Loading...
HomeMy WebLinkAboutNC0020290_Sewer Line Moratorium_20200220 Therecsa Coletta Town of Burnsville Councilor: Mayor Judy Buchanan Denise Collier Jeanne Martin °F Bu�s`4 Ru&ell Fox Town Clerk �° � Bunnie Melntonh 1a _ February 14th, 2020 LS © lS f Vl5 .,1 Ms. Linda Culpepper l5 NC DEW DWR/NPDES FEB 2 0 2020 Compliance & Expedited Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 DIVISION OF WATER RESOURCES DIRECTOR'S OFFICE Subject: Burnsville Sewer Line Moratorium NPDES Permit NC0020290 Burnsville WWTP Dear Ms. Culpepper, The Town of Burnsville received the letter for the sewer line moratorium on February 12th, 2020.The date that it was issued was October 215t, 2019.The Town did not receive any notice of the October 2019 moratorium. As of October 215t, 2019 letter,the Burnsville Wastewater Plant was running on average of 84.15 percent capacity. The Burnsville Wastewater Treatment Plant experienced an equipment failure on January 30th, 2020 causing the 300,000 gallon-per-day contact stabilization unit to become inoperable and unrepairable. I have been in contact and working with MJ Chen, Ivan Messina, and Mike Dowd with McGill Associates,the Town's engineering firm, on a short term plan to implement emergency actions as well as a long term plan for a complete reconstruction of the Burnsville Wastewater Treatment Plant. As of February 10th the Town Council gone under contract with McGill Associates to proceed with the short term and long term plans and immediate action to the Burnsville Wastewater Treatment Plant. Sincerely, Dillon Lundy Public Works Director • P.O. Box 97 • Burnsville, North Carolina 28714 • Phone (828) 682-2420 • FAX (828) 682-7757