Loading...
HomeMy WebLinkAboutWQ0011313_Plan of Action_20200226e V�I�w ES"' f__4T nVA REAL ESTATE HOLDINGS February 26, 2020 Morella Sanchez -King Regional Supervisor Water Quality Regional Operations Section 127 Cardinal Drive Ext. Wilmington, NC 28405 Morella. Sanchez-kins(&,ncdear.gov RE: Compliance Inspection Report Peppertree Resort WWTP Non -discharge Permit No. WQ0011313 Carteret County Dear Ms. Sanchez -King: Please accept this letter as Festiva Real Estate Holdings, LLC's response to your Compliance Inspection Letter and Report dated February 11, 2020. Enclosed is the proposal from SE Industrial Services, LLC regarding the work they will be performing on this facility. Work is scheduled to begin on March 2, 2020. Subject to favorable weather conditions, the estimated completion date is April 10, 2020. Please let me know if you have any further questions or concerns. Sincerely, } Elleveve Donahue General Counsel Enclosures: As Indicated. ONE VANCE GAP ROAD ASHEVILLE, NC 28805 P 828.348.2505 AI.ND,USTRIAL Southeast Industrial Services, LLC 1299 Hibbs Rd Newport, NC 28570 Estimate If 1076-20E 1/18120 Peppertree 715 W Fort Macon Rd Atlantic Beach, NC 28512 Dear RC, Thanks for the opportunity to provide this proposal. This proposal is good for 30 days. Please review the following and let me know if you have any questions. Project: Peppertree Waste Treatment Plant Scope of Work: • Remove the non -active tanks from waste plant • Backfill the area and plant grass seed once project is complete • SSPC.SP30 Near White Metal Abrasive blast interior of waste plant 2' below water level • SSPC.SP7 Brush Blast exterior of tanks, SSPC.SP6 Commerical blast bad areas on the exterior of tanks • Apply 2 coat Waste Water System Coating of Tnemec Coal Tar Epoxy to all steel. • Repair steel where needed. Clarifications: • Southeast Industrial will supply all material and equipment • Peppertree will remove fence and tree if in the way to remove existing tanks • Peppertree will remove all electrial for Southeast Industrial to remove exisiting tanks Payment Terms: • Progress Billing every 30 Days, Net 15 with 1.5% late fee after 15 days Project Total: 5292 560 00 Thanks, Trey Perry Southeast Industrial Services trey@sei-services.com 252-725-0010