Loading...
HomeMy WebLinkAboutNCC200748_NOI Application_20200225Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 2/24/2020 7:22:22 PM (NCG01 NOI Submission) Approve by Clark, Paul 2/25/2020 8:29:48 AM (Review- Construction NOI 22374) • The task was assigned to Clark, Paul by round robin distribution 2/24/2020 7:22 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 26, 2020 5:00 PM 2/24/2020 7:22 PM Submit by McCoy, Suzanne 2/25/2020 1:25:32 PM (Payment Verification for NCC200748) * BDG Architects • McCoy, Suzanne assigned the task to McCoy, Suzanne 2/25/2020 1:25 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 7, 2020 5:00 PM 2/25/2020 8:29 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Fifth Third Bank 1 b. Specific Lot This field rray be used to list specffc lot numbers. Numbers 1 2. County* Wake 3. Highway or Street 100 Capcom Avenue Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Wake Forest 5. State * NC 6. Zip Code* 27587 7. Latitude* Enter the latitude in decimal degrees 35.9502 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -78.5293 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/09/2020 Estimated Construction Project Start Date 10. Date to End * 09/30/2020 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 0.75 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.05 (acres)* 14. Post- 0.67 construction (Estimated) impervious area (acres) * NCC Project NCC-WAKE-2020-Fifth Third Bank Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Richland Creek Waterbody* %neof waterbody into which storrrwater runoff will discharge 15b. Waterbody 27-21-(1.5) Index No. * NCWaterbody Index Narrber Stormwater F No discharges will flow 17 Yes to additional wate rs * 15c. Additional Neuse Receiving Waterbody narre Waterbody 15d. Waterbody NCWaterbody Index Nurrber Index No. 15e. Additional Waterbody name Receiving Waterbody 15f. Waterbody NCWaterbody Index Nurrber Index No. 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Fifth Third Bank Name * 2. First Name* Gloria If Corporation, enter Pbegistered Agent First Barre 3. Last Name* Samuel If Corporation, enter Faegistered Agent Last %rre 3b. Title Vice President 4. Permitee E-mail gloria.samuel@53.com Address * 5. Permittee 513-534-0993 Telephone No.* 6. Permittee Mailing Street Address Address* 38 Fountain Square Plaza Address Line 2 MD 10ATA1 City State / Frovince / Region Cincinnati OH Fostal / Zip Code Country 45202 USA Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 38 Fountain Square Plaza Address Line 2 MD 10ATA1 City State / Frovince / Fbgion Cincinnati OH Fbstal / Zip Code Country 45202 USA 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Clay Contact - First Name * 2. Primary Site Hoskins Contact - Last Name * 3. Title 4. Site Contact E- choskins@vericonbuilds.com mail Address* 5. Site Contact 704-562-9974 Telephone No. 6. Organization Vericon Construction Name 7. Site Contact Street Address Mailing Address* 13504-J South Point Boulevard Address Line 2 city Charlotte Fbstal / Zip Code 28273 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region NC Country USA D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/30/2019 Approved * 2. E&SC Plan Project 2019-00002522 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Town of Wake Forest Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project. 5. E&SC Plan Fifth Third Bank Capcom Letter of Approval.pdf 90.05KB Approval Wst be FDFfornat letter/documentation Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. The original NOI certification form and the $100.00 fee was mailed via UPS to the address on the form and confirmed delivered on Thursday 02/20/20 at 10:23am (Tracking #1ZE8403X0199176672). 6. NOI Certification NCGO1 NOI Certification Form-Signed.pdf 286.66KB Form Mast be Ft7Ffon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ��otr� ��rrrrrrr°/ Type Name* Gloria Samuel Title Vice President Organization Fifth Third Bank Date * 02/24/2020 F. Tracking and COC Info NOI Tracking No. 22374 NC Reference No. NCG01-2020-0748 Uses 'count number' variable (incremrented by SP) Certificate of NCC200748 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 748 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)