HomeMy WebLinkAbout20161077 Ver 1_Final AsBuilt & Initial Credit Release_20200220Strickland, Bev
From:
Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent:
Thursday, February 20, 2020 4:41 PM
To:
Tugwell, Todd J CIV USARMY CESAW (US); McLendon, C S CIV USARMY CESAW (USA);
Crumbley, Tyler A CIV USARMY CESAW (USA); Gledhill-earley, Renee;
byron_hamstead@fws.gov; Bowers, Todd; Haupt, Mac; Wilson, Travis W.; Matthews,
Monte K CIV USARMY CESAW (USA); Leslie, Andrea J; Davis, Erin B; Jones, M Scott
(Scott) CIV USARMY CESAW (USA); Brown, David W CIV USARMY CESAW (US); Steve
Kichefski; Kim Browning; Davis, Erin B
Cc:
Wiesner, Paul; Baumgartner, Tim; David Tuch
Subject:
[External] Notice of NCDMS Record Drawing Review / Harrell Stream and Wetland Site
/ Jackson County /SAW-2016-02202
Attachments:
Harrell_100005_LT 03_STR_RW_Initial Release.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
Good afternoon,
The below referenced FINAL Record Drawing/As-Built Report review has been requested by NCDMS. Per Section
332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT
review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day
comment deadline shown below. When providing comments please indicate if your concerns are great enough that you
intend to request a site visit prior to the initial credit release. Comments provided after the 15-day comment deadline
(shown below) may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with
District Engineer's intent to approve or disapprove this Final As -Built and initial credit release.
Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO):
Harrell Stream and Wetland Site
DMS Project # 100005
RFP# 16-006811 - Issued 2/15/16
Institution Date: 10/6/16 - Full Delivery Little Tennessee River Basin Cataloging Unit 06010203 Jackson County, North
Carolina
Mitigation Plan Project Credits:
1,854 SMUs (Warm)
3.53 WMUs (Riparian)
As-Built-MYO Project Credits:
1,854 SMUs (Warm)
3.53 WMUs (Riparian)
Mitigation Plan Lengths/ Acreages:
2,430 ft.
5.11 acres
As-Built-MYO Lengths/ Acreages:
2,396 ft.
5.11 acres
FD Provider: EW Solutions - Contact: David Tuch, david@equinoxenvironmental.com, (828) 253-6856 ext. 202
NCDEQ- DMS PM: Paul Wiesner, paul.wiesner@ncdenr.gov, (828)-273-1673
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the portal here:
Harrell Str&Wtl_100005_MYO_2020
https://fi les. nc.gov/ncdeq/M itigation % 20Services/Docu ment% 20Ma nagement% 20Li bra ry/Projects/Ha rrel I-Str-Wtl-
100005-MYO-2020. pdf
Harrell Str&Wtl_100005_AB_2020
https://fi les. nc.gov/ncdeq/Mitigation`/`20Services/Docu ment% 20Ma nagement% 20Li bra ry/Projects/Ha rrel I-Str-Wtl-
100005-AB-2020. pdf
15-Day Comment Start Date: February 21, 2020 15-Day Comment Deadline: March 7, 2020 45-Day Credit Release
Approval Deadline: April 6, 2020
*NOTE: If a site visit is request by the IRT, comments are due 15 days after the site visit is complete.
Mitigation Plan lengths may vary from the As-Builts.
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG (r)
Mitigation Project Name Harrell Stream and Wetland Site County Jackson USACE Action ID 2016-02202
DMS ID 100005 Date Project Instituted 10/6/2016 NCDWR Permit No 2016-1077
River Basin LITTLE TENNESSEE Date Prepared 2/13/2020
Cataloging Unit 06010203
Credit Release Milestone
Stream Credits
Wetland Credits
Scheduled
Releases
(Stream)
Warm
Cool
Cold
Anticipated
Release Year
(Stream)
Actual
Release Date
(Stream)
Scheduled
Releases
(Forested)
Riparian
Rivenne
Riparian Non
rivenne
Non -riparian
Scheduled
Releases
(Coastal)
Coastal
anticipated
Release Year
(Wetland)
Actual
Release Date
(Wetland)
Potential Credits (Mitigation Plan)
1,854.000
3.530
Potential Credits (As -Built Survey)
1,854.000
3.530
1 (Site Establishment)
NIA
N/A
N/A
NIA
NIA
N/A
N/A
2 (Year 0 / As -Built)
30 %
556.200
2020
2/10/2020
30 %
1.059
30 %
2020
2/10/2020
3(Year 1 Monitoring)
10%
2021
10%
10%
2021
4 (Year 2 Monitoring)
10%
2022
10%
15 %
2022
5 (Year 3 Monitoring)
10%
2023
15 %
20 %
2023
6 (Year 4 Monitoring)
5 %
2024
5 %
10%
2024
7 (Year 5 Monitoring)
10%
2025
15 %
15 %
2025
8 (Year 6 Monitoring)
5 %
2026
5 %
NIA
2026
9 (Year 7 Monitoring)
10%
2027
10%
NIA
2027
Stream Bankfull Standard
10%
NIA
NIA
Total Credits Released to Date
556.200
1 1.059
NOTES:
CONTINGENCIES:
Signature of Wilmington District Official Approving Credit Release
Date
1 - For NCDMS, no credits are released during the first milestone
2 - For NCDMS projects, the second credit release milestone occurs automatically when the as -built report (baseline monitoring report) has been made available to the NCIRT by posting it to the NCDMS Portal, provided the following criteria have
been met:
1) Approval of the final Mitigation Plan
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan
4) Reciept of necessary DA permit authorization or written DA approval for porjects where DA permit issuance is not required
3 - A 10% reserve of credits is to be held back until the bankfull event performance standard has been met
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
DEBITS (released credits only)
Harrell Stream and Wetland Site
100005
LITTLE TENNESSEE
06010203
Ratios
1.5 2.5 10.0
County Jackson
Date Project Instituted 10/6/2016
Date Prepared 2/13/2020
USACE Action ID 2016-02202
NCDWR Permit No 2016-1077
£'
m
0
:
L
E m
m E
N
£
R E
o
w
c
0
£"
m m
w
c
c 0
g
_n °
K
C C
m o
`m •�
n`
c 0
A E
y
u�
_n c
c
C
m w
Z
_n w
`
c c
A O
•`m •m
n
•- $
Oc yJ
z K
c
2 c
o
`m ._
n
'-
C
O U
z
c c
A d
£
•`m d
n u
•O
z W
c c
L
m` m
n Z
•o
z
O
16._
m_
mNoA �oVdl
:
m CO
m
UmbN UL
c
m E
y
u
LeN
UmNA W
: c
O
m
io
it
UmN{p ayV`II
As -Built Amounts (feet and acres)
1,790.000
640.000
3.530
As -Built Amounts (mitigation credits)
1,790.000
64.000
3.530
Percentage Released
30%
30%
30%
Released Amounts (feet / acres)
537.000
192.000
1.059
Released Amounts (credits)
537.000
19.200
1.059
NCDWR Permit
USACE Action ID
Project Name
2012-01068
NCDOT TIP R-5000 - SW
Community College
Connector
0.050
2007-01879-387
SR 1179 - Division 14
125.000
2008-01975-350
SR 1165 - Division 14
145.000
2017-0306
2017-00684
NCDOT TIP B-5159
0.020
1998-1130
1998-31148
Highlands Cove
5.530
2013-01676
Cherokee Indian Hospital
0.240
2015-0805
2015-00979
Bryson City FedEx
Distribution Center
129.170
Remaining Amounts (feet / acres)
132.300
192.000
0.749
Remaining Amounts (credits)
132.3001
19.2001
0.749