HomeMy WebLinkAbout400045_Plan of Action_20200224PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD State university A&T State Unfvw COOPE I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTEN Fm.,nOwr,drNJ PPL, 1. Structure Name/Identifier (ID): Jimmy Dail Date: 2/ 14/2020 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker b. Designed 25 yr/24 hr. storm & structural freeboard c. Line b - line a (inches in red zone) d. Top of dike surface area according to design (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft) 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural design g. Volume of waste produced according to design h. Actual waste produced= current herd #/certified herd # x line current herd:1 3131 certified herdF 3000 i. Volume of wash water according to structural design j. Excess rainfall over evaporation according to design k. (line h + line i + line j) x 7.48 x (30 days/line f) _ 4. Total PAN to be land applied during draw down period I. Current waste analysis dated M M/ D D/YYYY m. (lines e + k)/1000 x (line 1) _ REPEAT SECTION I FOR EACH WASTE STR UCTURE ON SITE 18 19 1 81510 50807.9 180 405000 422685 0 47643 586342.24 1.2 764.580168 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILIT 1. structure ID: line m= 1 764.580168 2. structure ID: line m= 3. structure ID: line m= 4. structure ID: line m= 5. structure ID: line m= 6. structure ID: line m= n. lines 1+2+3+4+5+6 1 764.580168 III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERII o. tract # 13. field # a crop r. acres s. PAN balance t. total PAN u. application (Ib/acre) column r x s window 6165 1 overseed 18.9 897 oct-mar State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) 1 897 IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) 1 764.580168 X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) 1 897 Y. OVERALL PAN BALANCE (W-X)1 -132.41983 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pum haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new P) based on new information. If new fields are to be included as an option for lowering lagoon level, add thi fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled tc another permitted facility provide information regarding the herd population and lagoon freeboard level! receiving facility. NARRATIVE: PERSON COMPLETING THIS DOCUMENT: c EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 2/14/2020 PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES 'ersit; THIRTY (30) DAY DRAW DOWN PERIOD ERATIVE MON inches inches inches ft2 gallons days ft3 ft3 ft3 ft3 gallons Ib/1000 gal lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD .Y lb PAN lb PAN lb PAN lb PAN lb PAN lb PAN total lb PAN PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD ip and AN ese sat the