Loading...
HomeMy WebLinkAbout20011288 Ver 1_COMPLETE FILE_20010824.. i sNCDENR North Carolina Deparfinent_of.Environment and Natural Resources ?r Division of Coastal Management Michael F. Easley, Govemor Donna D. Moffitt, Director William G. Ross Jr., Secretary August 20, 2001 011288 MEMORANDUM: ' John R. Dorney, Environmental Biological Supervisor Division of Water Quality ?i F&6M-: f Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Town of Manteo Project Location: 100 Ananias Dare Street adjacent to the NC 400 Bridge and Doughs Creek on Roanoke Island in Dare County Proposed Project: Construct a 55' x 6' pier addition with a 6' x 9' platform Please indicate below your agency's position or viewpoint on the proposed project and return this form by September 10, 2001. If you have any questions regarding the proposed project, please contact Frank A. Jennings, III at (252) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached SIGNED DATE L,?7 1367 U.S.17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-39011 FAX: 252-264-37231 Internet http://dcm2.enr.state.nc,us An Equal Opportunity 1 Affirmative Acton Employer - 50% Recycled 110% Post Consumer Paper 'MEMORANDUM TO: John Dorney Regional Contact: Tom Steffens Non-Discharge Branch WO Supervisor: Roger Tharpp Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Town of Manteo Project Number 01 1288 Recvd From DCM Received Date 8/24101 Recvd By Region Project Type pier County Dare County2 Region Washington Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type` Impact Score Index Prim. Supp. Basin Req. Req. CA F-F-7T _0N MA «;hers O O N F _FT__ F1 SC QQW x0,151. ?- Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y O N Did you request more info? Q Y O N Have Project Changes/Conditions Been Discussed With Applicant? Q Y Q N Is Mitigation required? O Y Q N Recommendation: QQ Issue Q Issue/Cond O Deny Provided by Region: Latitude (ddmmss) Longitude (ddmmss) Comments: Issue no conditions cc: Regional Office Page Number 1 Central Office w DCM % DWQ % Development Type FEE (14300 1601 A35100093 1625 6253) (24300 1 602 435100095 234 1 private, non-commercial 1 , development that does not involve 5250 100%(S250) 0% (SO) the filling or excavation of any wetlands or open water areas: tl. Public or commercial development that does not involve the filling or BOO 100%(S400) 0%($0) excavation of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A. B, C, or D below applies: III(A). For Private, non-commercial development, If General water Quality 5250 100%(S250) 0% (SO) Certification No-3301 (see attached) can be applied: III(B): For public or commercial development, if General water Quality $400 100%(S400) 0% (SO) Certification No.3301 (see attached) can be applied: III(C). If General Water Quality Certification No. 3301 (see attached) could be applied, but DCM staff determined that additional review and $400 60%(S240) 40%($160) written DWQ concurrence is needed because of concerns related to water quality or aquatic life: 111(D). If General Water Quality Certfication No. 3301 (see attached) 5400 60%(S240) 40% (6160) can not be applied: IV. For development that involves the filling and/or excavation of more 5475 60%(S285) 40% (5190) than one acre of wetlands and/or open water areas: 44 DIVISION OF COASTAL MANAGEMENT 0 1 1 2 8 8 FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Town of Manteo 2. LOCATION OF PROJECT SITE: 100 Ananias Dare Street adjacent to NC 400 Bridge and Doughs Creek, Roanoke Island in Dare County Photo Index - 2000: 183-2137 (C-7) 1995: 182-1882 (U-20) 1989: 152-15 (L-14) 1984: 140-501 (W-11) 1978: 83-361 (Q-19) State Plane Coordinates - X: 2986100 Y: 802800 Manteo LR 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 03/23/01 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received - August 14, 2001 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Manteo Land Classification From LUP - Conservation (B) AEC(s) Involved: PTA, EW (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - N/A Planned - N/A (F) Type of Structures: Existing - Pier, boat ramp, parking Planned - Pier extension (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7_ HABITAT DESCRIPTION: [AREA] (A) Vegetated Wetlands (B) Non-Vegetated Wetlands (C) Estuarine Waters/Public Trust Area 384 sq.ft. covered (D) Total Area Disturbed: 384 sq. ft. covered (E) Primary Nursery Area: Yes (F) Water Classification: SC HQW Open: Closed 8. PROJECT SUMMARY: The applicant proposes to construct a 6 ft. wide 55 ft. long pier addition with a 6 ft. x 9 ft. platform at the Doughs Creek boatramp. s Town of Manteo Field Investigation Report Page Two Project Setting The development site is located at 100 Ananias Dare Street (SR 1190) in Manteo, on Roanoke Island in Dare County. The site is adjacent to Doughs Creek and in the location of the Town of Manteo's boatramp. The property is mostly covered with pavement for parking and the boatramp. Yard grass and pines vegetate the fringe green areas of the property. Other manmade features on the property include a 6' x 90' pier on the north side of the boatramp and a 12' x 17' dock on the south side of the boatramp. The water depth at the end of the pier is approximately -5 ft. below normal water level. The property has 70 ft. of shoreline on Dough's Creek. Adjacent property consists of a private lot with a single family dwelling on the north and the NCDOT right of way for the NC 400 bridge approach to Ice Plant Island. The waters of Doughs Creek are classified as SC HQW by the Division of Environmental Management and are closed to shellfish taking. Doughs Creek is designated a primary nursery area by the Division of Marine Fisheries. Development Proposal In order to provide increased public access to Doughs Creek, the applicant proposes to construct a 54 ft. long and 6 ft. wide pier extending to the existing dock on the south side of the boatramp. A 6' x 9' platform is proposed at the end of the pier. The applicant also requests that all decking on the existing dock and piers be authorized for replacement as well as any repairs that are necessary to maintain the existing structure. Anticipated Impacts The development proposal will result in approximately 384 sq. ft. of Public Trust Area and Estuarine Waters being shaded by the structure. Temporary water turbidity will occur during construction. Submitted by: Frank A. Jennings, III Date: August 17, 2001 Form DCM-MP-1 APPLICATION =i 10011 (To be completed by all applicants) "MIR _D FES A ? b. City, town, community or landmark Manteo. N.C. I. APPLICANT - c. Street address or secondary road number 100 Ananias Dare St. a. Landowner: Name Town of Manteo Address P. 0. Box 246 City Manteo State NC Zip 27954 Day Phone 252 473-2133 Fax 252 473-2135 b. Authorized Agent: Name Shannon Twiddy Address P. 0. Box 246 City Manteo State NC Zip 27954 Day Phone 252 473-2133 Fax 252 473-2135- c. Project name (if any) Pedestrian Access Walkway NOTE. Pernat will be issued in name of lw%downer(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT d. Is proposed work within city limits or planning jurisdiction? X Yes No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Dough' s Creek 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Pedestrian walkway 55' long 61wide with a 9 x 6 platform on the end replace existing decking in need of repair. b. Is the proposed activity maintenance of an existing project, new work, or both? Both c. Will the project be for public, private or commercial use? Public d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages.Provide public access by building a pedestrian walkway at the en of an existing public pier to increase e public's access o estaurine waters. To replace existing deg ing in nee o repairs. All construction -w-111 be designed and supervised by Albemarle Engineering a. County n a r p Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract approx. 1440 Sq. f t . b. Size of individual lot(s) same c. Approximate elevation of tract above MHW or NWL 31 d. Soil type(s) and texture(s) of tract ri/a concrete parking lot m. Describe existing wastewater. treatment facilities. municipal system no facilities planned on this site n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) Municipal System no additional discharge requested. o. Describe existing drinking water supply source. Municipal system no facilities planned on this site e. Vegetation on tract grasses/pines/holly tees f. Man-made features now on tract Parking lot, boat ramp, benches g. What is the CAMA Land Use Plan land classification of the site? (consult the local laid use plan.) Conservation Developed Rural Transitional Community Other h. How is the tract zoned by local government? B-1 village Business District i. Is the proposed project consistent with the applicable zoning? X Yes No (Anadi zoning compliance certificate, if applicable) Has a professional done for the tract? If yes, by whom? archaeological assessment been Yes X No k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? Yes X No Coastal (marsh) Other If yes, has a delineation been conducted? (Anach docununtatton, if available) 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by I V white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the 0 f& Form DCM-MP-1 r? F. 2001 site. Include highway or secondary road (SR) numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the I understand that any permit issued in response to this adjacent waterfront (riparian) landowners and application will allow only the development described in signed return receipts as proof that such owners the application. The project will be subject to conditions have received a copy of the application and plats and restrictions contained in the permit. by certified mail. Such landowners must be advised I certify that to the best of my knowledge, the proposed that they have 30 days in which to submit comments activity complies with the State of North Carolina's on the proposed project to the Division of Coastal approved Coastal Management Program and will be Management. Upon signing this form, the applicant conducted in a manner consistent with such program. further certifies that such notice has been provided. Name Sall B r i d ewa t e r I certify that I am authorized to grant, and do in fact, Address P.0-Box 501j' an eo . 54 grant permission to representatives of state and federal Phone review agencies to enter on the aforementioned lands in connection with evaluating information related to this Name NCDOT Gretchen Byrum application and follow-up monitoring of the ermit Address POB 1405, Elizabeth City,N279 04 roject. Phone 252 331 4737 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. none within my knowledge I further certify that the information provided in this application is truthful to the best of my knowledge. This is the g day of , -W0 9 Print Name Mayor Lee Tugwell Signature Landowner or Authorize gent • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development S7 DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. 400 copies of this public document were printed at a total cost of $52.48 or $ .13 per copy. t Form D.CM-MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application which relate to this proposed project. a. Dock(s) and/or Pier(s) (1) _ Commercial x community _ Private (2) Number 1 (3) Length 551 (4) Width 6 (5) Finger Piers Yes x No (i) Number (ii) Length (iii) Width (6) Platform(s) x Yes No (i) Number 1 (ii) Length 61 (iii) Width 9, (7) Number of slips proposed (8) Proximity of structure to adjacent riparian property lines +/-50' (N) +/-2' from (9) Width of water body +/-225' (10) Water depth at waterward end of pier at MLW or NWL 0. S" A, 5 " Boathouse (including covered lifts) N/A (1) Commercial Private c. (2) (3) Length Width Groin (e.g. wood, sheetpile, etc.) (1) Number (2) Length(s) N/A d. Breakwater (e.g. wood, sheetpile, etc.) I (1 (1) Length n I A (2) Average distance from MHW, NWL or wetlands YJ , (A (3) Maximum distance beyond MHW, NWL or wetlands n A e. Mooring buoys N/A (1) _ Commercial -Community _ Private (2) Number (3) Description of buoy (Color, inscription, size, anchor, etc.) (4) Width of water body (5) Distance.' buoy(s) to be placed beyond shoreline f. Mooring structure (boatlift, mooring pilings, etc.) rl (1) _ Commercial -Community _ Private (2) Number ?-I I t'A- (3) Length n I a (4) Width 414 _ g. Other (Give complete dr?sFHption) bridge S t'f I Applicant or Project Name U ?I Signature Date 400 copies of this public document were printed at a total cost of $7.00 or $ .02 per copy. s tt _?, .? •R }rnn Project Narrative The Town of Manteo's C.A.M.A. Major Permit Application is supported by goals that have been established by Town residents in surveys taken over the last twenty years. In both of the comprehensive surveys that were conducted, the maintenance and expansion of unrestricted public access and enjoyment of our public trust waters were identified as being of great importance. Manteo is unique and stands out among the Dare County Municipalities in that the primary attraction is the town itself. its streets, its sidewalks, its boardwalk, its neighborhoods, and its waterfront. The visitor to Manteo comes for the total experience as opposed to a fixed feature or facility. The Town has worked diligently to maintain the pedestrian scale in the downtown waterfront area that was established over one-hundred years ago. The Town of Manteo is asking for your consideration of permitting our application to construct a pedestrian walkway that would extend out into Shallowbag Bay. Manteo recognizes the need to supply the tourist and resident populations with the aesthetic experience they desire, while also recognizing its responsibility to supply citizens with cost effective improvements. The construction of the pedestrian walkway will increase public access over public trust waters while looping together an existing system comprised of boardwalks and docks. •! FORT RALEI6N IONAL HISTOAI6 ITE?• e•t pint l \. Jnidp APETHAN GAR ND STCOLON NS P¦ntir No FORT RALEIGH CITY 1 1161 BEQti IDSiE_ - Y lie i??e? • ' ,ir v Int DOGWOOD HILL ??s NOR WOSDS dpoen r 4r'•,MaRRRISON _ o??OfNtl1CE.S_ . _ BRAKE 1,01 00 y s p? Ran I J 'lit ' 116 ` R 4 7 G /ate. . UNNY 111 SIDE III I \ ' I . WOO .Ae at r el-•- T' . 'T. ? ^ f Ralik Ce1elM . , MANTFO AIRPORT r r' 1.1 D 6 ? te? I Re?eeb WAR. pR ISLAµV-% GA ENS . a , St Rk p. ... V YI Rd 9 VA SYI• ES 8 EN ATE ' , Lake Bl rml fit r' 4 td a "t '? ? i ! O A I r ? ° / epee ` BURNSI J T V ..5 a 1 FORE M TEd . WILD eo , WOOD o R•a I _? Bwm Point , ^ ' ? ? . iTilRi RiIR ' ' 112 [ _t! ? Y9 Sopl ev 1 A _ V C mot ? Q ? ALIFrit{tJllI. • HEIGHTS our1511 M , ?pkSlsll Aa S klt" ICEPLANTISLAN a i ' /?+ ®+? , c Oefc Ceirikws? ' y Po nt 8 `. i ?M rT la g r - ?? G Nal\? Ball ft Point \ r CM N Sh tawhet Iem6y. p 14 S pPau ti R¦mP Ce.nlr Wu• C1 u ` J VIS LAN swj* E CC,-:7 p t 0 C3 =c" Fork d Point 1 - t. y Cdley Ike ¦Rom One Ceunlp skemale Iner _ Mr¦n -Crr J w2m, - 1 AS d•? Win M1NaTOf 1 • 0 • shbee SKYC 0 1131 - o ? ?? e p a ? n f e ll ?, tkc= ?? I 70 Qq 4 ,? '0 ? ra ; . • •- ? ? ia; : oh ' •• ( ?` 6 I ? y. d ? )!L f s ' r -------------- .?. n r r . - ?.l, F0 •J7. C C;7 r } e ? 7 I'` woeR Rodin J' n - ? - 4 alai rrr -v ? r .; 4 1 i ,4tlE4akl°c S(%1tID h- RGAHCWE ' N~'r 1 ~ w~rEO ~.C. HASSt~~ JR. ~ ~-IrtE ~ ~ ~ LEIGH HASSELL (DB t8, PG 197} _ - - ,y~: ~ . J 9~ E ±39,76 ~p N 83`49 0 ;eoa~~,w O 1 ` s uu~U K~~~~~ try DOUGH S CREEK N/F ~A~i: ~o STAT N /F \ ,r E OF NORTH ~,~t o ~ , n .ti l'-~ NORTH CAROLINA ~ ~ ~ ;U (D8 332, PG 4 ~ ~ a m z' O 332, PC 452) PIN; 10 98 1 7 ( 8 5 98815 73 3347) _ ~zwo 9 ca _ ~ ,...ti ~ 5, W21 ~ wu«„esc ~ ~ q•, L S~ p= aZ~NZZZ30 Ng 0oa°O~~ou ~ s 5 E ~ ~ 1R~ o~ IL as ~~ag~a 0 V1CINiTY MAP NT ~ ~ ~ O ( s) ~a~P~ ~ R ~ = 2S Uj WLy, ~ r~WCna~wSwl 2 N ~5 N C ua / ~ g6 SHORELINE (b7 9 01 W wr Or;rO 1 K Z, OR: n5~ P~ ~ s~6 66.28 O 0 ca 0S -0 U S < n%cr n1 <•J3 U7 m 00 a o 0 3: co \ a L r - - ,~Y; r r, n ~Y~ 101, v ~ ~ , a, N y3(>- m N! F ` 01 j ZI J.Ca SASS ~ ELL JP. A- Ei 1 ~ HASS , EL_ vz, ~ , (;~P ' B, PG ? 07` _ ~1 I ( '`Y(<I tjo . n ~ ~ ~.I . ~ k' I'~,t „ ~ x 8 (,AP i _ E I C ~ Z i~. \ - ,1 ~ ~ - --~.m3S~ - ~ ~8,: r- - ~in':.~`~. ~~^1'"`I,,,11Ur~r r,.' ~ ~ ~ !All N' S, _~i C - - ~ X y ~ I . I ` I I - -"EE DETAIL I ~rt ~_~i ~ - . t . ~ ~ i~ rV~ C.r t. ir~z,E ~~.T~ {r ~1 ~ - L } } 4 jr 1 I h !ll~ P~LNG~ ~ DaUGH ~ ~ ~ ~9 Nii~h.`TC----- CREEK ; o f -MIN - HIGH CURB ~ r ~N CENTER _ T Z _ - . _ t r, DECKING-_ T , Q ~I x ~ a=v ~ ~ ~ j ? ~ 5 , • 30' MAX ~ s ~ _ n~ ~ ~ /s ~ ~ ~ ~j ~ ~;;ARRIAGE BOLTS _ _ _ J~ ~ , ~ - a° ~ ,,c ri ~ ;I~ P_ . / VARIES ~ tip. ~ ~ ~ ~ `N ':ENTER ~ 4 ~ . ti,~, ' ~ t~ ~ ~ ~ , ~ ~ i L ~ n ~ - ~ V~'; ~ t~, ~ X t G G1RL'E~` Nt .~N tACH ~i ~ G 0 ,i ~ SIDE OF PILING w ~ `;!Fs` THRU -Iz ~ BOLTS ~~ai~F; (LING C , ~ ti 2 a a, t;R;~ BRACE 3' MINIMUM N ~ ~ V E P~A;:E PILINGS AT 10` O.C J 10' 0. C o Qi - -x'' J ~ ~7R1D~ G• r~ ~,lt 1 ~ ~ P y. ~ ~ HC ACCE W a J HC ACCESSIBLE WALKWAY SECTION W F14 06 LEGEND - o NTS p O U >J J _,1 J - EX PIPE ~ Nc RowfP AIEIER Poi a~1 IjAN!;RAIL`.> a?dL` DECKING TO BE R~-:~;TED ~ - E7~ REBAR _J TO BE R ;TED NO. i GRADE MAiER!AL- i M,:;iSTURE p W n - REe~a SET C.uM~ENT < '9~ aND SECURED W/ 3,. HDG - IAANHOLE QED W/ 3- HDG SCREWS IN PRE-DRILLED HOLES a A ~ - EX CONC.IAON. yo ~ 1(C)(6) HANDRAILS SHALL BE o l a o / ~ ? -CONC. MON. $ET ®-DROP INL`;T ~ 1 ~C} / / ~y ~ - P/K NAIL ~ . ^ _ P x - ExlsnNC ~~POT GRADE 1~4 ?HIS SI,Rs `E SUBJECT T~ AN} fA~=S ri gF /K NAIL SET ~ 1 t~` ~~`TN ~ "~iSCLnCt' 2'i A ~~JLL AND Afr~iRA-1[ (it ~ - SEM'ER $ER41CE rM~ -CATS VANE Q~ 1 1 ~2° 1 /4" TO 1 112" IN WIDTH OR DIAMETER z Q A I ~ ,~~"TH THE OUTSIDE FA:E OF THE HANDRAIL a 6 Q,' U) a AREA 87 `-~~RDINATE 'OMPU?AtQtr~ ~ .RAJ, ®-WATER ?IETER W ~ MAX R 4 EO;~[ A6 ;EL 9'i - PHDNE PEDESTAL - N C C.S AIONUAIENT q MAXIMUM 3 1/2" FR;jM THE WALL OR BUILDING FACE = O a 4'rN NC fJ988O1552991t ~ ~ nECORDEO Pf_FERENCE D8 86, FG a2.' UTILITY POLE ~ -CONCRETE HOIf ~ ~ DB 291. PC 21=i --(-GUY PARE 7 1 c DB 335 PC zi~i, G'IRE HYDRANT - UCHT POLL Q ~~NT~NU~U~ ~ 4 Y t, V) '^~1I s t<.;'~.LDiN~. ~~E`S SHOIVN NEREO~ M PF ti~F ~ ty ELECT 1RANS. '>3E Si~,~ .1R MAKES NO ~EPrIErai~C~l, ~~L'd -DEPTH OF WATER x 8 ~ ~ ZONING ~'~C~OR RESTRICTIVE `.CVENANT E'H~ ELEVATION; (NGVD 19291 AS SHONN 3^ x 8 HANDRAIL Q "M1N. g rHE AvERa•':E rpR WArER EIEVaiICN ~-a "MIN. TO 34"MAX TO FINSIHED q z Vr `•_KING AL_ SUF Vv".-KING SURFACE. W g AI SURFACES ON HANDRAIL TO BE R~; JTED Ph TED AND SANDED .4 04 V g HA~'~DRA HANDRAIL DETAIL 0 . o N CAfZo R U CT' O N ¦ FILE N6.: .97 9700400 SEAL _ SURVEYED: MIT11 - 0 2 OSES ONLY, DRAWN: "'A ' 12/14/00 C a, , ~ . S CHECKED: -w~__m._ I _ ~ ti, . 12/14/00 MRM _ _ - . r . _ - . ~ - - _ _........EX NOPA1Ai_Y+ATERLf,NE E! E'~ t SCALE: :10 1"=s' TYP_CAL CROSS SECTION SHEET NO. SCALE: H~ t = tO v: = t0' 1 OF 1 SHEETS