Loading...
HomeMy WebLinkAboutNCC200733_NOI Application_20200225Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 2/24/2020 10:34:18 AM (NCG01 NOI Submission) Approve by Clark, Paul 2/24/2020 11:29:30 AM (Review- Construction NOI 22310) • Georgoulias, Bethany reassigned the task to Clark, Paul 2/24/2020 10:38 AM • The task was assigned to McCoy, Suzanne by round robin distribution 2/24/2020 10:34 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 26, 2020 5:00 PM 2/24/2020 10:34 AM Submit by McCoy, Suzanne 2/25/2020 1:21:22 PM (Payment Verification for NCC200733) * Arlington Properties Inc. • McCoy, Suzanne assigned the task to McCoy, Suzanne 2/25/2020 1:20 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 6, 2020 5:00 PM 2/24/2020 11:29 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Tapestry University 1 b. Specific Lot This field any be used to list specifc lot numbers. Numbers 2. County* Mecklenburg 3. Highway or Street 7226 N. Tryon St Address* Street name only is acceptable if no address number assigned yet 4. CityorTownship* Charlotte 5. State * NC 6. Zip Code* 28213 7. Latitude* Enter the latitude in decimal degrees 35.2855 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -80.7579 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/02/2020 Estimated Construction Project Start Date 10. Date to End * 08/03/2020 Estimated Construction Project End Date 11. SIC (Primary) * Residential, Other than SFE (1522) Standard Industrial C]assification for Development 12. Acres to be 17.30 disturbed* (including off -site borrow and waste areas) 13. Total site area 19.40 (acres) * 14. Post- 1.10 construction (Estimated) impervious area (acres) * NCC Project NCC-MECKL-2020-Tapestry University Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Toby Creek Waterbody* Narreof waterbody into which storrrwater runoff will discharge 15b. Waterbody 13-17-5-4 Index No.* NCWaterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Flarnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Arlington Properties Name * 2. First Name* William If Corporation, enter Pegistered Agent First Barre 3. Last Name* Morris If Corporation, enter Faegistered Agent Last %rre 3b. Title VP Development 4. Permitee E-mail wmorris@arlingtonproperties.net Address * 5. Permittee 205-397-6831 Telephone No.* 6. Permittee Mailing Street Address Address* 2 North 20th Street Address Line 2 Suite 700 City State / Frovince / Faegion Birmingham AL Fbstal / Zip Code Country 35203 USA Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 2 North 20th Street Address Line 2 Suite 700 City State / Frovince / Fbgion Birmingham AL Fbstal / Zip Code Country 35203 USA 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site William Contact - First Name * 2. Primary Site Morris Contact - Last Name * 3. Title VP Development 4. Site Contact E- wmorris@arlingtonproperties.net mail Address* 5. Site Contact 205-397-6831 Telephone No. 6. Organization Arlington Properties Name 7. Site Contact Street Address Mailing Address* 2 North 20th Street Address Line 2 Suite 700 city Birmingham Fbstal / Zip Code 35203 8. Consultant Name (Optional) Robert Tripp, PE First and Last nacre 9. Consultant E-mail robert.tripp@merrick.com This person will be copied on all correspondence. 10. Consultant 704-612-0917 Telephone No. State / Rovince / Region AL Country USA D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 02/21/2020 Approved * 2. E&SC Plan Project LDGP-2020-00024 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* City of Charlotte Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project. 5. E&SC Plan Letter of Approval modified April 2019 - Tapestry Approval 29.92KB University.pdf letter/documentation Mist be R7Fforrrat Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. 6. NOI Certification NCG01 - Signed ENOI.pdf 66.29KB Form Mast be Ft7Ffon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature �llur.��r �lrtd�•t.�i� Type Name* William Morris Title VP Development Organization Arlington Properties Date * 02/24/2020 F. Tracking and COC Info NOI Tracking No. 22310 NC Reference No. NCG01-2020-0733 Uses 'count number' variable (incremrented by SP) Certificate of NCC200733 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 733 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)