HomeMy WebLinkAboutNCC200774_ESC Approval Submitted_20200226� onrco't y eOf
Engineering
February 24, 2020
BMC East, LLC
C/O Donna Thagard
8020 Arco Corporate Dr., Ste.
Suite 400
Raleigh, NC 27617
300 W Crowell Street, Monroe, NC 28112
monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1
RE: LETTER OF APPROVAL
EROSION AND SEDIMENT CONTROL SUBMITTAL
Project Name: BMC Truss Manufacturing
Submittal No.: 20-00201259
Disturbed Area: 2.6 Acres
Location: 2979 Mason Street
Submitted by: Chris Hope, P.E.
Date Received: January 30, 2020
New Submittal: Revision: X
Dear Ms. Thagard:
The City of Monroe Engineering Department has reviewed the subject erosion and sedimentation control plan. The
noted plan has been reviewed and is found to be acceptable; therefore, you are issued this Letter of Approval and
Certificate of Plan Approval. Plan approvals shall expire within three (3) years following the date of this approval
if no land disturbing activity has been undertaken, as required by the City of Monroe Code of Ordinance Chapter
158.16 (G). The Certificate of Approval, NCGO1 permit, Certificate of Coverage (COC) and record of inspections
must be posted at a conspicuous location at the job site. If you proceed prior to approval of all plans you are doing
so at your own risk.
Chapter 15 8.16 (H) of the City Ordinance requires that a copy of the approved erosion control plan be on file at the
job site. In addition, the City maintains the right of entry for periodic inspection as indicated in Chapter 158.17 (D)
of the City Ordinance and by the G.S. I I3A-61.1(a). This letter is due notice of such inspection.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the
above named project. The NOI form may be accessed at. https:Hedocs.deq.nc.gov/Forfns/NCGOI-NOI. Please
direct questions about the NOI form to Annette Lucas at Annette.lucaskncdenr. og_v or Paul Clark at
Paul.clarkAncdenr. og_v. After you submit a complete and correct NOI Form, a COC will be emailed to you within
three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or
after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at
the job site:
� onrco't y eOf
Engineering
300 W Crowell Street, Monroe, NC 28112
monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. Please notify us to set up a preconstruction meeting prior to disturbing any land.
If a preconstruction is not set up it will be a violation. A copy of an approved Certificate of Coverage (COC) should
be provided at this meeting.
Sincerely,
%GNyA gPIFFIN
CE I — Erosion Control
cc: Chris Hope, P.E., Engineering Services, 2617 Rolling Hills Drive, Monroe, NC 28110
Doug Helms, MCT Contractors, 2717 Chamber Drive, Monroe, NC 28111
Zahid Khan, NCDEMLR-Mooresville Regional Office -email address: Zahid.khan(a ncdenr.gov
Sam Starnes, City of Monroe -Erosion Control Inspector, 3003 West Crowell St., Monroe, NC 28111
File