Dear Mr. Garcy Ward,
Workman, Liz S
Wednesday, February 19, 2020 3:31 PM
Carpenter,Kristi; 'thomas.a.steffens@usace.army.mil'; Yeung, Hon F; Johnson, Jay B;
Brittingham, Cathy; Lane, Stephen; Ward, Garcy
Easterly, Sara; Rogers, Phillip
RE: NC 43 connector to NC55 (R-4463), DWR 20070932v.3, Approval Letter
R-4463A_Permit_Drawings_Buffer_20200218.pdf, R-4463A_Permit Drawings_
20200218.pdf, R-4463A PJD Addendum2_19_2020.pdf
Thank you for the review of the Individual Permit Modification application (Dec. 10, 2019) for R-4463A. We are including
the following requested items with this email:
• PJD Addendum to the "original" PJD package submittal on August 23, 2019 — this addendum covers additional
area to the east of a double culvert on US 17 Business.
• Revised Buffer Drawings with calculations for mitigable impacts at Site 5B due to the roadway fill in Zones 1 and
2. Wetland acreage was subtracted out from the buffer impacts for mitigation amounts.
• Swale information/calculations for Site 5 are on the Permit Drawings (including the Stormwater Management
Plan). These drawings were updated to show buffers along Site 5.
Buffer Mitigation is Required
Ms. Beth Harmon with Division of Mitigation Services has been contacted for the mitigation of riparian buffer impacts in
Zones 1 and 2 due to roadway fill. On the Buffer Drawings -sheets 3 and 4, we have the following impacts:
Zone 1 Zone 2
Site 5B 2,264 1,906
Wetlands at Site 5B 2,221 472
Difference 43 sq. ft 1,434 sq. ft.
We are requesting Neuse River riparian buffer mitigation in HUC Unit 03020204 for Zone 1 totaling 43 sq. ft. and for
Zone 2 totaling 1,434 sq. ft. A DMS commitment letter is pending.
Thank you for your assistance with this project. If you have any questions or need additional information, please contact
me at 919-854-6221 or Isworkman@ncdot.gov.
Sincerely,
Liz
Elizabeth Workman -Maurer
Division 2 Project Manager
252 439 2824 office
919 854 6221 direct
Isworkman@ncdot.gov
NCDOT Division 2
Project Development
1037 W. H. Smith Blvd.
Greenville, NC 27835
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Facebook Twitter YouTube
From: Carpenter, Kristi <kristilynn.carpenter@ncdenr.gov>
Sent: Thursday, February 13, 2020 1:55 PM
To: Workman, Liz S <Isworkman@ncdot.gov>; 'thomas.a.steffens@usace.army.mil'
<thomas.a.steffens@usace.army.mil>; Yeung, Hon F <hfyeung@ncdot.gov>; Johnson, Jay B <jbjohnson@ncdot.gov>;
Brittingham, Cathy <cathy.brittingham@ncdenr.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>; Ward, Garcy
<ga rcy. wa rd @ n cd e n r.gov>
Subject: NC 43 connector to NC55 (R-4463), DWR 20070932v.3, Approval Letter
All,
This email is being sent to you because you have been identified as an electronic copy recipient of the subject
document. If you have any questions about this email or the attached document, please contact Garcy Ward at (252) 946-
6481 or garcy.ward@ncdenr.gov.
If you have General Certification questions please use the following link to access the site map for General Certifications
on our Website: https://deg.nc.gov/about/divisions/water-resources/water-quality-permitting/401-buffer-permitting-
branch/general.
Sincerely,
Kristi Lynn Carpenter
Kristi Lynn Carpenter
Administrative Assistant
401 & Buffer Transportation Permitting Branch
Department of Environmental Quality
Division of Water Resources
919.707.3872 office
kristilynn.carpenter(cDncdenr.gov
512 N Salisbury Street, 12th Floor
1617 Mail Service Center
Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.