1. Structure Name/Identifier (ID): Jimmy Dail
Date: 2/ 14/2020
2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard
a. Current liquid level according to marker
b. Designed 25 yr/24 hr. storm & structural freeboard
c. Line b - line a (inches in red zone)
d. Top of dike surface area according to design
(area at below structural freeboard elevation)
e. (Line c/12) x (line d) x (7.48 gallons/ft)
3. Projected volume of waste liquid produced during draw down period
f. Temporary storage period according to structural design
g. Volume of waste produced according to design
h. Actual waste produced=
current herd #/certified herd # x line
current herd:1 3131 certified herdF 3000
i. Volume of wash water according to structural design
j. Excess rainfall over evaporation according to design
k. (line h + line i + line j) x 7.48 x (30 days/line f) _
4. Total PAN to be land applied during draw down period
I. Current waste analysis dated
M M/ D D/YYYY
m. (lines e + k)/1000 x (line 1) _
REPEAT SECTION I FOR EACH WASTE STR UCTURE ON SITE
18
19
1
81510
50807.9
180
405000
422685
0
47643
586342.24
1.2
764.580168
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD
AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILIT
1.
structure ID:
line m=
1 764.580168
2.
structure ID:
line m=
3.
structure ID:
line m=
4.
structure ID:
line m=
5.
structure ID:
line m=
6.
structure ID:
line m=
n.
lines 1+2+3+4+5+6
1 764.580168
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII
o. tract # 13. field # a crop r. acres s. PAN balance t. total PAN u. application
(Ib/acre) column r x s window
6165 1 overseed 18.9 897 oct-mar
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) 1 897
IV. FACILITY'S POA OVERALL PAN BALANCE
W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) 1 764.580168
X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) 1 897
Y. OVERALL PAN BALANCE (W-X)1 -132.41983
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pum
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new P)
based on new information. If new fields are to be included as an option for lowering lagoon level, add thi
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled tc
another permitted facility provide information regarding the herd population and lagoon freeboard level!
receiving facility.
NARRATIVE:
PERSON COMPLETING THIS DOCUMENT:
c
EVE H. HONEYCUTT
NC COOPERATIVE EXTENSION
LENOIR AND GREENE COUNTIES
Date Completed: 2/14/2020
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
'ersit; THIRTY (30) DAY DRAW DOWN PERIOD
ERATIVE
MON
inches
inches
inches
ft2
gallons
days
ft3
ft3
ft3
ft3
gallons
Ib/1000 gal
lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
.Y
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
lb PAN
total lb PAN
PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
ip and
AN
ese
sat the