Loading...
HomeMy WebLinkAbout400144_Plan of Action_20200224PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIC State university AST State University COOPERATIVE I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION Peapla - Pravrding Solu[rons 1. Structure Name/Identifier (ID): Danny Miller Date: 2/26/2020 Site 1 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker 18.5 inches b. Designed 25 yr/24 hr. storm & structural freeboard 19 inches c. Line b - line a (inches in red zone) 0.5 inches d. Top of dike surface area according to design 30475 ft2 (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft)1 9498.0 gallons 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural del days g. Volume of waste produced according to design 1 31649 ft3 h. Actual waste produced= current herd #/certified herd # x line g 0 ft3 current herd:1 Icertified herdF 3840 i. Volume of wash water according to structural design 0 ft3 j. Excess rainfall over evaporation according to design 1 17777 ft3 k. (line h + line i + line i) x 7.48 x (30 days/line f) = I gallons 4. Total PAN to be land applied during draw down period I. Current waste analysis dated 1.14 Ib/1000 gal M M/ D D/YYYY m. (lines e + k)/1000 x (line 1) = 10.8277675 lb PAN REPEAT SECTION I FOR EACH WASTE STR UCTURE ON SITE PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILIT 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1+2+3+4+5+6 = line m= line m= line m= line m= line m= line m= 10.8277675 lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN 10.8277675 total lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII o. tract # 13. field # a crop r. acres s. PAN balance t. total PAN u. application Ob/acre) column r x s window 1489 1 w 4.68 121 566 Sept -Apr 1489 11 w 1.43 93 132 Sept -Apr 1489 2 w 6 121 726 Sept -Apr 1489 3 w 4.68 121 566 Sept -Apr 1489 4 w 6 121 726 Sept -Apr 1581 10 w 5.15 121 623 Sept -Apr 1581 5 w 5.15 125 643 Sept -Apr 1581 6 w 5.15 121 623 Sept -Apr State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) Y. OVERALL PAN BALANCE (W-X) 4605 10.8277675 4605 -4594.1722 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: waiting on waste report 212612020 plenty of PAN remaining PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 3/27/2015 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD �Y :)D.