at bottom as "A." Column 9: Compare daily values to IUP limits above,put "0" if at or below limit, "I" if above, tally at bottom as "B." Column 10: Compare daily values to TRC limits above,put "0" if below limit, "I" if at or above, tally at bottom as "C." Col. 1: From IDMRs From IDMRs From IDMRs CoI. 5: Col 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Daily Flow, mgd Daily Cone. mg/I Daily Load Ibs/day Count Regular Violation ? TRC Violation ? 1 7/22/19 0.002 0.694 1 0 0 1 8/19/19 1 0.0025 0.111 1 0 0 1 9/4/19 0.0026 0.0364 1 0 0 1 9/16/19 OM23 0.269 1 0 0 1 9/18/19 0.00245 0.0514 1 0 0 I 10/28/19 0.00209 0.07 1 0 0 I 11/25/19 OuO16 0D596 1 0 0 P 12/12/19 0.0058 29.0 1 1 1 1 12/19/19 0.002 6.69 1 1 1 List these Totals on next page=> A= 9 B = 2 C= 2 Title: SNC With Limits Compliance Judgment Worksheet Filename: Compliance�udgment_Worksheet_for_SNC_With_Limits_Form_Mar_2013.docx Revision date: 1/5/Ol Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REGO Engineered Controls international IUP Number: 1o1J I Pipe Number: 001 Parameter: zinc Six Month SNC Determination Period: 7/I/2019 to 12/31/2019 Average Lirnit Compliance Monthly Avg. Limits IUP Limit * TRC criteria = TRC Limit Circle which units apply from IUP Circle 1.4 For TRC for BOD, TSS, oil, fat, grease; Circle 1.2 for all other pollutants to Limits TRC compliance judgment not required for H: Monthly Avg. Limit: L480 * 1.2 or 1.4 =TRC Avg. Limit: 1.776 mg/( or Ibs/day Column l: [-Industry self P-POTW Column 5: Use only if IUP has (monthly, or other) average limit. Average values of all sampling events collected wtihin the "average" period (for example, for a monthly average limit, use all values collected within a calendar month) and enter this average in column 5. Treat this average as a count. Compare this average to the appropriate average IUP limit or TRC limit. Colmnn 7: Use only if IUP has average limits in Ibs/day. Use ( mgd * mg/l * 8.34 = Ibs/day ). Column 8: Put "1" for each average value, tally up at bottom as "D." Column 9: Compare average values to IUP limits above,put "0" if at or below limit, "l" if above, tally at bottom as "E." Column 10: Compare average values to TRC limits above,put "0" if below limit, "I" if at or above, tally at bottom as "F." Col. 1: From IDMRs From IDMRs From IDMRs Col. 5: CoI 6: Col 7: Col 8: Col 9: Col 10: Sample Type Sample Date Avg Cone. mg/I Avg. Load Ibs/day Count Regular Violation 9 TRC Violation 9 A July 2019 0.694 1 0 0 A August2019 0 111 1 0 0 A September 2019 0.119 1 0 0 A October 2019 0.070 1 0 0 A November 2019 0.0596 1 0 0 A December 2019 17.85 1 1 1 List these Totals on next page => D = E = F= 6 I I SIGNIFICANT NON-COMPLIANCE (SNC) LIMITS DETERMINATION Calculate % and Circle Answers t\ naflw, rolo»Iota the o/ of PPmll„r.,i.n1Qf;n,."- R/A = 9.220/n Title: SNC With Linuts Compliance Judgment Workshee[ Filename: Compliance_Judgment_Wmksheet_for_SNC_With_Limits_Form_Mar_2013.docx Revision date: 1/5/Ol Compliance Judgment Worksheet For SNC With Limits Use separate sheets for each Industry SNC determination for Flow optional, see Section 7-E Use separate sheets for each Pollutant SIU Name: REGG Engineered Controls international IUP Number: 1011 I Pipe Number: 001 Parameter: zinc Six Month SNC Determination Period: 7/1/2019 to 12/31/2019 2) Is B/A greater than or equal to 0.66 (or 66 % ) ? 3) Average: Calculate the % of Regular violations: 4) Is E/D greater than or equal to 0.66 (or 66 %) ? 5) Daily: Calculate the %of TRC Violations: 6) Is C/A greater than or equal to 0.33 (or 33 %) ? 6) Average: Calculate the %of TRC Violations: 7) Is F/D greater than or equal to 0.33 (or 33 %) ? Daily Chronic violator? ED= 16.7% Average Chronic violator? C/A = 22.2% Daily TRC Violator? F/D= IE7% Average TRC Violator? 8) Did any violation, alone or in combination with other discharges, cause pass -through or interference at the POTW, or endanger the health of POTW workers or the public? 9) Did any violation cause imminent endangerment to human health /welfare or to the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such discharge? Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No 10) If the answer to a� of these questions is � the SIU is in Signficant Non -Compliance (SNC) for this parameter. They must be listed on the Significant Non -Compliance Report (SNCR) form in the Pretreatment Annual Report (PAR), described in the PAR narrative (including parameter, period, and POTW actions), and the POTW must take adequate enforcement as outlined in its Enforcement Response Plan (ERP). Is the SIU in SNC for this six month period? CIRCLE ONE: YES NO Was the SIU in SNC for THE SAME PARAMETER in the previous six month compliance period? CIRCLE ONE: YES NO If YES to EITHER question, DESCRIBE IN NARRATIVE. Please note if SIU was in SNC for the previous six month compliance period and is also in SNC for this six month compliance period, escalated enforcement actions must be taken as soon as possible, preferably before the end of the second consecutive period. Failure to take the action within 2 months after the end of the second consecutive period will subject the POTW to enforcement by the Division. The options are: Consent Order with Enforceable schedule; Administrative Order with Enforceable schedule; Formal notice to comply issued, or Permit modification. See Chapter 9 - Pretreatment Annual Reports, Chapter 8 - Enforcement, and the POTW's Enforcement Response Plan (ERP). Definitions: Count The number of daily sample data values or the number of average sampling events used for checking compliance with average limits. TRC Technical Review Criteria, Multiply the actual IUP limits by the proper TRC Criteria value to get a TRC Limit: TRC Criteria =1.4 for BOD, TSS, oil, fat, grease TRC Criteria = 1.2 for all other pollutants Not required to perform TRC compliance judgment for pH. SNCR Significant Non -Compliance Report SNC Significant Non -Compliance Title: SNC With Limits Compliance Judgment Worksheet Filename: Compliance�udgment_Worksheet_for_SNC_With_Linrits_Form_Mar_2013.docx Revision date: 1/5/Ol