HomeMy WebLinkAbout400144_Plan of Action_20200224PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIC State university
AST State University
COOPERATIVE
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION
Peapla - Pravrding Solu[rons
1. Structure Name/Identifier (ID): Danny Miller Date: 2/26/2020
Site 1
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker 18.5 inches
b. Designed 25 yr/24 hr. storm & structural freeboard 19 inches
c. Line b - line a (inches in red zone) 0.5 inches
d. Top of dike surface area according to design 30475 ft2
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft)1 9498.0 gallons
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural del days
g. Volume of waste produced according to design 1 31649 ft3
h. Actual waste produced=
current herd #/certified herd # x line g 0 ft3
current herd:1 Icertified herdF 3840
i. Volume of wash water according to structural design 0 ft3
j. Excess rainfall over evaporation according to design 1 17777 ft3
k. (line h + line i + line i) x 7.48 x (30 days/line f) = I gallons
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated 1.14 Ib/1000 gal
M M/ D D/YYYY
m. (lines e + k)/1000 x (line 1) = 10.8277675 lb PAN
REPEAT SECTION I FOR EACH WASTE STR UCTURE ON SITE
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILIT
1. structure ID:
2. structure ID:
3. structure ID:
4. structure ID:
5. structure ID:
6. structure ID:
n. lines 1+2+3+4+5+6 =
line m=
line m=
line m=
line m=
line m=
line m=
10.8277675 lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
10.8277675 total lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII
o. tract # 13. field # a crop r. acres s. PAN balance t. total PAN u. application
Ob/acre) column r x s window
1489
1
w
4.68
121
566
Sept -Apr
1489
11
w
1.43
93
132
Sept -Apr
1489
2
w
6
121
726
Sept -Apr
1489
3
w
4.68
121
566
Sept -Apr
1489
4
w
6
121
726
Sept -Apr
1581
10
w
5.15
121
623
Sept -Apr
1581
5
w
5.15
125
643
Sept -Apr
1581
6
w
5.15
121
623
Sept -Apr
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.)
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II)
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III)
Y. OVERALL PAN BALANCE (W-X)
4605
10.8277675
4605
-4594.1722
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility
provide information regarding the herd population and lagoon freeboard levels at the receiving
facility.
NARRATIVE:
waiting on waste report 212612020
plenty of PAN remaining
PERSON COMPLETING THIS DOCUMENT:
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 3/27/2015
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
�Y
:)D.