Loading...
HomeMy WebLinkAbout20120443 Ver 5_Modifications_20171218Kimley»>Horn December 15, 2017 Ms. Sheri Montalvo NC Division of Water Resources 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 RE: Nationwide Permit 27 Modification Application - (USA CE SAW -2012-00932; DWR # 2012-0043 v4) South Buffalo Creek Habitat and Water Quality Improvement Project, Phase IV City of Greensboro, Guilford County, North Carolina Dear Ms. Montalvo: On behalf of the City of Greensboro, Kimley-Horn is submitting the attached application request for the modification of an existing Nationwide Permit (NWP) 27 for the above referenced project. The proposed project is a continuation of a larger project implemented to improve the water quality and habitat within the South Buffalo Creek (SBC) watershed. The purpose of this phase is to improve the water quality functions of South Buffalo Creek and its floodplain, enhance and protect the natural ecosystem and riparian community, and improve aquatic and terrestrial habitat by implementing additional improvements to the mainstem of SBC. Habitat structures, such as rock and log vanes, will provide aquatic habitat and habitat diversity by providing an improved riffle/pool sequence. Additionally, grade control and bank stabilization measures will reduce erosion. The South Buffalo Creek Phase IV plans have been modified since the issuance of the 404/401 Permit (USACE SAW -2012-00932; DWR # 2012-0043 v4). Plans were changed in response to erosion control comments received from the Department of Environmental Quality, and after a further evaluation of the stream profile which resulted in minor design changes to structure tie-ins and locations. The proposed impact changes are as follows (increase or decrease from the permitted area/length): Site 1 • Temporary wetland: Net decrease of 0.001 acre [44 square feet] • Temporary stream: Net increase of 23 linear feet • Temporary buffer zone 1: Net increase of 419 square feet • Temporary buffer zone 2: Net decrease of 105 square feet Site 2 Temporary wetland: Net decrease of 0.012 acre [523 square feet] Temporary buffer zone 1: Net increase of 12 square feet Temporary buffer zone 2: Net decrease of 47 square feet Kimley>>> Horn Page 2 The following information has been included as part of this modification request: • Revised PCN Application Form Impact 0 Revised Permit Impact Figures Tables 0 Check for DWR Water Quality • Signed Agent Authorization Certification Fee of $240.00 • Updated Plan Sheets If there is any additional information you need to assist in the processing of this modification request, please do not hesitate to contact me at 919-677-2113 or William.Sullivan@Kimley-Horn.com. Sincerely, William Sullivan Cc: Johnnie Hill — City of Greensboro; Sue Homewood — NCDWR; David Bailey— USACE AGENT AUTHORIZATION FORM Name: Address: 2 „ (Q 50'JV'k Flo -s- Cv c 4,, P orf"' 5Lv o PC Phone: 33 L - 373 - Zs 7_ n Project Name/Description: South Buffalo Creek — Phase IV Date: /0 The Department of the Army U.S. Army Corps of Engineers, Wilmington District Attention: David E. Bailey Field Office: Raleiih Regulatory Field Office Re: Wetland Related Consulting and Permitting To Whom It May Concern: The City of Greensboro hereby designates and authorizes Kimley-Horn and Associates, Inc. to act on our behalf as our agent solely for the purpose of processing Jurisdictional Determinations, Section 404 permits/Section 401 Water Quality Certifications applications, and to furnish upon request supplemental information in support of applications, etc. from this day forward until successful completion of the permitting process or revocation by the owner. In addition, I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. Authorized this the i2 day of t Print Property Owner's Name Cc: Karen Higgins NC Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary (T) Impact Site 1 Temporary Access Bottomland ❑ Yes ® Corps 0.03 acre ❑ P ® T Road Hardwood Forest ® No ❑ DWQ Impact Site 2 Temporary Access Bottomland ❑ Yes ® Corps 0.08 acre ❑ P ® T Road Hardwood Forest ® No ❑ DWQ 2g. Total wetland impacts 0.11 acre 2h. Comments: Proposed temporary wetland impacts will result from the use of a temporary access road. The temporary access road serves to transport materials to and from the construction sites. Proposed impacts to the wetlands will be temporary in nature and will be avoided to the extent practical. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) Impact Site 1 ❑ P ® T Enhancement Piedmont Creek ® PER ❑ INT ® Corps ❑ DWQ 8 129 Impact Site 1 Enhancement South Buffalo ® PER ® Corps 30 635 F1 ®T Creek F1 INT F1 DWQ Impact Site 2 Enhancement South Buffalo ® PER ® Corps 30 1,303 F1 ®T Creek F1 INT F1 DWQ Impact Site 2 Stream S3 - LIT to ® PER ® Corps F1 P ®T Temporary Crossing South Buffalo El INT El DWQ 2 16 Creek 3h. Total stream and tributary impacts 2,083 LF 3i. Comments: Proposed temporary impacts to South Buffalo Creek and Piedmont Creek will result from the enhancement and restoration of the channel and banks. Enhancement and restoration activities will include laying the South Buffalo Creek banks back in select locations to allow for improved access to the adjacent floodplains. Rock silt dams, ripples, and log vanes will also be constructed to increase in -stream habitat. Temporary impacts to stream S3 will occur as a result of being piped under a temporary road crossing for construction access. All fill material will be removed from stream S3 upon completion of the proposed project and the impact site will be restored to preconstruction conditions. Page 5 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar -Pamlico ® Other: Jordan Lake Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) Stream name mitigation (square feet) (square feet) or Temporary required? (T) Impact Site 1 Temporary Access Piedmont Creek ElYes 5,789 1,387 ElP ® T Road ® No Impact Site 1 Temporary ❑ Yes El P ®T Access Road; South Buffalo Creek ®No 28,313 5,800 Stream Restoration Impact Site 2 Temporary ❑ Yes El P ®T Access Road; South Buffalo Creek No 43,164 14,502 Stream Restoration 6h. Total buffer impacts 77,266 21,689 6i. Comments: Temporary buffer impacts will result from the use of a temporary access road during the construction process. Temporary roads are considered "Allowable" under the Jordan Watershed Riparian Buffer Rules: Table of Uses, provided that the disturbed area is restored to pre -construction conditions and replanted. All of the temporary road occurring within Zone 1 and Zone 2 buffers will be restored to pre -construction conditions and seeded (if located in an easement) or planted after construction is completed. Additional temporary buffer impacts will result from the stabilization of targeted banks within South Buffalo Creek. Soft materials (including rock vanes and log vanes) will be used to stabilize the banks, therefore the activity is considered stream restoration and "Exempt" under the Jordan Watershed Riparian Buffer Rules: Table of Uses. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. This project has been designed to restore habitat and water quality within the project area and downstream areas of the Cape Fear River basin and Jordan Lake watershed. Access to the site will be limited to designated construction access areas. Buffers and streams will only be impacted when neccesary and when targeted restoration activites are underway. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Silt fences will be used throughout construction to prevent sediment runoff into South Buffalo Creek. Additionally, construction access and access roads are specified and located in areas designed to result in the lowest impacts possible to buffers, wetlands, and streams. All temporary wetland crossings will be protected with timber and mud mats during construction activities. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation Page 7 of 12 PCN Form — Version 1.3 December 10, 2008 Version 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ® Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: A detailed hydraulic analysis was conducted of South Buffalo Creek for Phases I through III using a HEC -RAS model and a No -Rise certification was received for those Phases. A similar analysis will be completed for Phase IV and it is assumed a No -Impact will be achieved. The No -Impact submittal will be reviewed by NC Flood Mapping Program for Greensboro, NC. 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM Panel 3710786300J (effective June 18, 2007). William Sullivan + . 11/6/2017 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 12 of 12 PCN Form — Version 1.3 December 10, 2008 Version M1xY- t • ` k 7 � f 4 i � Temporary Stream Impact Piedmont Creek 129 linear feet x Decreased Temporary Zone 2 Impact 1 Piedmont Creek 203 square feet Tempora py- * 0. OAIJ/ A y kl*- } Increased Temporary Zone 1 Impact 14 square feet f. 0 50 100 11 Feet Legend Proposed Gradelines Proposed Structures Updated Limits of Disturbance Kimley>»Horn dl A vi Jill Ill lilt L N Increased Temporary Zone 1 Impact Temporary Wetland Impact 392 square feet Y Temporary Stream Impact v 0.01 acre #' South Buffalo Creek pact 612 linear feet Temporary Wetland Impact 0.02 acre Increased Temporary Zone 2 Impact 98 square feet - - Temporary Wetland Impact 0.002 acre L. Increased Temporary Stream Impact South Buffalo Creek 23 linear feet Temporary Wetland Impacts Modified Impacts Stream Ste 1: Buffer ImpactsTable Temporary Buffer Impacts: Zone 1 , �� Stream Zone 1 Impacts (sq. ft.) Zone 2 Impacts (sq. ft.) Wetland _' Temporary Buffer Impacts: Zone 2 Temporary Stream Impacts � Zone 1 - Piedmont Creek 5,789 SDuth Buffalo Creek 28,313 5,800 Delineated Streams Zone 2 1U Totals k 1 fi 7,390 ,I, - t Figure 5a: Impact Site 1 (REVISED) Temporary Wetland Impact 0.002 acre L. Increased Temporary Stream Impact South Buffalo Creek 23 linear feet Temporary Wetland Impacts Modified Impacts Stream Ste 1: Buffer ImpactsTable Temporary Buffer Impacts: Zone 1 , �� Stream Zone 1 Impacts (sq. ft.) Zone 2 Impacts (sq. ft.) Wetland _' Temporary Buffer Impacts: Zone 2 Temporary Stream Impacts � Zone 1 - Piedmont Creek 5,789 SDuth Buffalo Creek 28,313 5,800 Delineated Streams Zone 2 1U Totals 33,899 7,390 ,I, - t Figure 5a: Impact Site 1 (REVISED) South Buffalo Creek Phase IV Greensboro, North Carolina Site 2: Buffer Impacts Table LegendProposed Structures Temporary Buffer Impacts: Zone 1 Stream , Zone 1 Impacts (sq.ft.) Zone 2 Impacts (sq.ft.) Proposed Gradelines Temporary Wetland Impacts Modified Impacts I III! I ii� il� 111 4 1111 ,. - Totals: •5-27 Wetland V Delineated Streams Temporary Buffer Impacts: Z Zone 1 X1111111♦ one 2 Updated of • . Temporary Stream Impacts 111 t Zone 2 It �Y a ff i�11�1E1 r ► ;�`': .. _ _ �111111�• � , •11111111 � ,�� !+ , y''' ��„ �, ` � - _ �e. r. - _ { 1\ �\ i� 111111 s C_c' •• `Y?.:'�V�_'...w A` -\ ,� `•. :.� � ���� Ii+IC� Vii;,♦1111- 'wL.� v� 67♦ :.� r "x'a�; y ' /, F a lr4 .� .i�i1111111��1j•�14- �~ `�i, "�'aF ell , . !1� �1 e d Yk V�'►1. 1111111111��1<°' tl �• ,. .�1�,�1���1�1'"1♦1♦�111��1.1�1.11 � , a�`�s.• r'� . kW Kersev a, � < ,•. _ � ,� ' 1♦111 1,/%,-P.•,��!`" �- ',,,�•� i1�� X1111; _ �i♦�1�11111♦1♦♦♦ ` :." , .w. _fia ��� `� ���jj - � ��71♦♦1111♦1 i tial 1 1 �" . ,� ` �� • � �.: LOP— 1j1���� . - ♦ l.1�1 . I Z� • I♦�11�♦1•. • d � ♦ -' � .,' A r� 7 �•♦♦11 1111♦♦♦♦♦, • � •�..1.1�i111♦♦1♦.� p1♦111♦1♦1p• � � ��711111�1♦♦�� ��1111�1� • �•+�f �1♦1111111 11 X111 .• '' • :. � ••�� , .11 ♦111111 ♦1 1♦' , ' V..'�r,1�1X♦♦1♦.111.♦♦♦mo1♦i1•1j11�♦♦11.1�111•1;1♦-..1♦111-1i11] ii1ei ..W11♦11�1.111•♦1 4•Xi♦1♦„.�1!1111�1♦11.11!1111♦11111111111♦111111► 11♦, p�� 111111♦111<111111 ♦1♦1 ♦1111 ♦� • t • V ►11.,�1/1�1111�1♦1♦1�♦1♦1]11♦11�1�11♦1111111111��,,, •....�1� 1♦11111♦ TemporaryTA •. South• Creek DecreasedP 47 square feet Temporary Zone•.1,303 linear feet Temporary• Impact 1 P_ 1 L...,1 \.:./ t \ L.,1 '% ,! \.,:/ \-I 1 V 1 1 CONSTRUCTION DRAWINGS SOUTH BUFFALO CREEK PHASE IV HABITAT AND WATER QUALITY IMPROVEMENT PROJECT DEVELOPED FORS CITY OF GREENSBORO GREENSBORO, NORTH CAROLINA CONTRACT NO. 2017-072 PROJECT NO. P05778 LG [ENT: ENGINEER: SURVEYOR: PROJECT CONTACTS CITY OF GREENSBORO 2602 S. ELM ---EUGENE STREET P.O.BOX 3136 GREENSBORO, NORTH CAROLINA 27406 PHONE: (336) 373-2527 FAX: (336) 373-3119 ATTN.: JEREMY MCCALL, P.E. KIMLEY—HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE ST., STE. 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-20€0 FAX: (919) 677-2050 ATTN.: JENNIFER L. MURPHY, P.E. LEVEL CROSS SURVEYING, PLLC 668 MARSH COUNTRY LANE RANDLEMAN, NC 27317-7228 PHONE: (336) 495-1713 ATTN.: BILL DURHAM, PLS SHEET INDEX -EU MSCFVPMON NO. 01 TITLE SHEET 02 GENERAL NOTES 03 LEGENDS 04 EXISTING CONDITIONS KEY SHEEP 05-09 EXISTING CONDITIONS 10 SITE PLAN AND PROFILE KEY SHEET 14 SITE PLAN AND PROFILE a Uj ... .....:. .. ._,:,. ..-. r :. .... ..-: � Glx,.-. ...:..... ,.-.. .. .--. - - -. �} .. ... ..,. ... .. ... _.:: #_. 29 Lit� 15 {) TYPICAL CROSS SECTION W. _ Ta 16 17 DETAILS - w f a EROSION AND SEDIMENT CONTROL DETAILS 22 EROSION CONTROL KEY SHEET 23-28 EROSION CONTROL PLANS VICINITY MAP LOCATION SAP � � 29 PLANTING NATES AND DETAILS n � 30 PLANTING PLAN KEY SHEET 0 Know what's below, 31-36 PLANTING PLANS Call before you dig. 37 CROSS SECTIONS E GENERAL NOTES: .2 1. A PRE—CONSTRUCTION CONFERENCE MUST BE HELD WITH REPRESENTATIVES OF THE CITY & CONTRACTOR OF RECORD BEFORE ANY WORK CAN BE STARTED ON SITE, STREAM, FLOODPLAINS, AND SLOUGHS M SHALL BE INSTALLED ACCORDING TO APPROVED PLANS AND PROFILES. IF CL A FIELD CHANGE IS NEEDED, THE REDESIGN AREA(S) MUST BE APPROVED BY THE CITY PRIOR TO INSTALLATION. I s 2. THE CONTRACTOR SHALL HAVE A SET OF SEALED CONSTRUCTION DRAWINGS ON THE PROJECT SITE AT ALL TIMES. 3. THE CONTRACTOR SHALL ADHERE TO ALL FEDERAL, STATE, COUNTY, AND CITY LAWS, ORDINANCES, AND REGULATIONS WHICH IN ANY MANNER AFFECTS THE CONDUCT OF THE PROJECT, INCLUDING, BUT NOT LIMITED TO INITIATING, MAINTAINING, & SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK, 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONFORM TO ALL REQUIREMENTS OF THE SPECIFICATION AS THEY RELATE TO COORDINATION WITH THE OWNERS AND THE UTILITIES THAT EXIST ON SITE, CONTRACTOR MUST ALSO COMPLY WITH ALL NCDOT AND UTILITY OWNER REQUIREMENTS WHEN OPERATING WITHIN THE RIGHT—OF---WAY AND EASEMENTS. 5. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PROJECT SPECIFICATIONS AND THE CITY OF GREENSBORO STANDARD SPECIFICATIONS. IN THE CASE OF CONFLICT, THE PROJECT SPECIFICATION SHALL GOVERN. IN CASE OF A CONFLICT BETWEEN THE STANDARD SPECIFICATIONS AND THE SPECIAL CONDITIONS, THE SPECIAL CONDITIONS SHALL GOVERN. THE CONTRACTOR SHALL OBTAIN AND USE ALL APPLICABLE ADDENDA. 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE ITS WORK WITH ANY WORK TO BE PERFORMED BY THE UTILITY OWNERS OR OTHERS IN THE RIGHT—OF—WAY. ARRANGE A SCHEDULE OF OPERATIONS THAT WILL ALLOW FOR THE COMPLETION OF THE PROJECT WITHOUT ANY UNDUE DELAY. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING STRUCTURES, UTILITIES, FENCES, SHRUBBERY, AND RETAINING WALLS, ETC. WHICH ARE NOT TO BE DISTURBED DURING CONSTRUCTION. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 8. ALL EXCESS MATERIALS SHALL BE HAULED OFF BY THE CONTRACTOR. EXCESS GRADE MATERIAL SHALL BE SPREAD AT THE DESIGNATED PERMANENT STOCKPILE AREA WITHIN THESE DRAWINGS. REFUSE SHALL BE DISPOSED OF LEGALLY OFFSITE. 9. THE PROPOSED BANKFULL LINE, FLOODPLAIN LINE, SLOUGH LINE AND, CUT LINE SHOWN WITHIN THE PLAN/PROFILE SHEETS DENOTE PROPOSED GRADING BREAKLINES, OR GRADE TRANSITION POINTS, AS INDICATED IN THE TYPICAL CROSS --SECTIONS, PROFILE, AND CROSS—SECTIONS. GRADE LINES MAY BE ADJUSTED AT THEIR BEGINNING, ENDING, AND AT STRUCTURES AS DIRECTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE—IN OR TO CREATE A MORE "NATURAL" APPEARANCE FOR STREAM, WETLAND WORK, AND SLOUGH WORK. SUBSURFACE: LIMITED SUBSURFACE DATA IS MADE AVAILABLE TO THE CONTRACTOR FOR THIS PROJECT (SEE PROJECT MANUAL). THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ADDITIONAL SUBSURFACE EVALUATIONS. UTILITIES: THE CONTRACTOR SHALL CALL THE "CONTACT ONE—CALL CENTER" BY DIALING 811 BEFORE DIGGING. THE CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES INSIDE THE CONSTRUCTION CORRIDOR. TOPSOIL REMOVAL AND STOCKPILE: 1. TOPSOIL CONSISTING OF LOAM AND ORGANICS SHALL BE REPLACED IN ALL GRADED FLOODPLAIN, WETLAND SLOUGHS, AND STREAM BANK AREAS TO A MINIMUM 4" DEPTH UNLESS A GREATER DEPTH IS OTHERWISE SPECIFIED. THE FINAL GRADE ELEVATIONS INCLUDE THE APPLICATION OF THIS TOPSOIL LAYER. THEREFORE, IN THESE AREAS IT MAY BE NECESSARY TO OVER EXCAVATE TO ACCOUNT FOR THE REPLACEMENT DEPTH OF THE TOPSOIL. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARILY STOCKPILING THE TOPSOIL FOR RE—PLACEMENT THROUGHOUT CONSTRUCTION. TRAFFIC CONTROL: 1. ACCESS TO PRIVATE RESIDENTIAL DRIVEWAYS MUST BE MAINTAINED DURING CONSTRUCTION. IF ACCESS TO PRIVATE RESIDENTIAL DRIVEWAYS CANNOT BE MAINTAINED DUE TO CONSTRUCTION ACTIVITIES, ON—STREET PARKING WITHIN 50 FEET OF PRIVATE ACCESS TO THE RIGHT—OF—WAY AND PEDESTRIAN WALKWAY AROUND CONSTRUCTION ACTIVITY MUST BE PROVIDED. 2. CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT TRAFFIC FLOW IS MAINTAINED ON ALL IMPACTED CITY STREETS DURING CONSTRUCTION, 3. WHEN A TEMPORARY CLOSING IS REQUIRED, THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF GREENSBORO AND GDOT TO IMPLEMENT A TRAFFIC CONTROL PLAN. CONSTRUCTION SEQUENCE: 1. THE CONTRACTOR SHALL PROVIDE A SCHEDULE OF WORK TO THE CITY AND ENGINEER FOR APPROVAL. THE CONTRACTOR SHOULD GENERALLY PLAN TO CONSTRUCT THE PROPOSED STREAM IMPROVEMENTS FROM UPSTREAM TO DOWNSTREAM TO PROTECT COMPLETED STREAM SECTIONS FROM CONSTRUCTION ACTIVITIES DURING CONSTRUCTION. THE CONTRACTOR MAY PROPOSE AN ALTERNATIVE CONSTRUCTION SCHEDULE FOR APPROVAL BY THE ENGINEER. 2. THE CONTRACTOR SHALL COORDINATE A PRE—CONSTRUCTION MEETING WITH CITY STAFF, PRIVATE AND PUBLIC UTILITIES, AND THE DESIGN ENGINEER. THE CONTRACTOR SHALL SCHEDULE THE MEETING A MINIMUM OF 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY. 3. THE CONTRACTOR SHALL PROVIDE THE START DATE OF ANY ONSITE LAND DISTURBANCE ACTIVITY TO LAND QUALITY SECTION'S WINSTON—SALEM REGIONAL OFFICE AT (338) 778-9800 48 HOURS PRIOR TO MOBILIZATION. 4. THE CONTRACTOR SHALL INSTALL TRAFFIC CONTROL MEASURES, EROSION CONTROL MEASURES, TREE PROTECTION FENCING, AND OTHER MEASURES AS SHOWN ON THE PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE ITEMS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER WHEN FENCE INSTALLATION IS COMPLETE FOR INSPECTION BY THE CITY, INSPECTION BY THE LAND QUALITY SECTION IS NOT NECESSARY PRIOR TO COMMENCING LAND DISTURBANCE AS THE LAND QUALITY SECTION WILL PERFORM PERIODIC INSPECTIONS FOR COMPLIANCE. 5. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES REQUIRED FOR WORKING IN A LIVE STREAM PER THE PLANS AND SPECIFICATIONS AND/OR AS DIRECTED BY THE PROJECT ENGINEER. SEE EROSION AND SEDIMENT CONTROL PLAN. 6. THE CONTRACTOR SHALL SET/STAKE AT A MINIMUM THE STREAM CENTERLINE, PROPOSED TOP AND TOE OF SLOPES AND BREAKLINES, STRUCTURE LOCATIONS, AND LIMITS OF DISTURBANCE IN THE FIELD PER THE DRAWINGS. THE ENGINEER RESERVES THE RIGHT TO ADJUST THE LOCATION AND ELEVATIONS OF THE PROPOSED ITEMS BEFORE THE CONTRACTOR BEGINS ANY CONSTRUCTION, 7. CLEAR VEGETATION AS WORK PROGRESSES ALONG THE PROPOSED BANK STABILIZATION, STREAM CHANNEL ALIGNMENTS, AND BANKFULL BENCH EXCAVATION LOCATIONS. THE CONTRACTOR SHOULD PAY SPECIAL ATTENTION TO REMOVED TREES THAT CAN BE USED IN THE PROPOSED LOG STRUCTURES OR AS TRANSPLANTS. STOCKPILE TREES THAT WILL BE USED LATER AS ROQTWADS AND LOGS. SHRUBS AND TREES LESS THAN 3" IN DIAMETER THAT ARE TO BE TRANSPLANTED SHALL BE MARKED WITH HIGHLY VISIBLE TAPE BY THE ENGINEER. THESE SHRUBS AND TREES SHALL BE SAVED FOR TRANSPLANTING AND STOCKPILED. ALL SHRUBS AND TREES MARKED TO BE TRANSPLANTED SHALL BE REMOVED ENSURING THAT THE ROOT MASS IS INTACT. CONSTRUCTION SEQUENCE CONTINUED 8. WHERE DESIGNATED, THE CONTRACTOR SHALL CONSTRUCT PROPOSED CHANNEL IMPROVEMENTS. AS THE SITE IS GRADED THE CONTRACTOR SHALL STOCKPILE TOPSOIL FOR LATER USE. 9. THE CONTRACTOR SHALL CONSTRUCT CHANNEL AND BANK STABILIZATION TO A STABLE FORM BEFORE MOVING OUT OF THE WORK AREA. A STABLE FORM SHALL INCLUDE, BUT IS NOT LIMITED TO, THE COMPLETION OF FINAL GRADE, THE COMPLETE INSTALLATION OF IN—STREAM STRUCTURES, TRANSPLANTS, EROSION CONTROL MATTING, TOPSOIL AND TEMPORARY VEGETATION ACCORDING TO THE TEMPORARY SEEDING SCHEDULE. SECTIONS OF STREAM WITHIN THE PUMP AROUND OPERATION WORK ZONE SHALL BE STABILIZED WITH MATTING BY THE END OF THE WORK DAY, 10. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES REQUIRED FOR WORKING IN A LIVE STREAM PER THE PLANS AND SPECIFICATIONS AND/OR AS DIRECTED BY THE PROJECT ENGINEER. SEE EROSION AND SEDIMENT CONTROL PLAN. 11. CONSTRUCTION SHALL BE COMPLETED INCLUDING TEMPORARY VEGETATION, EROSION CONTROL MATTING, TRANSPLANTS, AND STRUCTURES. AS NECESSARY CONTRACTOR SHALL RE—SEED AREAS WITH TEMPORARY SEEDING TO MEET THE COVERAGE REQUIREMENTS IN THE PROJECT SPECIAL CONDITIONS. 12. IF CONSTRUCTION IS COMPLETED DURING THE PLANTING SEASON SPECIFIED HEREIN, THEN INSTALL FINAL PLANTING PER THE DRAWINGS AND SPECIFICATIONS. OTHERWISE, DELAY FINAL PLANTING UNTIL THE PLANTING SEASON. 13. THE CONTRACTOR SHALL COORDINATE A FINAL SITE INSPECTION WITH THE CITY STAFF AND ENGINEER TO REVIEW THE COMPLETED SITE CONSTRUCTION AND TO OBTAIN FINAL APPROVAL. 14. UPON FINAL APPROVAL, THE CONTRACTOR SHALL NOTIFY THE LAND QUALITY SECTION WHEN ALL LAND DISTURBANCE ACTIVITY IS COMPLETE AND A GOOD STAND OF TEMPORARY VEGETATION AND ADEQUATE PERMANENT GROUND COVER HAS BEEN ESTABLISHED. 15. REMOVE SILT AND CONSTRUCTION FENCES, AND OTHER TEMPORARY EROSION CONTROL DEVICES AFTER APPROVAL. Know what'sbelow. Call before you dig. q PREPARED IN THE OFFICE OF: CLIENT: DATE: !��>•``��.�CARQ��, 8116117 PROJECT: CITY OF GREENSBORO SOUTH BUFFALO CREEK HABITAT E . Q; . DRAWN eY. o a.' ���5 �� JLY AV NAM Alaft, NC LICENSE #F-0102 — SUL DESIGNED 6Y: AND WATER QUALITY K I421 FAYETTEVILLE ST., STE. 6� TITLE: 0446[!8 JLY REV. No.: REVISIONi DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 IMPROVEMENT PROJECT PHASE IV �► CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, Is intended only for the specific purpose im ePHONE: (919) 677-2000 GENERAL /� [ �"� �,� �� WRW and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by GE1 VERAL,,,, NOTES '�, `•••"• Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. C@20.17 ��i,F�R L .�`� JOB NUMBER: SHEET NL#MSM Copyright Kimley—Horn and Associates, Inc„ 2017 SEAL: ��lfrtreol 17, 012137010 02 gF 37 E U-) di 0 E SURVEY LEGEND CURB INLET/CATCH BASIN SANITARY SEWER MANHOLE FIRE HYDRANT LIGHT POLE POWER/UTILITY POLE GUY WIRE R C- P REINFORCED CONCRETE PIPE M I P CORRUGATED METAL PIPE VALVE WATER METER n SI GN ZR TREE EXISTING BEDROCK TOP OF BANK OVERHEAD POWER STORM SEWER SANITARY SEWER .. . ........................ . ..... ROAD CENTERLINE BUILDINGS & STRUCTURES RETAINING WALL SIDEWALK 110100 STREAM CENTERLINE SWALE OR DITCH MAJOR CONTOUR MINOR CONTOUR .............. ............... BACK OF CURB EDGE OF PAVEMENT ........... ...... ............... ... .... ... FACE OF CURB TOP OF BANK PROPERTY BOUNDARY ZONE 1 BUFFER ZONE 2 BUFFER LIDAR CONTOURS FROM LIDAR (NOT SURVEYED) EXISTING LEGEND FROM PREVIOUSLY COMPLETED PHASES EXISTING LOG CROSS VANE EXISTING BOULDER CLUSTER new— ak� EXISTING ROCK A -VANE Pl-- EXISTING SOIL LIFTED SLOUGH Va > > > rd - ENTRANCE WITH BOULDER SILL PROPOSED PLAN LEGEND nm PROPOSED STREAM CENTERLINE PROPOSED STREAM BANKFULL PROPOSED MAJOR CONTOUR _734— PROPOSED MINOR CONTOUR 107+20.00 CROSS SECTION —1w INNER BERM BENCH BM— BANKFULL BENCH PROPOSED CONSTRUCTED RIFFLE PROPOSED LOG VANE 16 .flk, PROPOSED ROCK CROSS VANE 0 PROPOSED LOG J -HOOK PROP OSED TOE WO OD EXISTING MINOR CONTOUR PROPOSED ROCK TOE MAJOR CONTOUR PROPOSED RIP RAP .flk, PROPOSED ROCK CROSS VANE 0 PROPOSED PROFILE LEGEND EXISTING GROUND ELEVATION AT PROPOSED CENTERLINE PROPOSED CHANNEL BOTTOM ELEVATION M EXISTING ROCK VANE EXISTING LOG VANE EXISTING MINOR CONTOUR EXISTING LOG ROCK AND ROLL RIFFLE MAJOR CONTOUR EXISTING BOULDER STEP POOL MINOR CONTOUR EXISTING RIP RAP LIMITS OF DISTURBANCE EXISTING CHANNEL PLUG EXISTING VEGETATED SOIL LIFT TEMPORARY SILT FENCE EXISTING WETLAND tTPF TREE PROTECTION FENCE EXISTING BRUSH MATTRESS PROPOSED PROFILE LEGEND EXISTING GROUND ELEVATION AT PROPOSED CENTERLINE PROPOSED CHANNEL BOTTOM ELEVATION M CROSS SECTION LEGEND EXISTING GROUND PROPOSED GROUN PROPOSED FILL C 0 0 n_ M V) O 0 Know what'sbelow. 0 Call before you dig. PREPARED IN THE OFFICE OF: CLIENT: DATE: PROJECT: CAR 9/12/17 E ...... SOUTH BUFFALO CREEK HABITAT ..& oo DRAWN BY: C CITY OF GREENSBORO 0 JLY > C NC LICENSE #F-0102 SEA DESIGNED BY: AND WATER QUALITY 421 FAYETTEVILLE ST., STE. 600 TITLE: x JILY < REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 IMPROVEMENT PROJECT PHASE IV 2f I I I I CHECKED BY. Klmley)))Horn 2000 This document, together with the concepts and designs presented herein, as on instrument of service, is intended only for the specific purpose PHONE: (919) 677-ifi WRW and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by LEGENDS Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. @2017 -*e L JOB NUMBER: SHEET NUMBER: Copyright Kimley—Horn and Associates, Inc., 2017 ISE '?41111"11 012137010 03 OF 37 PROPOSED EROSION CONTROL LEGEND EXISTING MAJOR CONTOUR LIVE STAKE PLANTINGS EXISTING MINOR CONTOUR ZONE 2 - PROPOSED MAJOR CONTOUR ZONE 3 - PROPOSED MINOR CONTOUR LOD PROPOSED LIMITS OF DISTURBANCE ZONE 5 - UTILITY/EASMENT PLANTINGS ZZ/r3_"� PROPOSED TEMPORARY SILT FENCE PROPOSED tTPF TREE PROTECTION FENCE ifiT PROPOSED COMBINATION TREE PROTECTION/SILT FENCE DIVERSION SWALE/BERM 20 PROPOSED TEMPORARY HAUL ROAD PROPOSED TEMPORARY CONSTRUCTION ENTRANCE/EXIT PROPOSED TIMBER MAT 1s PROPOSED TEMPORARY DEEP STREAM CROSSING W/ MUD MATr5 PROPOSED TEMPORARY STREAM CROSSING W/ PIPE 19 PROPOSED TEMPORARY STAGING AREA TREE TO BE REMOVED CD CD— PROPOSED COFFER DAM Sc— Sc— PROPOSED 21 5 FLOATING SILTCURTAIN !III! PROPOSED 18 COIR WATTI1--L- E" 4� 8 PROPOSED Q COIR FIBER MATTING APPLICATION�T PROPOSED SKIMMER BASIN r4_"� ID PROPOSED IMPERVIOUS DIKE FOR PUMP AROUND 21 PROPOSED DEWATERING PUMP AROUND 21 PROPOSED SILT FENCE STONE OUTLET 18 roe PROPOSED GEOTEXTILE DEWATERING DIRT BAG 21 PROPOSED ( B2 TEMPORARY SLOPE DRAIN 0 PROPOSED TEMPORARY ROCK CHECK DAM 3 K�9) PROPOSED K-7-"\ TEMPORARY PIPE INLET PROTECTION W CROSS SECTION LEGEND EXISTING GROUND PROPOSED GROUN PROPOSED FILL C 0 0 n_ M V) O 0 Know what'sbelow. 0 Call before you dig. PREPARED IN THE OFFICE OF: CLIENT: DATE: PROJECT: CAR 9/12/17 E ...... SOUTH BUFFALO CREEK HABITAT ..& oo DRAWN BY: C CITY OF GREENSBORO 0 JLY > C NC LICENSE #F-0102 SEA DESIGNED BY: AND WATER QUALITY 421 FAYETTEVILLE ST., STE. 600 TITLE: x JILY < REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 IMPROVEMENT PROJECT PHASE IV 2f I I I I CHECKED BY. Klmley)))Horn 2000 This document, together with the concepts and designs presented herein, as on instrument of service, is intended only for the specific purpose PHONE: (919) 677-ifi WRW and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by LEGENDS Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. @2017 -*e L JOB NUMBER: SHEET NUMBER: Copyright Kimley—Horn and Associates, Inc., 2017 ISE '?41111"11 012137010 03 OF 37 PROPOSED PLANTING PLAN LEGEND ZONE 1 - LIVE STAKE PLANTINGS ZONE 2 - SLOUGH/BANKFULL BENCH PLANTINGS ZONE 3 - RIPARIAN PLANTINGS ZONE 4 - WETLAND PLANTINGS ZONE 5 - UTILITY/EASMENT PLANTINGS CROSS SECTION LEGEND EXISTING GROUND PROPOSED GROUN PROPOSED FILL C 0 0 n_ M V) O 0 Know what'sbelow. 0 Call before you dig. PREPARED IN THE OFFICE OF: CLIENT: DATE: PROJECT: CAR 9/12/17 E ...... SOUTH BUFFALO CREEK HABITAT ..& oo DRAWN BY: C CITY OF GREENSBORO 0 JLY > C NC LICENSE #F-0102 SEA DESIGNED BY: AND WATER QUALITY 421 FAYETTEVILLE ST., STE. 600 TITLE: x JILY < REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 IMPROVEMENT PROJECT PHASE IV 2f I I I I CHECKED BY. Klmley)))Horn 2000 This document, together with the concepts and designs presented herein, as on instrument of service, is intended only for the specific purpose PHONE: (919) 677-ifi WRW and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by LEGENDS Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. @2017 -*e L JOB NUMBER: SHEET NUMBER: Copyright Kimley—Horn and Associates, Inc., 2017 ISE '?41111"11 012137010 03 OF 37 w I ' 0 m ' < /07 ` 001 ...... . ... ..... . ............ 0- CIO <1 \ VOD 1i SHEE 07 <) K SE1Y TRIBUTARY QO 00 007 001 -Go 001 LOD 60 OD UT 3 / / Lo / AREA + LLI Ld TE to CD / SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS FT ----- / � y / � '� _-- `` . ------~- --___ u------____ '_---' 1� 0 � 1� 2� -''-- ................ ���~ ~�^~ = ~ �� ^ _~ >, .v , ,v v` vv v i.V v �, . ` ° % i a l � v , _. v �\A � / Ii t. i ! � �Lq , ' v `� A i i ,_\ \iia' \ ` �\ 14\�\ 161l f( i } $ } I '^�:. A , f,,,\ _... '` � -\ASA v \ ! �'s �� - ( I I . / ,-, _�,_ /7 f m i i I€ 3! 14 vv� Av\ 1 1 l w `y 2- // s s pp1 i i 1/ /\ � v v, V \; / l v I i I I i i ,,s\ \A� \ iI . , r' I i i v A `, V\ > -- ( �" / r ' Off/ I j I !� j i i I v v :, A ;t O (`7 I ,� i 1 €' i I E 1 € 3 's .� .. _ \ \ \ .�'.\ x`I \\\ .7` i I i 0) _" U '" ' ✓r- / ->' / i / / r 4// p1 /J \ / I--- f —4o0 O i [ l ; t f I E # S ,^- �*, � `�."` i ��\ \`\ - I; ') `� , / �\ %jfjf // / jf� / rr' -..__E ice/ Q ����D O ti * i i [ I i i \,- • ;; \, -, \\ \ l i / /ii// // !'iii l 01 J v t v t i I ",ate,, `�`� "1. ! tip\ !� # } 's t r`'.} ,t,t j / �// // � I v I I 3 i v A �� \ vv� v y ? t/<�/ / i /���i� 0q; �' j1,, 'fir I i ``� -.,�,�� v y �'v v� y''"'v v >_v y.,. / / / �. O O` v v v vv \ Z v �� ii/r //%/ �% O I € , I ( , , , A :ter �v ! _ //r //� t 1 m / O y \ . �' v v `� ! v v s: ~v l \ r \ i r /j/ �p0 \! \ r / .:,} \ \v' \ \\ \ A V 1`: V �i' I) , i s} t ii 1 \ Az,! y t i V A V V vv I N \\ ✓< ✓ r // r/ /r/ O i \ r i I I , i - A ,V v v v vi z\ \\ i z ✓� / / � // /,; G✓ O VO 3 \ •\VV:�\,, t I i V v v v �, t= ,mac \ \ / / r� ', r \ I j i 1 i E 1. \ s. l�''`V y \ \v v§\� ��>i I ✓ fir, 1 ',// OO O \ v r / : I € ` ( € i 1 4 , V / , ? i =i t \ V v r,z \ \ f...,,, r ,✓ . r r /,///, / ,/' i I E l t 1'i \ 'V 1 \ _ • t t ti t' � � �\ t` `vy, ''3,•`= ,�,; 4.1' �,'-,r ,,,,., ""„ ,. r' v� y i / ,/' .�1 f0 I I I �``'q ij/ y\ t / :�hl 1 ��t yvv y ;t ; � i�,I v�.,, I d i } ',w I r'�i \ t\ \ \ V / } , t t �} ,t , ;,A v a 4. G✓ ✓ �'� 00 i ! i i }' V V .v A i` �� =\I s \ t \ \ �t'' 3 > \ \'`. "Oi k'' ,i: , ✓ ✓ i \\' 11 ��� �' / I I I i � l A �\ t,1 t \i > \ L., vt �� r 'v "v ! v [ I I i 's V A A\\ v Av tV V / t i =! \ _ v, v, ! \ /r, ?fir r r\ r ✓/, -✓ iS �V 0 t i I v r' v v `� t` v � `� v i r , �h w%` ,y An / �r 0 \ \ \ H f I 1 ! i ! I `,v\V v v ,� vv yv �'` i t\ _ \ , � y V 10, / // F a�� r� r �V \ ��,`Y>, y<f O X04 \ S' I t 3 i\v v v vv.. ,v v v i \lx\ ' \ �\ v �V ` v \ yv/�' / / / �r �� / r y\vv �: O I i! v v,, v A A A v \ \ ��i !` v ! \: V p c f ✓'. r r'� r r r"'� v _ V_ _ LO i € i ! €i A A 'A \ V A t 1 , v y ..a, ,� >. i^' /' fie"'=- ✓/ ' ".,'''\Vv „�% �. Ui Z O I- 0 Z O U 0 Z f_ V) X W L0 O N N t c d 0 m O 0 r- V) N 0 0 E I lti r > a,n \ ``\\\\\\\\\\\ \\w \ \\ \. \\ \ \ \ QQ � / / /' "~, �% `*/ /�` r''r l , ✓ ,✓ i r r ../' ' i l ,i -' �'" °' a \ \ \ .\ \ \ ,.� , \ ; I ` `\, \ `, 'o "\ } t / / ,>, ''/ .l' '' ✓' t i '. ?'k " ; 4 \ \, \ \ \ \ ' , t t, tt a i t \ "`.,.. . QO ,, I I \�, ,f,�;` .✓ �' ✓ f r..✓ ,,,,r r . ,.�%'..... ,r„ i \ %1. r s \ \ +.. s 7i i_.� t ;, \ \ \ \ \ ! ,.- t ,C"a .. ! .I \\ 01 \` / s ::..,i'' 3"-i r:.: r ^'b'I - ; , f ` I • n s,; ,F- ".r ,/ /r % ri ,4 f' \ „� f i ,H i, t i \ A It i i\ k L, , '' u r - i t , ti u A \V v t ..a v' \. , t �1 � v., .. " y, / y: /' Q� C� 'I r f ' Y '•i _ /- ✓ ;s ` t \11 \\ .;., kj�ir ,\ V \\ i 'i \ , , .ii. xt l t \ '�� ��`'" p ':A �, , \rQr* _/?,� ,'.�'" ',, ` , JS, y-" /' 0 v„a z, A \ i t'. y\ A Op ,, �f a �� � ' ✓ ✓ ✓ ' r r \ ._ , ;t t. A ` ! 1 t. t t; V A Ott _ ., r t , y� >MS < / ,v ,, r r , r0� ./,, // <` 1 i \ \ \ \ - _'1\ I t '1 v :t t ci �,,' : v. r � y \� '�V i r. ✓.;'/,r /. vim' \y 1 \ t t \\ l y\l �'I i ti \ p. �"`- r * 'y .\ z^;.vYf�/���`t?' ,,'' ,.,-"✓ ,,r'.p�J ,/" {; :, � �s i V V A V v t tt t, `,,'t t ` \\ V Q O% e .. x ;:a ,, „- ;,,: ,r'� srz-., ;r ,_�, '' ,r'' 'ry fir /` / x l :.., i f .,.,,� t �U i _„a \ A t ,t \ t f t ' 1 i /�, V/ �2 ,,' / , ''t�`' v � r r;:;V' r ,' ` r r i ."^- .; \in .``� \ \ \ t 1 i ` i i :�\ i £�^ , ..V, '\ .�C -,' < <_s' � e y,' ,�, -�._. f ,f e' W r �!�'” �' ,. �l A s. t r .•A \, A :. ,I il; ; t; .I 0p \ V `%� t 'x t,r , - ''r`� ,: � Y .'C. 'rr,� '/'' ./'' - ~~: r t /� `ti ”: I L ,� V A �'!, t r z ilii i',V 'E i -v4 �::.,u V ;,r.;rty,. ,- `'` p '? :� �. t..: y i,,., F f /', ,.. .,, 1 i ,I t ', i' , .. :,i ,A L` I 1 i i 1 i•i i tt $ \ „ ;/ .xr,v:..� ' V''>,�;`%. , `�,, �v i� / ,.:"^,`„ b.. -._ 3 ' : , „ ` , � W tri €z t� a. - \ i t z " ,, ;._. � 7 ss `-0 is t r„ z ; \ \ t i ,'t t! / s t©w", � 'sl It i , ., � ..,,�� � r �� {e':�L�,.csu, ✓/' OQ l 8 U (. .t i ,� 1\ i ' i i I / / / ' ,i < I/ r, / / 't1;- ✓ tt / 0p \ a'1 / ✓/ y OD s f I OO ' ii \v v\\ \y / /// v t�,, t I t i{ �t � tt�, V , I -se ti, j� �/I// / N \ �_ 11 z ,I f .t \ \ t t _ , , s ... c. \t`, i` t'i{, s/ s 00 / n' . a\ �O\ \.00 / ::j I - i, j ` t +t \ - / '' ,'t t t', t % �} ' f f r , i �/ .r ^ J Q mss.; ;. • t - ;t , t , . ; it _. 1 \ t ,y \ t ` v ,, '"r'/,' ✓}i,!', /' p�imzn U2O t v \ o r r a r i I \ / t l \\ ;t \ E \ p0 M _ r ' \ ( , \ \ i � t \ \ ,..1-L J� p \ i' a t , 0 } ;..A l 1 v \ ,�, 4 .., ,. ". , >. , r ;.- "" 4.,.,,k,..;ht', t : I } 3 i ,� , ,. A \ M y 1 i �\ \\ � ;` y / , LJ , \. A , v 'r r \ �o v ', , / , , : v''v v y t , y < , n { t; A \ V vV A \ ,.. r5 ':' ,% : } i, , 1 i I ,.z_v A A \ A \`, \! i , i .._ , { , . - - ; \ V V A j 1 \�i \ \ f .1• `5E V t . , i , i I , y y ,;; _ I a s S' O w s tt 1 3 , i i; i. \ \ \, ; 3 1\ ! t 1 i i ;. 'r , t x 1 t :` a` l I , :t' \ r ,l i 3 , .,, , , p ? �.�. a,y `-` `*,..r .: ,' i i , t7 ,i; t ,� it .D ..t2 k, I : ', s s . t {' „t V ild! '..`�, A \ A„` S` :, ? x ir.i \ ;ti'iljlt§ , I{ { ; •t; .. - \ \\ '' 3` i 1 `•. i t p t t- I , i i i t 1 I I t _. _, � „ A { G { - , t , : :-' -;_ __ ` \\ V \ V -t i x ::'S°fi� t,F,z iE I} 1i� ` ; _ :- , : i : , i . : p _ O \ \ j - r ; v \ , j 1I} \ 'v ; ; ,, t ;.` F, t .i;I: E : Y` I j x , \ y ,, , k '# I l i \ v \? ;, ,, t i I; i %� I i °f j \ 4 ;}t' i I t / '[j y j ` \ n I 4. i i i t , i 1ti t t, t 1 }, :3 3 { Ii t t iii {l- v{ V t tt % Q.. { 3 3 (}tt € \ }'\ i i` It 1 �{ i , t t { // f E;" i 4 3 1 , .:. .f 1= i ti i �'1 }I.i.i t `i ,,-` I { { i'1 Ion { '3', } t 1 , , l � I t; , / \ i t , , i, i k '1 t } tsc %i: t S i }:t. '}t:i t t€ }i r;-<-: i ` i `; , ,1 t. %, i't t i , i i JI 4 i l t,, \ Y, i; i. •t ;i i, , a. t t , 3 t i:. i; { I < , . . , _ C( , " .a. E , I f f, ; 0 tx . ,1 p , - , oo. .. _. �. , 7 I i i j,f) tf -i 3 a sit , { - -. ,-.. 1 ti `I { r Si �.',,{; iil Ilt F ; . �I \ ! ;.. 1 , , z `I i i"€ ..i -"a '�,# E:F Sal. 4 i i �. ¢ _ i"= �t i 3 - i i,; I , t ,v, QS,,, -a? : � t; t Ii / . 1 k ",\ ,I 5 , t ( 1 • I % � t`, I` t , I , /y�� ' '�'y{, - . ,. ..... ,. .:.. t , rI r r ( t i I'.. I N i1 xt i.i 1 `'i I a 1, ,; : {} t1 9 :i t ,y 4: l} Ij1\x i \ ti } I !', €,r I; , i'11\ Iti i i , is -'.t , t i ,; \,;,�„• o is c, - t „ n '}i{: bJ ; r x k i ,� ii ( - izx , -t \ - - < -.i , i !f: ?j l I : t, , <I I ' c'k lit i I 3 i ' l I I I 'f`' tl t 'FI I ,l i - ,: . 1 ` ii :l t jj Il }% t j \ t t{ •1', { �} xt £ j t i I x ,z ';. t t t .t , j S i t ,, 'e J ”' t i i I i% 'i F ,, t i i j i r~ '-n = { : ... .. . , _:.. a -..' I: , t i I t 1. r , , # , , t 1 4 s } \ t" { f , :.. n r .,. I , -1 .• \>- , , \ \ \ € 3 `' ,Illi: O t- t} \; Q '; x ; , N C C N 51 m O ,, N O 1 r- O N a 7 Cn Z O I- E Z O U CD Z X w O to N t En c a MATCHLINE SEE SHEET 05 ': 1i,t:. i €ilijit''tr 1 hat / \ � k s s# s 1'' it, f \ i k ^,d �S , ( 3i##ii'? 1',° \\ I t;i{{;.,._, __,_ D ## it / \ € # t ti { ; i ve zk of tsa t,+ to ttz .. , I „ k } \ , ; j , : t \ # liar hz� a tnn a,' , #,#,£3}.i ti ;{i O ! {f \\ \ 2s i y 1 '`' i y . ,�„mm __ -. -x. _- -_ t [( _ , , 3,333 p # 1:' f v , - - 3.333 � \ , \ # : i ,i 1 ti # tt{t l i{ ..., € t F \. ti- (t .3 r i € ##£ / \ : _ t ..,; - , .: .,:.. .,,,. .i.. - 33:33 .t,.. ,33 .;,.;\ . 1 • . 1 '#' p /'. _. , "3.3.3,3 .” ` t,i 't r I.:y: s ii # } : ; , ,. i ; 1 f E I , #, tf#{! ## <ii vt f f ,} 1 ' I r..: 1 x }1 { __„ _ ._ 4 ,. 3 a r , : < i I 333:("3' i . , 1 ; 1 { <### 1, r'3 r' O € #jr' { .4 ! �•` 1 : } # {... , �": . # f , 7; �; J€ it � } ,3,333..---^_"'"". ,w....,_. 3333 _:_ ,. 1 , # { , , , ' • 3_3,33 i `a , ,+t , f , (Q� j # yj]js i , - . -E , , } { '. ; . i , i { { {� � \ ?< ! k t ,,,"......., " 3333.. x : , _ t # {' ##s # I , if ` } / 3333 / , k , tt i , (;;4 tt , t i #t I:: , = i r , x t r' t ,{i3< , O' f €i -3333..._ 5 s. r01�''1^ ;. :. 3133 ,..:. t - .. i 1 # :>; t r < , ,.f t # s; € t` f �`t t t £'3 , 3 t t .. { I 1 r ::, , t .t t r .FF} ; 1€ �5 € # ,15: i.._„ -_„"."'k i , �y% „ 4� I I F m t : 4 x £ ..,_ ._.. 33,33, : .:.. {, , , .,. 1 r rrt:, " < : ; t # ' l } 1 { # I :a { . , 4 _. _.. / �. , 1 _ s t i �t I € I :, t. ,:a ,jl##, ip f: # 3 I i # \ t "t ' 'j6 i .., - -i. .e. ,_ ._. s. t b e; , { % v I;;#t;:€ t :t# O S t , t t } p :. _. 3333 :. ..;. ..: 33:33 > ; € � '# :'i : s ii � �:� # F+ .t P ,'1 �f' `� 1 it II �i z ,_,, , t ; i 't:: I I ;; tt3 # is € e 1 I :Ir i \\ * "I' 1 _ - 33:33 ..- ...: ' t #r !{ j :� 1, 1 ,r, , :; ,.k:l t3 #€ #3, 1 kE i k �� + , 1,, 1 t r 1 :; f; 1 i f 1 r E I r 7##3k{`:i { 1 4 #;,:i:3 ;'; l O , t , 1 , , i # a if , x z, , / ssr;,-ts J- ; ; t 1 i i :. :.. 33,33 < :_ ... ._ 3333 J _" ..,./" s 1 r 1 '"i# 1 1 t } .#i. '{;t#i;'} _ F3 # ! a } t -- u ,, f It# .:, 3333. :.. , s i 'i' t 1 t 1 { , . f tt { t , {#f t,tjr # #, •� t } r $ s - r t , . ' - G F < / �, 'I F t F i ?"'-{<` p` _ #r. # .. - _ _.. 1 t4--r,.�t / 1 1 ; r O t#€ € i t{ I t I I 1 {#' Sri '+ \ i _ _._. .. 33:33 .. , #q(" , : t t 1 7 1 , ' 1 . : i , ?{ .#. '� ".." .....w,.,_,. . r \f . , i < , : S , k t t#r f <# f _ ,.-.,,w _.. _,. ._ t 3333 3.333. - ' ., i'v f ' z i s : i i t #, :,#;;tl 7 7 3 i I i __ v ' 3. r , f , .:; ; ,r''' ,` f ` f ........_ ni k 3 _ _ , rm u r I e 1 f , r _. x �:'. 3333 f t ' I u `1 r -I 1 i t I I #' t %:: 1 f f t {:1It> t ({ (( €. r \ tl 1 3 r''` _.,. £3 , , . \ f (,1 , k i { , f Zt'1', _ "'" O €. ,€ # t r 1 \\ \ t i .._,.... i ( tt r t:� ; , r r = ' ' 3333 s # 1 1 f rF 7{ >r , , ..:. ,:,. 33;33 ... .:. i ' / f i ' ' , 3 ! } p , { z } t r I p / i i '� �,,, ,,, ,,,„,, I t k,,, ft �„ R t , . p I ! / i i I � t,',,# 'r , { .' # is -.j i { 1 � > { � 4 ;, , r _ f r, f A i f r / fay 1M 1 ;i AM � � u: t �; 1 \ € f / t 1 ,� e,:.� u3 e , ” # i # k`1€ p F i+ _. '\ _ ° 1 i ti nt 1 r t k' { #{ cz \ t j \' ; ,,t i : i , t { k i':#'{>t: ,h S; # }} I # # /" \`\'t it .,{ , /y� S ' ! k1J i \ } w i I f I f a I 1 t i -, 1 t;'{ t f ;#�k t / `\ ,,,: -'\ `a, t t ,i to en t y ". ,.,. _>_ 3333 , . , f / i5 . e^^, } i i , i , % t # #i zf / , ;.J :a. \, �, t 'k a} \ a � N , 7 i „ 1 S , : . , i a, + : a k ; t : , i / c,"u"' ^,{ 1 *,E'er- i # # ._. ., f i � 1 s t „I' i 1 / �' '� } � t 1 k ups �[ f 1 t ; i { ` i j ; # , i. , O / „`A 1.�i. i t a*3 j / i. ... .: , ; r f t 5 i e?: i, x i ,i , �1 f j i �,{r t i , # j , ! r 1 q r #1333.#: ",, i }�I'"i i I ( , { , i:t jj F k f { ` t t , j .._ t :. t . - { .i a t i ,t;i 3333 c ; i�.i k "# i/ � \ - ,- ,{ i ``^-.. ., f t .. t i t._-. ,, ..sr:,.. ;E31 { i �t � s < rn �'{ 3 4 `"'_,'k e , -.. \ t s 333:3 ... , \ ,, ,.,,,f.:. .i€ � , ', r' .,:il ._.:............ O , i .., _. , .i t . i i lit'}}t=`€ ' :it J i3 1 '� -\./. \ `..,.t i i{€ v h I E A t .r t � i , \ # r , t t'"t l , \ k f i«„ t t 1 i3 ,:. 3 .':. i'' : , \ it ', a } , t , : 3333 , , t i t {;. .e{Ya: z+.,,, ,,,, 13 } r 3 f I \ \ \ :k , 1 i ,-, — f ` , ..:. , , :: ,3333\ .. Q \ ,._ i ,$„ .ii ,r^ : ^,t ".! v' A 't . f 3 , ...; U \ a , i t , .,(. -,< { ,*,E `ti ':+d _ i'\r' , } k t i y , . i I! , . _i i ,: , . j:s:3 Iy £ai &a� tri \ { , f i ,,. „ as ' ; , >, s # .;. e. i i i' 3333 \ \ ..ri: . E .x. 0 ,ll ,.,t ..rt L., ;. d. rA I . . ; . .. } ^,,,%"'\ � i � - I \ , _._ . { t W. 1 „ .. ',.. .a., .:.. 33;33 , k \ ... i , ., : \ -\ ,': \ .w.," Cp� ' - r s ` I t ` t < i " i` E ! € f i \ I , iM { , fie, .A # } t t o ( L"___ _ S , s -- a i ' \ \ % i iy n\ ,a,i # n j ( � # f 1 ( [ t 1 1� ti v ,Ai '{ t' " �\ ij / , \ { s �`i r; / v i �. , , t , . ;, ,," ,3,,3_33__. \ S t. i : i;1 ': t :' s: ; ( # f / ` may\ , ii } ¢ } 3t r , \ , , \ t sl .. , c ,.r-: _ , , * is } , k . :;, , z s # f v'V 't ff i { �i rvl { ie+.t f n, \ .. 5 ... _.........., '. .. \ v i + #' 3:r, r t .. 3 3 f. , " i 't <% \ , \. t , O r r 1 _µ , A , .1 -_ 0 1 0 1'. ,, , 4 \ \ f i 1 r„ t \ \ \ \ \ t} ,,t , Jr 00 i 33:33 ; 33:33 \ -;.. .._., \ --,., \ l ,.;t, it 3: / - txQf .. 1, , -A } t \ , \ \ \ 4 \ ; ;O \\ ,�� fi r f ;\ \ \i \ ` V A v'. A \ \ \ us i �O \ '. v „tiltf. ? . # ' '�.,.t t; : __-, /� 0 O ' A { `, .,- -. 33:33 ... .. _. _m „w \ 1 , �.- \ V ' , �, hk , �� 01 O: -- rj 3_ _333 ".. -_� >. S: \ , M t.' Iris jj i t c 0 }: k f ,--" t , , ,,. 333_3... 33_33. \.\ y.4 \ _ {., s`.+x , , i s I i ,"Y! i 1 1s+` f' :"3 { .- _. \ \ 1 ' p1 0 t z � _ ' \ - \i \ 1' /f .� 1 . . ,: E L: a) C rre E 0 It C"I 0 C14 Z ME cn Z Z 0 Z I - (n x Uj r- 0 -C cn CO (n C 4) E ............. .... ..... .... . ..... ..... . .. ............. . ..... . .. . . . . ...... . . ..... .... ..... ..... 7- .. ... ..... .. .... ..... 130- 0 . ....... Oil 07", > .. .. ... ... Z .... . .. . .. .... . . ..... ....... GO, GO, 7,37 L 00 ------- GO, GQ 001 001 _�7 -4 OD (101 Go- . ..... .. .... .. ........ . . . . .. .... ... ... .. . .... -00 . ...... . .. >/ LOD OD L OD LOD Lq6' LOD LCD�­LoD F- LOD -LOD -LOD LLJ LOD LOD ui L 0, . .... ... ... 0 LJ ....... LOD LIJ LOD' LOD b LOD ...... LOD LLJ VOD LOD LOD OD LOD ... .... . ... F- < . . ..... . ... LOD �LOD_ ..... ... . . ..... .......... 7RA: 2 C7 6 15 7, PC 2562 0 ... .... ....... . ........ . ........... ................. 30' 0 15' 30' 60' Know what'sbelow. Call before you dig. PREPARED IN THE OFFICE OF: CLIENT: DATE- 7/11/17 PROJECT: xx CARO DRAWN BY: SOUTH BUFFALO CREEK HABITAT CITY OF GREENSBORO fSSI-- JLY NC LICENSE #F-0102 SEAL DESIGNED BY: AND WATER QUALITY 421 FAYETTEVILLE ST STE 600 A 11 V TI TLE: REM RALEIGH, NORTH CAROLINA 27601 � &� — _j .1 . - IN PROVEN ENT PROJECT PHASE IV < REV. No.: SION: DATE: DRAWN BY: CHECKED BY. CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose U I PHONE: (919) 677-2000 L I S I . I III ..-* N WRW y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by EXISTING CONDITION J Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. @ 2017 tit JOB NUMBER: SHEET NUMBER: Copyright Kimley-Horn and Associates, Inc., 2017 SEAL: 1 17 012137010 1 07 OF 37 = xvx qb ^° ^ °^ `°� �°` ,"`� ""` "x " X. xx" xx <0� X .,, x `Xx `x= xx xx^ xx I x �xx `x "xx " /' . 'x, x`xx ^,, ^x, "/ 40 00 , , x x , ` , ^ ~ x , ^ ~- � � �� - -- p " ` x x ~ , ` x x � ^ , ,~| ' x x " x x x , ^ x x ^ -- ' ^ - ~ ----um —.LOD / , ` , x , x ' ' x , , , ' , / x \ x , ` x / � x , / ` ' ' ` ^ ' ` ^ x `- x ` ' x . / x , ` ~ x x . , . ^ x ` x x ` '/ / �4� � ' - �� ��� - x / - ~ '_-i � / ^ ' ' " . , x , ` .o , " ` x , ' , x x ` x ` ^ x ` ^ � / �6 `` ' -' ' ` � ' ` |`« ' ` jf " ' ` ` ° ' ` « ^ ' ` ' ' ` ` .` ' ` ` ` ' '� / �, - czNH } '. ` ` " � ' « ` ``. ` « `�' ' x ` ^ ' ` `^_-� « = ` , ` " ` ' " x ` ' « v ' ` ` » ` � ` ` ` � ^ ` ~ ` " � « » ' ' ^ / \ / <` ------- �� _ _ � � , , ~ , � , � , � ` , � , � - , �� ' ~ `¥^x ` x ' � ' ` � , ' ` � , ' " a ` « ` ' � N�' - ` " _ ' / = �'`� , " , , ^|,`| , , , ` , , ^ `' ^ ` ` , , , ` , x , _ , , ` _ , , , , �~� ` / ' ,' ,~ � 0 ~ , , ` , x x x'�' ' ` " ' ' / `---_ �� `�~��/' \ '��� � / /� � ' " ` ` ^ ' ` ` ` ' ` ` ` ' ' ' 'K �`." " " , ' `~ ` " . ° , +., , , " ^ , ' . , . , , , . . . � _ " ' ' '' '' ''' '' ' \ � \ ` x x - ' / `� '/ / CL " ~`� , , ` x ,-``` x x x x ` ` ��� � `` \� 0 < REV. No.: REVISION: DATE: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. Copyright Kimley—Horn and Associates, Inc., 2017 PREPARED IN THE OFFICE OF: CLIENT: MATCHLINE SEE SHEET 09 30' 0 1 5' 30' 60' 6mr%m=mm1Tr5m==mmm=m� Call before you dig. CA DRAM BY: SOUTH BUFFALO CREEK HABITAT CITY OF GREENSBORO SSI JLY AND WATER QUALITY SEA DESIGNED BY: JLY CHECKED BY: IMPROVEMENT PROJECT PHASE IV EXISTING CONDITIONS :' WRW L ON JOB NUMBER: SHEET NUMBER: SEAL. soffit;% 012137010 .11 1417 08 OF 37 MATCH LINE SEE SHEET 08 M A N N C V C N E C O i C W l J Q REV. No.: REVISION: DATE: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose Y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. Copyright Kimley—Hornand Associates, Inc., 2017 E C"I IIII... . ...... - - ---------- I. ... .. . ... ... . . III.... ....... III IZ II.......... IIII/x I.. ... ... .. I.......... ...... II`7 GOI II_V I-- - -- --- IiL ---------- II..... ..... . II5r,- 00 IIISHEET 13 Ii IISHEET 12 IIIUV IILOD U I.......... I—LOD IIII:4. I I 1. V) ....... ....... II1,7 ....... > ................... ILLI zto. ILL. ............. . ...... 4 0 CL . . ...... ...... . ... IZ ...... ........ .......... I........... .......... < . .. ........... . I< ... ..... .. .. a_ . . ..... . ......... Lli I0 II... . ...... IC II.......... .... . ...... 100' 0 100' 200' 0 r Know whatlsbelow. - - _--_ ICall before you dig. DATE: PREPARED IN THE OFFICE OF: CLIENT: PROJECT: CA 7/11/17 E SOUTH BUFFALO CREEK HABITAT C: CITY OF GREENSBORO 0 * JILY Is > I I -1 NC LICENSE #F-0102 SEAL =DESIGNED BY. AND WATER QUALITY 421 FAYETTEVILLE ST., STE. 600 TI TLE: 04460 JILY < REV. No.: RE\fiSION: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 CHECKED BY: Ilm"PROVEMENT PROJECT PHASE IV This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose i m e orn PHONE: (919) 677-2000 SITE PLAN AND PRO ILF and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by WRW Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. @ 2017 JOB NUMBER: SHEET NUMBER: Copyright Kimley—Horn and Associates, Inc., 2017 SE L: 012137010 10 OF 37 NOTES: 1. SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. 2. SEE TYPICAL SECTIONS FOR CHANNEL GRADING BELOW CONTOURS SHOWN. It I 001 00 } t }l 101 r ,..:" . , i ti /' tFDi l t3Ctl OD -.... A 1 J, �4` :i 4k iL40 -=- 11 iM1 f itl 1 ... .® ....._ ..... - _ - v -... i 7S$ > }vI r. _ , r. i ' f r CONVERT ROCK A VANE TO ' SILL USING EXISTING BOULDI %r BOULDERS INTO GROUND UN j, STABLE. BACKFILL WITH C ' SOIL AND CHANNEL MATERI) 18" (M TOP IN.) RIP RAP BA C`RFATIN(; A FI AT �TFFP f`C O REVISED NOTE FOR BACKFILL MATERIAL TO INCLUDE ON-SITE SOIL AND CHANNEL MATERIAL AND 12/05/2017 JLM JLM PREPARED IN THE OFFICE OF: v REFERENCE TO DETAIL FOR RIP RAP SPECIFICATION. E CLIENT: ; ! 0,` II / IJl1 11141 BACKFILL f •4 "�+ � I/ i rr?�tt�lr 1 r r f i� BACKFILL EXISTING VANE WITH WELL GRADED MIX ItI 'f 'w ;-- ,t ;`{ OF 2" TO 12" RIP RAP ��� � it BEGIN PROJECT STA. 103+23 _r,: . L \; \,\ .l ` > fir jj1 114 ; r j f/J fes) ji 1 11II {1.{�rgt., iT tt r f CITY OF GREENSBORO SITE PLAN AND PROFILE NOTES: 1. SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. 2. SEE TYPICAL SECTIONS FOR CHANNEL GRADING BELOW CONTOURS SHOWN. 3. STRUCTURE ELEVATIONS AND LOCATIONS (I.E. RIFFLES, LOG J—HOOKS, ROCK J—HOOKS, AND CROSS VANES) MAY BE FIELD ADJUSTED BASED ON ACTUAL FIELD CONDITIONS, a. 9 40 0 20 40 80 Know what's below. Call before you dig. �uuru,� DATE: PROJECT: �., 10/9/17 c ••� ° ••4;--- DRAWN BY: SOUTH BUFFALO CREEK HABITAT .4 0.•�9 = JLY SEAL= DESIGNED BY: AND WATER QUALITY $ JLY IMPROVEMENT PROJECT PHASE IV Q►: CHECKED BY: Q�,� WRW -� 'FFI; •�1 JOB NUMBER: SHEET NUMBER: ����t 1 012137010 SEAL: 11 06 37 L� e � w 730 i N 3 U-1 7-,4n 107+00 109+00 110+00 111+00 112+00 PREPARED IN THE OFFICE OF: DRAWN BY: I CHECKED BY: CLIENT: NC LICENSE #F-0102 421 FAYETTEVILLE ST., STE. 600 TI TLE: RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 © 2017 0 NCA Q '�• = 9� 4 !• SEA ' ¢ 0446 C SEAL: W w w cn Uj w V) W z _...I a ro 0 NOTES: 1. SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. 2. SEE TYPICAL SECTIONS FOR CHANNEL GRADING BELOW CONTOURS SHOWN. 3. PROPOSED CHANNEL INVERT BETWEEN STRUCTURES IS APPROXIMATE. SEE DETAILS, TYPICAL SECTION, AND CROSS SECTIONS FOR STRUCTURE AND POOL DIMENSIONS. 4. STRUCTURE ELEVATIONS AND LOCATIONS (I.E. RIFFLES, LOG J—HOOKS, ROCK J—HOOKS, AND CROSS VANES) MAY BE FIELD ADJUSTED BASED ON ACTUAL FIELD CONDITIONS. 30 0 15 30 60 Know what's below. Call before you dig. ATE: BY: PROJECT: ;AWN BY: 7!SOUTH BUFFALO CREEK HABITAT JL :SIGNED BY: AND WATER QUALITY B IECKEBY DBY: IMPROVEMENT PROJECT PHASE IV WRW B NUMBER: SHEET NUMBER: 012137010 12 OF 37 Do w + 729 LO NO h �000N J o _ i-'--6, 729 U -1 I -ON TcnW Oh �Ln N WO 728 ; O Q W O i- h o h p �i J h O 728 p > Q W Omo Q Lam. JO _ ��� w U- O W _ (n W t0 = h N li } Ln LL O (O �Oh OQ� +U� WN 727. c� Q wi 00 N o > '1 O h m o0 r ? f 727 OF- --i V) W QQw O� .. _ =H W O O Z V) O V) W Q W 726 - X F- wv>w 726 725 725 724 724 107+00 109+00 110+00 111+00 112+00 PREPARED IN THE OFFICE OF: DRAWN BY: I CHECKED BY: CLIENT: NC LICENSE #F-0102 421 FAYETTEVILLE ST., STE. 600 TI TLE: RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 © 2017 0 NCA Q '�• = 9� 4 !• SEA ' ¢ 0446 C SEAL: W w w cn Uj w V) W z _...I a ro 0 NOTES: 1. SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. 2. SEE TYPICAL SECTIONS FOR CHANNEL GRADING BELOW CONTOURS SHOWN. 3. PROPOSED CHANNEL INVERT BETWEEN STRUCTURES IS APPROXIMATE. SEE DETAILS, TYPICAL SECTION, AND CROSS SECTIONS FOR STRUCTURE AND POOL DIMENSIONS. 4. STRUCTURE ELEVATIONS AND LOCATIONS (I.E. RIFFLES, LOG J—HOOKS, ROCK J—HOOKS, AND CROSS VANES) MAY BE FIELD ADJUSTED BASED ON ACTUAL FIELD CONDITIONS. 30 0 15 30 60 Know what's below. Call before you dig. ATE: BY: PROJECT: ;AWN BY: 7!SOUTH BUFFALO CREEK HABITAT JL :SIGNED BY: AND WATER QUALITY B IECKEBY DBY: IMPROVEMENT PROJECT PHASE IV WRW B NUMBER: SHEET NUMBER: 012137010 12 OF 37 E w T m E O 0 a 728 I,- 3 N T 5 728 113+00 114+00 115+00 116+00 117+00 118+00 91 6 0 ,� � k "` .._ „: „- «'cam;^,, I3 1111.„., "`-. , ,z GJl ,f P ll i 111^,^1. ' Z:a'"".\e,� .___ __.._ �, . ,,., r ,1111, .,-_ - FA-.,,,.,�.-.,,-,..._,�,�~wp~ -; _.. C i, rr, x 11 �„ « M1 x "I'. -1111 I'll,,\ t'd5 , 1 t , - �,-. r. �-. ..,: .. --... ,- 1111 1111,\ I _„_.. t v1 F\ .., -..-..,..._..-i-,<«,,,.-.w..,,,._.,�....._lA .�:..,..,...._.... r� ..,_............. .. }s,,__. ,,._,,..,..:..,__,......._.-y , -.: ... ,..,_ -111.1--- ,....,... _ _._.._..__ .,,.,, _ 111-1 .,: _.. .. 1111 G"r'-„._ FP.., -'"--. _-�,,.,...._.. ._ .............._.._-1-, 11..._»„_, \ 1111-...,,,,1111_....,,,_.... 1111 ................_.... 111,1. 1111...1111_. .. ?3 .. 1111 1111...,1111 1111 1111,..., ._..,<,._ fi Yi• �wra,,,^s.�_1 ,. 1111_.. ... ,., c....„. 1111.. JN r_--""--. 5' _£-tn. ....... .. .............__,.... 11,1,1 ,..., ,._ ._.... 1111, t _._ ... 1111 s...-... ,1111 ... _ .._ ,. ,_....... ........ _ ., .. _ ,< ,. -._-._ _ _. _ . -... .._. _ , 1111. , . _ 1111 4.. . .<......_,,,.,-.v.-.„.< rz 11'"11__'" ^.6?1111... .-. #Y'.. 1111 _ 1111,„ 1111... 1111,,, t '\. , 1111 1111.. 1111 1111 . » 1111 „... 1111.,, ... ., _ 1111... ., . -. ,. _1,111 ,.. � ry ... _.. .,_ ........-111«1... __ ....,..._...<..., ...,._.._. _.. .," _._ _..._.... ._„ „ ............_..,....,. ,..,. . 1111..,_ _ . , „ 1111 „_ .. „ 11,11. 1111... ,.._._ .. 1111_ ,..,., ' ., ... ,_-.' f.}J _ ..-._ ._- 1111 « __ „. ___. _.... " 1111. 111,1._. 1111. _.„ ,1111 _ 1111 ..., _ .. ,1111.- _ _......, _. ..._ 1111- ,. _ - .. l 1111. ,.. 1111. 1111___ 1111..„1111. _, _. -- .,,_, ... 1111.,. 1 1111.. _ . , .z r ., , - _ ,'' _. , 1111 _ .. , . _,...._ ._ _ <.. _ .. _._, 1111... .__ ._. _ 1111 .. _ "" "". _ __ .. _, _ _ 1111 11,11.. .. - , _ _e... _.. 11,11,.., <." r.. 1111. ..,.,p - .,_ �_ _ _ - - : - �. C�. _, 1111 ...-_. -__ <� . � _ 1111. .._.0 �. ,�.-... 111,1 1111.. _ i s' w... ... 'v ^ _ _.: � ,� 1111 1111 _..� � �..-- i _ ., 1111 111,1 ._ _ 11,11. -1111- � ^- \ _.. - ..,., ». ... _... 1,^111 , _ . __.., _ 1111..__ _,. - .._...... ,. 11,11- \.� '^. 1,11.,1„ ,. .. -... 1,111 , > , <.,. .� R .. � �., ._._.. .__.._ ,-_„ 1111 ._ , , , x _ t _ , F5J , ,... 1111 -" .' , .. ,. �' F { '1111 �� „ �- - / 1 HE { .._�,_ 11„11 ,x _ , PROPOSED AR r , / vv /, OF RIFFLE� 11I I'll, f.'._.._ I STA. 117+15.0 v- _ _._- _ ,1111- _� _ ,-.. ,1111.1111 1111 ~". �� - ' _ _„ - •--- ,,., ,-, 1111. _. 1 :. ,.., ...-1111_ 11 e✓ \ ,." < ., ,...-1111 ... __.. I 11-,,,r , n , e' 1111„'^ «1111^ ~_ - w r ,..r' ,„. 1111 "`f,.. 1,1,„11. 1«111,. 1111 ,1111.„ ......_.„. .Y -1` -- - � ° ' r _ « E '� _ ,,, _ . _.. 1111 ,_ PROPOSED LOG VAN �" «- _ ..„. _ „ ._, ; ; µ TA. 116+2Q.5 f D LOG -PROPOSED HEAD OF --1111__ _----____._._..._...._...___ _ ._ _ I t S 1111_ , < / \ _'. , -- _ - _ _. 1111 PROPOSE <- 1111 RIFFLE STA. 112+81.7 I i ';� / „„ - i \ r .t . / t i � \'± i , ., _ _. 1111.. _ ; x / „ _ - C' / / _ \ :. 1. , 11 _, " � _ �" J HOOK r'. 1111 - - -" �.. .»1111 .,..._..r .,.....,. 1111__- -; ,m `, / 11 -Q z \ „ .,., _, .:ti ,. .. 1111. F - ' ..,,. .. "" �;. «,., «..✓.. L ,r' ",r- ..,.,,�. ..«. 1111. - .-. 2 { '. ,,� / / �. ^ \ ` .. _ 1111.,, ..\ .., _ \ S - ,,,,r,. 1,111, .. .. ` , , <. _ 1111.. _ <; -t>. -. 11,11_,„_-' PROPOSED HEAD OF RIFFLE _, _ ._ µ _� � _.. ~ 1111 ... _ 1111 . -u _. _., " n.~ x 11:11_, " _ m .__ _ :. (r t 1111 � �- _ _ .m - I \ aa� _,., _ STA. 115+7.4 / 1111 ._ :<s 1._. .-, „�' - 1111.~i:, _. , _ ", , / � . o _. M _ ..;, _. w- - � , "" M f _.- _ ....: � � ., , � ` , 1111 _. : � � �........:.„1111. �.�.„_ :�; � .� i 1111_ \ L { p 1111 < _ _ _ _ - _ �. �. �_----- _, 11:11 _. n , ____w. �,--_,�.�.rx,-. '� :�. _._ ;,..�,„: _� .. 1111. �. , .; � . , . ,„~� ~.,_. 1111 _ � 1111 _ _ -,,:' \ " : {30� 1: w. v, 7 , . -- t3 \.. 1111 : < m .. _: _u ,-. 1, _ n _ 11:11 _., _ � ;-.-; .. �,_ .�_ w . / ,x t. �} - ,,w..._. „„_,w -«.w CSG z , 1111. ~ __.� .. _ M s _ _M ' 11,11. r- „: 7 - _ ..- _. _ i` _ r.,,, §� ✓ Cl{}� €7Ga: ilei Y i. ;11,11. r- _„ r. _. _ .: x..__.. OC3I Z __ 1111.__ 1111. 25 .. « _ . ..�_ _> 1111 �_ r 3 _.- / _ Go ._1111'._-1111__,._ _. _. 1111 �.„ ,� , _. _ .. _ _. v .7 , , PROPOSED -H , ,. _. t_ -f- LOG J OOK _ 1111 M...m_ 1111 �i _ "_ cao 1111_ 1111 µ ;< ,, . �_, r _ _ - -.- . 1111 ;' < Z x, ,-_ _, _ _ _ .. ,1111__ n� - ,,_ ,. _ - _ STA. 113+19.1 1 :,11 11._' «1111.1111_. ,_, _<_ _ G oo ~ �., . ro „,.. 8 «_. 11 +0 _- - N _ �l ` „_ _ �- __ 1111 _ <. _.. - �,. _ 1111 --_ - _. _, 1111_.. -M, F1t11, _ „.. _ _ 1111 � _ _. 1111_. _ , £i� _ 1111_ ,� ___- 1111_ 11:,11 __. ' _ aJ M__ -„ _ 1111: _. ' „„� �O P V \ -11,11. -1111 " ^ ,y„. ,1111 ,_ 1111. r-.^.,. _..,e.`..1�yy ..._ ..1. „. _ . _., .,. ., "'"' ._�.-,.: : .-. .�}�U� V� _ 111,,,,,1 ,,,.. « ,- , ,. . -.,- ,1111 _.,. c+...y. :sY' �w., -,._ . ) «.,.«_ 1111 ,__//pp//����tt...,,_,.,,•uw._ £, '^` \ --_. r ,,... ',.. --.. ,.., ,. . ,... __. Vht-5. � .. ,,,111,1,. yyry, - .,., ._ 1111,. Vv .. ,. «,. ~ ,-,,,,, ,,,. ,„, . y � , :., ... 1111 - .,.w""" -^�.<;" _ 1111... YYFFzzhh"+ j .. 1,111.,., -_,. -, a3V ._. _...: _„_ _,,. 111..1 ........... .. _ 1111_, ._, ,......__ ,__ ._ 1111. .. ,. .. .. �""r , P O CO +.*. `�--,,.. ,.<. 1111. .-.. 1111. .m..,,.-. .,._.,..,. .. _ <.. 7 _ _- _ 1111.._ ; „1111 1111,. -^ 1111. 1111_ _ 1111_ 1111._ <: _ �. 1111 _ 1111 __..._._ 1111 «��- __� _ 1111.__ 1111: .. �.__: �... _ 9 s- _. 1111 _. _ 1111 `u w__. - 1111 . - ... __ _ 1111 _ _ � m. 1111 _. U_j m. " „1111. �. P " 1111._ 1111_ W -. _ _. , _, _ � _ 1111 _„_ _ _ :. _ -,:. . _ 1111.. « _ �< _, _-.�.._: _ 1111_„.. �____- 1111 _.. ,_ �,« 1 I r. _. 1111_ _ 1111- 11,11_,.. _ /� P ., 11,11 , ..,.._ 1111..-+^'^."'� _... ,_.., . ,. ,,,11,,11 ,. � ..' n ` - <., ,_, 11,11.-.- w. .,,. __ 1111, .. _ ✓ M 11»11..«, ...,,- Q .- 1111.- „ 1111_ «. 1111 ., 1,111 �„ .._ -.. ... _ «„ „„..,.- O .. O 1111. P, ,. p.- --1-1111,111111 +. -w.., r,: 11,11 w„ 1111. 1111, ..w ` r'�' ,. _ �.„. _ _„,,._ 1111_ 1 _< 1111 1111___.. .n„. _„ 1111_. 1 .�.�, -<_ 1111., � � _.._�. 1111,_._ _., .„1111 '�w w to 1111 „_ .„ � c � w�.. ,,. .�...--�_-�•-1111_... _ _._ _-_ - Z �.,y .W...-.._.,„„- - 1111,. �,.�^ .. ' ,. - _ .. _ .. , , „.»,_ .'�-1111__. ,„..., .., . T. T y"_.. .,._... ,.-�..„ � N,, _,. r _ -.:.. '1,111,,.= .�._.. m. <, '� �.,\ .«1111,... ,,1111.. _.,,>,� .. .... :... ... ... 1111.._ 1111 ... ,,. _ ,/' -, ,1111 , _ 1111 1111 _." ......._ .. 111.1, w � . �,._.._..�, _.,.., __ .� m`-,. „ - 1111.. . 1111. � . ,1111. _. ~ ::1111 �--"'"'' . d W +00 �_.„._ 1111, 1111. _. _ _ � ., _ 114 -: "r" : - :: > - -_ -- 1111 _ ,� ._ _ tn _. _.. �:... ,. P 1,111. Y ... .. 1111-�,.T'""" U . _ _ _ 1111.. . ^ Y 1111 ,� _< ; __ , „.. _..M M . „ n„.. _. „_ _ _, ., 1111_ 7 r. _ ,� _ __ 1111,_.„1111_ _ � ,.;' ,�,., 1111 � ..� _- - 2 111,1. 72 ' ,<r-_ 1111_.._ _ _ ./ M._ „ 1111 _ _ . 1111. _.„ _. � 1111.___ _,< :�. / ___ 111,,1... 1 c rt x z w 1111,,_. _. „_ , _ ,rv._ -- -.,. --_w.'" < ;> 1111 � �, 111;1.. w_<.. , . eFB ,,w / _ :: 7 R a, ,.,, BFB -- B. 1 , _ 7.i ; �_ _ 29 / _ eF _1,11_1 iF f / J _ 7 e" \ <: - - _16B _ .. 1111 . r 1111 m.".; _ _ , _ _. / /' _w.r m. 1111._ 1111 1111 _ _ _ ."".^�-:..,�- "'- i ... _. < IQB.,. .,< -_ 1111. _ _., _. __..,_ 1111... ~ µ ,• , :. ;,,• , � ~. n ..." Fa-�"'`..��7,.,.- r' , E• 1F S1111. _.: _., _ _ ._ _.1111 _ i . / / .r / 1111 _, _:_ _ ._ ._. : / .,r...-- -111`1` i ,►'"",.,• 1111.- w i _ _. _ . _ _ - ,_ - / i _ - ~11,11 - _E _ _ U --._. _ FB 8 _ 1111. / � _.� _ �. 1111_ 1111 1111.. , � ,� ,,' ,, _ , 1111._=----- B _ _ r _ .. _< 1111 _. _ 1111 ;; 7`L ---- ,., r 111,1 _ / _ .^_. 1111_ _ ... ,... _. _ 1111 _. _ BFB -� 1111 `, .-' ,- , 5 t- i r _ _. 7 1 _ ..„ W BFB ' -=- / / _ w.. - 27 E?Q 1111 _ .11,, _11 - -,, _", , BFB ,> 1111 e 1111_ _._.__ 1111. .. 1111. .._...Y.___ 1 . ,^" }` \\_ � :/ , � , - ,<.,. _.,.-1111__ I1 f� s _ /:�- ____ _: ww. _ 26. c _ (y ttp n l 1111,- �.Y.... ... .-1111, _ -„ ._ „,.. 8 1111., f , ., y _ M1JL%'".,,. LF G 4 X _. . t l 1111.. ,. 11,11.. r_ .. _ ., 1111_ _ 7 , ,.\„ `",� _ _,-. _ „,1111 , ..; `�, , 'r,r � I i `L , /_,M�_y_ I„ "D _w , _ . � i 1111 .„ . _ _ 1111. ... „ -.. ._ � ,_, 0, BF 7 -r-- , 1111_ _ �.„_._:_...... ,.,.. _ _., B ; FB m .. , �,,. ,1111 ,_ -�'�! �. _ I , 1 "Ls� \ eF - 7 3 _ j 1111. B .-_-- 2 7 _ _ s , t � � ^7 1111 _ _,._ _...._.. ..,..:._,., __. «. 1111 ,,. t : , ., ,., : 1111 i � ,. 1111... .,.. -# .: \ , \ Y , I $ .. 1,- _,. 1 111 - .. -. _, . t e , f Y.. i �...„._ _ F / a, � 30.0 � t<a .-.,_.._.�,� _; , � ,, . B - <_ ... _ ,_ �_ « « _ ..„ 2 \ \ __..B._ 1111 3 1111..„_ . 7 - 11 _ 1111 _ D< 3 \ \ \ " } n L , ., \ \ _... ,,BFB .. - ~ _. a M� .., \ k\4,? � BF �, . <, , : � . ,- , , 3 •. _ , 1;:111_ _. _ „._ 1111 _ .. .r ... mss_... B ; 73 1111 t t _. \ 9' 1 \ \ ! t c t t „�... - _ '. 1111 W - v _"_i 4 f \ E _ _ 1111.. , _„�. 1111._ �. 3 _, _, .,�_ 1111_ �,�. „. _ 720.7 r .x L e \ a \ \ 730 ~ - RFR - �_i 7 . _. 1111, 2 r Loi[ �°«"' \ \ \ �1 7 {L� Gtlti _ - 11 _ „ J « Of I« ; i, vv v v v !, t _ v ✓ D v v 732 1 1, { GQ . t(7D I , v, , a. , v v, v v% L 4 LOD } 0 v v v v a 733 / -" 1 Lfl Z y v. v I L,. r EC39 v v o6v_._._--_L00 Z y v v V \. '.A y , Q v v v v v ,_ ', :.. 734 v "w f v " «,,, , v v v v v A M v v v „ ,'', ,, y rv,v v` , �. ~ .". ~ �,.' z v v v v �:���-r� v v v / .„ v - v .1111 <1 v v - 1111. v , v ____�__ �. w,f PROPOSED LOG J -HOOK . 1111 „ «. _ .. _ J V \ �. _. v.. _m,.._ 1111.,„ ... f/ ..- - - -1111 ,.. ......... ,.«,_. v_......__„ r, TA _ e v �511-1 w S 115+32,9 1111___. y' _ 1111 _ . _. 1111 _ ,. it y -- G r �, , ,_ 1111 _ _ _ - w v v . v _ v v w m__ ." - ....._�.. 1111 ti w , v k 417.........._....LGD _ LZ}LT L ,. r c V y -, r 1111..y .._..�._...- _ �::z __ 1111 .-^ m _. .. « �.. .._._,.....__ .„...._...<_. _ ._ _-. ,. .. .. __._ 1111.,„__~ _ - .,,..« . .� ,__ , ._ __ .__ _„ ..,, __ __ ._ _,...... _ 1111._ _ -w V ',� , V '\ j1 `.v w. .. , - - , - \ V A V A \ , _ ,_ .,_, - _,_, ._ .,_ _.^....._..- _,. - _~ ... -. 1111. „ \ \ ` a „„ .,,., -_. - _,....,.._ _„ - ,_. _,_ _„ .~. , .,,,,.. " , ,. v v `vv v _ _ ~, _ / y v v v v ~1111. _ _._.._...«__...._._.., 3_ v , _ 1111.. 1111 1111__ _. //,},, F „ to i i \ \ \ \ \ , .,, fL.. .. 1111 \ , , F v v v y z: -` _, .,1111 „11 c_-,---' , , , V F , , v y , v v t v v v ' \ \ 1 1 1 1 1 111 ... _........ ,.._ - _ - \ -.\ \, . \ .. \ ,/ .- ..,, '^ .._. -,... ,., „� 1111- .. ' \ , I \ \ \ 1111,„. 1111. _.. ., ,.. „« Q . - ,,. .. _ -1,111. .. � _. ,. ._ .. .. .. _. _. 1111 _.. .:. -. -. / . _. ,.. 1111 It 0- 0 m (n 0 11 -I_ A 11 30 0 15 30 60 Know what's below. Cali before you dig. ATE: 7/11/17 PROJECT: 'AWN BY: SOUTH BUFFALO CREEK HABITAT JLY :SIGNED BY: AND WATER QUALITY JLY IECKEO BY: IMPROVEMENT PROJECT PHASE IV - WRW B NUMBER: SHEET NUMBER: 012137010 13 OF 37 - _______ -- III -- _- ______. _ Ir 7271-1 00 EFOn x7 0 w J LL L,_ O w 727 +_ O +0 1111 _ �r00; �N N. . Z � _ W O _ _ 1111 _ 1111 I ro� - t� { d On . O�� = Q� ]� w� N - . 726 Qw zcnw oQ J Ln N 0r-> ��-r� o U�r +� 726 1111.. . 1111 1111-11111-1-1 11,11. ._ ... 1111 ....... .. 1111. _. . .._ JV7W _... . ..,._ _.. . s(... .. , j....11 .. ............. QJ CD<W 0Q 1111._. ... ..._..... �� 1111 _ _ _, -- W =cnw 10cnw �...�N n- r w[�-J �QI? = (n W p I- J 725 � to w 725 _. .. __ ......._.... ,. ....._.. ......... _ _ 11.11_ 1111 ._ . _ _ _ _ . _ 1111 11.11 1111 ... _ .-e. 72III 4 - , -~ _ 724 - - _ 1.11__ 1. 1111 . _ 1111_ _ _ _ ....._...... 11.1.1 ........... _ .. .1111 _ _ - 7231 _ , .. I..11 _. _ ..11 11 ..._.._ .1111 .­.... _ ...... ..... ... . 723 722 ........_ .... ... _ . _ .. 11 _ . _. 1I . ..:.._._ __ _ 11.11_ _ 1111 _ ._..__..._. .111.1. .......... ....._1111_ 1111... .111.1 ...... . 722 711-1 1-121 __, 1111_.. .....__..._ ,.. .11.1.1....._ "_ 1111_.. 1111.. 1111.._. 1111.... -"...._._... 1,.1.11... .1111. ..1_..111 .1.111. 1 111.._, II 11... _J.. ...__... , ._...... 1111... ..,I11 . ..._..,..1111. . ., 1...1___... ............... .1.....1...11. .1.._.1.1.1.... ................ ........._...,... , 111...,.1... . . ,.__............1.11 ........... 1111._. ..1111.. ...._..._.. ......... ,,._.... ......_.. .1....1..11_... 1111__. 1111:: 1111 ..._ -. 1111.. 721 720 720 113+00 114+00 115+00 116+00 117+00 118+00 91 6 0 ,� � k "` .._ „: „- «'cam;^,, I3 1111.„., "`-. , ,z GJl ,f P ll i 111^,^1. ' Z:a'"".\e,� .___ __.._ �, . ,,., r ,1111, .,-_ - FA-.,,,.,�.-.,,-,..._,�,�~wp~ -; _.. C i, rr, x 11 �„ « M1 x "I'. -1111 I'll,,\ t'd5 , 1 t , - �,-. r. �-. ..,: .. --... ,- 1111 1111,\ I _„_.. t v1 F\ .., -..-..,..._..-i-,<«,,,.-.w..,,,._.,�....._lA .�:..,..,...._.... r� ..,_............. .. }s,,__. ,,._,,..,..:..,__,......._.-y , -.: ... ,..,_ -111.1--- ,....,... _ _._.._..__ .,,.,, _ 111-1 .,: _.. .. 1111 G"r'-„._ FP.., -'"--. _-�,,.,...._.. ._ .............._.._-1-, 11..._»„_, \ 1111-...,,,,1111_....,,,_.... 1111 ................_.... 111,1. 1111...1111_. .. ?3 .. 1111 1111...,1111 1111 1111,..., ._..,<,._ fi Yi• �wra,,,^s.�_1 ,. 1111_.. ... ,., c....„. 1111.. JN r_--""--. 5' _£-tn. ....... .. .............__,.... 11,1,1 ,..., ,._ ._.... 1111, t _._ ... 1111 s...-... ,1111 ... _ .._ ,. ,_....... ........ _ ., .. _ ,< ,. -._-._ _ _. _ . -... .._. _ , 1111. , . _ 1111 4.. . .<......_,,,.,-.v.-.„.< rz 11'"11__'" ^.6?1111... .-. #Y'.. 1111 _ 1111,„ 1111... 1111,,, t '\. , 1111 1111.. 1111 1111 . » 1111 „... 1111.,, ... ., _ 1111... ., . -. ,. _1,111 ,.. � ry ... _.. .,_ ........-111«1... __ ....,..._...<..., ...,._.._. _.. .," _._ _..._.... ._„ „ ............_..,....,. ,..,. . 1111..,_ _ . , „ 1111 „_ .. „ 11,11. 1111... ,.._._ .. 1111_ ,..,., ' ., ... ,_-.' f.}J _ ..-._ ._- 1111 « __ „. ___. _.... " 1111. 111,1._. 1111. _.„ ,1111 _ 1111 ..., _ .. ,1111.- _ _......, _. ..._ 1111- ,. _ - .. l 1111. ,.. 1111. 1111___ 1111..„1111. _, _. -- .,,_, ... 1111.,. 1 1111.. _ . , .z r ., , - _ ,'' _. , 1111 _ .. , . _,...._ ._ _ <.. _ .. _._, 1111... .__ ._. _ 1111 .. _ "" "". _ __ .. _, _ _ 1111 11,11.. .. - , _ _e... _.. 11,11,.., <." r.. 1111. ..,.,p - .,_ �_ _ _ - - : - �. C�. _, 1111 ...-_. -__ <� . � _ 1111. .._.0 �. ,�.-... 111,1 1111.. _ i s' w... ... 'v ^ _ _.: � ,� 1111 1111 _..� � �..-- i _ ., 1111 111,1 ._ _ 11,11. -1111- � ^- \ _.. - ..,., ». ... _... 1,^111 , _ . __.., _ 1111..__ _,. - .._...... ,. 11,11- \.� '^. 1,11.,1„ ,. .. -... 1,111 , > , <.,. .� R .. � �., ._._.. .__.._ ,-_„ 1111 ._ , , , x _ t _ , F5J , ,... 1111 -" .' , .. ,. �' F { '1111 �� „ �- - / 1 HE { .._�,_ 11„11 ,x _ , PROPOSED AR r , / vv /, OF RIFFLE� 11I I'll, f.'._.._ I STA. 117+15.0 v- _ _._- _ ,1111- _� _ ,-.. ,1111.1111 1111 ~". �� - ' _ _„ - •--- ,,., ,-, 1111. _. 1 :. ,.., ...-1111_ 11 e✓ \ ,." < ., ,...-1111 ... __.. I 11-,,,r , n , e' 1111„'^ «1111^ ~_ - w r ,..r' ,„. 1111 "`f,.. 1,1,„11. 1«111,. 1111 ,1111.„ ......_.„. .Y -1` -- - � ° ' r _ « E '� _ ,,, _ . _.. 1111 ,_ PROPOSED LOG VAN �" «- _ ..„. _ „ ._, ; ; µ TA. 116+2Q.5 f D LOG -PROPOSED HEAD OF --1111__ _----____._._..._...._...___ _ ._ _ I t S 1111_ , < / \ _'. , -- _ - _ _. 1111 PROPOSE <- 1111 RIFFLE STA. 112+81.7 I i ';� / „„ - i \ r .t . / t i � \'± i , ., _ _. 1111.. _ ; x / „ _ - C' / / _ \ :. 1. , 11 _, " � _ �" J HOOK r'. 1111 - - -" �.. .»1111 .,..._..r .,.....,. 1111__- -; ,m `, / 11 -Q z \ „ .,., _, .:ti ,. .. 1111. F - ' ..,,. .. "" �;. «,., «..✓.. L ,r' ",r- ..,.,,�. ..«. 1111. - .-. 2 { '. ,,� / / �. ^ \ ` .. _ 1111.,, ..\ .., _ \ S - ,,,,r,. 1,111, .. .. ` , , <. _ 1111.. _ <; -t>. -. 11,11_,„_-' PROPOSED HEAD OF RIFFLE _, _ ._ µ _� � _.. ~ 1111 ... _ 1111 . -u _. _., " n.~ x 11:11_, " _ m .__ _ :. (r t 1111 � �- _ _ .m - I \ aa� _,., _ STA. 115+7.4 / 1111 ._ :<s 1._. .-, „�' - 1111.~i:, _. , _ ", , / � . o _. M _ ..;, _. w- - � , "" M f _.- _ ....: � � ., , � ` , 1111 _. : � � �........:.„1111. �.�.„_ :�; � .� i 1111_ \ L { p 1111 < _ _ _ _ - _ �. �. �_----- _, 11:11 _. n , ____w. �,--_,�.�.rx,-. '� :�. _._ ;,..�,„: _� .. 1111. �. , .; � . , . ,„~� ~.,_. 1111 _ � 1111 _ _ -,,:' \ " : {30� 1: w. v, 7 , . -- t3 \.. 1111 : < m .. _: _u ,-. 1, _ n _ 11:11 _., _ � ;-.-; .. �,_ .�_ w . / ,x t. �} - ,,w..._. „„_,w -«.w CSG z , 1111. ~ __.� .. _ M s _ _M ' 11,11. r- „: 7 - _ ..- _. _ i` _ r.,,, §� ✓ Cl{}� €7Ga: ilei Y i. ;11,11. r- _„ r. _. _ .: x..__.. OC3I Z __ 1111.__ 1111. 25 .. « _ . ..�_ _> 1111 �_ r 3 _.- / _ Go ._1111'._-1111__,._ _. _. 1111 �.„ ,� , _. _ .. _ _. v .7 , , PROPOSED -H , ,. _. t_ -f- LOG J OOK _ 1111 M...m_ 1111 �i _ "_ cao 1111_ 1111 µ ;< ,, . �_, r _ _ - -.- . 1111 ;' < Z x, ,-_ _, _ _ _ .. ,1111__ n� - ,,_ ,. _ - _ STA. 113+19.1 1 :,11 11._' «1111.1111_. ,_, _<_ _ G oo ~ �., . ro „,.. 8 «_. 11 +0 _- - N _ �l ` „_ _ �- __ 1111 _ <. _.. - �,. _ 1111 --_ - _. _, 1111_.. -M, F1t11, _ „.. _ _ 1111 � _ _. 1111_. _ , £i� _ 1111_ ,� ___- 1111_ 11:,11 __. ' _ aJ M__ -„ _ 1111: _. ' „„� �O P V \ -11,11. -1111 " ^ ,y„. ,1111 ,_ 1111. r-.^.,. _..,e.`..1�yy ..._ ..1. „. _ . _., .,. ., "'"' ._�.-,.: : .-. .�}�U� V� _ 111,,,,,1 ,,,.. « ,- , ,. . -.,- ,1111 _.,. c+...y. :sY' �w., -,._ . ) «.,.«_ 1111 ,__//pp//����tt...,,_,.,,•uw._ £, '^` \ --_. r ,,... ',.. --.. ,.., ,. . ,... __. Vht-5. � .. ,,,111,1,. yyry, - .,., ._ 1111,. Vv .. ,. «,. ~ ,-,,,,, ,,,. ,„, . y � , :., ... 1111 - .,.w""" -^�.<;" _ 1111... YYFFzzhh"+ j .. 1,111.,., -_,. -, a3V ._. _...: _„_ _,,. 111..1 ........... .. _ 1111_, ._, ,......__ ,__ ._ 1111. .. ,. .. .. �""r , P O CO +.*. `�--,,.. ,.<. 1111. .-.. 1111. .m..,,.-. .,._.,..,. .. _ <.. 7 _ _- _ 1111.._ ; „1111 1111,. -^ 1111. 1111_ _ 1111_ 1111._ <: _ �. 1111 _ 1111 __..._._ 1111 «��- __� _ 1111.__ 1111: .. �.__: �... _ 9 s- _. 1111 _. _ 1111 `u w__. - 1111 . - ... __ _ 1111 _ _ � m. 1111 _. U_j m. " „1111. �. P " 1111._ 1111_ W -. _ _. , _, _ � _ 1111 _„_ _ _ :. _ -,:. . _ 1111.. « _ �< _, _-.�.._: _ 1111_„.. �____- 1111 _.. ,_ �,« 1 I r. _. 1111_ _ 1111- 11,11_,.. _ /� P ., 11,11 , ..,.._ 1111..-+^'^."'� _... ,_.., . ,. ,,,11,,11 ,. � ..' n ` - <., ,_, 11,11.-.- w. .,,. __ 1111, .. _ ✓ M 11»11..«, ...,,- Q .- 1111.- „ 1111_ «. 1111 ., 1,111 �„ .._ -.. ... _ «„ „„..,.- O .. O 1111. P, ,. p.- --1-1111,111111 +. -w.., r,: 11,11 w„ 1111. 1111, ..w ` r'�' ,. _ �.„. _ _„,,._ 1111_ 1 _< 1111 1111___.. .n„. _„ 1111_. 1 .�.�, -<_ 1111., � � _.._�. 1111,_._ _., .„1111 '�w w to 1111 „_ .„ � c � w�.. ,,. .�...--�_-�•-1111_... _ _._ _-_ - Z �.,y .W...-.._.,„„- - 1111,. �,.�^ .. ' ,. - _ .. _ .. , , „.»,_ .'�-1111__. ,„..., .., . T. T y"_.. .,._... ,.-�..„ � N,, _,. r _ -.:.. '1,111,,.= .�._.. m. <, '� �.,\ .«1111,... ,,1111.. _.,,>,� .. .... :... ... ... 1111.._ 1111 ... ,,. _ ,/' -, ,1111 , _ 1111 1111 _." ......._ .. 111.1, w � . �,._.._..�, _.,.., __ .� m`-,. „ - 1111.. . 1111. � . ,1111. _. ~ ::1111 �--"'"'' . d W +00 �_.„._ 1111, 1111. _. _ _ � ., _ 114 -: "r" : - :: > - -_ -- 1111 _ ,� ._ _ tn _. _.. �:... ,. P 1,111. Y ... .. 1111-�,.T'""" U . _ _ _ 1111.. . ^ Y 1111 ,� _< ; __ , „.. _..M M . „ n„.. _. „_ _ _, ., 1111_ 7 r. _ ,� _ __ 1111,_.„1111_ _ � ,.;' ,�,., 1111 � ..� _- - 2 111,1. 72 ' ,<r-_ 1111_.._ _ _ ./ M._ „ 1111 _ _ . 1111. _.„ _. � 1111.___ _,< :�. / ___ 111,,1... 1 c rt x z w 1111,,_. _. „_ , _ ,rv._ -- -.,. --_w.'" < ;> 1111 � �, 111;1.. w_<.. , . eFB ,,w / _ :: 7 R a, ,.,, BFB -- B. 1 , _ 7.i ; �_ _ 29 / _ eF _1,11_1 iF f / J _ 7 e" \ <: - - _16B _ .. 1111 . r 1111 m.".; _ _ , _ _. / /' _w.r m. 1111._ 1111 1111 _ _ _ ."".^�-:..,�- "'- i ... _. < IQB.,. .,< -_ 1111. _ _., _. __..,_ 1111... ~ µ ,• , :. ;,,• , � ~. n ..." Fa-�"'`..��7,.,.- r' , E• 1F S1111. _.: _., _ _ ._ _.1111 _ i . / / .r / 1111 _, _:_ _ ._ ._. : / .,r...-- -111`1` i ,►'"",.,• 1111.- w i _ _. _ . _ _ - ,_ - / i _ - ~11,11 - _E _ _ U --._. _ FB 8 _ 1111. / � _.� _ �. 1111_ 1111 1111.. , � ,� ,,' ,, _ , 1111._=----- B _ _ r _ .. _< 1111 _. _ 1111 ;; 7`L ---- ,., r 111,1 _ / _ .^_. 1111_ _ ... ,... _. _ 1111 _. _ BFB -� 1111 `, .-' ,- , 5 t- i r _ _. 7 1 _ ..„ W BFB ' -=- / / _ w.. - 27 E?Q 1111 _ .11,, _11 - -,, _", , BFB ,> 1111 e 1111_ _._.__ 1111. .. 1111. .._...Y.___ 1 . ,^" }` \\_ � :/ , � , - ,<.,. _.,.-1111__ I1 f� s _ /:�- ____ _: ww. _ 26. c _ (y ttp n l 1111,- �.Y.... ... .-1111, _ -„ ._ „,.. 8 1111., f , ., y _ M1JL%'".,,. LF G 4 X _. . t l 1111.. ,. 11,11.. r_ .. _ ., 1111_ _ 7 , ,.\„ `",� _ _,-. _ „,1111 , ..; `�, , 'r,r � I i `L , /_,M�_y_ I„ "D _w , _ . � i 1111 .„ . _ _ 1111. ... „ -.. ._ � ,_, 0, BF 7 -r-- , 1111_ _ �.„_._:_...... ,.,.. _ _., B ; FB m .. , �,,. ,1111 ,_ -�'�! �. _ I , 1 "Ls� \ eF - 7 3 _ j 1111. B .-_-- 2 7 _ _ s , t � � ^7 1111 _ _,._ _...._.. ..,..:._,., __. «. 1111 ,,. t : , ., ,., : 1111 i � ,. 1111... .,.. -# .: \ , \ Y , I $ .. 1,- _,. 1 111 - .. -. _, . t e , f Y.. i �...„._ _ F / a, � 30.0 � t<a .-.,_.._.�,� _; , � ,, . B - <_ ... _ ,_ �_ « « _ ..„ 2 \ \ __..B._ 1111 3 1111..„_ . 7 - 11 _ 1111 _ D< 3 \ \ \ " } n L , ., \ \ _... ,,BFB .. - ~ _. a M� .., \ k\4,? � BF �, . <, , : � . ,- , , 3 •. _ , 1;:111_ _. _ „._ 1111 _ .. .r ... mss_... B ; 73 1111 t t _. \ 9' 1 \ \ ! t c t t „�... - _ '. 1111 W - v _"_i 4 f \ E _ _ 1111.. , _„�. 1111._ �. 3 _, _, .,�_ 1111_ �,�. „. _ 720.7 r .x L e \ a \ \ 730 ~ - RFR - �_i 7 . _. 1111, 2 r Loi[ �°«"' \ \ \ �1 7 {L� Gtlti _ - 11 _ „ J « Of I« ; i, vv v v v !, t _ v ✓ D v v 732 1 1, { GQ . t(7D I , v, , a. , v v, v v% L 4 LOD } 0 v v v v a 733 / -" 1 Lfl Z y v. v I L,. r EC39 v v o6v_._._--_L00 Z y v v V \. '.A y , Q v v v v v ,_ ', :.. 734 v "w f v " «,,, , v v v v v A M v v v „ ,'', ,, y rv,v v` , �. ~ .". ~ �,.' z v v v v �:���-r� v v v / .„ v - v .1111 <1 v v - 1111. v , v ____�__ �. w,f PROPOSED LOG J -HOOK . 1111 „ «. _ .. _ J V \ �. _. v.. _m,.._ 1111.,„ ... f/ ..- - - -1111 ,.. ......... ,.«,_. v_......__„ r, TA _ e v �511-1 w S 115+32,9 1111___. y' _ 1111 _ . _. 1111 _ ,. it y -- G r �, , ,_ 1111 _ _ _ - w v v . v _ v v w m__ ." - ....._�.. 1111 ti w , v k 417.........._....LGD _ LZ}LT L ,. r c V y -, r 1111..y .._..�._...- _ �::z __ 1111 .-^ m _. .. « �.. .._._,.....__ .„...._...<_. _ ._ _-. ,. .. .. __._ 1111.,„__~ _ - .,,..« . .� ,__ , ._ __ .__ _„ ..,, __ __ ._ _,...... _ 1111._ _ -w V ',� , V '\ j1 `.v w. .. , - - , - \ V A V A \ , _ ,_ .,_, - _,_, ._ .,_ _.^....._..- _,. - _~ ... -. 1111. „ \ \ ` a „„ .,,., -_. - _,....,.._ _„ - ,_. _,_ _„ .~. , .,,,,.. " , ,. v v `vv v _ _ ~, _ / y v v v v ~1111. _ _._.._...«__...._._.., 3_ v , _ 1111.. 1111 1111__ _. //,},, F „ to i i \ \ \ \ \ , .,, fL.. .. 1111 \ , , F v v v y z: -` _, .,1111 „11 c_-,---' , , , V F , , v y , v v t v v v ' \ \ 1 1 1 1 1 111 ... _........ ,.._ - _ - \ -.\ \, . \ .. \ ,/ .- ..,, '^ .._. -,... ,., „� 1111- .. ' \ , I \ \ \ 1111,„. 1111. _.. ., ,.. „« Q . - ,,. .. _ -1,111. .. � _. ,. ._ .. .. .. _. _. 1111 _.. .:. -. -. / . _. ,.. 1111 It 0- 0 m (n 0 11 -I_ A 11 30 0 15 30 60 Know what's below. Cali before you dig. ATE: 7/11/17 PROJECT: 'AWN BY: SOUTH BUFFALO CREEK HABITAT JLY :SIGNED BY: AND WATER QUALITY JLY IECKEO BY: IMPROVEMENT PROJECT PHASE IV - WRW B NUMBER: SHEET NUMBER: 012137010 13 OF 37 M 728 728 119+00 120+00 121+00 122+00 123+00 124+00 125+00 N, , U ) / I , '��, \, µ- / 4 , I I -, "" -- , \ , I X , > I I I --� � � I " , ,� 11 , � - , , . , - , - /',-,',, ,,-� - � , , , I ­ ��, , ,�;/ " I � , I I , , - , 11 I 1� I I \ I I \ , � I \ 11�1\1 " \ I I Z1111 I 1� 1� , " , _, _: I I ,\ \ � , ,\, I 1�­ /,, 1, � 1� , I , � \��\ _ . , , �, , I � , I x ,1�1 / 11 I , I I I I ­ .... .. / ,<� ^ � , , �. - I I 11 I .1 . , . . . . . . . . _ , I , I �', , 17 , 11 I . I . I I I I . . . �,� I \ , 11 — I � � I , , " \ - E' v q �i LU 0 0 a U 2 U m ' BW HOOK BOULDERS TO TIE FLAT INTO POINT BAR ANCHOR LOG BY PINNING WITH HEADER ROCK LARGER BRUSH LAID PERPENDICULAR TO FLOW A� 75% BRUSH (STICKS/LEAVES/BRANCHES) 25% ON-SITE EARTH MATERIAL -o-o-o�o••o•° / J BANK W BMD o GRADE Y Z m o EX CAVATED POOL M BMW BACKFILL MATERIAL FOOTER LOG SECTION A -A NAIL FILTER FABRIC TO BACK OF LOG VANE, SEE SPECIFICATIONS. BACKFILL MATERIAL 0W KW _ FILTER FABRIC, TYP. 7 g� LOG VANE ARM BACKFILL MATERIAL PLAN VIEW r 0 PLAN VIEW NOT TO �a VANE 1's SCALE POOL PER PROFILE SEE PLAN VIE EXTENTS OF TOE WO NOTES: 1. REFER TO PROJECT SPECIFICATIONS FOR IN–STREAM STRUCTURE PLACEMENT, CONSTRUCTION, AND MATERIAL REQUIREMENTS. 2. METHODS FOR SECURING LOGS: • 1/4- STAINLESS STEEL CABLE • 1/2- GALVANIZED REBAR 3. STRUCTURE DIMENSIONS ARE CONTAINED WITHIN THE IN–STREAM STRUCTURE DATA TABLE THIS SHEET. COMPACTED EARTH - STREAM BANK STREAM CHANNEL MR��� COMPACTED STREAM BED SECTION B -B COIR FABRIC (TYP) SEE DETAIL BANKFULL ELEVATION LIVE CUTTINGS (PER PLANTING SHEET) NON -WOVEN GEOTEXTILE FABRIC---,. BRUSH LAID PERPENDICULAR TO THE-/ STREAM BED AND COMPACTED. TOE WOOD SHALL NOT EXTEND OUT INTO CHANNEL BEYOND THE GRADES SHOWN IN THE TYPICAL CROSS-SECTIONS, PLAN, OR CROSS-SECTIONS. 4"-8" DIAMETER LOGS LAID - PERPENDICULAR TO STREAM. ALL VOIDS WITH EARTH AND BRUSH. CONSTRUCT RIFFLE_ WITH 1.0' DEEP :GRADATION OF 1"-12" RIP -RAP, #57 ST -"- AND APPROXIMA 10% STICKS, BRAN( LESS THAN DIAMETER, AND P TOP OF BANK A RIFFLE PLAN VIEW INNER BERM ELEVATION (SEE PLAN, PROFILE, AND TYPICAL SECTIONS) -MATCH TYPICAL DIMENSIONS (-6" MAX ABOVE "BASE FLOW" COIR FIP`D MATTING TOP BANK HEAD RIFFLE SECTION A -A SEE PLANS FOR ELEVATION -,--TOE OF RIFFLE SECTION B -B CONSTRUCTED RIFFLENOT TO SCALE 16 `-STREAM GRADING PER PLAN BASE/NORMAL FLOW ELEVATION EXCAVATED POOL PER PROFILE 18" MIN.] NOTE: 1. BRUSH SHALL BE A VARIETY OF DIAMETERS AND SHALL BE LAID GENERALLY PERPENDICULAR TO FLOW AND COMPACTED BY DIRT. 2. FIRST LAYER OF BRUSH SHALL BE A BED OF 3- LIMBS/BRUSH SET 18- MIN. BELOW THE BED. 3. LAYERS ABOVE FIRST LAYER SHALL BE 75% BRUSH OF A VARIETY OF SIZES WITH 25% ON SITE MATERIAL FILLING VOIDS. 4. BRUSH BROUGHT UP IN LIFTS. 5. GRADING ABOVE THE TOE WOOD PER THE TYPICAL SECTION AND/OR GRADING PLAN. BANK GRADING ABOVE RIP RAP PER TYPICAL SEC11ON OR GRADING ON PLAN -6"-18" RIP RAP AT GRADE/FLUSH WITH BANK --TOE OF SLOPE RIFFLE SECTION WATER SURFACE .,� .,. -LOPE CONSTRUCT RIFFLE WITH 1.0' DEEP GRADATION OF 1"-12" RIP -RAP, #57 STONE, AND APPROXIMATELY 10% STICKS, BRANCHES LESS THAN 4" IN DIAMETER, AND LEAF PACK. 6"-18" RIP RAP AT GRADE OR FLUSH WITH BANK WATER SURFACE TOE OF SLOPE 0 18" DEEP POOL SECTION TOE WOOD PROTECTION2�� ROCK TOE PROTECTION r4 16 NOT TO SCALE NOT TO SCALE IN -STREAM STRUCTURE DATA TABLE1 BURY END OF - LOG VANE INTO CHANNELBED, H2 E) KNNEL / W J J W � � H - Y Z Y z a 04 a m HOOK BOULDERS TO TIE FLAT INTO POINT BAR ANCHOR LOG BY PINNING WITH HEADER ROCK LARGER BRUSH LAID PERPENDICULAR TO FLOW A� 75% BRUSH (STICKS/LEAVES/BRANCHES) 25% ON-SITE EARTH MATERIAL -o-o-o�o••o•° / J BANK W BMD o GRADE Y Z m o EX CAVATED POOL M BMW BACKFILL MATERIAL FOOTER LOG SECTION A -A NAIL FILTER FABRIC TO BACK OF LOG VANE, SEE SPECIFICATIONS. BACKFILL MATERIAL 0W KW _ FILTER FABRIC, TYP. 7 g� LOG VANE ARM BACKFILL MATERIAL PLAN VIEW r 0 PLAN VIEW NOT TO �a VANE 1's SCALE POOL PER PROFILE SEE PLAN VIE EXTENTS OF TOE WO NOTES: 1. REFER TO PROJECT SPECIFICATIONS FOR IN–STREAM STRUCTURE PLACEMENT, CONSTRUCTION, AND MATERIAL REQUIREMENTS. 2. METHODS FOR SECURING LOGS: • 1/4- STAINLESS STEEL CABLE • 1/2- GALVANIZED REBAR 3. STRUCTURE DIMENSIONS ARE CONTAINED WITHIN THE IN–STREAM STRUCTURE DATA TABLE THIS SHEET. COMPACTED EARTH - STREAM BANK STREAM CHANNEL MR��� COMPACTED STREAM BED SECTION B -B COIR FABRIC (TYP) SEE DETAIL BANKFULL ELEVATION LIVE CUTTINGS (PER PLANTING SHEET) NON -WOVEN GEOTEXTILE FABRIC---,. BRUSH LAID PERPENDICULAR TO THE-/ STREAM BED AND COMPACTED. TOE WOOD SHALL NOT EXTEND OUT INTO CHANNEL BEYOND THE GRADES SHOWN IN THE TYPICAL CROSS-SECTIONS, PLAN, OR CROSS-SECTIONS. 4"-8" DIAMETER LOGS LAID - PERPENDICULAR TO STREAM. ALL VOIDS WITH EARTH AND BRUSH. CONSTRUCT RIFFLE_ WITH 1.0' DEEP :GRADATION OF 1"-12" RIP -RAP, #57 ST -"- AND APPROXIMA 10% STICKS, BRAN( LESS THAN DIAMETER, AND P TOP OF BANK A RIFFLE PLAN VIEW INNER BERM ELEVATION (SEE PLAN, PROFILE, AND TYPICAL SECTIONS) -MATCH TYPICAL DIMENSIONS (-6" MAX ABOVE "BASE FLOW" COIR FIP`D MATTING TOP BANK HEAD RIFFLE SECTION A -A SEE PLANS FOR ELEVATION -,--TOE OF RIFFLE SECTION B -B CONSTRUCTED RIFFLENOT TO SCALE 16 `-STREAM GRADING PER PLAN BASE/NORMAL FLOW ELEVATION EXCAVATED POOL PER PROFILE 18" MIN.] NOTE: 1. BRUSH SHALL BE A VARIETY OF DIAMETERS AND SHALL BE LAID GENERALLY PERPENDICULAR TO FLOW AND COMPACTED BY DIRT. 2. FIRST LAYER OF BRUSH SHALL BE A BED OF 3- LIMBS/BRUSH SET 18- MIN. BELOW THE BED. 3. LAYERS ABOVE FIRST LAYER SHALL BE 75% BRUSH OF A VARIETY OF SIZES WITH 25% ON SITE MATERIAL FILLING VOIDS. 4. BRUSH BROUGHT UP IN LIFTS. 5. GRADING ABOVE THE TOE WOOD PER THE TYPICAL SECTION AND/OR GRADING PLAN. BANK GRADING ABOVE RIP RAP PER TYPICAL SEC11ON OR GRADING ON PLAN -6"-18" RIP RAP AT GRADE/FLUSH WITH BANK --TOE OF SLOPE RIFFLE SECTION WATER SURFACE .,� .,. -LOPE CONSTRUCT RIFFLE WITH 1.0' DEEP GRADATION OF 1"-12" RIP -RAP, #57 STONE, AND APPROXIMATELY 10% STICKS, BRANCHES LESS THAN 4" IN DIAMETER, AND LEAF PACK. 6"-18" RIP RAP AT GRADE OR FLUSH WITH BANK WATER SURFACE TOE OF SLOPE 0 18" DEEP POOL SECTION TOE WOOD PROTECTION2�� ROCK TOE PROTECTION r4 16 NOT TO SCALE NOT TO SCALE IN -STREAM STRUCTURE DATA TABLE1 E) BOULDER MEAN LOG MINIMUM BACKFILL MATERIAL! SL OW Bw Kw As (DEGREES) DIAMETER DIAMETER BMD BMw MATERIAL WELL GRADED MIX %COMP.! (FT) (FT) (FT) (FT) N (IN) (IN) (FT) (FT) 2"-12" RIP RAP 70 SEE PROFILE FOR NATURAL CHANNEL MATERIAL 10 SPACING SEE PLAN NCDOT NO. 57 STONE 10 BETWEEN STEPS VARIES 48.6 5 1.0-2.0 36 12 4 2 10 SHEETS HARDWOOD MULCH AND INVERT ELEVATIONS TABLE NOTES 1. DIAMTETER PROVIDED WITHIN THE IN -STREAM STRUCTURE DATATABLE APPLYTO ALL DETAILS ON THIS SHEET. 2. % COMPOSITION=PERCENT COMPOSITION BY VOLUME OF MATERIAL. 0 a N o REVISE RIP RAP DEPTH FOR ROCK TOE PROTECTION DETAIL Tj FROM 12 TO 18" DEEP 12/05/2017 JLM JLM PREPARED IN THE OFFICE OF: REVISE NOTES FOR CONSTRUCTED RIFFLE TO REFERENCE 1.0' RIFFLE DEPTH. 12/05/2017 JLM JLM E C 0 > w,Klmley REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: / This document, together with the concepts and designs presented herein, as on instrument of service, is intended only for the specific purpose Y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. Copyright Kimley—Horn and Associates, Inc., 2017 CLIENT: e Know what's below. Call before you dig. ,CAO�,,,,- DATE: 10/9/17 PROJECT: CITY OFGREENSBORO��.••••s••�•..' - DRAWN BY: SOUTH BUFFALO CREEK HABITAT V :q JLY SEAL f : DESIGNED BY: AND WATER QUALITY 608 JLY IMPROVEMENT PROJECT PHASE IV ' CHECKED BY: DETAILS-`�' G "�`•`••�Q WRW --��i FFI� �� JOB NUMBER: SHEET NUMBER: SEAL: 012137010 16 OF 37 El THROAT WIDTH SEE (TW DATA TABLE BELOW -►A BOULDER �3—FOOTER BOULDER -KEY IN VANE TO BANK MINIMUM OF 4' AT AN ELEVATION EQUAL TO INNER BERM OR SLIGHTLY LOWER �o PLAN VIEW HEADER BOULDER ,TYP. SEE PROFILE FOR FLOW _ ELEVATION NOTES: 1. DEEPEST PART OF POOL TO BE IN LINE WITH WHERE VANE ARM TIES INTO INNER BERM. 2. DO NOT EXCAVATE POOL TOO CLOSE TO FOOTER BOULDERS. 3. VOID SPACES BETWEEN BOULDERS SHALL BE PLUGGED WITH APPROPRIATE SIZED STONE. BOULDERS SHOULD NOT HAVE GAPS 4. COMPACT INNER BERM TO EXTENT POSSIBLE OR AT THE DIRECTION OF THE ENGINEER. 5. POOL DEPTH SHOULD BE ACCORDING TO PROFILE. ROCK CROSS VANENOT TO SCALE Q J7 IN -STREAM STRUCTURE DATA TABLE1 0.5'-0.75' BACKFILL, TYP BACKFILL WITH 2.0' WIDE x 3.10 BED 20* TO* 30' DEEP GRADATION OF CLASS A AND EXCAVATED POOL BACKFILL MATERIAL! Ix B RIP RAP, AND NATURAL COBBLE 2 MIN. FOOTER BOULDER, TYP. (DEGREES) DIAMETER MATERIAL. NONWOVEN GEOTEXTILE BMD BMW MATERIAL WELL GRADED MIX M FABRIC TO BE USED BETWEEN (FT) (FT) BOULDERS IN VANE ARM SHOULD (%) w BOULDERS AND BACKFILL NOT BE GAPPED OR HAVE ANY (FT) Z SEE PROFILE FOR SIGNIFICANT SPACES Z EXCAVATED TRENCH FOOTER BED. 6" DEPTH OF #57 STONE 2"-12" RIP RAP 70 FOR ROCK CROSS VANE SECTION A -A NONWOVEN GEOTEXTILE FABRIC, TYP. CONSTRUCTION TIE VANE ARM INTO INNER BERM NATURAL CHANNEL MATERIAL 10 THE MAXIMUM ARM SOLO ENLESS DOES y 48.6 NOT ALLOW 1.0-2.0 INNER BERM SEE STRUCTURE HEADER DATA TABLE BOULDERS 12 4 NONWOVEN FOR SLOPE ... 10 10 GEOTEXTILE FLOW ... FABRIC SHEETS POOL EXCAVATED PER 0.5'-0.75' BED PROFILE MATERIAL BACKFILL, AND INVERT TYP. NONWOVEN FOOTER BED BACKFILL WITH 2.0' WIDE x 3.0' 2' MIN. GEOTEXTILE BOULDERS BOULDERS IN VANE ARM SHOULD DEEP GRADATION OF CLASS A AND FABRIC NOT BE GAPPED OR HAVE ANY ELEVATIONS B RIP RAP, AND NATURAL COBBLE SIGNIFICANT SPACES MATERIAL. NONWOVEN GEOTEXTILE SECTION B -B FABRIC TO BE USED BETWEEN BOULDERS AND BACKFILL NOTES: 1. DEEPEST PART OF POOL TO BE IN LINE WITH WHERE VANE ARM TIES INTO INNER BERM. 2. DO NOT EXCAVATE POOL TOO CLOSE TO FOOTER BOULDERS. 3. VOID SPACES BETWEEN BOULDERS SHALL BE PLUGGED WITH APPROPRIATE SIZED STONE. BOULDERS SHOULD NOT HAVE GAPS 4. COMPACT INNER BERM TO EXTENT POSSIBLE OR AT THE DIRECTION OF THE ENGINEER. 5. POOL DEPTH SHOULD BE ACCORDING TO PROFILE. ROCK CROSS VANENOT TO SCALE Q J7 IN -STREAM STRUCTURE DATA TABLE1 O BOULDER MEAN LOG MINIMUM BACKFILL MATERIAL! SL OW BW Kw AS (DEGREES) DIAMETER DIAMETER BMD BMW MATERIAL WELL GRADED MIX %COMP.! (FT) (FT) (FT) (FT} (%) (IN) (IN) (FT) (FT) SEE PROFILE FOR 2"-12" RIP RAP 70 SPACING NATURAL CHANNEL MATERIAL 10 BETWEEN STEPS 3.5 48.6 5 1.0-2.0 SEE PLAN 36 12 4 2 NCDOT NO. 57 STONE 10 10 SHEETS HARDWOOD MULCH AND INVERT ELEVATIONS TABLE NOTES 1. DIAMTEfER PROVIDED WITHIN THE IN -STREAM STRUCTURE DATA TABLE APPLIES TO ROCK CROSS VANE DETAILON THIS SHEET. 2. % COMPOSITION=PERCENT COMPOSITION BY VOLUME OF MATERIAL. Q REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: o' / This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose Y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. Copyright Kimley—Horn and Associates, Inc., 2017 DIRECTION OF FLOW Cr 1/3 BASE FLOW w O w c� 0 w BURY END OF LOG VANE INTO - CHANNEL BED 1' 2' KEY INTO BANK MIN. ANCHOR LOGBY PINNING ' HEADER ROC POOL EXCAVATED PER PROFILE OR DIRECTION OF ENGINEER 1/3 1/3 BASE FLOW BASE FLOW 8 A LOG VANE, 8"-12". DIAMETER--/ HEADER ROCK A FOOTER ROCK PLAN VIEW MATTING WOODEN ANCHOR TRENCH AND TOE IN TRENCH ON 1' CENTERS ANCHOR OVERLAP FON 1' CENTERS ■ ■ ■ ■ ■ n ■ ■ ■ - i ■ ii■ i ■/ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Is 6" OVERLAY (MIN.) PLAN VIEW TRENCH IN MATTING AND ANCHOR SLOUGH BOTTOM NOTE: IN AREAS TO BE MATTED, ALL SEEDING, SOIL AMENDMENTS, AND SOIL PREPARATION MUST BE COMPLETED IN ACCORDANCE WITH THE PROJECT STO PLACEMENT. PECIFICATIONS AND PLANTING NOTES PRIOR N W a a/- NAIL FILTER w, FABRIC TO BACK OF LOG VANE 24" MIN. BOULDER, TYP. SEE PROFILE FOR ELEVATION NONWOVEN GEOTEX11LE FABRIC, TYP. -\ FLOW._ WELL GRADED MIX OF 1"-12" RIP RAP, #57 STONE AND NATURAL CHANNEL MATERIAL LOG VANE COVER UPSTREAM FACES WITH NONWOVEN GEOTEXTILE FABRIC, TYP. "KEY INTO BANK MINIMUM OF 4.0' AT AN ELEVATION EQUAL TO SLIGHTLY LOWER THAN INNER BERM 2.0' MIN. 2.0' MIN. SECTION A -A FLOW WELL GRADED MIX OF 1"-12" RIP RAP, #57 STONE AND NATURAL CHANNEL MATERIAL LOG T TO Q� J ONE COIR FIBER MATTING ROLL WIDTH CENTERED AT TOE OF SLOPE MINIMUM ROLL WIDTH =12.0' COIR FIBER MATTING \ WOODEN— ANCHOR PLACED AT TOE OF SLOPE U j_ EXISTING GRADE SLOUGH SIDE SLOPE PROPOSED GRADE TRENCH IN MATTING 6" MIN. LIVESTAKE, TYP. BARE ROOT; TYP. COIR FIBER MATTING ANCHORS ON - 3' CENTERS EXTEND MATTING TO TOE OF SLOPE AND KEY IN RIFFLE BANKFULL BED EXCAVATED POOL 1. DEEPEST PART OF POOL TO BE IN LINE WITH WHERE VANE ARM TIES INTO THE BANK. 2. BACKFILL MIX TO BE USED TO REDUCE VOIDS BETWEEN HEADERS AND FOOTERS. 3. LOGS SHOULD BE. 8"-12" DIAMETER. 4. BOULDERS SHALL BE 2' X 2' X 2'. HEADER ROCK, TYP. 24" MIN. DIA. SECTION B -B NONWOVEN GEOTEXTILE FABRIC, TYP. 18" (TYP.) BACKFILL ANCHORS ON 1' CENTERS IN TRENCH MATTING SHALL BE PLACED IN TRENCH AND BACKFILLED LIVE STAKE, TYP. PLAN FLOODPLAIN / EXISTING GROUND 6" MIN. STREAM BED - TYPICAL SLOUGH CROSS SECTION TYPICAL STREAM BANK CROSS SECTION COIR FIBER MATTING 2 Q J7 NOT TO SCALE what's Belo dig. DATE' PROJECT: o%% CAti CLIENT: ,"0�.,, 7/11/17 CITY OF GREENSBORO .-***.ss -- DRAWN BY: SOUTH BUFFALO CREEK HABITAT �f y JLY DESIGNED BY: AND WATER QUALITY NC LICENSE #F-0102 = SEA 421 FAYETTEVILLE ST., STE.600 - 608 - JLY IMPROVEMENT PROJECT PHASE IV TITLE: RALEIGH, NORTH CAROLINA 27601 BY: �• .' CHECKED PHONE: (919) 677-2000 '-y� • .•••••N�• WRW C 2017 DETAILS - -.- ft ` • ��JOB NUMBER: SHEET NUMBER: '//nuns► i 7 012137010 17 37 SEAL• Di= xr t r . 7V X aW MOM? 7R4FnC #AL BF LEAMIAV A =WXnW S17E A4V AM= VAMENLY f ! A RUM AM a7 .. MBUt AUNIMN SZE r ti A, srm #r7m/ y ]' AAV BUT AWA MflD*W rS MIN Raw./. ooDOa� aAci)i ° aoo.�1�; o00o ao pOQA�o�i: sa,� GO CSO °O\ 0 00900 G�4SCyi,'f%+lo 1 a (►o.0 4.id �wi���n°B�o a� Q ° � tA�6i O aoco ta�'r clv oo°l�c6o�vouoc0ap�o�rc,cVvQoo;*D oa ocOcoo_o ..ot oo•aaoopoOQao b o00 •tooto� a c� o cOo}aD oDQ4q *0 .. Q ,foo. �DaoolO° oo°D0099?0900 °"a000�oc°Opco pp orp D oof°�opa�°,.°,°1Oa�a�cQoa°.co°pOQo�a°10oyc 1iYcQ�4 a1Qo 00oO�'� vc o��°o° �� o u a 0? aq4°ea 04o•�c0. :: `> °Oo O�:ooa'a� -, t �oc°a:QcooaOpp tOoO.p sYoo c ° aa0 aO.pOoo.0�O9J\O°_ a HF v�0 °°°aD.a O° cO+o°�O OGa?oDa�p\OpD OV.,42O '� ,t pooaj�cca�p�pwDQc00aoaooaY�.° Do h�a pJp�f��y00000O�Qa* ai0o°o°Aooac°�OoicOao .: >: ac�cpp o0 Oooc a;oho a0 00°`°OY~'' 0° op .ca dQo°o�cl°OoQo9��o°'oOc��cnO�o�co0�oo�Qo � aGyc00� �o0gc0'�o a+ 9woc G'100 OwOcOT'0 o0c o DleooQaOd�CDO'�Gia30{ti•�gap O°�ia96)10 1.°.O l�o'cc?c0aoo�ol :o.cO aoc �'69`oa0 aj'o�;o�:. SrONE -:.� is0p a_pa apo Doti.• p` t� •r 1'd 0`,O Op�i a.0 pp GREENSBORO TEMPORARYel ry OF GREENSBORO -7 i i DETAIL f• f. Ajj%k (STATE REQUIREMENTS) , • f f N07F& 1. SEE PLANS FOR LOCATION W ALL T ICAW PROM TIi3V. FENCES. 2. ALL rREE PR07FCTION DEVrms MUST BE INSTALLED PRrOR TO LAAO prsn RBAAm IMCLwzw ThE CUTTING hF ANY 7mr4 AAD. ,MUST BE INSPECTED BY mE th4BAN FORESTER OR HIS •DESI&AEF. 3. ATI GRADING, 71 mmA4G, FrLLIN8 AR Srwmv OF MATERIALS IS re oxim XN 7TE TREE PRD7FCrXW AREA. 4. rREE PROTEMON FENCE MAY NOT BE REMOVED NITHOUT 77E APPROVAL OF 77E VMW FGA ER OR HIS DEsimer. 5. TIE TREE CONSi£74VATION AREA SHOI XD BE DES26NA460 NI7H "TUTEE COAGERVArION AITEA' SIGNS P057W Vr518LY aV 771E OUTRIDE OF 7HE FEMCED-IN AREA. 8r6MS MAY AVlr sE POSTED ON Tic mfES. sEF EXAAftE BEZON. EXAMPLE SIGN TREE CONSE RYATiON 16' x 12- SIGN i" BLOCK LETTERS ARRA B ACK LETTERSBORDER O WHITE BACKGROUND ALL WEATHER MEDIA ZONA.DE 100• SUGGESTED SPACING BETWEEN SIGNS CONSER.YAQON DEAML C I T Y OF GREENS B O R O r448 TD. AV. Z TANDARD TREE PROTECTION DETAIL 03-08 V 08-08 103-10 METAL FENCE POST 14 GAUGE MINIMUM H06 NIKE (OPTIONAL) EROSION CON7770L .FABRIC Q MAINTAIN ADEQUATE DISTANCE FOR �I p SEDIAOVNT REMOVAL & MAINTENANCE t V NOTES. AREA TO BE BY SILT FENCE -SPACIN& OF POSTS USAN H06 NIKE MITH APPROVED EROSION SLOPE CON7Ra FABRICS TO BE 8'-0" ON CENTER. SLOPE' -SPACIA(S OF POSTS NI7HOUT hVG HIRE USING APPROVED EROSION Ow►DM AWA CONTROL FABRICS TO BE 6'-0" ON CENTER. (ft.) POST, METAL TDOST 5'-0" OR 6'-0' IN HEIGHT DEPpoxAv ON FILL <2% SLOPE (MIN. 1.33 LB/LF SIFEL CONST W770W 10,000 FABRIC. 3'-0" IN MOTH (MUST BE sTAAvAw SPECIFICATIONS 75 FOR SILT PEACE - AS774 D ) NI7H 12" BIA M IN rREACY. 5%-10% STOAT (IF USED) ,/4 NASMV STaW PLACED 1 '-0' DEEP AT SILT FENCE. It SPLICES IN FABRIC SHOULD BE OVERLAPPED A MIN. OF 4 FT. .25 �MAXIAYJM DRAINAGE AREA a 1/4 ACRE PER 100 FT OF FENCE FOR 2r OR LESS SLOPE. EX. EARTH 15 to BACKFILL AAS PAW 14F 2 C I T Y OF G R E E N S B O R O COAPACT THITROt1&hILY STD. W. REV. SILT FENCE DETAIL SILT FENCE wsr BE ENTREAChIED AM7 1 2 006 3 430 SECURM KITH COARACTED SOIL. W SLICING AE7HOD" MAY ALSO BE USED 03/09 4" TO INSTALL SIL r FENCE (SFE Acorn I AAV SFV 'EROSry DE ATLAAiVIAD LES MAAVAL " SECTION 6.62). USE'COG S7D"32 STONE DITCH CHECK FOR FENCE OUTLETS AT A MAXIMUM 100 FT SPACIAL AAO Ar ALL AAhmL Li9AINAGE AAEAS. (SEE SHEET 2 OF 2). NOTES. AREA TO BE BY SILT FENCE -SPACIN& OF POSTS USAN H06 NIKE MITH APPROVED EROSION SLOPE CON7Ra FABRICS TO BE 8'-0" ON CENTER. SLOPE' -SPACIA(S OF POSTS NI7HOUT hVG HIRE USING APPROVED EROSION Ow►DM AWA CONTROL FABRICS TO BE 6'-0" ON CENTER. (ft.) POST, METAL TDOST 5'-0" OR 6'-0' IN HEIGHT DEPpoxAv ON FILL <2% SLOPE (MIN. 1.33 LB/LF SIFEL CONST W770W 10,000 FABRIC. 3'-0" IN MOTH (MUST BE sTAAvAw SPECIFICATIONS 75 FOR SILT PEACE - AS774 D ) NI7H 12" BIA M IN rREACY. 5%-10% STOAT (IF USED) ,/4 NASMV STaW PLACED 1 '-0' DEEP AT SILT FENCE. 5,000 SPLICES IN FABRIC SHOULD BE OVERLAPPED A MIN. OF 4 FT. .25 �MAXIAYJM DRAINAGE AREA a 1/4 ACRE PER 100 FT OF FENCE FOR 2r OR LESS SLOPE. SILT FENCE TO BE REMOVED AFTER C0464•IW770V IS COMPLE7F AS DIRECTED BY 15 THE CONST7TUCTION INSPECTOR. PAW 14F 2 C I T Y OF G R E E N S B O R O STD. W. REV. SILT FENCE DETAIL 1 2 006 3 430 03/09 18 MAXIMUM WATER MAXIMUM RETAINED AREA TO BE BY SILT FENCE SLOPE MAXM SLOPE' LEMSTH Ow►DM AWA (ft.) 90. FT. <2% 100 10,000 75 7,500 5%-10% 50 5,000 10%-20% .25 2,500 >20% 1 15 1,500 C06 STO. #432 STONE DIT ouTjW. • ' CHECK TO BE USED FORSILT t FENCE STONE OUTLET - ALL LSSTDE SLOM ARE 1 STONE TO 2 s 'CLASS B' RIP -RAP ' wn -IV"* - 12' THICK LAYER OF #57• MASHED STONE FOR EROSION r �'s ti� ii :�' • 'r' �:Y CONTROL ON FACES ,, Cly=riy ari a •_ & NO TES.* S. NON-EROSIVE OUTLETS ARE TO BE PLACED IN THE SILT FENCE AS SHOMN ON THE PRaxCT PLANS AND AS DIRECTED BY THE CONSTRUCTION INSPECTOR. R. N0N-ER0SIVE OUTLETS ARE TO BE LOCATED AT ALL NATURAL DRAINAGE AREAS ANI! REPRESSIONS,- WITH THE EXCEPTION OF PERENNIAL STREAMS. 3. THE MAXIMUM DRAINAGE AREA IMPOUNDED AT EACH OUTLET MUST NOT EXCEED 1/4 ACRE. PAW 2W2 C I T Y OF OREENSO OR O SILT FENCE DETAIL STD. NQ. I REV.12�os _ 430 o3�oe I EDGE OF PAVEMENT WNSLOUPSLOPE STAKE PE STAKE SEE INSET A PAM FLOW r� _ EXCELSZOR WATTLE O1�oQ� TYPE 4 EROSION J CONTROL MATTING SEE INSETa MATTING Fot t FLdw FLOW SLOPE xiN s. ISOMETRIC VIEW TOP VIEW ANCHOR CABLE OR CHAT CURTAI 2UPSLOPE FABRIC STAKEINSTALL 2 IN. (2 OZ.) `� � CURTAIN SN "U" SEE INSET c NATURAL GROUND SHAPED ,1-� ULHLOY ENT i I I . i . CURTAIN WEIGHT ANCHOR (MIN 0)i I 40 LB ANCHOR (18 OZ/SQ YD) 3 A A STAIKES Gass :3» RIP-PAR".PER 100 OF 2' DOWNSLOPE_ :. '; .;`,..'.`:: NE FLOW MATTING' STAKE STAPLES ! _:2. MIN.CURTAIN) RIVER! Q JAI. csAoz.I s " I'IM-N t,�J?r �xouoea HANNEL BOTTOM N w INSET A / 32 MIN. s MIN., +�Rauwt4Y o INSET B INSET C 1,>� CRSS SECTION - TRAPEZOIDAL DITCH TosasE , -! ?!VERSION °CINT f_ 4 24' - O 1 0- NOTES. slckAGE• vm. MiN,, aetro;cu; RF -A, p FLOC FTs PER. ACFE. O=STURBEC. AREA 0 1. USE MINIMUM 12" 'DIA. EXCELSIOR MATTLE vxw, wAaN n r.TtNJ - Lam. plPs'MAX, 2' UPSLOPE 2. USE 2 FT MOODEN STAKES KITH A 2" X 2" NOMINAL CROSS SECTION. - 3. ONLY INSTALL #Ar7ZE(Sl IN Drrm SUCH THAT FLOW PASSES OVER 771E WErR FORMED x zr�u3rFlr: ntRttir sTfma � Z STAKE IN THE CENTER OF THE MATTLE AND NOT AROUND THE MATTLE TO PREVENT BANK EROSION. F w 4. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES Ar AN ANGLE PROIFILE MIEN 2' MAX. NATURAL GROUND TO WEDGE MATTLE TO BOTTOM OF DITCH. 0 5- PROVIDE STAPLES MADE OF 0.125" DIA. STEEL MIRE FORMED INTO A PLAN f1 U SHAPE NOr ass THAN 12" IN LENG771 tVOTt3. PI..N 6. INSTALL STAPLES APPROXIMATELY EVERY 1 LF ON 807H SIDES OF MA TALE i; INSTALL CLASS B .nrP.-RAP �'V A SFbT=CIRCLE AROG:JCt TWE PIPE INLET. 9ttICf3 UF' T,SE S.O.NE o AND AT EACH END TO SECURE Ir TO THF SOIL. HIGhE R -OV-,rAC,9 --SAV, NNERE IT TIES TO TtlF E/MBA�MENT. _THE M�AiIAiG/M" CRSS itrlDT7i ,OF .THE DEPTH = 1.1 x BANKFULL DEPTH Z 7. INSTALL MATTING IN ACCORDANCE KITH SECTION 1631 OF 771E STANDARD SPECIFICATIONS. RIP=RAP SH0ZXV 8E '3 FT, THE AfINZAIIDW BOTTOV NIDTH 51f©ULQ 1.'E '1 FT: `AND A MINIASWM:HEZ5HT SECTION A -A Q B. PRIOR TO POLYACRYLAMIDE (PAM1 APPLICATION, OBTAIN A SOIL SAMPLE FROM PROJECT Ol 2 FCCT -''GUT iOULD. A41SO OE 1'!"F GOFER TITAN 711E St10ULDCR'Ol TiIG"Lh'/AtixmCNT. LOCATION AND FROM ANY OFFSITE BORROW MATERIAL. ANALYZE FOR APPROPRIATE PAM �' A 1 FT T.H1CX,LAYER OF -05 LTR.'A571 ASHED SrO Stt'ktlt? BE fLACEO �ti Tt'E JttFSIOE SG ^PE WIDTH = 1.2 x CHANNEL WIDTH O ENSURE ADEQUATE FLOCCULANT TO BE APPLIED TO EACH WAr&F - Or THE, RIP -RAP., NOTES: V) CONTACT IS MADE 2' DOWNSLOPE 9. INTIALLY APPLY 2 OUNCES OF ANIONIC OR A/EUT7MALLY CHARGED PAM OVER MATTLE WHERE 13. THE SEVZMENT. STORAGE AREA .MHOULD BE EXGAVATEO AR9gti Vr THE DttTSIDE ;rJF THE 3T01iE WITH GROUND USING STAKE MATER MILL FLOW AND 1 OUNCE OF PAM ON MATTING ON EACH SIDE OF MATTLE. REAPPLY r MI °LIRCLL 1t7,. f3LLt1M cRaDE. DOUBLE SILT CURTAINS SHOULD BE SPACED 10 APART. 4 MATTING PAM AFTER EVERY RAINFALL EVENT THAT IS EQUAL TO OR E 4: EXCEEDS 0.50'. INSPECT EPOSION COY7R£N_ OFFICES AT LEAS7 ONCE WEEKLY AND AFT69 EAT.' RAINFALL PRIJ'O CIN✓ w WOODEN STAKES & 10. ONLY POLYACRYLAMIDES FROM THE NC DWO APPROVED LIST ARE TO BE USED. ANY i EVENT OF -41-0" OR GREATER EXCAVATE SEDIAEN7 FROM THE DERPESSION' NCE ACCUMULATED WIRE STAPLES. OTHER PROPOSED FLOCCULANT REQUIRES REM# & APPROVAL BY 7HE DWO AQUATIC B DEPTH HAS, REACHED t12: THE: DESIGN DEPTH ,0F" FHE FRAF TO MAINTAIN ADEQUATE STO.4AGF AREA. j TOXICOLOGY UNIT. REPLACED ANY CONTAMINATED 6TONE. 0 CRSS SECTION - VEE DITCH 11. WATTLES SHOULD BE SPACED IN DITCH USING THE FORMULA: 5; ANY 171P -RAP DISPLACED FRO.k ITS OR!CINAL LOCATI(}N SHOt.10 SF REPLACED IMI&0IATEL-r': IMAT7i.E DIA. (FT) X 1001 / SLOPE (%) i4 .8:. dm -F /7ISTUR8ED AREAS HAVE BEEN S:T48 L IZEB FILL 7hF DEPFiESS10,V AAV ESTABLISH FINAL (TURBIDITY) ///���C12. MATrAL MATTING IS NOT REDUIRED ON DITCH LINES WHERE COMPLETE MATTINGGRADE ANG STABILME R-rOUI G.R 19 COVER.��OA��N 'II�� '5 � - � PAb�' ! QF' 2 INSTALLATION IS INDICATED ON 171E PLANS. '° T. TltC a^TOTAL£ VCKUML REOLfIREU :^ 3600 CUL'1C FT FCR ACF[. Of D�SFURDEG AhEA. � V L v �18) PAGE 2 &F 2 CI TY OF 0REENS00R0 OI T Y OF 0REENS00R0 RC1 T Y OF 0REENSa0R0 NOT TO SCALE STD. Nat -REV. a STD: NQ. REV. w STD. NO.,REV. WATTLE WITH POLYACRYLAMIDE (PAM) 457 �/10 WATTLE WITH POLYACRYLAMIDE (PAM) 457 12/10 7 ROCK PIPE 'INLET PROTECTION 453 Q6/09 x4 M 4 18 18 Know what's below. o Call before you dig. DATE: CLIENT: ��►TTTTTTj. a PREPARED IN THE OFFICE OF: �•�`' CA '' 9/12!17 PROJECT: •••••• SOUTH BUFFALO CREEK HABITAT CITY OF GREENSBORO'��SS R•%'-,- DRAWN BY: a' JLB AND WATER QUALITY w NC LICENSE #F-0102 � Q' SEA r - � M DESIGNED BY: - J 421 FAYERALEIGH, NORTH ST., STE.600 TITLE: = 0446 SLY IMPROVEMENT PROJECT PHASE 1V REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 EROSION AND SEDIMENT �• orn PHONE: (919) 677-2000 CHECKED BY: This document, together with the. concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose •••..... •'• VVRW x and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by --, / •••• Kimley-Horn and Associates, Inc, shall be without liability to Kimley-Horn and Associates, Inc. ©2017 CONTROL DETAILS --/ FFR L •Q�, `1, JOB NUMBER: SHEET NUMBER: Copyright Kimsey -Horn and Associates, Inc., 2017 SEAL: / /11111111 ! 012137010 18 OF 37 STREAM BANK uEa ns Ern e+rn�Er B I,P BION AND SEDIMENT CONTROL PLAN SHEETS TEMPORARY STREAMWITH PIPE( -', NOT TO MUD MATS a 8" TO 12" SPIKES EVERY 2 FT WIDTH AS NEEDED — — — — — TOP ELEVATION OF STORMWATER — — — — — �T #5 WASHED ��mnirrrn._ DESIGN OF QF SPILLWAYS DRAINAGE AREA WEIR LENGTH 1 (ACRES) (FT) 1 4.0 2 6.0 3 8.0 4 10.0 5 12.0 1 DIMENSIONS SHOWN ARE MINIMUM EXISTING SLOPE #1 RIP --RAP 61101- ► I ►lel MAX. 1 VARY TIMBER SIZE GRIP DRAG CHAIN UNEVEN SURFACE FOR EXISTING SLOPES IMPROVED TRACTION VARIES10 HEIGHT 8c WIDTH DETERMINED BY EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. CHOOSE TIMBER WITH SIZE AND STRENGTH TO SUPPORT KEY RIP RAP INTO THE DAM SECTION A_A YED RIP RAP CONSTRICTION EQUIPMENT u� , ' .`. =: E FOR STABILIZATION. #5 WASHED STONE SPIKES EVERY 2 FT A LENGTH AS NEEDED FRONT VIEW GRIP/DRAG CHAIN STAGGERED ENDS TEMPORARY ROCK CHECK LOAM TO GRIP BANK 1 9 NOT TO SCALE SUGGESTED HARDWOOD THREADED ROD ON OUTER SUPPORT EVERY 3 FT WIDTH 1. PREDRILL AND INSET 3/4" THREADED STEEL RODS EVERY 3' AND SECURE WITH AT LEAST ONE NUT. 2. NAIL INDIVIDUAL 7IM13ERS TOGETHER EVERY 2` WITH 8" TO 12" BARN SPIKES. SILT FENCE LOCATED AROUND PERIMETER OF TEMPORARY STOCKPILE TEMPORARY SOIL STOCKPILE STREAM CHANNEL BRIDGE MAT I f ( IGS LENGTH T II. i Ill IIII�41 I SLOPE t SLOPE � HEIGHT SURFACE FLOW s DIVERSION SF SF _a �-. O - t;i lil ITI--ITI--Ji1 T Ii1 Cil--[ih•-{i---tlF--IIF--711 Ili-�II I€ I€ T 1f 1� II IY- -- ILII SECTION A -A _SF SF t! } 'I, 0 PLAN VIEVII I STOCKPILE DIMENSIONS LENGTH WIDTH I HEIGHT I SLOPE 1 1 SLOPE 2 STOCKPILE 11 80` 80 10' MAX. 3:1 MAX. 3:1 MAX. RECOMMENDED BRIDGE MAT RECOMMENDED 1/4 SUPPORT A 1/4 SUPPORT TEMPORARY STOCKPILE 4 19 H, NOT TO SCALE s EG €YaEEv. FILTER FABRIC—/ LCLASS B STONE A _,,,_ 2'-3' TYP. Q LO STREAMBANK BOULDERS OR APPROVED SURFACE FLOW BASE FLOW STREAMBANK SURFACE FLOW --Z DIVERSION NOTES: EQUIVALENT DIVERSION Z ' 1. CONSTRUCT STREAM CROSSING WHEN FLOW IS AT NORMAL BASEFLOW. 2. MINIMIZE CLEARING AND EXCAVATION OF STREAMBANKS. DO NOT EXCAVATE CHANNEL BOTTOM. LIj � 3. INSTALL STREAM CROSSING PERPENDICULAR TO THE FLAW.'_/PICAL TIMBER MAT 4. MAINTAIN CROSSING S4 THAT RUNOFF IN THE CONSTRUCTION i 1 Q ROAD DOES NOT ENTER EXISTING CHANNEL.9 5. STABILIZE AN ACCESS RAMP OF CLASS B STONE TO THE NOT TO SCALE co EDGE OF THE MUD MAT. 6. CONTRACTOR SHALL DETERMINE AN APPROPRIATE RAMP w ANGLE ACCORDING TO THE EQUIPMENT UTILIZED. MAINTENANCE,: w 1. INSPECT TEMPORARY STREAM CROSSINGS AFTER C RUNOFF—PRODUCING RAINS TO CHECK FOR BLOCKAGE IN CHANNEL, EROSION OF ABUTMENTS, CHANNEL SCOUR, RIPRAP DISPLACEMENT, OR PIPING. MAKE ALL REPAIRS IMMEDIATELY < TO PREVENT FURTHER DAMAGE TO THE INSTALLATION. a TEMPORARY DEEP STREAM CROSSING MUD MAT 19r NOT TO SCALE , Know w elow. Call before you dig, PREPARED IN THE OFFICE OF: DRAWN� 8/16/17 PR0 !ECT: CLIENT: +►+�i1{� DATE: CITY OF GREENSBORO �.*o.••••'•••"`B: SOUTH BUFFALO CREEK HABITAT NC LICENSE #F-0 02 _ = JLY r" : � DESIGNED BY: A N L.f WATER V( � AL I T Y AFIL SIAL 421 FAYETiEVILLE ST., STI.60E �• usa Qom`; SLYTITLE: Ys REV, No.: REVSaIN: PATE: DRAM BY: CHECKED BY-. RALEIGH, NORTH CAROLINA 27601 CHECKED BY: IMPROVEMENT p OVEM NT PROJECT PH"c IV This document, together with the concepts and designs presented Yerein, as on instrument of service, is :mended only for the specific purpose PHONE. (919) 677-2000 ERV 1�❑1MVT VRW yr . and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by CONTROL (� "� [ • �� •"""• .*� Kirnley�-Horn and Associates, Inc. shall be without liability to Kimley--Horn and Associates, Inc. @2Q17 CONTROL DE [ AIL, ��'������{��y�'�'t�t,w. 49 NUMBER; SHEET NUMBER: Copyright Kimley—Horn and Associates, Inc., 2017 SEAL: �/ ' W 012137010 19 OF 37 0. DIMENSIONS TOP OF BERM WIDTH 10.00' D2 COMPACTED BERM 2.0' MINIMUM 4.00' E 95% COMPACTION, D5 0.50' D6 STANDARD PROCTOR. SECTION A -A 0.25' PIPE SIZE CHANNEL DEPTH o a� STABILIZE OUTLET WITH PIPE DIAMETER 111 1.5' MINIMUM 3.0' WIDE X 10.0' LONG (in) 2 1 1.5' FREE BOARD (in) X 2.0' DEPTH OF CLASS DOWNSLOPE EXISTING 16.0 4. m GROUND, STEEP CUT - - 1.5 E SLOPE OR FILL SLOPE. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP a A 5. EARTH BERM SHALL BE STABILIZED w/SEEDING ACCORDING TO THE TECHNICAL SPECIFICATIONS. IMMEDIATELY AFTER CONSTRUCTION WITH SEEDING. 9 1,5 1,5 UPSLOPE EXISTING CD -' 29.0 l 2.5 GROUND, STEEP CUT 1.5 2:1 SIDE 1.5 TOE SLOPE OR FILL SLOPE. 29.0 29.0 SLOPES, MAX. CHANNEL BOTTOM 2.0 3.0 2.0 WIDTH =2.0' MINIMUM STABILIZE DIVERSION BERM r 4.0 33.0 CHANNEL WITH TEMPORARY `V 2.0 CROSS SECTION SEEDING AND OL 3.0 3.0 4.0 MATTING (SEE PROJIECTCSOPETCIAL CONDITIONS FOR EROSION >1 CONTROL MATTING) 5311 STABILIZE DIVERSION BERM CHANNEL WITH TEMPORARY UPSLOPE EXISTING GROUND, SEEDING AND EROSION CONTROL STEEP CUT SLOPE OR MATTING (SEE PROJECT SPECIAL q FILL SLOPE. CONDITIOFOR CONTROLNMATTING) EROSION PLAN DIVERSION BERMNOT TO SCALE E J� STEEL FENCE POST TOP OF EARTHEN BERM BOTTOM ANCHORED WITH STAPLES S• CLEAN OUT MARKER INFLOW DIVERSION BERM HOLD-DOWN STAKES -x, HAND -COMPACTED ISLAND OF INLET 2:1 D2 A'j• i 10' SPACING STRUCTURE DIMENSIONS D1 10.00' D2 1.75' -: INLET CROSS PIPE 4.00' D4 CORRUGATED D5 0.50' D6 PLASTIC PIPE _.........: SECTION A -A 0.25' PIPE SIZE SEE TABLE FOR o a� STABILIZE OUTLET WITH PIPE DIAMETER CONNECT SKIMMER TO OUTLET BARREL WITH HOSE PER SKIMMER DETAIL THIS SHEET. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE 3.0' WIDE X 10.0' LONG (in) (in) (in) X 2.0' DEPTH OF CLASS r� T... 16.0 4. 1 AND B RIP RAP ON FILTER FABRIC EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIP RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. None 1.5 1,5 - - STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP a A 5. EARTH BERM SHALL BE STABILIZED w/SEEDING ACCORDING TO THE TECHNICAL SPECIFICATIONS. IMMEDIATELY AFTER CONSTRUCTION WITH SEEDING. 9 1,5 1,5 2.0 4.0 2.5 29.0 l 2.5 1.5 1.5 _. _. 1.5 TOE STRUCTURE DIMENSIONS D1 10.00' D2 1.75' D3 4.00' D4 5.00' D5 0.50' D6 2.00' D7 0.25' PIPE SIZE 15" TOP OF D3 HAND -COMPACTED a B B a LEVEL SECTION FILL (ISLAND) 0 0 D4 D7 N TOP OF DIVERSION D6 ___� ;,. DIVERSION BERM DIVERSION BERM FLOW FLOW NATURAL GROUND ° e °dd < a a d °f 4_ >. D53:1 °°° °° ° V o °°�° .._.. .'......' A d d d 4° d° d dd d ° ° .... DIVERSION CHANNEL ° - - - - - - HAND -COMPACTED ,__ A ISLAND OF INLET SECTION B -B PLAN VIEW BASIN INLET PROTECTION RIP RAP DISSIPATOR PAD SEE TABLE FOR DIMENSIONS LENGTH(Li) X WIDTH(Wi) X DEPTH(Di) F PROTECT WEIR WITH - NONWOVEN GEOTEXTII FILTER FABRIC AND > RIP RAP SEE TABLE FOR SIZES) 3 01 RIP RAP 4 THICKNESS TREATMENT SURFACE AREA (SA) AT STORAGE DEPTH JUTE NETTING ANCHOR BOTTOM WITH STAPLES vr`N. \e Q co V v� JUTE BAFFLES WITH STEEL POSTS, o WOVEN WIRE FABRIC BACKING AND COIR 01 FIBER NETTING. r- SKIMMER o (SEE DETAIL) 20 U I- ® I ! \ `- PRIMARY SPILLWAY �Z,, BARREL -OUTFALL TO -� RIP RAP DISSIPATOR PAD ES RIP RAP DISSIPATOR PAD SEE TABLE FOR DIMENSIONS Uj SEE TABLE FOR DIMENSIONS o LENGTH(Ld) X WIDTH(Wd) X DEPTH(Dd) EXTEND RIP RAP BEYOND TOE Z OF EARTHEN BERM TO LENGTH "We" Q SEE TABLE FOR DIMENSIONS E TEMPORARY SLOPE DRAIN NOT TO SCALE v WOODEN STAKE WITH RETRIEVAL ROPE CLEAN OUT ELEVATION TOP OF BERMPRIMARY SPILLWAY MARKED. SEE DATA TABLE FOR ELEVATION. ELEVATION INVERT ELEVATION SKIMMER SEE DATA TABLE FOR SIZE 5'� AND DETAIL 20 \ - _ WEIR Ds I -(I 1-1 I E=1�=1 I F=WlEi (= I I 'S• IL Illi�lll-III-III-II�III��ill I 111 -III- NONWOVEN 111=111- -II� GEOTEXTILE -III-III= I FILTER FABRIC11-III-- - - 9UUj_6.6FREU$U_jAUI BARREL - OUTFALL TO RIP RAP DISSIPATOR PAD SEE TABLE FOR DIMENSIONS LENGTH(Ld) X WIDTH(Wd) X DEPTH(Dd) TOP OF STORAGE AREA ALUMINUM SIRAP� FLEXIBLE HOSE, SS CLAMPS, - AND THREADED MALE NIPPLE ON OUTLET END SCHEDULE 40 COUPLI CONNECTION OUTLET END: CONNECTION TO OUTLET PIPE OR� RISER BAFFLES WITH METAL POST, WOVEN WIRE FABRIC BACKING AND COIR FIBER NETTING, TYP. 1ST INLET M o CELL ZONE (257.) (35%) OUTLET ZONE 2ND CELL 1ST CELL BAFFLE LENGTH BAFFLE LENGTH BAFFLE LENGTH BL4 - I (BL3 ter' BL2 LENGTH (Lt) SKIMMER BASIN CROSS SECTION 0.5 FOOT 1.0 FOOT MIN. MIN. LINE WEIR WITH RIP RAP �- SEE TABLE FOR SIZE AND DEPTH (Dd) NONWOVEN --� GEOTEXTILE FILTER FABRIC INLET ZONE BAFFLE LENGTH TOP OF BERM RIP RAP THICKNESS DITCH AND BURY (Dd) FILTER FABRIC EDGE R LENGTH I (MIN. 12" OF FABRIC) PRIMARY SPILLWAY CROSS SECTION SCHEDULE 40 501 ' -ID PV. BARREL PIPE LONGER THAN SHOWN. NOT INCLUDED WITH SKIMMER SUPPLIED BY USER. o PERSPECTIVE VIEW NOTES MAINTENANCE ZTLET Skimmer Sizing Table 0 .. 2ND ZONE X Length (L) CELL (15%) TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. w (25%) 2. �� o a� TOP OF STORAGE AREA ALUMINUM SIRAP� FLEXIBLE HOSE, SS CLAMPS, - AND THREADED MALE NIPPLE ON OUTLET END SCHEDULE 40 COUPLI CONNECTION OUTLET END: CONNECTION TO OUTLET PIPE OR� RISER BAFFLES WITH METAL POST, WOVEN WIRE FABRIC BACKING AND COIR FIBER NETTING, TYP. 1ST INLET M o CELL ZONE (257.) (35%) OUTLET ZONE 2ND CELL 1ST CELL BAFFLE LENGTH BAFFLE LENGTH BAFFLE LENGTH BL4 - I (BL3 ter' BL2 LENGTH (Lt) SKIMMER BASIN CROSS SECTION 0.5 FOOT 1.0 FOOT MIN. MIN. LINE WEIR WITH RIP RAP �- SEE TABLE FOR SIZE AND DEPTH (Dd) NONWOVEN --� GEOTEXTILE FILTER FABRIC INLET ZONE BAFFLE LENGTH TOP OF BERM RIP RAP THICKNESS DITCH AND BURY (Dd) FILTER FABRIC EDGE R LENGTH I (MIN. 12" OF FABRIC) PRIMARY SPILLWAY CROSS SECTION SCHEDULE 40 501 ' -ID PV. BARREL PIPE LONGER THAN SHOWN. NOT INCLUDED WITH SKIMMER SUPPLIED BY USER. o PERSPECTIVE VIEW NOTES MAINTENANCE REQUIRED SURFACE AREA Skimmer Sizing Table 1. DRIVE STEEL FENCE POST AT LEAST 18" INTO SOLID GROUND. INSPECT AND EMPTY SKIMMER OF ALL DEBRIS AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE 0 Length (L) Width (W) PVC Float Diameter TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. Inlet Extention Diameter Barrel Pipe Diameter 2. WOOD POST ARE NOT ACCEPTABLE. PLACE THE SEDIMENT THAT IS REMOVED IN A DESIGNATED DISPOSAL AREA. REPAIR NETTING. a� (in) 3. CONNECT SKIMMER TO OUTLET BARREL WITH HOSE PER SKIMMER DETAIL THIS SHEET. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING. PERIODICALLY CHECK THE DEPTH OF THE SPILLWAY TO ENSURE U (in) (in) (in) IT IS A MINIMUM OF 1.5 FEET BELOW THE LOW POINT OF THE EMBANKMENT. IMMEDIATELY FILL ANY SETTLEMENT OF THE a 16.0 4. USE FOR DRAINAGE AREAS NOT EXCEEDING 10 (TEN) ACRES. EMBANKMENT TO SLIGHTLY ABOVE DESIGN GRADE. ANY RIP RAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY. None 1.5 1,5 1.5 STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP a 27,0 5. EARTH BERM SHALL BE STABILIZED w/SEEDING ACCORDING TO THE TECHNICAL SPECIFICATIONS. IMMEDIATELY AFTER CONSTRUCTION WITH SEEDING. 0- U m O O r M N 0 v a� E C 0 L w I OfJ Q REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose Y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2017 SKIMMER BASIN NOT TO SCALE n we CLIENT: INC LICENSE #F-0102 421 FAYETTEVILLE ST., STE. 600 TI TLE: RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 © 2017 •� Mole] 0 11 SO '= , CAI I NOTES: 3H DOOR 1. SKIMMER IS TO BE A SURFACE DEWATERING DEVICE SUCH AS BMP SKIMMER OR APPROVED DEVICE. 2. BARREL PIPE SHOULD BE SIZED 1.4 TIMES THE DEPTH OF WATER WITH A MINIMUM LENGTH OF 6.0', SO THE INLET CAN BE PULLED FOR MAINTENANCE. DAT STANE.'.)"Arm"D NOT TO SCALE (�201 SKIMMER BASIN DATA TABLE BASIN DATA REQUIRED SURFACE AREA Skimmer Sizing Table PROVIDED SURFACE AREA (SA) 2,999 SF BASIN BOTTOM ELEVATION Standard Size Length (L) Width (W) PVC Float Diameter Vent Diameter Inlet Extention Diameter Barrel Pipe Diameter Flexible Hose Diameter Male Outlet Fitting Diam. Coupling Cann. Diam. (in) (in) (in) (in) (in) (in) (in) (in) (in) (in) 1.5 16.0 16,0 2.0 1.0 None 1.5 1,5 1.5 4.0 2.0 27,0 27.0 2.5 1.0 2,0 1,5 1,5 2.0 4.0 2.5 29.0 29.0 2.5 1.5 2.5 1.5 1.5 1.5 4.0 3.0 29.0 29.0 3.0 2.0 3.0 2.0 2.0 2.0 4.0 4.0 33.0 33.0 4.0 2.0 4.0 3,0 3.0 3.0 4.0 5.0 40.0 40.0 5.0 2.0 5.0 4.0 4.0 4.0 6.0 6.0 47.0 47.0 6.0 2.0 6.0 5.0 5.0 5.0 6.0 8.0 60.0 60.0 8.0 2.0 8.0 6.0 6.0 6.0 8.0 STANE.'.)"Arm"D NOT TO SCALE (�201 SKIMMER BASIN DATA TABLE BASIN DATA REQUIRED SURFACE AREA 2,152 SF PROVIDED SURFACE AREA (SA) 2,999 SF BASIN BOTTOM ELEVATION 733.0 FT BASIN STORAGE ELEVATION 736.0 FT TOP OF BERM ELEVATION 737.5 FT BASIN LENGTH (Lt) 90 FT BASIN WIDTH (Wt) 30 FT LENGTH TO WIDTH RATIO 3.0 SIDE SLOPE 3 :1 STORAGE DEPTH (Dt) 3.00 FT REQUIRED VOLUME 4,957 CF PROVIDED VOLUME 6,084 CF CLEANOUT ELEVATION 734.8 FT SKIMMER OUTLET DATA SKIMMER DIAMETER 1.5 IN OUTLET BARREL DIAMETER 4.0 IN BARREL MATERIAL PVC BARREL INVERT IN. 733.0 FT BARREL INVERT OUT 732.0 FT BARREL LENGTH 84 FT BARREL SLOPE 1.19 % DISSIPATOR PAD RIP RAP Class A LENGTH (Ld) 5 FT WIDTH (Wd) 3 FT RIP RAP THICKNESSS (Dd) 12 IN INLET PROTECTION DISSIPATOR PAD RIP RAP Class 1 LENGTH (Li) 16 FT WIDTH (Wi) 6 FT RIP RAP THICKNESSS (Di) 24 IN PRIMARY SPILLWAY INVERT ELEVATION 736.0 FT WEIR LENGTH (WL) 6.5 FT WEIR SIDE SLOPE 3 :1 RIP RAP SIZE Class B WIDTH (We) 9 FT DEPTH (Ds) 18 IN BAFFLE ZONE LENGTHS INLET ZONE LENGTH (BL1) 35 FT IST CELL LENGTH (BL2) 25 FT 2ND CELL LENGTH (BL3) 25 FT OUTLET ZONE LENGTH (BL4) 15 FT Know what's below. Call before you dig. DATE: PROJECT: ���•`'�� CARO 7/11 /17 �•...E$••••.. / DRAWN BY: SOUTH BUFFALO CREED HABITAT a: JLY SEAT. DESIGNED BY: AND WATER QUALITY So JLY IMPROVEMENT PROJECT PHASE IV CHECKED BY: 41 JOB NUMBER: SHEET NUMBER: SEAL: r,,,t►► X117 012137010 20 OF 37 - LL. ` {{. GEOTEXTILE DEWATERING -' DIRT BAG WITH STABILIZED M G OUTLET. E 21 L BY-PASS PUMP OUTLET -W--- o NTH ENERGY DISSIPATOR, TYP. L � 21 <1 -0 [�__ IMPERVIOUS DIKE, TYP. 21 � DEWATERING PUMP FOR SEDIMENT LADEN WATER WITHIN WORK AREA m EDGE OF FLOODPLAIN, TYP. DRY WORK AREA. TEMPORARY FLEXIBLE PUMP HOSE, TYP. a M rn SEQUENCE OF CONSTRUCTION FOR TYPICAL STREAM WORK AREA I. CONTRACTOR SHALL DETERMINE A PROPOSED SIZE AND LOCATION OF GEOTEX11LE DEWATERING DIRT BAG FOR APPROVAL BY THE ENGINEER PRIOR TO INSTALLATION. 2. INSTALL GEOTEXTILE DEWATERING DIRT BAG, AS APPROVED. 3. INSTALL BYPASS PUMP AND DEWATERING PUMP AND NECESSARY TEMPORARY FLEXIBLE HOSE. CONNECT DEWATERING PUMP TO GEOTEXTILE DEWATERING BAG. 4. PLACE UPSTREAM IMPERVIOUS DIKE AND/OR COFFER DAMS TO ISOLATE THE WORK AREA. BEGIN BYPASS PUMPING FOR STREAM PUMP AROUND OPERATION. 5. PLACE DOWNSTREAM IMPERVIOUS DIKE FOR STREAM PUMP AROUND OPERATION. BEGIN DEWATERING THE ISOLATED WORK AREA. AREA TO BE DEWATERED SHALL BE EQUAL TO ONE DAY'S WORK. 6, PERFORM STREAM REPAIR WORK IN ACCORDANCE WITH THE PLANS. 7, EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES AND/OR COFFER DAMS. REMOVE IMPERVIOUS DIKES, COFFER DAMS, PUMPS, AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM IMPERVIOUS DIKES COFFER DAM FIRST). 8. PUMP AROUND AREA TO BE STABILIZED WITH MATTING AT THE END OF EACH WORK DAY. THE IMPERVIOUS DIKE LOCATIONS AS SHOWN ON THIS SHEET ONLY SHOW THE UPPER AND LOWER EXTENT OF WORK FOR EACH STREAM SEGMENT. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKE(S) FOR EACH DAY'S WORK. 9. REMOVE DIRT BAG AND PROPERLY DISPOSE OF CAPTURED SEDIMENT AND DIRT BAG. STABILIZE DISTURBED AREA WITH SEED AND MULCH. STREAM DIVERSION AND PUMP AROUND GENERAL NOTES 1. ALL STREAM WORK TO BE PERFORMED "IN THE DRY" OUT OF STREAM FLOW EITHER BY PUMP -AROUND OR STREAM DIVERSION WITH SILT CURTAIN. 2. CONTRACTOR SHALL USE A "SILENT PUMP" FOR ALL PUMP -AROUND WORK ASSOCIATED WITH THIS PROJECT. 3. IMPERVIOUS DIKES OR COFFER DAMS ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW. 4. MAINTENANCE OF STREAM FLOW OPERATIONS SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES PUMPS AND HOSES. 5. GRADED STREAM BANKS SHALL BE STABILIZED, WITH MATTING, PRIOR TO PREDICTED RAIN FALL EVENTS, UNLESS ALL RAIU EVENT FLOW CAN BE PUMPED AROUND FOR PREDICTED EVENT. 6. PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. 7. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL NOTES. BYPASS PUMP FOR CLEAN UPSTREAM CHANNEL BASE FLOW -- DAILY CONSTRUCTION AREA TO BE STABILIZED BY THE END OF THE DAY. MAY VARY IN SIZE FROM TOTAL WORK AREA. EXISTING STREAM CHANNEL FP S Fp % EXISTING STREAM TOE OF BANK, TYP. TOP OF EXISTING STREAM BANK, TYP. . -1 0 to Q UD 0 co SILT CURTAIN, TYP, S� SC o GDB 0 a3 EDGE OF FLOODPLAIN, TYP. GEOTEXTILE DEWATERING DIRT BAG WITH STABILIZED OUTLET. 6 � 21 rE w cn cs i I< - 0 ao P [a MINIMUM REQUIRED BASE FLOW WIDTH FROM TOE Of BANK SLOPE 21 t � 0 i � TO DRY WORK AREA COFFER DAM OR 3 4 IMPERVIOUS DIKE, TYP. 21 21 DEWATERING PUMP FOR SEDIMENT LADEN WATER WITHIN WORK AREA, IF NEEDED TO CREATE A DRY WORK AREA FILL PORT WITH CAP INTERNAL STABILIZATION BAFFLE FILL PIPE ---_ DRY WORK MIN. COFFER AREA HEIGHT = 4.0' "---- DRAIN WITH CAP EXISTING STREAM MIN. COFFER GRADE WIDTH = 9.0' ` FRONT ELEVATION -DAILY CONSTRUCTION AREA TO BE STABILIZED BY THE END OF THE DAY, MAY VARY IN SIZE FROM TOTAL WORK AREA. Fp PP AQ& 7.0' MIN. OFFSET WIDTH FROM BANK WATER SURFACE ELEVATION (WSE) OF DIVERTED STREAM BASE FLOW. WSE OF DIVERTED FLOW AT 75% OF DAM HETI INTERNAL STABILIZATION BAFFLE FILL PORT WITH CAP, TYR COFFER DAM GENERAL NOTES 1. A WATER -INFLATED TEMPORARY DAM, OR APPROVED EQUAL, SHALL BE USED FOR THE COFFER DAM. 2. DYNAMIC WATER HEIGHT CONDITIONS SHALL NOT EXCEED 75% OF THE PROPERLY FILLED HEIGHT OF THE BARRIER, OR MANUFACTURER SPECIFICATIONS. 3. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS OR MANUFACTURER'S TECHNICAL SPECIFICATIONS FOR THE COFFER DAM PRIOR TO CONSTRUCTION, 4. THERE SHOULD BE A MINIMUM 7.0' OFFSET WIDTH BETWEEN THE EDGE OF THE COFFER DAM AND THE STREAM BANK TO DIVERT THE STREAM BASE FLOW. THE CONTRACTOR SHALL INCREASE THIS WIDTH AS NECESSARY TO INSURE THE SAFE PASSAGE OF STREAM WATERS AROUND THE WORK AREA. LIFTING LOOP (OPTIONAL) STREAM DIVERSION AREA SHOULD BE _j MOVED ACROSS THE CHANNEL AS THERMAL ANY STRUCTURES THAT SPAN THE CHANNEL ARE CONSTRUCTED SO THAT IN --STREAM WORK IS ALWAYS 11,4S4- �q4f CONSTRUCTED "IN THE DRY" DRAIN WITH CAP far, TQe rQe �O@ FILL PORT WITH CAP DRAW WITH CAP ---� SIDE ELEVATION FILL PIPE FILL PIPE .,. ,.,.., .,... �,., TIONAL) PLAN VIEW LIFTING LOOP (OPTIONAL) THERMAL SEAL DRAIN WITH CAP XAMPLE OF WATER FILLED COFFER DAM � NOT TO SCALE 21 EXAMPLEOE STREAM DIVERSION OPERATION(--_2� GEOTEXTILE DEWATER DIRT BAG GENERAL NOTES EXAMPLE OF POPERATION 1 NOT TO SCALE t. GEOTEXTILE DEWATERING DIRT BAG DIMENSIONS ARE VARIABLE AND DEPENDENT ON SPECIFIC SITE NOT TO SCALE � 1 0.5! 1 CONSTRAINTS AND PROPOSED CONSTRUCTION OPERATIONS. WIDTH 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING THE SIZE AND LOCATION OF THE TOP OF IMPERVIOUS RANGE GEOTEXTILE DEWATERING DIRT BAG FOR APPROVAL BY THE ENGINEER PRIOR TO CONSTRUCTION. DIKE SEWN IN SPOUT C� 4.0'-15.01 3. THE CONTRACTOR SHALL INSURE THAT THE DIRT BAG IS OF A SUFFICIENT SIZE AND STRENGTH TO PROPERLY DEWATER THE PUMP HOSE INFLUENT. FLOW A A PUMP 4. DIRT BAG SHALL BE REPLACED WHEN FULL OF SEDIMENT OR WHEN FLOW THROUGH BAG IS LIMITED PONDED DRY WORK 4 x DISCHARGE BY SEDIMENT ACCUMULATION. WATER AREA HOSE GEOTEXTILE DEWATERING FILTER BAG FLOW 5. IF GEOTEXTILE DEWATERING DIRT BAG IS PLACED IN EXISTING VEGETATED AREA ADJACENT TO AN �? a UNDISTURBED STREAM NO OUTLET IS REQUIRED (PREFERRED). IF GEOTEX LE DEWATERING DIRT _0 A A BAG IS PLACED ON DISTURBED SOIL THEN A STABILIZED OUTLET/CHANNEL NEEDS TO BE PROVIDED. Q PLAN VIEW uj PLATE UPSTREAM SIDE° ° 6. THE STABILIZED OUTLET WILL BE A MINIMUM OF 1' THICK AND CONSIST OF A WELL GRADED MIX OF OF IMPERVIOUS DIKE WITH x PUMP WELL GRADED _j 1"-6" RIP RAP PER THE DIMENSIONS BELOW. PLACE FILTER FABRIC BETWEEN THE RIP RAP AND o SANDBAGS, RIP RAP OR HOSE MIX 8"-12" HIGH STRENGTH SOIL FOUNDATION. THE STABILIZED OUTLET WILL EXTEND FROM THE SPECIAL STILLING BASIN TO z OTHER NON -ERODIBLE RIP RAP STRAPPING FOR THE BANK OF THE CHANNEL BELOW THE WORK AREA. �_ SECURING SPOUT TO LENGTH RANGE MATERIAL, 1 FOOT THICK PUMP HOSE 6.0'-15.0'AN TOP WIDTH PLATE WITH IMPERVIOUS p � 1 3.o MIN. POLYETHYLENE PLAN VIEW GEOTEXTILE MEMBRANE, 20 MIL 2 HIGH STRENGTH DOUBLE ... 2 MAX. THICK 0.5 LAYER OF NCDOT DEWATERING STABILIZE OUTLET Uj HEIGHT = a �1 PLAN N0. 57 STONE STITCHED J TYPE DIRT BAG AS NEEDED 1/2 BKF DEPTH MIN. SEAMS ` DRY WORK PUMP z OR WSE + 1.O' a o` a a s o HOSE g �� ¢ AREA 0.5 LAYER OF 2 -3 OW ___. RIP RAP 7777 I- I 1-11 I- � II-----I 172�7t � I 1'7!1`11 _; 1�_I 11'---1 I 1---I I ! a A 4 R � � - © GRADE o a a �? -1if IIf -EI1111- [II 1II II1 If1�I EXISTING LENGTH RANGE a- EXISTING STREAM BED �- __ ___ jjj ``' CLASS I RIP RAP, NEW w- �"' �' � �' GROUND PUMP6.0'-15.0' F4 TRENCH IN FABRIC MERSEY BARRIER OR FILTER FABRIC 1-1 MIN. 1 FOOT OTHER APPROVED SECTION A-ADISCHARGE NON -ERODIBLE MATERIAL FILTER FABRIC PER: :1 HOSE EXISTING GROUND \_ SPECIFICATIONS SECTION A -A DIRT BAG TO D TNO,PLACED ENERGY D ON 0.5' OF NCDOT N(}. STREAM BANK. NON -WOVEN FILTER FABRIC 3.0 FEET 57 STONE PROVIDE STABILIZED OUTLET TO STREAM 21 STABILIZED OUTLET SIDE VIEW CHANNEL PUMP OUTLET SEE NOTES 5_6 0- r4 _)i V) IMPERVIOUS DIKE NOT TO SCALE o NOT TO SCALE 21 GEOTEXTILE DEWATERING DIRT BA.G6 21 Know what'sbelow. C6111 before YOU dig. a PREPARED IN THE OFFICE OF: CLIENT: ,� DATE: PROJECT, *{{{{{{ Ili �, CARO ,.''.ESS.. � DRAWN 6 /17 CITY OF GREENSBORO o��, SOUTH BUFFALO CREEK HABITAT _ AND WATER QUALITY NG LICENSE #I" I3I©Z - SEMI DESIGNED ev: /� /� ( �'+ i 421 RALEIFAYEGH, NORTH ST., STE.6tXT �� - JLY IMPROVEMENT PROJECT ECT PHASE IV TI TLE: % ¢ REV. No.: REVi ON: DATE: oRAwrr BY: CHECKED BY: RALEIGH, N©FiTFi GAR©LINA 27601 : er EROSION AND SEDIMENT : �► • cHEcKI o sv: This document, together with the concepts and designs presented herein, as on instrument of service, is intended only for the specific purpose im e orl I PHONE: (9191677-2000 -, �t and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by t "'i, WRVS Kimley-Horn and Associates, Inc. shoal be without Liability to Kirnley-Horn and Associates, Inc. C@2017 CONTROL, DETAILS �P�fo'I"11111111e;"4 � L' ���` 408 NUMBER: SHEET NUMBER: Copyright Kimley-Horn and Associates, Inc., 2017 SEAL: !111{111 { V 012137010 21 of 37 I = I" ., 1, , I " -, I % � " " , i � ! I It, � , I V I , I 11 � -1 , , 11 , "I / t - , /_ � �, : ­ � ww ..... _1 -1 ____ I ". %�\ \, I I I � � i �0\/ �. � / � �".j --- - - - /, I ,7 11 I . . ;, ! I 1, " ', , , , I 1� 11 � , " ", �111, / I � �� - ---' / I -- I �_�" -+ 4 � I " ,� a I'', � , 1� I I , I it 1� � � \ & I _­ V :: ", -/// ! '. , .-- - %--� ,� --,, 'k"..", \ ! , i�, - , " ":, , I a , � 'I W.- ly .-1:­�:,"_`;�-,,,,, , , : , : :3 '' I I \ � , , ,�� I W � , _/ ! _%, ....v .. ��,� 11 : ." , I I � 7 � ,11 _,", __ " ,I 11 I I - � ­ . " I ; I , \\ I,, , , I f I , " ", , "� g, 1 1! )1._:_._:1'1 k' i�i , -_ " Z__ 4� i \ \ , ; � " � \ -1. , .�� � ,I \\ �, ", I ; , , I t � � ::;y ­­­' �'. .. - � , � .... / E, \',' `,,I`,:. " \ � , 1, I � V , �.', I - 117 ; 11 ;, 1 1 , ,-�:>� _. i 11 11 ��1, , I ; I I ; I � / I ; � d) I I , I , , 1, , " I I � � , \ N-1_.___/1 ; � I � k . I k � " 1 " / I I :::�::��:,-:::-�'�,:-� \-_,",1'%i- I . 11 � . 1, : \\ "', I I � I i I . � I , I , - , I , ilil I \ \ ,�� I I I 1-1; "".....­', \� �1? t ;. "I" :'--\).,,,, I � � ; I , I / 11 %....%.�4�.,�; Z . , , , , I �,­` , , , I I , I , !I I : :.?. +, -, - , , " C """,", � , I" I" I , �..:-:.---'.*-`: " ""', ., �( I i 1��%" � -_ -_ -_ _____ ,_ -/ /"/, - 1, ''\\ I \ , � " - -1_1-1 ..... � I i! - - - 1q, I . ­­ :. .\"-, , ! , , /1� � , e I . : -1 , \ "., \ ,� � : � ii , : ; : , , ..: .... � . ; 11 � i I I . . : S : I � " , , , i , " & � & i d;; A ,� I ­ - .. __1 , - - � I , . . :_ q -` / ,,, "i .-,--,, �,�;�`, I N , - I � Z I � I I f: Xr- I -��_­ . ...... ..... , I I . - ,,�., I -, ., , , . I C , , . I I I � I "' � -- , I , V : /` � , I , 1, - ­_ / � 11 � � "",�,"', , " , , , . I , , ,\ ___ "�,��,�,�,���,-�,.��'ll",��l"+",�"� 44 � I � I "I" "I I / I" tr 4 " ` . , � "", * 11 ,.". 1 �N .2, " \, """"', � , \ I , , � I . I ...... I .... ...."._", , �i , - \�� � ..." !". -!, ,". ,,,, � I , , . - 1, I 1\ I ", \ , I I ,,, I - _ � ... � ­- �.' : ,t.l �, ",..,-. ��'; , : �� L ,,, I , i " I -, "I - 1, 11"__ ... ­' , I \1 " ', .P ,..../ I , . ,� / 1"..\ ... \\ , - " - \ , " , \ , , vm I � i ,� - ­ .), -::-- - - �, / � - : I � " , , , " , " ! , & I � ��AA i I I I _;� I " . \\ ,\ / �;, 1, , , ,,,,, _ ... , � , ; ; ! _ I ! ; . �, __ - \ ; : � ,I, , \ """", , \ , 1, \\ , \ N ,1� � LA i_ -o - I "' , , �. . i / 1, "I , \, \\ , / ;+ , I I I is 9F- � - �;� , "', �-,:, 6� \ ; " 1� M ,\ " - " ,/ I ; � ­�Z--�--�, --1 ,I , - ­ - /,� _.'_/ _ 1.� . " , 1'­,�­­ � , I. I "" , N I \\ " / \ \ ; " I - -f �_ 11 � I I_ i :;:,:j�;;:� . ... ........ ;" - __._ , � ; ; ...... ; . I I 11 I , � , I , IV- I � ... ... -­ - .. +� � , 1-_-.-.-_ 11 .., \ \ + , \ - � j ___S - , � --- , , . , . �,/,� ,.", ... � _. _­­ i I" " " ,,�, �, " / 1- \\ " / ,,, , , , "', , \, \ ____ --- ­111­11� ... _" I- I SHEET 28 _-I.-, _:� I- I I ; - --- . , � / '�� A ; \1 I � .11 ­ _�._ � " � , � " � _- ­ _____ M� TIAT . I .. ..... ­.. - / " , -­­ , , , , �\'%\ 1, " ..... / 4�, " . I � � \\ ,� / , __ . , E '11, , I I", � , ,�, ,�, ,\, I \ \ I - 11 " " , '�'+'� - - -�,+�-i.',,';i,--`N ........ 11 I / a- I , 1\ ­ ­ - - _____&­__�:­ '- ­/ �*. . I I I/ ", . -.171 1, 11 , I'-.----- I I... -pr , � : ii- �!-­, \ , .1-11 ........ . I 11 I I - , -1 .-: el . :+:4*+* ' -1: * 14_ I --- 11'i - , / ­ ..... , 'i, I . _,V\� / / 11 / "'. , , \"� �,�� � � 11-1--_ , " I �11 _ __ -, _,<�+: +"P:_._. Z; : 11 I \ \ , , ____1--1_1 __­ � , -_ - 1-1 .; , , .�_:� , I I _,�,V% � �/ , , �1� � ,-,-- ,,,,, , i� - -, , , " _�,4:t .. '. ': ', - * ,5 ... ­­­ I � ,/ N I "I �-w �� "I � ..... ; - -, "", — - -�- ,; . % / ­ ­. . I - 4"�*�.%i . ......... '11--__ ..... .. 11 � - ., * . + ; 11 1�1\ / / ..... . . . ............ I tr) ---------- �-;._ ", , * I * I - ,�"""k�,,-��.'..--'-*..,�.,--,�-,..'- ��:�""..�'.,','.,:�-.-".--,��,,,----,z-z�"z�� 5�� � \' . ,.,�-e_ x - �, , , , " , , - " . I ,,.. . i . . ,�� ; '- ' - - -- -- ­­ _' ­_ I I ", "" i�­ - I �-:-X,% . ", " I I ,/ // . , .... .. ­­­ - - __ ... , __ �. . " - . ,:�,�:.��`.: - . ­: _,___�___ ,,, �_,_.�, , /'/ _ , " ", / I .. - �i __ � � '11_ � ,,�A / I 11 ,-, ,,,--' _-,,_--_"::�, -- __ -1 — . , � ! I , __._ _, � . , -,N-:.�,,.,­ / I � 1\ , N / / , // , . "I - / I .1 . . . ­_��+ .*+*:,.,: * - + - , - . - . - .t,: . , _­,�,,�,�­:_­"4� V6 11 _ I I _+�-,, .- I 11 - '' , _____�__ I , ­_ - .. I , . �.: .,�. . ix. .,;-+�".,--+.+++..+:..:+:+:-:. .1-1. %',­ .... ­ ­1�1!�111 - ­_ /�_ �" , 11 I ­ + I , . � / ."�_ _ _�,: , - I :-:-:.:-:. . - . . . . ... � .:� � � , ­ " , I SHEET 23, \ I .: n::__,R,'­ __ I ___---- . - �,�, , - 1P, ----. I I ..'+ .. + 1. .... , , * +: , 11 \ ­ " �_ ­_ .,.,- _. _1 _ __ - -_ - 110r_7_1z��, - / ,iv-, "I,, I I . .1+1.*.1.*.1.*.1,';*0 .'.'.'.* ,,, , \_'\.. ,,, >_ 1, 11 ; ", 1 , / /.' // I ,'�`. ", " � . .................... -11111 _ I .:.:,+ .�....%..+.. + .*�-'��,%-.­ +*,. / - + ;1�1 ',_� I .'_`�;/, ­- -, - ,�,�,,�� ..... _., I / / !I \\N,, _%!M,��w / " `11'1%1' %. \\ ,\,,�,_ \""' `­ ---� �11.:�:_.­­ --_--A , ,�:::� lzx_� - �, N , ,� " t :*:+..:.* 1-1-1 I- +.: -:.:-:-:+�1�1?x "', x, 1, I / (" I "" - . I .V ---- --- In:: +;x�, ...-:-* -,--. � ". �>...,��.t�-+.--�+i��1--�.-..�.I ,4: 1. \ , " 11 , , 'N�1\ " � i � ...... . . . ,%, ", 1_:, I , / /­­ :: . --.-.I- / / ///,�/ � ­­ - Z ! , I - __ ­ ........ _111-_ I � -.:-:-: ............. �1, - � �. i , . I / I ,,, \ , I I _ _ - - __ - �\ �N , i .�.;+� 1* * - '% -*+ -*+*. , , ztx- ..-+ -:;!�,.+-, .. '. -, ,\", I _ " ,:�::��:� - - , -- i \ - � i ... /I . ,� ". -. %-+-:-,�-+ , ,/ i / I'll - � - I vql, �),� -­,"", " -:.;� _.", " -1 , i ___ ii: , \ , \ __ \ / � / 1� .,/ / ,,, '' - - -I- _51 I ­ , , + :* �­... " . x . � +,.., e , I " � � - , _______1__ _ ..". I— _1 ... _ ". ..- :C1 ,;,7i � I , * ; t , r - .... : � + � , 'f� " :.,� *:�+ -� . , ..... , �/ , "I 1\ I / // I � + , , I .... ...... I . ... I-_ ­ ... ­ - -:-.-;-, - -;� - --' * * tl,,�,�:-.i�-�i*�:.,-*.,+�.--+-�, + '--..; '. " . ?:" . " //-" \, ,._ _ ... ­ ... 11 I :, , ��_; , : . �N t.� � . ,,, /,�- '111- - "I". �, , , , - - _­E�:_ ���,P_�!7��,� ,-, ­ , ­ , R , ­­.----- -, -+.:.:..-:.+ . , I , , � :., -I,-- � 5 _, :_--",_,�..�:'-`,:.,,: ...... __ - " �'. � - .... __ :+: '. - - E��� " , I . . . _�+..? , �_ 11,; - � ---- I \\ \,\11 1� .1 � \ .. , I I—- , �_,�, I- I I I - , \ - � - -, � , I . I / , , � , `� i � 1/, / ",/ / , " , , , - , �,-,R .1.1.1.111" .1 �, '�, 1. : I / 0 , 'I" .. .... ", , , , x I '_ It __ - 'I / I � � 'I.,.,.,.,.*+% +:�: ... -*. -�. I , `�� I , r, . � � _____Ia�, ". " ­- � ... I �"i,\ " �-, " .._�. 1�1 , I ... �;,�_ ­ /1 " ". . 111�` , N .-=�__ . , _�:�, - ___ - " . .. .. -1 1 N � , \ ,'� - -_ --- _� _ 2 * , * * , , , , , . . - - . +, \ i ; / , \ " I I - -";, ­�_,_ _ , :�,.:� ­ 11 , � - � " 4;t.. ._.+... -- * +:. � ; 1. i / '11'1'­��' , (/.,__1 -k, , \ " I i� � W"', %, ,,, , � : �i,-,`­�:� ... _­ � - " ,,,,, _ �\, - t % ,///"/ / " ( // /Z /" / I I I ! � " \ , ___ ,� A� _1 I .1 ,/ '-, / �. � . .-.+-,:�-+.X..--- .� � - + + . � . . +-. +.,.:*�:+-'.:+-. . \ I , 1\ " : ,", I 1 7 ,, � , I , � - _ , -,.-,,, ­ ... -, . . . .+ �;-:�- -,, .+-:-,-;, -+-.-.-+ 4: � j / � .. � " r.-,..,---" I �� .., _', I : 1� W" ,)I' 1 1, � Z . , _ _', + � _,�X­ .11 . .,.*,*.,�*11, . + . . . . � .... , + . , , . 11 `---1 .. .... ,�;� / ,�: ,� _; ; "" 11 1� , , 1 /� , / . .. A , " , U, 4" -1.1 ... ­ .. .. .. ... ­­­­_ ...... .. - , ; � I , " , �,,,�,' ". "� ;:� , ; , I . I - _ I -4�� ­.. g I - ­­ ... :+:-:+.*.:-:..+.++.�.+.....,....+,+,4�+++�* . , . I �,� 11 - _ . " , , ­ , � � \ \ I I / / ,/ / � // ., 1"� . � '_" - . -K.- +- - - .... " : -\; , �� , ­', I // ,/-/ - � ; __ �z7�, � .... ..".1--l- ... ....... m I— ; I � . � .,�. ��_ � � / // � I I. __ __' - - �;;11-1 " I'll 6 ", I " - 1 11's"'Y14 ,� � ��,4�1.1 - - - '* "' \ n �, ,�.` , -1, , / , i .i_ � , , 1�1, - - _'�11 -, 11=1 . I! . 1: . I .. .. " - / / I / , ", " " ... ­ �'�' . .-���-,.*-,.,.:-:.:.++:.:.:.:.:.:-�� �, 11_� �: , , , , / , "', _____ - t�. t� . -, . : , I , �,,� ;" , � I I _ ___� _-, " " ­_ - _ - I " " /, " � . "�_ , , " - .11, �­ : . -, _i I ,:+::: , * +'!' , '_'; I '11'�� / / - t , , / 1, , _ "I -;,,,, -1 : .*.+.1.*_1.1.1. . .% ... � .................. ..... .1 , ; � �, , - I / / ,/ � // ,�, I , , , \ " __ ­ ­ ­pR , , I , . � , � 1. . I / I � w j I �, , , ,+: � ­ - --"--- � , ­ - -- _,"', / ... "' ,- -_ _� . "p,!j : I ... ­ -,jn, -� - - . � :,. �� . ,..*-:.,-:-*.:-:-+-*�-+.+*:-,-*,.+-+.:.:.+-:.+-:!�"+!*�-:�*-,.+.. - . . � I I 4, I 1 . �, 1; �t, ,� , , ­ ­-, --- � : . i� .... . - 11 11 /1"', ; / / , /// ,/,' / /I/ -- � , , _ , - , .11 ; I � I � �� ,�_. ., ­ :::,, ­ " " , '.1 � .. ... �� �, I '..... . -1_ ­ ... I ; . I : ....... .�I�: : * + 4 1 11* t..*,. -� 11 I " I ',','_­._ . " 1. I I , _ / / ,/ // e � , , -11 1+-1 '' : +­..... 11 ::,-.., - � .... : " � - ----- � I / 4 `�+ `�11 t. - . , /' I / �zl � I / / / I - I " , 11 -, ; I 11�', I", .1, . - - I \11 I" I ��,, _�__ ' * ' : - � , .: , _.�4� \�\ I � I I ,,�//,// -- , � �, " _­ 11 _ , ; I . . , \ . .... _.,_ ....... + . - -X4' , � ,�/ e, // : (1) 4 , * + * , * . .:.:.:.:.+-..:.:-;-.*'�.;;.'�:.:-* + +­� 4 X I , I . , ­::�::' . , "I ; I ; __-.1- . ...... 4- . 4X -X -.-X t - � , , , 11 --- ­ ,- _ - ,� I , __ ... ; �, I " I :� - � 11 / ....... � . , \ , , , _;, , ._­­ I ­ I I t ;­,"', J - � . I � , , _ - .. - - -1 : - . : 11 I � % � " ­ , ; : i / I , E , , � , , ,� , ... T _ ....... �- )! � "'. I ,�` / /'Sam I I !� , + � .... V ... "I"';�\\/ � -, -, - , ,,, _,�_-,/� I /- �'z Z�, - t + / f ,;�/ /I , , , -0 _ 11 6,41 .��. � + � , . � .... � ... .... ­'/ , 1\ : \ ,; -:r - � . . ....... � x"'; i i I ;-;; - � � " ,,� +�,+t*::-:+:.:.:+:.:+*.-:.:.:.:.,+�,.:7:��.�-��.� I * ,\ _.. "" ­­­_/� �, I : ; / . " / I - / . ; / / I I , , ." , �&,, I- " � ; � / ; , . 1. .... ­­­�"v_, ...— . , I W, ­ / S I / / / // "I / .:/ / _1/1�1 I , � 1 \\ ", I ;Ili; I -,-.,� -f,.,�r - ". ., , - , / ,,;�� 1� 41) i _,�'! � , �� , '11, , '11, '\ I- ..... ; i . , 1. - � "' `­­ - �(111 . � , _ i : , �, ,,,, "'.." ::+-',*+-:+:- - ��? I \, -11 , 1/_,.,"-.' ": , I / ­ ­ - - � + * * ­ +�,. "' - "' � , \ ; .-,...�-...."-.,.,�,.,.,.,.-,-""-""--; / I I i - . I , , � . , VI/ I - I �­­­ �� , . .\ � . . + ; ..: .,. . +. � . _k,:;),t,� , .- I � '\ ; A "...; . % . , -.,+*+,.,+*. i� I - -, / / , /� /; � / 1, I ? I � . . I . . � - 1 " , / - -- , "I "I 11 .11, 11 / ; - � .� + : .+ : +.:� .:. . . _� r, //, / � -- -/ -,/-I , , 1, y i I"! i�l \ ____ ........ r / f _ J� � . .,. ,�.-+ . . �--,_-,.;-_1`1 ".:— ., .; 0. I I/ , ,.-±"--, : .� - , _ 1-11, , " �, i X --�, �,� - -, ---/ � ,�, .. I :­ .. � � I 1. e , - 1),� - , I � ­ �_ 11 . . , .", . � � 0 . + + . ­_ - �­ � + - .- - _:".- 6;�,�-,? /, , "I i, ,,� 1, I A , I _.. /1) 1, �1, . . , � ,� � f ,­ ... - \*" " , * * "I'll. ­`­ I 1:1 , , I � --- , . . z ­+ � ,­­_', " , , , _111-, - ­­­ ... ­_ I , I " . I , - I - , , ­ I ­ ,/ - '�� -11 , ­:��,i,__ `;, -, --\ -- . // ,/,/ / / (1) �� "O ,,, " .1 1i �? .." � \ \ '1� ,� ..� ;;, N, - ; ;, 7 /, "/, , . \\ 1, - "' :: `::x. . I " ". � = , .,�_ y `// , � , ,, "\ 1:. 11 ­_,��, ­ " �% IN � . ,1V . _+,;� 11C., -,11 � 4. . . / - ._ / , yv�,� , �� 11 / I — — // �/ , 1 / , (n Z t, "",�� \" ; /1�1 -- --- __ ...... _ , - ­ ... / " / \ I 11 . . ; :,4 � .... ­_*�_�� .... .. ... � ....... 1. , ". � ... \ -, O', ; I � /,, " / /' /,// � -- " "'.- �`.,;`,, `,',-,`. ,\ ... Z \ I " � 1, \ � * , , 11 " :1 , --1-11' /.111 ,:��Iq, � / /� ; ': / '. / /; /, ", �_, .. \ ... __ _ __ " ", 11 I / " I \ � / I I " � , ,z- ; , " ­�,:�_: __ ,I -1--_ ..... "-' , / _�� � _`­` / / � , " / /,; ,/// r,-- - / 11 .. ..... :_,_/ , - — - � ��', -\ �,,,, -1-1, 11 i � I \ \ ,�+-_ - . . . ... e . .. ... "' ,. � " / , .- .- 1�r���=F��4DI ,;/, " \ �, - Z — -` 11 "I i "I 11 I , . ", I ....... 4 - � / / . .. ",/--1-11 - , / / � "I / ,;, �', ­ - \ I �;, �_%_:_+X_.-._ :: "i '_,­ - _-L ;,?�, _­ , , , \ 1; \ � ,_1 x . � + , , �?� 1�_`,_ 1�. I b.'// ,,, , � +, ,,\ \ , -__1 , I / ,� 1� I ; 11 9W � '� 11 . , AR \ � ...-- - , ,_', . . � � I I --.I. -I .... :� ...... ,/ , ,�� ��, / // ; "-"-- , - - I __ - ­ - .- 16 - \ \ , " / - , , , V,�,� �1, ,,;.",\ Z, 11 � '__, , _--_1 , , ', " \1 \ i - � '. , " ::- . . / V i , - .4.1�1,_�,I,',_e­ ,,� ,,AP'- . 0", �* , J� ; I ,11�,. ,, - - - I \ I \ " , , � " 11 � 1. �, . + ��,V e., / , - �_ , ; - - I—. 1-1 - I - ) 11 ++:_.�. - ,g,�-�%'.:., I �y . i* i, /:�',�,;,'. I , I j � , 2� : i% . � I - I - 11 > �, � I 1� 1, � 7 - - * * _ -1.1 ,�. //..- / , - , ­\ `� ,- � I I �.�. � � . - -:.:..::.-:::-.+.. L�"­ 11 - -.-:-.'�,+-:.:-.+-.-�+�.,.,...:+:.:::� . , \ N, I , /�_11 � , ,­­ -, " '\ , " /, ".�7, 1 , �' I - , , ,,\ , '. ", +* .Y , **** , " - � "I'll � " � \ . I . - ­.... : 11 I + . ;11 , " I W � I '�! ��,z .- - � ; � I - ,� " " , :, e�;11 i ; I .�_. . . -.11- , 1W , /I -_ - -_Z��,�,-� :::,-.,.+ - _ -- � ,\,�, � V , I .... � + ` - I . - - ��2� ""; I / " - - 11 +,�� " I ." .t ,:+ , . . + . I � ... "" ..:.�;� / - I " j �� , �11 - 11 . ..'...'........ � ­­­ ... "I ....... ­ -/ , 1 '4,1 \ . . .I.- , ...... 11-11.1 ..... � .......... _1 .... I �, ... -�,_ - - ­>'---�- -=7 / - \ I _ , _ . � , _ ; 11 --- , .. -1_.,:,_ � � , , t4 ._ -, . I ... � �n / I / .. 4 . : , ""/// / - � ­:��', / /1 " , , 1�11 � I , ,� I T�� : � � -, __ _, - / I - I �/ " \�, I . .+.1�1�4.1.1.*.. 11� , "" , _. - , �� . o ­­ .. ... .... . . ,',,,-,<,, �< '-,-. . I / / ///�, _ " I I I t %, . ­__­ � .... ..... "I. I I _ � � ? / -1 � -, . I - ­ . �� � , " I / I .1', "', _ , , 1� -V. � ,.; . /r". ­­­ tr. . I \ ..... -, � / �-, —wel;- - __ -_ - ­-­, ", ', : I __ - - I/ ".., '&WAWAA.� , iia ;\ -.1 ..... �\w . *111% .1 1: i , ,� -_ ,/ ./ `�` I /I , ! I . I V, ____ -1, , , - ", I , L 11�, , / 1/1"' ", 1_� 1� _-, /� "I, \� """, - , \ ­ ,� /,�, ) .1 I" _1 ... -x+., ;�,�,�, I ��,/, 11� . / "/' .. / "/ - � \ I . I-- +_-X� - /1� / / / - — \ `__�_,_ I ..++.. , _�', - ....� ""', " , , "? _____ ,',,-, `_,�,-"�""'­,'-, I ; %I ;11 I ­­ 4+ 11 il - , .*,;�,� 'I �:�-........ , ,_,� �71 � / / - � " V�/,X /// /� fil�, / i ___ - ___ 1_'/1 1�1 __ " /� ___ I , \ /11, - / . I \-__ �', . � - //,/,- I I ''A , / I I ; ,_,/� I :! �', ; � 11, . I I --,. I 11,11 .- 11 1 I ,-"-: '\ �­­ --- ­­­� _ /�/ I Z_ I I 1�. ii .: " //, / ;� � I 11 // li - I i �o *\ , _ _!�_ " ii ; //A///X�, / I" ,/ I � . I " I X . - � 11 . ­ ... -1-1.1.1. _ -- ­-, "�',�', / �,�// /,' / \" � ;",/, .-I-1 ­", I , "� \ ­+;�.;�, I'll'. -1 ,; I' � ;1 // . __ , ­.. 1, /_-1, _1-'11-1 �:­_ 1-1 .1 � ; . , , _� i. __1 , � , ­,,,� /\. : � ......... I !, T ,� :-­-�'�� �, -- -� 1-_-___ ...... . 1--v, ­­/�_.,�_� .......... , I I :il 11 '__­­­­ " ; -_ � �1 ,�,�i,�­, I .� _*��­ I I -, ,/*'\ 1__��> ,/_,", - I" / _// --- , " .­­ X.,.� I " t % �* � �.:..",\, , , -, " � .,. � I - 1� " .1. 1-"' / J - .� 11 11 s " �, :. .,. _-_ 1�1'1 , " / /, '' / _ 1:�1:11, ­,��,�,­,,, � I I \ -�;--%-��,i -,..-.. 'W i I __ ........ ­ " " "_,_ 1/_1 ,I, � ". � / " I � , _­­_ I - 1; - - --;-��� i , � " _,", I" ; \ �,/, _ ... � , -,-,-,,----,',�,-,,,,--,,-_, ,,;`��"-,�-- SHEET I ;;��_� - I - . - ��_, ,­' I � I .. -.-f - " , , ,,�, \ \ ,,,,,,, 4 , -�,' / __ V0"w SHEET 26 /,,,', 1�i� _� , - 11 ,� i ,� _��, , � - --- - ". _ � , , " , /,� __ / -1 "! , � +1 . 4 � ..... � - I " / I " " , , 4 , I � \ "_ , , , , , __1 __ , ­ , . 11 ,_ "I -:1 ­­ ..... !­ --.;,. - : �­ - lz:z, ,,� :'_'%,, . " /1,11 'If ; ) ,� , I . / �� �­i ­ -Fo-75--vp , , - , - - , 1, -1 I .,. , 1)� \ . _ , I . .... __ - , " ; - L I _1/� �, "- __ - "', \ \ ,,- ,,�, ,.�­_� " . - , � ­� I 11� . ......... ­ __..." 11 , , ;�� ,�o - _­` 11 , /; / ��� , �­; � ; -:1, ;_�. . . ... - !, I _j I i __,I�z � . , .�­ , �, 'I', " 1!;[ 1 -71 - , , ,/ , " ... , .... . ... I_, �L� , " I 11 . ... .... ...... -_ �, -W ,�, -11 ,x" / ",/ � " . 1, , " I - - �._:L_ = vl`: — �k­­ ........... _��;� ""I", �, ,,',/ - "I i " _ ­­­. ­ - ­ , " ;!..� � - , I I �". - '� "' / " - - _.""; \ � .1, : I I I ; I ""!-x " , . ; ��� - - L 1/'*., " (­,�-,.-5" 1 1 1 \ � I 4 " 4 I , I /� :�/ ,­­"; � '. �_�, I I 7 I -1 .... ... _ I I — / It" ... (/ � - , , , ��: , , I �_ ,_1 "' " -, , , , , " 111__�' - -/' / , I I I . ..... � . ....... . ... .)" ....... � _,��; 1�;_ ­�,�- � � � I/ , " 1�;, I , ­­� , ; , �, I ....... 11, ­ . , /I 11, � - "XI 11 I "__' , ` / , , / - I I / '.1 - 1. :;4, � , . ./ 'It,�.'.'� ., ! 11'flt , ��, �� I ,., 11 \ ... _,; �, � " 1� I , ( � �: " , " . ..... ..... � , I // ­'.- I .... / -11 I ?_��_ J, "tpr / z / '_� I 11 .1 �,; "I ,�? �. ./ i1i I ;I,-,- \ , �,_',` i "' I - - -1/_ ��.'.��_. �, ­�­ _�' . �, / / / / I ,� " " _... '.1 : �� A'. % I ­.. ­ ... ­­ 11 +.1, � ... L:� . _ _ I\\ ­_, \1 . �� f�� �, ­ ..... . 1� I / .1 , �, 11 � " .... . � .... - - /, " ", � ; .� - , , - _ I -1 -.- - . - ­ . __ �� I— '.1 , . __ , / , 11 , /_ � 11� - , , ­ - -1, - IL .. '-Q �� � � , �'%-Z- / -, � ` 1, -��.+--:�-+, �,,� ".", \ / _� ­_ """-, ­ _ 1. `11�` _ , �; -��, " / - , 1�1 ." '_ ", / / , - ­ . I" i ­ >`-:." . i ­��_ � "I , " , - 11 I - �.�. � t ,.,,; 11-11 .., + * _�`�� , I 1_� ,11 _/.%i , . � V,__ i / ­___+� ­­�' 11 e / , - , -1 -, . 11 _-1 / , ­ - � /$" / , � . ; ,� 1 _� " �� ,�', ", " - " ,-. 'ei, ,/ , / / 4, \ .. V'i � i ___ I \ \�_, -11 I .... _ , , ___ / �/ 1/� I _\/.',/ � .1 , �1+ * -�:,�'.'.'� I - I j / \ .1 \­'� " , , -, S I 4- ,_L�__ �� "I _____ --- _­ /, -,/ , " �� I 11 ` -11 I �', 1\ \ I I .... g, t, - _�� 4`6,11ii "I,. /11 / / /" --\ , 11 // /I _ .... _ �' I : ­ / , ­­__ - - .:-*-,,�', I I -e lrl.� I " ­__ _>__��,.,., --1 ".. I ! , ,!;,i-, - / N, �, I � ... : . _.­ ,.<. _- �� � ' '­ 7' , _ - . - - "I _1�__ __ _z_ — - - __ Id- :11 I r " .1 / - / . // '11p/ ,/ " \ _ : 1,�� ... . . -,,. _-, � I , I I -,�Z­W__ - -1 � / " 11 I 'I, v:: : -, 4_ - - - - _. �� - �� � - z. -_-� = - --- �' ­­ , I , " " � / \ /, '�,_ �_ 11 '_'_ 11 ... I - I �� � + " I --�, � - �-_-�;___-��_, �F����T- E� = =. =. =7= = = �__­ I , I /, I \ ,--,.-��<!j 'L_ ­ , ,,, , " � ----,-, - , - = &_:= - _,�', �- �', I I ,A I I " \ , - _­/ kl' I �_,_ I- \� \ , ,�, " _�_=�=,�,_ �_ - . -, - --7, - - - ... ­,-�:7. ; I - ....... _ .... __ , - .... .. _ , - , . ..... !�:---- - " _. , r .. - _.11z I ��, 11 I ; I �, � i ! 1, � I , ;�, " ­ ... ,_ , ", ".1- ...... � ... ­ , I � i - "" ....". -_ I I _' -, -, - 1, I .... _ .. .. � Z�� �-11 �, /, - - 11 / / I I I � (�,I,�— ,,, I., ,�, - , __ ,""';,,�, ­, \ ..... " ­­ �" "" ..'.." ....... �, ­_-,�_-�z,zzt:�� i " 7 \ ; I __ " "I : ­- 24/' /P 41 ; I q __� � ... 1�.,_1.111­ I .i / I., ! x __"? -P,mi, .. I--, I I � / ; / __,__f,�, ­-/ _1 \ - , I 1, 11. / 11 . _\ ��"-- ­- ­- , �� :,�, .-, '�, ?"', "I ., � >� �� , - � - ____ _. // I , - . : � ­�,,�, \­` , i ...'�� I 11 , �', � I I .� '4 ;____ " - .11 1-1 ­­ -, ____ - __ ,� 4�_*�111 ... �� I.,-- .V ��,;��, � � i . j . / , " .'r --w- , " �,�:7, , Ib - -E� �� i / -m - , I- __ -� " .­ �, _­ - .. " , \'A� ";A, I & - / , rr,�,� - 11 �� - __ � �, ,/ ; , (, -, - 11 " ;,. li�, \ ­--­ I 1:__1 " '11�� ,,, t� ... . I I , _,___,�__ ! I I - "), � I k. \ - �� I - -1 �, -, " -, ,,,�.. - - li,!,, 7; �4"� _� , I Ai � ­ �r -, .� I / 'i N I .. ..... - _� -_ § : '/ , W -, ��-,,� -'-- , " - ­ I I - ) , 7-�T,Fr,`F_-,-��4 ...- - - ____ � I \,""', - I ; � Ili- , ;�-:::,.-�;:��77,�'�_, ,�,��'�--,'.t.�,�.:.��-�.-',�-7��-,+��-�z.�-,-- <' .... 11. - — — ­;,�­ �. - ;;; - - 11-1 ­- -1 - � . 7 � -,,. j; 1� />97v- ", / ,- _f�,nr noR!'=-�� \1 -,,-,- - _ �7 _. - 111�t_ -1 ­ � , , - ___ -1 __ - �� � - " i 11 /I ".11 - �__ � -,��,, ("�,. b, �,._-..-=�'-,--.::,,-­� ­ ­ 1�, - _� �'��;7`:�­- 7- .. _ ,­.: ' , - - ----- � �jj��__, I I 1�1=�11 I _ �_.� , , - ,,- /I // �.:, . ..... -11 I ­ �` 4 , � , 1��\ 7_1��,J"i�'ll�t'IN��"17�:��l----- - � � r � 11 11 � - — ­ �.-_,�. __1 --'-. --zz� , . . - ­ ;11 �, F \ I I ­,;�-: -t,�,-,-_`� — � ... �1- ; I / , �� -.1.1' , I , 7- :14�__��;_�::,_­: �_ � _ . ...... I � �__ .... � ... 1k I 11 �, ­­_ I -- ­ -- V - Z V�,�`, � \ /. �, I I � A, , , r- ,.--,-, , � - ,_ I , / t-,, /-" - , ­� - _ r�. - - , , * , + ­­ A =:_� ,�� , - - I 11� I , / � .1, , . \ \,� -_ - �- I - - - I I 11 , . ;_­ � , ­ - - . 11 I � , .", - ,�. - gA 11 , .,,,N V, ­+ -, " " I I �� , -1 - - _W-�_ ,��_ !/ , 111 I I - -_ n i \1 / a ­_ , ,*, 1-111 -11 11.1', .7..+��.i,tt��: � I',, �n,_Z,_ 7_�� __ - - " ��­,-..=­ - i " , ­ , -1 ��_�_ _ __ I \ � 11 , 5 - wk � ��­��- ��_ W �_ 11 ,// I \ " I 1_� �%�t� z ­ - . I I , .. ,--_,,-­­,-,��2_-:�, :::- �� I _e _`­_ ....... �� - , �_ : / 1-1 I 11 I- : - r - 51 5_�,�� 1 / .,.-----,-, ­ - I A , " / - ; "I" �.,; . " ,� ,,- I I _­- I_ - �� --\\�,N ,,� ­ ,; � ��i,;,� . .. ... ­-, .... ........ . ....... " "I - - - �_ ­ '/ , � - ... , , � - " � � ��. _­ � � _�, 11, 1 - �'�, �11'.1-33'. / \ lf� ,';�/,'/ I- 1�11 . " -1 _.:�\N��­�0, I ,�.� n =.-. -. -+.;.- -. � - _K11 ." , �� 77_.��? - , .�� _� s � " , , i / \ _1� 111ax- ­­ I , , \A�, � - . - - . , - - ,\- .\� � , ... 11 \ , - // i /I // // � I . . . . . I . - -_,:�; '� - - * ** , , I'll ­ . . I �` ��:-,�. ��\\,\ - .", ­: - .... � --- --- ,/ ( / / / 1, I ^\ " / � 1� -�-:-:..x - �\ /I , � /", I �', / 11_��' 31- -��, �\\, , - :: x.% I � " I I / , '' I_- - ­­ _�,_ I - _­ — � V/ ,. I , � / / ." v, . - /,� I �\\, ", I : " ��_ /� __1 _ - , - N..- - \ / - I I �­ , et4� ' - . +' ... -..+..++1. ....... N, -- / & I / , - - --- ' % ..... +,.,.,�.�,+,. 1. \ \-, ��, " 1 / ,\- "i -+.�. F / - � \ * ­ '* ' ,-*:':*:::, .,.F,. ....... , ;, � %'� / - - L_ . I .:. f -�4'�� _'o -,�...- - - .++x - .. . , � / . , � +, . - I ,. I I., , � , 1, 1, - - - .:.*.:.+ . *-+.X*.X.+-I+.-...-+..+..,- " r -- --, "I , I ,�e,;"_,_,_ , ,�,� 11 � ��\�\ -.'_�' I - - .++.4.++. . .+, . + , I I . � . _: " , 7� . .,�. 1. + + � \, ", " t ... \\ ,�� __ _ , I //�,,, , ,,,,� . + �\,�' I + , I -�,- r I—— I-, � I "'i 1�/,, / ` \\,\ \ � ___ ". _ t-��:�:: -- - . .. + .+� +...+.%..+.-.., , , __ t / / y I __1_1q . ,,,, / -.11 - 1�� ..., + � i � ,,�' I 11 / . - _ : _ _ _: : "; _ .11.1 - I , ­ "I " * � I . - , � / / _ 1. I / ....... X. � ... - - ; -- - 1_�___�'_�,_'R_,'�_ -11 -11 -.I., , � � I ,� _ - -_ ­ _ I �-!+�.:+.%..+..X+X :_:_:.X..ti.:_:_: + * * + " ... F � .1 r ��;, // " ­ -,--: " \ ,� I , � / / !�4L V ,_ "I , , , \\, - I , ��--- -, � � � " _­<�' ,., - I ; t �� � - , - __ � - ,;:; * , , \_11 ',�� � ". .........%+. - . _ . - " , -11, j / " , I ::� ... �.�_- ­ ...... ............ Z i / / " � ,�_.,.*. � .... _#,� ��`..*.H�� ,.. , ii I - - - - � , �,­ , ) �// /41 . I . . . :.:.:+*+ -.X .......... ...... � ....... I � �' / - ,� � — 77��"­',�;; , � ;, ( ,� ',-,/ , " � 1 , / / \ . Z,­­;�:�'. __;� ;::; _* - � .......... � ...... � ... I i � � � / . . : X.:.:�:-:. .., �4�� -1, " , _46 -_.i�� ; / / e , .. /'( .. ... ..... �. ......�+.....+...+.. "' I 1 ,,�-/ , I �� ....... _ //;/ : / I I I * * I ... � / / ,/ I " * : .�"/ �- --- -,-,- -_ N. . . - !041%*;�* ..................... - ;,/�/�/ , � - I I I ,_ I ��,,�, ,I . � ��,;, , , � - I � , 'i�l - - - , � , / / , , ,\ I I \\`,��, /­_ _,., - - - � ,,v��,;, *. .*-:.+-+ . � + + : +*_*�. , I 11 , � . / - ,�, j -1, ,�,�11 ,/ - , ��" ". , � , I . I � :., . , , :�,-,­,--��:- z= = r:7 � ��_T .... � . . I *+Xi�,X,.:.!�+.\, I " I , . ­ I , , .... . ....... *+%*.*. I . _­ - , �, , � _, . , , � . /,,�/, IP' �, ,,-,, / , �\\! " \-""� I I . . I . I I ' * ... 11 , _�__:, I , , " , ��-__ + + -+.�%%' ' + 4 * , , , � / � I �, /, I /I- / // '� I 11 ", ': : . .�� - " I I - - i , - �­ - �7-.-�.-:-.-.-.-.-.+.-.-,..+..++.-+-+..-.... � � .... I . + - " \ ,\ i , " i '� "\--",(, " ,� I � I I \ ,T.,�. 1� , * ............... � , * . . * . ...... , * " _11 "I � - ,/ �,, 'I \ - g "- / ,,, \ , ,��ir_l�-1--l�,�l-_-:-----z,-f--- t + + , + . !� + "'. . + . . . + .- �, "), � , , . � ­­ ­. , - , , ; I � -r _;�:,�,��.. I— __­­­_�__*_z��' "'�:��' - , * I I , I �, ,� ,� -- �. z�,:_�- �; , i:_ ..+++�..:.:++X'1 . .* * ,.:-:-:.:.:-X.,+ .:.:.:.:..+:.�+�*..,.:.:.:.:+.-'+'�:.:+��,-.+.:� /", \ , , ?1'i I �, _ , ,�. - -,..,- - ,kil � I � , ,��,/�� , , , ,��,� 44�� . . .... � ..... ­. . �­ .......... . n I i /' " / I 1�1 I . I I \ \1, \ / � ; I -, ­ , 1, I ­�. - . + , + . . + � :. ....%+.I.I...... . . . " ! ; I . I /V ,­ .1 - -I 7 I ,\ . _­1­_____­��:_:=_ -,4�,�'-.*.,-.*.*.:.*-+..*�:.,.:.+ .,.+.* ........ � ... � . I ..... I . . . .::. - .:.:,:.:.:.:+,+,+* "ir . , ,� � " - -;��/ ) \� I � ,_ �_ ,� \ Al, " / I I : '==. �,`*'.'.*-:-:,-�,�,+,-:+, , * * X 'f- 7 " ! i , N , . I ; I " - - -- -/ - -­­ �: �,,_,� . , \ ;_ � :� * ..... /", . , ,�r - Z ", - - /" - 11 I , , -,- ­-�',',­�-­ \ - & ,�-"/, "�,, ,! " , I \ \ \ , ,\ 11 ­­ ­ � _T.-�-� -�� ............... � . . I + + � � . � :. :' ::: x . + . �*.*­ I I /� I ; � , . ....... " ' * ... * ' * , ' ' + + * . . . . ... - . . . . . . + '. _:.. _.+.:-:_:-� 1, , , \ I '. + 4 ........ I . �'.%+.'...'..+%'.'...+ 1+ .*.*.1+*+1.+++.1.1.*.+.1+141. .1.% . .:. .:, +,..++��. I ,,� � i ol, T I , � . I" .... � ; � \ 11 11 / ", I * * ..... � ................... .- ..___ - . - lt_%��_ + ++1 I ; � I " / I I I I ; , .,+,.*+*. . ..+...+...+.+..+�.+.,...+..++.....+ . + .. -:.::*�:*+-::+,:::::+Nt"..+,::�,�, :::., * .... ­­ ,+��, !1:.._:_. .- 4; 11 , ; ­ �/ Ir""',�1 " ...... _1 ........ I ... __ :+ + . \ I I ,;*// ,�� , * �. t".*+,.*+*.*- + ­',-�:",`_ -11 . 1, _9­/�� I ,_X++.:+*.++1-:-x .::.,:.-: :::+::+-,:"+ : ..,.+.:-..4 , ,,%,� ` ; / � , , " , ;""--,�:­,' , ,�', , 1�, ol , I .�, I ,,,, � - , , \ \ i ___ _ - + . , _NN 11 , , - ,� �-�'11, , - , "Ill, , 11 I ,. -, , *+*' * . , , , / / I I - ,�T%f "' ; _­- ", / , � " -�, " , / -7;- .7;�::�.*+:':'�:*+:": : .... � ... � ... � ... . ++,..+.+,. * + - . , . � + . . . � . + . . . + . . . . +*.,.,+ . . + . ......+....+..%�'. � "�11'7 , � _� .... ­ ....... I __ 11 / // "I ! I - +.++...,..+ , , , .1'.. .,�, ­­­­ ......... i I : � .1e / / / " , � X �� , \ " , ­ -_ """ . %+�..-+....,...'.+.... - � \ , ; \ ,� , \ , " � 4 , __ \ I \\ \, , :�i_�.;I.i+ ;� ............... - . ""�il i I i I ,�� ; 11 I / , " "' * ... ***"** .... ­­* ­ .. . ................... 1-1.1i�!'.1.+.1-1. .+.1.+.... I j S I I , w . . * * * --_4 , 11 i � I / 1, � � "'; � ,,, I 11 , I . . .+ "I �_� _,,,�/' //,"//j,`," , " , N \ � ":+�* '. ++:4�'+:..'.:..*.:.:+:�'+.+.:.:.:.:..*+:.'.:�.'.:�.*+.'.:+:.'+'4*.*.*.'. + +' +.' I // , 9 , , - �", ., ,,­� ­11-��,_ I I ,1�,� - , -,, I / ", \ \\ . " . : '­­­+­­­­­ ....... * , , , '+'+*,*,.**' . /� " �,�,� f , " //, , I "., -; -+- -. - �'� ... * , , * , , , , -:-* :_1..:_._1_+-'1�'.�:­1__, '. \ .'. ., * * , * * , * , , "', - - -;-,.,-t ,;� ,P , ;_ / . . :, �, _ -, ­­­­ :�: � " - 11 \ ,_ ,_ _ � , , I ; �; ­� - / " X�7 �, , , "' �, .*+::�. .:.:+:".*.+.'.*.'.*.'.'+'�'.*.:.:.* ­ 1',-1- � � _ + :-.+:::x- -,I..+ . . . .%,.*.*.,.,.,.,.*.,.%* ..... I ....... * ..... _.. ..�....%%..+.. . + . ,*:�� 1.4* 11 \ / , \ I �\ � . � ,+:�:.:+..:.* .4:.:.:.:+:.:.:+'.*+:4:.:.'4�l:.*.'4:+:�:.'++.+.*.*4'+*.'.'.* 1_� I � , , . ; / *1 'I": I . I ,'I // .1 --------­---------­ � "I I '­.�..+ . . . - ­* .......... � . . + ..+.....+,+�+.++........+ ....%....+ ..+ . . . . . . + . � . + . . . .,.,. . . . . �+...'.+.........+...+. , ...... . . . . . . .,.,.+.*.*.%'. , �, .. 4 I " -- ; , " I �1, \", � 1, . 1; ; " 1, I ( ./ly I . _ - +4t ..: . .. .. ........ + . . . . , . '.....%+...+, . . . / I I / , /I " , ! I 11 -1 .... I I " I "";­ _, ++ - -_ ........ T_ - I / M I i '! ; , \ ,� �_ 'N _ . .... 1. � -, , + , +- -:-:-+-:-:-+,-: ....... � ......... ..... � � . . . .+. -v.� ........ ............ - - i/ , 1 14, �', " , I � , ""I"':". �1, .. . : + -�;4 " *'+'+ . � ......... . .. � , \ \ \ :.x+x+ I 1�� I" ��, I " x, - / 1� - ,,, \ ,; ,/ . - . ;�, ....... _-1-- .... I ......... I-- ....... I I I I x 1� , ___ I \ \ . . . .1.1.*.%1.1.!1-;%`;,�:%,�, . . , , - 1, � 1� ! 4 , � I � . , I I \_____1 ...... - .... . ..... . .............. � ...... � ................................ � ..+ + . * . I . * . * . � ., X, 1- / I \ I I I . ; " - I, , � , - - , , I `� :-:,, * -, , " - - 11 I , ,4 .. ..... .. -, -- - 11 , \1, ; _. � ..... . __ .. . _X .+. / , I I � "I ........ - - , � � 1, . . .*.*,+.*.*.+.4,+ 1 . . %� I I / .�!' �� I Z I . t I 1 / / 1, , , i I � " " 1 �7 .11; 1_ ...... , � �. . �z +. .++. 5 `�_ , \ , I � � 11 < - - � I , _­­ , � " I ,:,* * �;' -, , -.%+.%-.. ,.:-.X+*+1.1+*41.+.*.1. + + � . . + ..+..-++.-...-.-. + . + 1 %++%'.%% .%-:+*-:,:t�-v�.., 1\ � - - --- /_<i I , -�'!'x ",/// ., ... - - . .���+. .1+*.'.*+,.:.*+,.,+ .. . / - "I, .:.+�,., � 1�1__ - *�,�XX�:-X-+,+,"..X. +..+%+.-,�.. + .:+ .:�:+:..,+:-:.:+:-X .�,+:.:.+,+:.:.:-,+:+:.:.:.:.:+:+,.:...:.�++.-.:.:+.+::.: X� -.-.%%%-.-.+.-.+ - + - . - - - - . - - _+._ """ , / I __ - 11 .^_�. /V i I I , 1, . . : :+. ,:!� , : :� - - , , I - -- _ , " \ J"�� . _� I ,� I 1�1� " I I 1�11 " '0`0.:+:. ,.+-.,7 , . 1\ �, , .�� , 1� � � , I ; , I I , - - . I 1 14:.:+:I. - ::: ........%. , ....... -.-- " i % 11 � __ I r ,,, I -, __ . ..+4. , � 11 I N� \ ; ' :+.'.� . I,- , " I , - -1 - - -_ - . I !! I � ,�� ..� __-i'll, '1-1-1--- -1 .. ., 4� . � - ....... - . . I- ......... ,.,� - . f - / 11 .1 _ .... / " __:;..;�, _­�, ­ Y// _ 11- , z�_�-` � . ' - - . ......... . _' '' ,/�:_ I -�--+�t.".%%+....­" +­.- - �.1%1 t.*��.+ ; + * +�It.;*,+ 4 + .+*,j1 : _' + %X+....'. + . .+/ / , ., I , - lf�l -_ \, _� 11 I I " *t + . + 11�, I " ';'�� �--� �;; , � I - � 1� , - , , , , /h ;! ; / " , * - , !+ * �� `N� ... "I ,; "a -� - , " . 11 _ ' ' +'***'*'+*++ + +*+ ­ � I 1, 11 " .. ., - + 4.. .'*'**'* *:;4:i _ _ _ ;1; . _ - _11 _ ��,:�-, ... � / " 1�1 I I .1, - ,,:� - 1�1 ­ 1"I'+" ."'-'.'I'." I'l .'.'.'�'.'.'4'.'.'-'1 .' - � - .*.'4'+*�'.*�*.'1* 1 1 11 , ' ' _f'_.� . .+ . j�%'t : t � . .;,�+ .� , .... "I 11 -_ I -_ _. , :�­--= ,,, /, " ; + + + .. . � 11 I I \ , :.:. - � .'�.'-'.'--:-_. ' _ . . .+ , * / - "I � , I '1� ­' . '�I�� . . ,�...+-+-+-.f' " - . ,� _ + I " I , I I 1;� � +4 :� ' 4 ...�.,.�! ; . . ;*.,. .*I +*.*. .V4' / I - , ..... � .... � " , . , ", 11 // / � %V , 1\ " I .1-1 ... ­� _,*;� .. . ....... - , � , *.+.*.*+ . � + . - �-,.:.:. / --I- �a , \ " " , 1�1 S " 11 .... � +.. ­,�%!.�, � / .... � - --- ..... 21' ,,, "',� _­_ " , � " 1 =�z:,_:�,�,:_­_­, ", ­. ­�-- . * . * . * . + * +-:+:-*+.,.q 11 I , _"\_ \­ .:-:+�.,.X-:- .. . �:*.';::;�,:'.-,*+:'+'�.'.--�+.--i.--�: . *....+x... -.-+-.-.-+-.- ..:+. :.-.+:.:.:+.".*+++*+*+,.*+,.,. .:-:-:-X�-'4 -_+�:'X+*�'.*+'.*+*.'. + �!v � � .:.:.:.:.,�+X*-�i'z-1,.X ,.:+.+.:. I ----_�' � �', � ......................... _ .......... . � .... ___ I *� � . 1 .4.+.4 ... *. .+�4.1.1'1+1-.....�4�+.I� . ... - � � ........... :-..,t�%-X 1.1.1.1� � , . 1, ____ . ........ � ....... * ... � '�, -� � ,'/\ e ! , I " � y =.=-= -,-,:�*+�Z­�' 1;:� --.'��'+,.- '-.,.:+, '+..�.' ,+:.,+:-.�:+,.....:..,-,...,+,.,..,.:.,..�,+:.,.:.,..:+.*.:.*..:.,+.-,.:+:.:.:+:.:+:..,.:+.,.: " ; / , " ,,,,, + - �� L T � I , / , , �=.:7. - _��' _-,-��,�., �, : .+: . .+� . � \ ..:+ .v - I - ­­­ .. - t ....... � ....... �... 11 � - I - +';� I -wv' o,� ;- ,.7.�,.*.,!;� � . - Ic ,�:-v_ I , 1 +-4.-+. - �41.1 .* ' ,�. � � . ;,. .1 I � � I", ,. 4 � .. , .1 1+* e, . _. +.::,.-,��- .,,-,�!;,... -.�%- - ... 4 ­ r ; ....... ; -- _i, " * , , , , , , I" - .. _� �. . %v-Xt.+X-�XX,4,. ' ,­ _��_;t *+' %�, ­�;7­ ...... � .;4'.. f ", - I , I " , .=.=!�� - ** . 4 .... . � � . , !_, _ _�, -1/ , , _:.:.:.+ , -- ­­_ 41�*.I.I.I.V.1-1 ,I, _ ; - 7 4 � _, _;:�l , , , __ /I //� / ., , , , -, -� __ - �1, ',,,,`/,/ . __. . . , , -,\ __ , � � , ,� ��.+ ,."*� ".+.,.,.,.,+, , - - . _:_ .. _ . _ . _ . _ . . + . � . . . + . � . , �:�:...:.._:.:..-:-:-,.:-*-:-,-*-+.:-�-X-+.:-:.++:-+-:.I 1 1, . , " _ .. . . - - .�: . *�'�,,�,� ­ - � . '�� 441�0'4"�+t* X �. _"�. X"� %'.%+� '.'.'.1 ", - " -�' _ , I I �� , - .!� �1+ 4+. + ..+*, .*.'�� ........ 4 . . . . .*.*.*�'.*.%'�'+�t ,% .t+ � , " : ,+; , ,,,/ �, ,Z _"i � . . + ..... . . - � , , , o" " , _ ::� . . - � 11 1 +�4++%%*++1�1�+ , ; _­­ - : .,.,+ . ,4 . . - - .a I \ ,�. � �. ' 1� '! , ....- ........ - ----- - ­.. � ..._...". -11-1-1 I 1. _� . - ..... I " ; " V, () �::;:::: - -, � -. -�� - - - 1, . . .-.i4�� ...... �', 1 ... 4�­,� , - ­­ 4 ....... !���� * t�. . �... .�... . -� ......... �.,+ I . . ­�.. ­­ -�.�y " - .... I I I - - : / , -, ­­ ­+ ____ . ...+,.... , //,/ e , � "I . & , ? , N /J� - � I "", . �111 I .�+ .�. . ,� .... ; ,, --- � ��, m . 11 __­ , , . I.t . - ....... - , ,,,,, ie, " �; I I �\ ...... ­­ � // __ - ;_.� __ � , �. .� . . . . . . / /,7 // / "', �, , , - _­­­ __ , ­­_ t.!_ - 1- ____ -_, _ A _1�,:�, - " - - _____*�: - - - , , _+__ _ 11­�� ...... � ... . ..... - = _­ - I I / Ile,, 1;e_1 I 11 ...... . ��, I / . .­ i � . k, ,,, I - __ .... � ....... ___1.-1-1---- ... ..... -1 -, __­.­­..___.___� "I � , ... ... -____1 ...... ....... � ...... - ... ". , ,�I�_ � I I ...... . ........... � ... 1, . � ­� .. ­ ... � .... ... ........... ......... � ..... I—— ,:1 11 � /,, / " 11 " .... I � ...... / / / // :, "­_ - I -1 I � I % � � � � �'� � � __ " ,�, 1�1", - "A -1 -__ --1- __ , '. _ , , '_',_____ ZP4- 11 q t p " ..... I .... 1-11 ... I / / "I / - -71 � t � \\ `� � I , N" _ , . ­­­__ -_ � c +,,�I,'. " � / 1 7 . ..... - _'� 1-11 ; . I " . I p � , , ., , _­ _�I,'. I I ., ; ,�/�/�, " 11 " / � . � � .� �, k __ , 'I, __ " ... ... �, - - � � I 1� � . � . � ...... ; I I /, , I I 11 : � I I / � % I I � k � I , ,� I � . ....... : : .�.,, I—- 11 ___ I I � -------- � ... ­ / � ..... ­.­-, �� - ..... . � , ; � � � . � \ __ , , � ___ - I � ...... ­­_ . ...... ­­ ... � ......... __ ..... ,�� __ . .... 11 -1 .... / I ,/ '­ - // . I : ... � . j � � ! � % 11 11 � - i , _. , 1�1 I\/ , - . I i . � , I " -- ­ _._ ­­­ . ... I_- I "", : , I "' . , . I '. I %. � � 11�, _� ­­ , " ­ ­__ , �� ;�- I 11 ........ : 11 �, / I" I : " .1 � : : '11-1 ... ­_ ......... _' ­_ - I , . " x � 1; � � \ , . ­ -_ - -1 ','�, - "I, , - / / , "f .1 ; . ........ ...... �, ­ I., 1, , / I ; % ; � 1, % I , . ...... I- / , "". . , 1_ .... ...... I.- I ", � I .... . , _ 1, , � � I � .% I I � , I � I "" � \ / � I e 11 , - , I .... _­­ " I , I i \ , 1( ..... � ;11� __ I \ 'I, � 11 I : ; . � w % I ; : -_ . �:,�, 11 e 1, � , � I 11 , i t i 4 I _ \ , \ 1� __ _. \ % , / � , /\, / \ , � ", .- I . I I . ; _ , " 1� I - , � I � : : ; \ \ � \ 1�1,1 I ; I / � 11 11 , " I __11 � t � t , ­­­ , , .......... ­­­ ... ­­­___ ...... __­ :.", I I , I --- _ ...... : . I : � , , , ; � .__ , I . I , Pll � ... � ......... . .. I-' / � -­, I ,� . _ _1-11 ... ... � 11 I t � ; I I 1\ " , , . I I ` , _­ I , 1. ��, : IN.___ ..... � ... ___ � I � i ; / I " , / , / , I I 11 " � I ; : ; ; " � , , I � I . I / I,-, __ " / / I ­ � � I I � k : 1\ �1, \ .\ � , / 11 ___­ � : _, " � I � \__, i I \ / , A . " ,� .... � - ; 1� i � Z I 11 1, ,,,,�� ", .11 � I N I I I , I I _ , , "" , 11 , _ I I , \ \\ � � \ \__ \ \ ... ........ ..... _ 1, ,� , I I . z � , 1�111, " - I ; " � I ; I , . : � � / I I I � + � .1 � . / / N\ 11 ". - / I ­­, _­­ " ... I / . .......... 1� : 11 I " � � � ; / -, , / ""... , � ... _. . � . " �?� �, ..... � , t . _ 11 I I __ _� - - __ � . . ............... _'. - ......... _ ....... . I \ -, , - _ _ `�__ 1;�11 " _ _,­ 1� 11 __ I ____ ... � � ....... � ... I ; 11 11 ", ,� I ; � . � . / � . 1. I . ...... k__.I.. I "" � ... � .. . ... . % I I ", , � ; � � I � I � : / � I \ , - III, , I " "', , , \ , , 2j� .11 ... _ 1, I-_ � I I " ; 11 , : . 1 I , 11 -, // � � I 11 I - "I � . . ....... , � , I - __ __ ,�", , I 1-1. _­ . , � , / � - I , I I _ " ., I I I ; , . , � , . . J '� I \ I ­,­_ ..... ... , , \ , /I ",,., I I \ "� I I , I ­­ ", ., j , . � I " , .......... .. I . - I 11 I I , , ! / � , , _.-I., � I - I . ..... � ....... - I—— , " , . i I � I I - _ - 11 , � , I '�­ - � I - I . . ....... I , .,--- I , . . , , , \ _11� / - I . � _11-111- ................ -1111-1 ....... , " : .1 %, I .1 " . , , � " - I , , ,� , .: : " / 11 ,� , ; , . ` 1 : 1 / c; \ , I , \ '__� -'c'- "I "" , " __ , ; , , / .... "_ " � I ; , , � i . , , � \1 ,_1...___1" - 1, I , . 1:tAT / / � . , _'. I I " . "I I . ..", . , , - , " , , , ; � I , -1 % / ___1.1111 ...... __ ....... __. .... _11-1.." , "X� . \ . q \ I "I --11 ... _ "I , 50' 200' ; \ , , I �� " , " __ ­­ 11 �, 11 11 I I , i � - i ; I \ `­_ ... � _ ", , , ­­ \ "I. , I 100' 0 100, ; j I � I j ! / , . i i . \ / ... * ........ ­* , __ \ - ... ___ .... _­" " , , - � , !, ; I , �_, � � 1 I I . � � / _ ... __­­ --- _ ... , , "" " ...... 5 1 " . � '.1 ; 5 11 I--,' ... . .... __ 1 , ...... 1.11 / '�F I _'�111`1' I - -.__ ..... , ""I I I I I I I I . i � I � . , I , I - , 111� . I . .......... ­ . .............. / " I I ; I / '1,1111 __­ ,� "" . � r Z � - - � , � ...... � : f 4 I �. k % \ / I \1 '�_, \ �­­ � I /' "" ".. " ­ ___ _­­�.:,�"< ""I .1/ 1nN01%N?71 11111111111111111111111111i EROSION CONTROL GENERAL NOTES: IN -STREAM AND SLOUGH EROSION CONTROL MEASURES: SITE EROSION CONTRQL MEASURES: 1. TOTAL AREA DISTURBED = 8.7 ACRES. 1. THE PROJECT CONSTRUCTION AREA IS LOCATED WITHIN AN ACTIVE FLOODPLAIN AND SUBJECT TO REGULAR FLOODING. AS 1. SKIMMER BASINS, DIVERSION BERMS, DIVERSION DITCHES AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE SUCH, THE CONTRACTOR SHALL LIMIT THE DAILY WORK AREA TO A STREAM, FLOODPLAIN, AND SLOUGH CHANNEL SECTION CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE 2. SOIL TYPES: CHEWACLA SANDY LOAM (CH), ENON-URBAN LAND COMPLEX (EuB). THAT CAN BE COMPLETELY CONSTRUCTED AND STABILIZED WITHIN A SINGLE DAY. A COMPLETED AND STABILIZED WORK LAND DISTURBANCE TAKES PLACE. 3. REFER TO SHEET 2, GENERAL NOTES, FOR THE PROJECT CONSTRUCTION SEQUENCE. AREA SHALL BE AT FINAL GRADE WITH MATTING, TEMPORARY SEEDING, AND/OR MULCH IN PLACE. 2. AS CONSTRUCTION PROGRESSES, DIVERSION BERMS AND DITCHES SHALL BE RELOCATED AS NEEDED TO ENSURE THAT THE 2. IN THE EVENT THAT THE WORK AREA CANNOT BE COMPLETED BY THE END OF THE WORK DAY, THE CONTRACTOR SHALL ENTIRE UPSLOPE DISTURBED AREA IS COLLECTED FOR TREATMENT. 4. THE CONTRACTOR SHALL BE FAMILIAR NTH THE EROSION AND SEDIMENT CONTROL REQUIREMENTS OF THE DRAWINGS, AS BE RESPONSIBLE FOR PROVIDING ADDITIONAL STABILIZATION AND EROSION AND SEDIMENT CONTROL MEASURES TO PROTECT WELL AS, THE REQUIREMENTS SPECIFIED IN THE PROJECT SPECIAL CONDITIONS. THE COMPLETED WORK FROM DAMAGE. ALL ADDITIONAL MEASURES MUST BE APPROVED BY THE ENGINEER. 3. STABILIZATION MEASURES SHALL BE APPLIED TO PROPOSED EROSION AND SEDIMENT CONTROL STRUCTURES IMMEDIATELY 5. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE CITY OF ALL WORK FOR THE STREAM SHALL BE PERFORMED FROM THE STREAM CHANNEL BANK, UNLESS STREAM PUMP AROUND AFTER INSTALLATION. RD DETAILS AND NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS. OR STREAM DIVERSION NTH SILT CURTAIN IS INSTALLED SO THAT STREAM CHANNEL WORK IS COMPLETED "IN THE DRY." 4. CONSTRUC11ON ENTRANCES SHALL BE INSTALLED AT ALL ACCESS LOCATIONS PER THE PLANS AND SPECIFICATIONS. 6. ALL CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE 3. ALL IN -STREAM CHANNEL WORK IS TO BE COMPLETED "IN THE DRY" BY INSTALLING STREAM PUMP AROUND OR STREAM 5. TEMPORARY SILT FENCE SHALL BE PROVIDED BETWEEN STREAMS AND AH DISTURBED AREAS THAT DRAIN TOWARD THE ELIMINATION SYSTEM (NPDES) STORM WATER GENERAL PERMIT (NCGO10000). THE CONTRACTOR SHALL BE RESPONSIBLE DIVERSION. SILT CURTAINS SHALL BE INSTALLED DOWNSTREAM OF ALL CONSTRUCTION WORK AREAS USING STREAM STREAM, UNTIL GROUND COVER IS REESTABLISHED. (3) FOR CONDUCTING, RECORDING AND SUBMITTING THE REQUIRED SELF -INSPECTION REPORTS TO THE APPROPRIATE AGENCIES. DIVERSION TO REDUCE SEDIMENT ENTERING THE DOWNSTREAM CHANNEL. 3. PERMIT DOCUMENTATION CAN BE FOUND IN THE PROJECT SPECIAL CONDITIONS. 6. SILT FENCE STONE OUTLETS SHALL BE CONSTRUCTED IN LOW LYING AREAS AND AREAS OF CONCENTRATED FLOW ALONG 7 THE LENGTH OF TEMPORARY SILT FENCING. IF LOCATIONS ARISE DURING THE COURSE OF CONSTRUCTION WHERE THE I— 4. ALL TEMPORARY ROCK CHECK DAMS SHALL BE CONSTRUCTED NTH A MAXIMUM 2H:1V SLOPE. Li 7. THE CONTRACTOR SHALL MAINTAIN A RAIN GAUGE ONSITE IN ACCORDANCE WITH THE NPDES GENERAL STORMWATER TEMPORARY SILT FENCE BECOMES OVERWHELMED NTH OVERLAND FLOW AND FAILS, THE CONTRACTOR SHALL REPAIR THESE Uj PERMIT AND SHALL KEEP A RECORD OF THE DAILY RAINFALL AMOUNT. AREAS WITH SILT FENCE OUTLETS. Z: U) 8. GROUND COVER AND SITE STABILIZATION LAEA5URES: >_ 9. FOLLOWING APPROVAL OF THE PROJECT EROSION CONTROL INSPECTOR, ALL TEMPORARY EROSION AND SEDIMENT CONTROL 7. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBIF FOR INSTALLING ADDITIONAL EROSION CONTROL Li y MEASURES SHALL BE REMOVED WITHIN 21 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES 1. TEMPORARY GROUND COVER: 1) FOR AN AREA WITH NO SLOPE, TEMPORARY GROUND COVER SHALL BE PROVIDED FOR MEASURES NOT SHOWN ON THE PLANS BUT NECESSARY TO CONTROL EXCESS SEDIMENT, AS DETERMINED BY THE ENGINEER _j ED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSIT10N OF OR EROSION CONTROL INSPECTOR. 0 ES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. THE AREA IF IT HAS NOT BEEN DISTURBED FOR 14 DAYS. 2) FOR AN AREA OF MODERATE SLOPE, TEMPORARY GROUND f� COVER SHALL BE PROVIDED IF THE AREA HAS NOT BEEN DISTURBED FOR 10 DAYS. MODERATE SLOPES IS DEFINED AS AN EROSION COUTROL MAINTENANCE: Z 0 5JAGING, STOCKPILES AND HAUL ROAD AREAS: INCLINED AREA WITH THE INCLINA11ON OF WHICH IS LESS THAN OR EQUAL TO THREE (3) UNITS OF HORIZONTAL DISTANCE 0 TO ONE (1) UNIT VERTICAL DISTANCE (3:1). 3) FOR AN AREA OF STEEP SLOPE, TEMPORARY GROUND COVER SHALL BE 3. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS I - Z 1. SPECIFIED AREAS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLANS HAVE BEEN ESTABLISHED AS HAUL ROADS PROVIDED FOR THE AREA IF IT HAS NOT BEEN DISTURBED FOR A PERIOD OF SEVEN (7) DAYS. STEEP SLOPE IS DEFINED NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL Uj :2 AND STAGING AREAS, AND TEMPORARY STOCKPILE LOCATIONS. WITH PRIOR APPROVAL, THE CONTRACTOR MAY MODIFY AS AN INCLINED AREA WITH THE INCLINATION OF WHICH IS GREATER THAN 3:1 SLOPE. BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 0 THE PROPOSED LOCATION OF STOCKPILE AREAS ALONG THE PROJECT, AS NECESSARY, TO CARRY OUT THE WORK. ALL Li (n TEMPORARY STOCKPILE AREAS MUST BE INSIDE THE LIMITS OF CONSTRUCTION AND APPROVED BY THE DESIGNER. 2. PERMANENT GROUND COVER: FOR AN AREA OF LAND -DISTURBING ACTIVITY WHERE GRADING AC11MTIES HAVE BEEN 4. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED � 0 STOCKPILE AREAS SHOULD NOT BE LOCATED WITHIN FORESTED AREAS. SILT FENCE SHALL BE REQUIRED IN AREAS WHERE COMPLETED, TEMPORARY OR PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION SHALL BE PROVIDED AS SOON IMMEDIATELY AND CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY Z LOOSE SOIL HAS BEEN PLACED IN THE STAGING AND STOCKPILING AREAS. TI T IN NO CASE LATER THAN SEVEN (7) DAYS AFTER COMPLETION OF GRADING. SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE < Z IMENT IS REMOVED IN THIS MANNER. 0 2. IF ANY MATERIAL IS TRANSPORTED OFFSITE, IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OFF-SITE 3. ALL AREAS STABILIZED NTH TEMPORARY OR PERMANENT SEEDING AND MULCH SHALL BE MAINTAINED AND REPAIRED IF V) MATERIAL IS TAKEN TO A PERMITTED FACILITY AND THIS ACTION IS CONDUCTED IN A MANNER THAT IS CONSISTENT WITH RAIN, WIND, STORMWATER OR FLOOD WATERS DISTURB OR WASH AWAY THE SEED AND/OR MULCH. 5. WHEN A CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SOIL BY 0 W THE APPROVED EROSION CONTROL PERMIT, OR A REVISED PLAN MUST BE OBTAINED PRIOR TO TRANSPORTING MATERIAL. CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL TO THAT OF THE ORIGINAL APPLICATION, Id C14 4. ALL DISTURBED AREAS WHICH ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED AND SEEDED, TEMPORARILY OR WI LI ED PER THE ORIGINAL APPLICATION. � \ , , I , , � /,^\\ C 2 : � � - ' 3 - -1 �5'1 1�.�o � ` - I - E`11 - -I- , ___ 1 ,4 - r) .,j I "" , /Z " ", 'N � X��/_"k\,\`, 1 C14 3. EXCAVATED MATERIAL MAY BE TEMPORARILY STOCKPILED IN THE TEMPORARY STAGING AND STOCKPILE AREAS. THE PERMANENTLY, IN ACCORDANCE WITH THE SPECIAL PROVISIONS AND THE PLANTING PLANS, HEREIN. PERMANENT SEEDING 0 LOCATION OF THE TEMPORARY STAGING AND STOCKPILE AREAS MAY BE ADJUSTED WITHIN THE LIMITS OF DISTURBANCE BY SHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. 6. ALL DRAINAGE INLETS DOWN SLOPE OF THE CONSTRUCTION WORK AREA SHALL BE PROTECTED FROM SILTATION. � 0 WI IOR APPROVAL OF THE DESIGNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN 0 = APPROPRIATE STABILIZATION MEASURES FOR THE STOCKPILE AREAS TO PREVENT EROSION AND SEDIMENTATION. . F CLEANING. (n c: 4. AN ONSITE PERMANENT STOCKPILE AREA HAS BEEN PROVIDED FOR THIS PROJECT. ALL EXCESS GRADED MATERIAL SHALL 7. COIR FIBER MATTING SHALL BE MONITORED AND REPAIRED AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. COIR .2 q11 MANENT STOCKPILE AREA. EXCESS GRADED MATERIAL SHALL BE SPREAD IN LIFTS AND FIBER MATTING SHALL BE LAID IN SUCH A WAY THAT GOOD CONTACT WITH THE GROUND IS ESTABLISHED. IF GOOD a COMPACTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS TO MEET THE GRADES DENOTED IN THE EROSION I CONTACT IS NOT ESTABLISHED, OR EROSION OCCURS UNDER THE COIR FIBER MATTING, THEN THE BANK SHALL BE < REPAIRED AND THE MATTING RESECURED. 0 .__1 t CIL 5. ALL HAUL ROAD AND TEMPORARY STOCKPILE LOCATIONS ONSITE MAY BE ADJUSTED IN THE FIELD TO PROTECT EXISTING 8. SHOULD THE SILT FENCE FABRIC COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE 0 TREES LARGER THAN 6" DBH. THE FINAL STAKING OF THE HAUL ROADS SHALL BE APPROVED BY THE DESIGNER BEFORE SEDIMENT DEPOSITS AS NECESSARY TO REDUCE PRESSURE ON THE FENCE; AVOID UNDERMINING SILT FENCE DURING M in CLEARING COMMENCES. CLEANOUT. 2 0 6. ALL DIVERSION BERMS WITHIN THE PERMANENT STOCKPILE AREA SHALL BE LINED WITH EROSION CONTROL MATTING PER 9. CHECK TEMPORARY ROCK SILT CHECK FOR EROSION, PIPING, AND ROCK DISPLACEMENT WEEKLY AND AFTER EVERY RAIN r� DETAIL IMMEDIATELY FOLLOWING INSTALLATION. EVENT. REMOVE SEDIMENT DEPOSITS, STRAW, LIMBS AND DEBRIS FROM BEHIND TEMPORARY ROCK SILT CHECK AS K) T CHANNEL CLOGGING. ADD STONES AS NECESSARY TO MAINTAIN DESIGN HEIGHT. cli I 11 , I I I �11­ I - I- � "I �� I I - , I ­ , , 11 Know what'sbelow. f% 11 -6 1 1 1 1 . I PREPARED IN THE OFFICE OF: I CLI ENT: is 1111ill", DATE: ca before you oig. � I I . I . I .0 J PROJECT: < REV. No.: REMSION: DATE: x I I I "' This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose hg� and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2017 NC LICENSE #F-0102 421 FAYETTEVILLE ST., STE. 600 TITLE: RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 � I @ 2017 CITY OF GREENSBORO EROSION AND SEDIMENT CONTROL KEY SHEET 11111111111111111111111 11 Afto ,, U1 141 if �% .. ..... 0. SOUTH BUFFALO CREEK HABITAT .. . 1�_ JILY I � 14. . .: q- SEAL '. = DESIGNED BY: AND WATER QUALITY . - - 04460 :: JILY . �� I * . - CHECKED BY: IMPROVEMENT PROJECT PHASE IV '. .�, , fit .. %* Z*..#.*. *** WRW ,,!14 L * .. %'�� JOBNUMBER: SHEET NUMBER: ",fill#[, /1/(7 012137010 1 22 OF 37 T L - a L E - i N '� N M C 0. Lo 'i PROPOSED LOCATION FOR TEMPORARY DEEP h STREAM CROSSING. SILT CURTAIN MUST BE INSTALLED WHEN TEMPORARY CROSSING IS iN USE N TO PREVENT SEDIMENT FROM ENTERING Ld DOWNSTREAM CHANNEL. 19 0 �, MATCHLINE SEE SHEET 24 1 + 1 .�., 1}I 1' 1 } } t 1 , , ` ` , 4 { { \ i a (! I 1 5 1 '.itllll ililt }i i s i I .l \.`:1. ,, }... v \ / o ___I s I i �i t I I 1 t t \ ' i + tt= illi is 1v \ i . 1. i t 4 a i { \ I : I I ! Ii1ii :I. i t }4` \\ s e .. t i ,t p ,__ i I ,, 1 { ! i + I i 1 f l {t ;`'; S \ \t i y- r t; 1 I { \ 1 s 1 / I i 1 I {i I Iii= i. I \\ \\ # ! i ! I r,., I 1 1 ;, it:t Iiiiy :j f 'i t t t t i \ •\ \ •^ _ i ",} ' i !e { { \ I ! 1 '•it t? I,t �. \ i i \ `\ \ \ \ z_ {. -s' _}- f - i i !1. i p ! k ,,y 3I t } t 1 \ ti t 1 ! ! j \ \ \ ;\ =' ; 1 ( { I ; i i I III ! 111j t\ I } 1 qN \ \ \ \ i '1 11tH 1 . tom' \ \ \ \ :r _. , . 1 } t i 11,} + j 1 \ i z 1 1 I t i It ;11 4t}i :l' S it ' \ \\ `\ n r l§ \•: I i : i ! .111111 \: ti ' I \ .... _, { , n ? 1 i t 11 , i i 1 f *1 I v t i t t} :t 1;111tI l l 1 Il1iL : 1: } '} tt\ 1 \\�\ A v\ v \v , r __ / Y t t r� it { �'.::':..... _. i I I I.t a. / ;\ �$ I \ 1 \ ',.,ti}11!`11 I"IIIjlt l I :iT ; t tI \ \ \ \\� ti ` � I` h L.Vf 1a .,, i ,I ' ". `; I ,I i I .— / - i � ? i \ \\ 1 :\ Airs 1s;11l titi ,:, i .1 1 \ IN . \ \\ \.\ . -,, -' , , \ , s ! ,} \ 1 .,f / I i w \ ji I1' I; } \ti\ j s\ \ t \ t\ I \ \ \ i fa ; t; it I I i _ _. w_.._ _ __ _. _ ._ _...... . „> } I \ j,[}I I \ i l \ t I1 •\I }1111`` I } \ �y \ y 1. y .... __... i ' > { t t ` li � t} t:,3osl , } \ I \% \ 11\ 1111 .,11 `tali li:i ill ltt`lii11t \ 1 1 t ? 1 \``. `,�` . y \� `i ,a z i i ., ».; i r.F„ ,..: Y " " ,s,. .,.. t i ,,1 \ \. \ \ t {} I t + 1 }1 i t5 • \r I \ \ , ` \ \ �, y �. � \\; , \ \y \t4 1 \ \ \''\�; 1 ,1,ili i 111 It' \. \t11 } 1 s` y \\\ \ \ , _, 11 I _ W _ } L_-__--1--: tf / \ \ \ 1 ` \ x $':n �/ �; i Ii 1 t'i 1I I i 1 I 111 r \ t ,\ \ \ i ? I `' \ \ ,_ r m-- : e: i a} i� ,� \'`^\ "' e. "" �, '\ \ \ ac' c^' XC..M 511 . 1 1 } ?� t1t44 z �.. 1 1 ! ! I E \ \ \ \ \ \ 'i ^- `�-\ `. s # i § .�.# �r 1 c; s �`_� ' ?1` i.\ ca.T°r i 2 11.15 ;`l ;ttl i f I. / q \\ \ \ \ q ... , , o"; t 1 ,I wo,\ v=. \ ,,. ? \ `\\\i {mac.` i\ i \ 1 1,I i`,j 1.:f J �, I 'P', \\ \ \ E I .lt i ` i'_- ;k ,,�,,I \ ,,a \ \ �� ' �O an �"' \-..\l \ i',I ill, I t ',i .5:111 ,�P f .t i \ \ \.\ \. € f ,t i ''.,' \ \`_ \ \ \ ? \ `n r \ \y \ `'.., :. t ( 1 1 i ¢ i \t ; f' f ., \. %s,. .. L_ ._ ii g t #;;_iil;.,,.\' ? \ '\ \ l \ 'C"•\\...�\ \\ /�11}: ; \ 1� I\i}1!I !rr/`i'Il rr / \ \ \ \ \ _,. ,< x .` µ \ \ \ \ \ �����\ \ \\\� \\ \\\\ i !ii I It }} i11,� . . t r EXISiING SLOUGHS ARE PRONE TO :,\ \ \ \ �\\ \ \ \ \ \;`\ \ \ �I I1 { I !' t}11111 :;..' / / - FLOOD. ANCHOR TIMBER MATS AND ` ?\ \ '\ \ \ \ `\ \ `\ 1 t I I '' } ` ' f COIR WATTLES SUFFICIENTLY TO t \ \ i ✓f , \ \i= // /: 1 1 r• s' / I j I 1 i j \\ \ i% \\ \\ \ \\ 1 i 1 i 1 r';'' `` ' PREVENT FROM WASHING AWAY. ` ._M_ , 'i s \ \ t / f E 1 \ \ i { •t5 r a +, v 1,s \ \ \\ \\ \\ / \\\ \ 4\\ P\ \ 11 \\\\ \\\? \ \ IS i}! s 5 .,1 i I i ', \ \ � \\ \'? \ \ ti ., m _ i i v v \ < \ a �ro s i r \ i t \ \ �''' L cy fs \.s �, I CxJ 1 \ - \ \ :' 1 \11 's { r i a V Ay � \ ! � - tn�rr r \11 I y \ Y y ;- \ 1. , t1y X, t \ \ \\ r S I 11 t t ! \ , \ \ \ \ ` `\ \ Ii . \t \ M \ \ \\, \ i 3 \� £ t `\ r k t ;':, i t j i .;. \ \ \` \ \ \ ,\ \moi\ ori � I j% jj a 7 \\ V VA f v �� :' I 1i , _ : , \ i >h ' s ' S \ ` V \ VA1, 7 I 1 \ '\ o' �1rk t ..''. v AvV At i 1 1 j t , 1 �Y \ i a i \ i I 1t, . r . _s -, \ \ \ \ 1 i 1 \ .. I ._.i ,.A I- } q , z 5 f t \ ? , \\ \\ \\\ l %- i i 5 \,�y, j.. -✓✓ r. r/ ,,,_~, ,., \,t \ \ \ `\\ 1 i :t %" `� i i , t t 1 `, �.\ \\ ' „&? # i . ' ' 1 ° r �'1, t( rr ;� — 'r.- : . \ \ \ \� \ I ''i i 1 \ ( 1 :T i .. _ I t , j i t 1 \ \\ \\ t <.; +.;. P^, { I 1 \ ? I ,t '� •r`� \ ? �\ \ i ` t r rt,,i �' i -;t ; i ,.\ \ \\ j i '<\:"'„: z'r �r f { /rt 411,}1; J f Li$ ;$ \ �\ i �� 1 t \ t I .I i i .. I ; r,a � :1 } i _. t \ \` :�i =,. s=° ��; �: <> .'Hx Q�: � f i ?\ i / y'. i i :3'. `.�€i i �\ � 1 I i 1 .. \ \ 1 i f } i \'' \\ \ -,0 11 f ft 1 1 i 11, 11'1= r \ i \ ? \\\ \ \ \ \ L \ 1 1 i j ..."., ' , '14 f f ! {I. .<.,�-"^.,�.., s "I ,y , } _, 1'. { I -, \ ` `� .a ^ > �.. ?.X �' .. ...1, . i 1 y 51 ✓^'`,11. \ 1 \ i \ \ :-; � { , 'i I ^ : ,, r f( I "_..... ' F i \\\ f ! 11 \ ,Iii ' \ l\ \ \ \ \ \ 1 'j i I ' i i i { i t, \ , i 1. i \,\ \\, / ;. i tr �iit i \\`` ,} \ \ \? \ ? 1 it ! } 3.. , 11 }} a t ; 1 t i \ \. . . . t \ \' \t \ 1 \\ 1 i : , . t v . . . .Y- �' :f Y -�� v 1 ,-, ' AA ( ?11111 i �/ } I 11 I t i t a , <.% A : / / Q' \ r } 1 i y� } ' \ i ? \ A \ < 1. t { vvA\ \�A r ; _ .y I \ ! \ ,i i S\1111},+, / �� / \V V A y . 1 �1 t ', ♦' AA '., fi K " ;x ice: '/. ' ,r , , t i; .,-; / ' \ t t1 = ;, 0 t r - ,i i yvv �,W A v r� °,,I. - 4 i \ :,\y r f' \ \ V \ A \ ^y %r;sn�„r . 11 ti A VA �<'!` �.;'"'.': ' - r=tr-I ,z_..«, r.».o,�-,*,, 1 t \k✓' \ .r tt `, 1.11- , , ,f.., \ f� _. ! v 1. 0 v '` ✓;11 is t 1 M I \ \ _S.`, , \ V , \ =Y 1 ): a ; , '?., ' ,� - ,v i t '4.,: ; ,t ,�• f .�/ � � - 4`, I } i VA t \ i V ` fi \ l ..i.. v % tom? ? % , .x.,: 1 '•::: A V, ? A i . I �V \ V A �s t i t • v V' �;vv vA r Oxy i i y ? p9 ,' lilt f/ \ \ v �`4V<' g� �} "`: v v A t v �} i v \ v i. :r. ? i, v I \ w 3. m `1 - r 1 T S i,+ , A ' } y111 t} �\ 1 A j f `� \ \ It A / i t r' v: ? V \ SSIN 1 I PORARY -PIPE STREAM CRO G TEM v • i �, ::r' i %i. ' v •� • �.� ' �.. _.., as i , d I �\ 1 2 X 16 LF OF 30PIPE r �'�`., � vv :�v'` Z STAGING AREA MUST MAINTAIN 50 \v y`vv ,v I > v v v , v y� yi . v , } ;. 'ty v v ', yv v y t1 I v vv, vv ✓ �. ? v Ca iv t i V yv t v v v. o t i i ; Yi , , BUFFER FROM EXISTING CHANNELS / `vim � /r �� v v vc� vv v??�? } . 11v v. �'y``�ci t v ,dI'lej / i \ I \ i r, I \i 11 "I'lla - 1 \ i1. I". 11t y i't / � v z}-:5,✓'r ( i � V A } } U, N ,; t� s / �� �0 r `v ?? v 't ,�%y•ya v Jnrr v v yv / } 't} 1 -, 1 .. C' V A "< ' / x \ �1 1 v 1 \ j ,/ /''r ., f r✓ r ,•e _ __ 3d1 v , A i t=i \ v A 1 V A A 1 t l v, / v v'\ , i? \ v A v A v1 S \ �. v 1 A Z 11 // 1..j is t t -\ ;"\ t l r' f \ \ m , V , i _ r , y t i \\ \ A\ 1 I Vv- ,,,,' \ \ i tt 1 r /v vV r v` } _ / . ./ / r/. / A y I" V 111 `i A 1'. v v V v v 1 / Y \ I V' V �V'.` y \ \ 1 x ,r ✓ sem• - �. `' 1 ( �\ \ \ s y V A v AA" .✓ /' -.. r. - l ,.A v l 2 y 1? V A` v A Y \\ c ` \ ?' \ \` \ \ \ �� AV AA' r / S �V A t C• v. .../ , ,, ��ti v ? v v i ,y// 41 ,.�; � ' .-C\ .r ✓ � ..� r ,"i" '' / 'a .t I V A '. A V V \ V , A A \ \ V A A A I `\. .?;i., V" ,'� A �-I ,.. ✓ ✓ .r ✓ •'' r Yvt'.'/ - ,� '✓F '\ t''� i 1 \ V A V A V A ii' E \ \ Sri \ \ \A` : A \ \ v V \ \ v r� t 1 ':1' "'� `v ,gyp / ,/ / / �`'�N\\ \✓„r,,r' „^°,",, ",,... :>. ✓ ri i A\ _ .9 , i V A A \" ` \ } i ;/ '�7.-. � v \ ``\�1 \ \v V A\ \ 'l 1 I V _._ y „7 / m°' �I ' �,,.�,:. 2 ,s ,' r ,,, r ,,,..� __-. A V ? A i ' } �'` A V A A , i 1 d wtir' l ;} �\ V �c� g1\�.A ? \� \ , i 1 V \ Ali i„ +°r \ `I 1 .A'�z ✓ y v \ \ � to V t ' '�` A V \ i \ , _;;_ _ .f. 3 t r. 4 "a" c A Ac ',{, 1, , i t J, j AA ,,� .J ,ry , t ? i i• " F �'� 4 /.'' \ . ? \ I 1, �`�. • .a" V n C" ` \. r✓ i u!3 t sv \ ? �V ? `� ✓ 6 " ! y i / 'tv 5. v } v vv� 1 r . i I : � /I 1, r; : - : a \ 11 I <. i rr � � .F �\ 1 ® ✓'` O S>✓�/'' ' i' ' j >'� '� i a� \A S .v , A\ 1 V A? yVA\1 S r A 1 ,, 1 1 1 11 1 1 1 1 1 1 i' s'' ,.A ,t r /r✓/✓"/� .rr r'� ;,.."\ { \ N i V A \ \ I. �,A\, .R��� 1 ! I 1 1 STAGING �/ .,r ,/,% ,= f v v v v v A `v v?v v 1 E! h + I 1 { ✓ �; v v !; ' {' ,C; '•i /' i % �'. '' r' ms's' F 5. , -s V s� i ., �\ \ \ € j \ \ y.'h",.t,v A 1 � i, I I 1 E' 1 E / �./j�� / r AV x �s\ v vv # vv wvv A A E ! 1 ( + 1 1 AREA / �� / / / �r /. \ \ v I V v vvv� \ 1 1'I•,E i �': 1 ! E / r %vA 1 1 1 !''-1, E E t i/ / // /-,"". _ :- . e y A v v GV.. v vk�'vv i` , A 11 1 E11 �' :;y / / ✓ r \ r \ q \ v vv v A k vv vim -v v A 4 E E 1 1 111'r /- A� v 11! v vvv w V E 11! 1 1 1 ir 'i✓ / 0 \ v, v vvv vvy v > 1 I E 1 1 E ! I I s /t !� / r- _ r \ I v \ �\ v 'k i 1 \ ,� v �, v 1 1 1 1 /�" •, j 1 1 / / / . I _','�;,., ii / / r" v v vi v v 1 11 1 1 v vA 1 �i i /// _ � v �. vv I v\ v\ v v s 1 t' l' € 1 ! 1 I 1 11 I'v / v 1 v 1! :' / v I c \ ;; \ { 1 m_ . .. . . . . .,. ,._, ._ /% //// / `ro it \\� .� \ # i, E ! I ,.. %lq 11 11/ ;' ....'.•,...•.• as. %, %>� ;,:,may ,\\ \ 1 f 11 E.. }} x1 14 If 11 11 11 11 O i 1 if �'// -'" 1 i# i \ \ t \1.\.\\ I- \,,,� i / / / i \'. E \ / l y .., '\ \ \ y 117 1. / Rip / r/ �/!// 1l i y \ ,';� \\ \\ e �v . 11 2t\ \ r /\ 11 ' ,KW; / iy/� off / ej: - �:i t 1 t \ , \,, �, j \ \\\�\\\\., y \ \"wee,,., f: ' i` e 301 i " 11 I tap,/ /' / f,, CONTRACTOR TO MINIMIZE DISTURBANCE TO ONLY THE ; `\\. ; `: ,,, ft?T Q * \ , I ' \i\ F !f J' ' / AREA NECESSARY TO REPAIR EXISTING STRUCTURES. ; ` �\ \ \\ "4 %151 Q / �� ;f % TIMBER MATS REQUIRED FOR STREAM CROSSING. i \'` \ \ j \ \\\� - \ ,; �� ti ! ` + J I v\ vv -v v vv� 1 11 1 1: EL 11 I I 11 / ,; f \ \ + \ \ \ \ 1 1 i/ / I �, : \ \ \ . \ � 11 1- // \ /, I 1 I % !4 p f a f V v\ Avvvv `� v v v `�`v ylvvvv`` r 1? / / / 1 v. r e I t �v € v'- V`w: `.'- `v�uvv `v - _— ,v v yy,,�v��,� Ss.. ' / / / /' ,i \ \ I z i/ f* / AVA i Y, v -\ \, � y ,, `, -, � v A V w\ \ \ \ v\�e 0 / / / ,\ is 111 \!\ } vVv y wa v vv\. v It p / // . ✓r " _"�,11 11 \ � 11 i } 1 yam"`"' / .,, ?^�„. A\ ' .- v' - � �, : �, A, \\\ v Z % _// / F ,,I ' >t ,� pit \..,. `'\ „ -\ y `\\ Q 1 / / // _', , , n% / / / i[ �� i / a� N. ., yv i / / f \ � / \ / / ! \ \ x iNe I �\, -, ` / r / / / / / ,✓ i ® , ,v / / i �� ti v K? / / / / ' v / v; N , / / / / / ;:� y. y 11 i l .r. / / / 11 / � ArI. -".,.13I az.,rW-_;....... ,dam i / .�� I" i / /a� \ ��. C 0EL I 0 0 j 30 0 15 30 60 4 e U 0 Know what's below. n N Call before you dig. NOTES: 1. SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. 2. CHANNEL WORK MUST BE COMPLETED "IN THE DRY". TO CONSTRUCT STRUCTURES IN STREAM CHANNEL, FLOW TO BE DIVERTED AROUND WORK AREA AND SILT CURTAIN INSTALLED DOWNSTREAM TO REDUCE SEDIMENT ENTERING DOWNSTREAM CHANNEL. STRUCTURE MAY BE BUILT IN SECTIONS TO WORK "IN THE DRY STREAM DIVERSION AREA. AN EXAMPLE OF STREAM DIVERSION IS SHOWN ON SHEET 24. 3. SEE PLANTING NOTES AND DETAILS (SHEET 29) FOR LOCATION OF COIR MATTING INSTALLATION. 0 REVISED SCALE. 12/05/2017 JLM JLM CLIENT: .11""111. DATE' o PREPARED IN THE OFFICE OF: ,0%%% CA .,,-.� ' '` 10/9117 PROJECT: CITY OF GREENSBORO w-°��•••••••••R DRAWN BY: SOUTH BUFFALO CREEK HABITAT G S JLY AND WATER QUALITY NC LICENSE #F-0102 _ � Q' SEAL WI 421 FAYETTEVILLE ST., STE. 600 = . 60 _ DESIGNED LY —' RALEIGH, NORTH CAROLINA 27601 TITLE: : 60 . IMPROVEMENT PROJECT PHASE IV `� REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: CHECKED BY: im e ))) orn PHONE: (919) 677-2000 EROSION AND SEDIMENT -- � •SIR.., �� • Q 1 VVRVV This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose -� �� ••••••► �4 Y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by i, R ' % SHEET NUMBER: y y y o CONTROL PLAN ,F JOB NUMBER: Kimie —Horn and Associates, Inc. shall be without liability to Kimle —Horn and Associates, Inc. C 2017 ��i ��'��-� Copyright Kimley-Horn and Associates, Inc., 2017 SEAL: 11111111111111111111111111111111111 t•r���" ` 012137010 23 of �7 - ` us -` � �� ;r+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +/ + ', //�/ / /' / ` \ � . ��+ + f_ + + U + + + + � + + + � + + + + + + � + + + + + + + + � + + + + + + + + + + + � + + + + + � + + + + + + + + + + + + + / /� /' / / / / \ \ \ \ \ U / NN k ' / / / / . \ \ \ n\ �� U NN + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + � + + + + + + + + + + + + + + + + ' / \ - + + + + + + + + + + + + + + + + + + + + + + + + + + +� + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + / / \ �� + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + � + + + + + + + + + + + + + + + + + + /+ + + + + + + / / � r \ ' �� � + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + � + + \ ` + + + + + + U + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + '`+ + + + + + + + \ \ \ � + + + + + � + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + � + + + + + + + + + + + + + + \ � '� + + + + + + ~+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ,� + + + + + + + + / �� �� � � \ \ �> `` U . . ` ^ . , . . . . ^ . . . . , . . . , . . . . . . . , . . ` . . , . . . , ' . . . . ` . . ` ' . , , . .( . ' ` . ` ' , . ^/ �_ �_ c} '� \ \ \ �`� � � = N�UOENSE#F�1U2 421F�h/ETTEV|LLE ST..�TE�8UO RAL�|QH.NORTHC��OL|NA276O1 '''^^' ��r � �� �� »��U���� ��^�� u�^Q������N�U�����~����~� � = ~ ' ; - \\�t> k - " , i �---�, 41 . . . � , ,q- --V-. _--j- ,,­� + + + , / �, _�, l I - , , � , I , -, "o I -, - - 11 I' 1 ,�11�141 11 � . I. I .,�, �i' -,11 - � V �' ". - ...... , I , . - � 11 I I -ir, -i - + , + s 1. I I'll i- i _�_ tl i. I .i.. � ,,, I , ; - + + -,­ '-:,"r -r - .." �i­ + ,1 -il + - 11 -r-1 � - � �,� I + .4- �,,�� '_'� \ ,1- -, _i_ .... .... �_x__�, 1 _K .l. -i" A- J �F� ll , \ 1��_`_ 1_11'__�_ , , I . 1. - 1___ ;11 , 11 ; i .� 1. / _ _ , I 11 ; . \_ < __.", '_ I ; \ I "I , � ; -1-1-.11 ....... . . .... "-, . " ;_ : , ".),:� , I \ ­___ ,�. � + . � . .. .... .. .... : \ 11- ... � �.. ,,, 11. I I ,,, \ R I I I's , , -` M 11 IN '____1 - + .- .... 7�� _1� ... ....... w, , + \ , i�� , - . ',_,�M�__, " - - ,/, 11_,1,11,_ek1k2\ - I - ___ I �"' 11, , 11 I , / . " _� '�� 1. SOME FEATURES SHOWN AS EXISTING ARE BASED UCTION OF PREVIOUS PHASES. 2. CHANNEL WORK MUST BE COMPLETED "IN THE DRY". TO CONSTRUCT STRUCTURES IN STREAM CHANNEL, FLOW TO BE DIVERTED AROUND WORK AREA AND SILT CURTAIN INSTALLED DOWNSTREAM TO REDUCE SEDIMENT ENTERING DOWNSTREAM CHANNEL. STRUCTURE MAY BE BUILT IN SECTIONS TO WORK "IN THE DRY" STREAM DIVERSION AREA. AN EXAMPLE OF STREAM DIVERSION IS SHOWN ON i SHEET 24. 3. SEE PLANTING NOTES AND DETAILS (SHEET 29) FOR LOCATION OF COIR MATTING INSTALLATION. - , �� �� ­iy. _�so , " " , , `� " , .1 \ - I i I -11, �­ i .... �"r V67 , � \ ,�'11/7_1r_ , , , " " , , , , I 1 41�1 - .... � , - - Z �� ry Li ___ 140"Ift, - - __ — ­::75��7:-;,:i� - - ­� I - - �� V) � � + -i- � � ­ ­ � I F�#i' __ : — i, !10 ,�,�, .,- � I . - ... ­ - - ____T_ -_ ­7.-,��',l­_*,�'�-­ ...__ I "'. I —, / , — - \ ; V __ - ____­:1;__�_ . ��� I � � + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ' + + + + + + + + + + + + + � + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ! , ` _�-�-,;,;��;* - ��__-- ,��: �7 - � _- ` ", 11 A�__ __ \___ -11 __ ___ �, lil 4_r7_� I,\\\\,\:\\ _,_ x", I \ I + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ' + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ^� ,-,,\ " ,,\ ...... ___ � � I � I+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +\ + + + + + + + + + + + + + + + + + + + + + f � + + + + + + + + + + + + + + + � + + + + + + + � ` + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +� + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + f + + + + + + + + f� + + + + + + �� + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + \ + + + + + + + + + + + + + + + + + + � + + + � + + + + + + + + + + + + + + + + + + + + + + + + ' + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + * + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + `v + +`�" + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + - /' + + + +~ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + f + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -`---- --7J8 -----' + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +~`�* + + + + + + + + + f + + + + + + + + + + + + + + + + + + � �u \ + + + + + + + _� ill -i 1.+ + + �� + + + + + + + + + + ___� IF + + + + + + + + + + + + + + + + � U ` ``' \ `� `�� | 1.+ + + + + + + + + + + + + + + + + + + + + -�� + + + + + + + + + + + + + + + + + + + + + + ' NN SCALE. 12/05/2017 JLM JLM CLIENT: 0111111111,11, DATE: PROJECT: I-* .,*..*.. .I. DRAWN BY: SOUTH BUFFALO CREEK HABITAT A% r%rn I TITLE: - . - _j RALEIGH, NORTH CAROLINA 27601 - too — < REV. No.: REMSION: DATE: DRAWN BY: CHECKED BY: -, �#, -. CHECKED BY- .. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose � � --, �,; .......... % WRVV SHEET NUMBER: ch it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by r'�2017 **'-',,-!'�Fi L - % JOB NUMBER: Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. I k��j CONTROL PLAN ."111111111 % Iti 012137010 1 25 OF :37 Copyright Kimley-Horn and Associates, Inc., 2017 IIIIIIIIIIIIIIIIIIIII I �� I - I SEAL: �� + + + + + + + + + + + + + + + + + + + + + + + + + � + � � � � + + � � + + + + + + 4- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -``'�. + + + + + + ` + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ' �^ - + + + + + + + + + �3� + + + + + + + + + + + + + + + + + + + + + + + + + -` ```� m4 ^� ```*` \ + + + + + + + + + + + + + f~ + + _�__+--�� -+ ++ + +++++++ +++--�_-�_v�' + + + + + + + + + + + + + + + + +` . ` `` \ -,ix \ + + + �~'+ + + + � + + + + +~�� + + + + + + + +- + + + + � + + � � � � � � � � � � r + ++ + ++ + + + + + � ,``�^, ``, + `_��._~` | + + +�. +���. + + + + + + + + + + * + i. + + + + + + + + + + +° + + + + + + + + + + + + +'-��-"a�--�--f + + + + + + + + + + + + + + +� + + \ ` . . , . . . , . . . ' ^ ' ^ ' ' ' ,^ . . . . . . . ^ . . . ` ' . . . . . . . ' . . , . . , ' ` . ` . . . ` . . . .~*`�+ SCALE. 12/05/2017 JLM JLM CLIENT: 0111111111,11, DATE: PROJECT: I-* .,*..*.. .I. DRAWN BY: SOUTH BUFFALO CREEK HABITAT A% r%rn I TITLE: - . - _j RALEIGH, NORTH CAROLINA 27601 - too — < REV. No.: REMSION: DATE: DRAWN BY: CHECKED BY: -, �#, -. CHECKED BY- .. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose � � --, �,; .......... % WRVV SHEET NUMBER: ch it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by r'�2017 **'-',,-!'�Fi L - % JOB NUMBER: Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. I k��j CONTROL PLAN ."111111111 % Iti 012137010 1 25 OF :37 Copyright Kimley-Horn and Associates, Inc., 2017 IIIIIIIIIIIIIIIIIIIII I �� I - I SEAL: �� T 1111. .0 """""""""` n _ _<.. t 4 , 0 „. y i , ti u , L \ i v.. > v ,. X t ., - ., i \ �, 1 \ \v ?, t , r .. C \ / j .�A 1 /r / btu --.1111 _ ... _--.._-„ , w X 1� ��% , \ " ,; \ ,;.k / ~ / 1111-. -1,111 , M , \ e X .. X `, % \ , .- f k , / =, ", A \ \ `. -"- A , o r ,� S \ 1 Y. X „Nw. ! 31 < n. p t \ \ \ i �` - /• N } } 1 1 \ \X x r,11 \ uM ; 1 i l - OD � t \ \ „ ,< \ _ ,.e! .-- 1 \ \ `v y v n `` e v , , \ ! \ 7,v �O A :.� 1y 3 iv \ �; CV A v"V \v , 0 \ t, , i r i ., V \ \ \ SY , . 11 i 11 ,\ ., i i \ \ „ ....._..... 1111 - �. \\ \ \ Srn \4 ...\ y y �: i v �- '\ i \ "/ ' ti. \ ,� ,fir ',.\ 11 L \ \:.\ \ R \ � :! \ \ `' / / _. 1 -.... \ <`, n .. : ; 11 v % ;\ i x x X �+ a v \ V j, \ v 1\, , 1.E /, X� X x , „ vV \ A %„ „ .. a ;, / „ x x x i :r \• \ •. r .� 1 \ •\ X A X X \ \\ iv \ v v A X X X X X��� \ N \ „, \ \ , 1 \ 1' ...\ v v A a , A, y v`V 1 " \ \ \l :1y/ V V -X X \ x X Y , V ,v % l 1., ; yv A ,vA ` i i 1 Y, X >; Y, \ A4�\*,,, ~... �•;.r3. , :\ -acyti V 1,`� �1 'V,", t. i.;r X ,<I 11 y , :.. ._...... 11 11. .. v .kl _ v 1\� 1 i i\ `� \1 i', , v V ,\ X X ?: r' v\ Gc= i .� 1 \ V ! . s > V \ . A V yv_..........-1111 \ \ v v \�v x v'v A ,/ l e, v v v v X 'Y r x V 'yv �. A / �; A vy A1111... '>, i 1 i 1 ,A \ 1 ,- ,\o'%\ ......_._.1 , y \ i \ i•. '\ .,a \ x r. x 3: x \ _ \ � � r.. \ \ �, \\ , ;� -v', _. \1111.,,.. �<., > :. Ca \ , \ , / 111...1_ \ `; X... X t 'r, :a, .\\\., t 1 " \ \ \ >, : \ \1111 �;;:---\ \ j,`-,< , ;;�,\o;,\\a�,,. , ! \ \ INSTALL COIR WATFLES ABOVE THE WATER SURFACE - &, " \ �,ti \ ,\\, ` , t 1 \ \ "! , ' ', \. `, \ ELEVATION AND BELOW GRADES BANKS UNTIL BANK IS a ;..k _. _......._.. ..._ 1111 \�i`, \4, \;._ \\ \N �, s, /1111 ti.,.� •,� t !. 3 \ \ i \ \ ... n.'111 / ' t f - \ , SUFFICIENTLY VEGETATE TO D PREVENT EROSION. `° . • :,, x ,. -.!„ \ y \ \ \ < } X X X. WATTLES MUST BE SUFFICIENTLY AN - \ '•, CHORD T �. ?'`.?. ,, ? ,..,<..,,, s \ \ ! \ \ * \ \\ , _.. 1111 1111_ , . 11 11 , _<.. . _.., m,,. , , \. .. \ PREVENT FROM WASHING AWAY. ,>: ., 1111. ,.._K.y... \ \ j \ \ . 1 \ <, < , \ \ Y j \ \\, \ v _. 1111 ^.%, \. ,_ ,.. ! ', ! i \ \. `� ,,., ,:. , \ \„ �" X \a,..•\ " _. 1111. t aI-Nz \ \ " ;/ \ \ \ \ \ �yy 1 1 C 'a `•.':`_, ,. .. +, a`'• ,. ? \ '! ! \ It `'�. \ 11 \ .-. - � 11..-- .. .. ......... ___ .. _ \, .. .r .. >g i \yam\ "b.,-,,\ z a. s ;-, ; � \ , .\''\ \ 1'\:: \ •\\ C/. X X X X X S _ ._ , w- \ l ``,, '-s `, .a �r ",. r.� \,.. ��"�_, •i:,"-:-` §� 1 I 1 `\` ~ \ "_•a a \ \ j / \___ 1111 _.. .. -. x •`' •..� Wiz. :\ `. - �. fi \ \ ` \ X X ,4•\ _ M \ � x , `" :'...� "• .� ,. ` `�y',3 -- .- "`+` -%'-k, , \ ", !y \ !\ ; ' , -''„ ` \ "I \ /. ;Z.; \ X x X X �I ,I / 1111.. _ •; ko �4n , _ \\ ; `fix,,; 4l. �, \ `-,, \ <r j Ji , ,. a - . , \ \a i �/A \ 1 3 , - 1 , \ x x x �/ `• 'I " , > \. 's+% , _ _ : ' _ ~., , _ „,,,_ -. _ AT ANY STREAM \ \ :. . ...,, ,\. _� ,: w -, \ �. �. LOCATION, r - �.11 _ v„ ; ` 9�t8 '\ <-.�,..- .; . \ ., \� , .::., \,� \ . a � I- `ti"..''\ M CROSSING X x \ , a' `\ \ <,. ' , \_ :: `\ \ ~~ TEMPORARY DEEP STREAM CROSSING IS \ \-`• '`\ '` �,`" , _ .:',`; `�\.. \ i \ a a, `^+. _ \ /-, X X x ,-, . t i; f' 'i, �! tt \ \ >,� e .\ � \ _ � ,%-� \ \; QT \ \~`\ � / \ REQUIRED. SILT CURTAIN MUST BE ,: , ~ , \ UC >., ? \ ~`' �A a INSTALLED WHEN TEMPORARY CROSSING IS x x .\ „ x r° 11 ;` \ `'`' '''\ Gam`• \ •""':'- --= 'til/ ''� ' \\, ~.�. .>\ - iiat \ \ .:. - , \� `' > , IN USE TO PREVENT SEDIMENT FROM X \ \ a \ ENTERING DOWNSTREAM CHANNEL1� 11 - . \ ` :.�, ,a '\\ '•.� •,� \ ^\ \ X ...• 111',1.: X..\ .�tS j'j €` \ \`� \ ' \ j / \ ;t / . �y \ �., .-.:, `� a x x x x x`7 tt . . '. rs , \\ \ x 1 - t `�. V) \ S 't ;> z Q x . ti . \1\1 _ , 11.11-,1111..:,„, t \ ` \ ,;. ;' ILLJ. A ,`:? \ \ \ \ • - ,.� 11,11 , ',. , \ - tn \ _ _ t 1111. i., \ ` a\ , \ . _ '.. .\_. \ ., ,.\ \ \, \ '�7"-,-.,.. � �.._.----' ._. _. ... ,,\ i \ ...__......._.._:z __ 1 i "`^� t t W..,. ,.. _ _ 1111.-1111 - �. ,,.\ \ \ 1. �' `\ \ .,T._:,. 1� 1111._ ,._� \\\ �,, .,1.. --.I ,1}'� 1t' , i`r ..,, -.1- V \ \ \ \ \�1\-yam _ . ---_. - 4' i Z > . • . • �'.." Y\ \ \ \'\ \ 3 \ \ - 1 _ _ _.._ -- _ \ ; V''', 1 ....111... ____ \; / _ .. _.- \ - ,: J `\. ' - \ `" , ~ \`\\\ \, \\ \ 9� r. Gb \\ �\ <,' \" -..__ - _ - -- ; `€ f X //_ t..._-----_._-1111__.'-- i;?`': \ _ /< t \ " \ v - ' \ �' \` \ \ \ \ \. ~ \ \�\., t..'' ' -... <_ 1111 '"'_` ..__.....,_•., 11,11._ 111,1 1,111.. _. ,.,. _ t C: / \�Y „1 i \ .� ^- -' \1 \ \ \ �\ k: \ \ '\`'.. • . a., �\ - ' ' : \ \\ \ \ \\ \ \ \ \ \ \ \ - \ `^-• .,�,� `\ '\;.: .._ ._ ._ _.. _......_ _. 111 1_.. -11 11 _ 11 - _ -- �-- - .. \I i t ! \S„ 2 _ 1111 .. _1111 __ - �.1 Ii ;t ;t ' \ V - ._ __. -- 1111_ _. 1111 __ ._.w - -,.,. \ `\ / a.ti? - p t \\\\\\\` \ \ \ .c ¢ter �,11)It ii ,1'" \ / „P si _. \ \ ✓' . ; •\\ , Q \ _ _. _ - 1,111, \ \\\\\. ,-, x . - .. ! \ \ I \ \ .. 11 11.. _. a' \ r { '`?tl , • .. • • �\.. ./� - • \ \,, \ \\ \ \ \�� \ \ \\ \ ,�._� ._ "`*, ~ ~ s .. _ rj t 1 i it x / ... � / 1,, tas`; . - \ / , ./ \ . ,. \ \ \ \ \ t \ \\ `. \• \ 111\,1 1111, 1 , i t / ,.,\r ,y`€ - \, v V ,- , '. , .A A FII - --, , e \'v f. .. V A . v . , A v A ~ --,- �. a' a �j 'i ; - s a,�,_ ! 11 x x ,� €, 'x ! '- x x x ,x n\ \ \ / \\ \ \ \ \ �V<''''•l t 5 , : � , 1 \ ,: t. \ ,,,� 1111.,. .- " . i % V v v / / ,' y� .v�v v v vvv �' - , _ 11,11__-� - xEit, s _ �F _ 1 ✓ ., ,c -,. ., ,.. ,,, ,,> ,� .. \ / '' `\ \\ \ \ \ \ \ \ ,� y.' k i, ..,> _-,._ __1111 1111. .� 1 �.t .. i' i. `I I F A i \ v� V ._ _.. ..., _ v \ V A v 0 v�, . --... --.., - . - _ _. 111 1...._ _ _v...< 1111 1111 j 1 j iX' ` - _ _. _. _. __ . 4 v v , , , `�\ . _ _. _ 1111 - v AAA v \ a a.,, -1- . _'_ _-_'_"__ _ - jji �( t _ _ _ < -� �_ ;v .1- t .. , \ . ,'. - ;"11,11 ? Ay.A v v, 1111_ ,.--__..........__ 1111_. ._._._.... - i i• ._ .__.......... "C, .y' :>, /: x <,, . •• . - . - . .,- . / ,..,,, ,A ,.A , A v .. .. _ 1111.. ._ 1111 <. 'Y'.g �� I :,,,, ' _. t -, - . . r/ ,r / \ V A V\'%\\ ` ,., �A`r... �_ V'" -. .� .. ... - i. 1111_ <._ A✓ • :.i - .a. - 'ti ` ?// v v >. x X .� X x ,r. x ,.,. .r x ,- X - - v -.• v� A ''(e,•y� V "a"`^• ` _ _ -c- - i ��� '•�" 1: .. _ _ ^,,1111 11 \�\ / \ 4, �! ��..,\ "111,1 } / \, 1111... \' E ? - 7 : , ! , i �,; 3:< y A a v\.'V V v . , _- ._ '" -w-`%C� X =.; mac= . i ti'•.v t'l: °' .. _ 1111 -...<_ ." '' / a v\ _ ._ ,1111 :.. . _ _. �. v11 , v' / i ter;. - _ - � `\ v I �, „ <- , ���o v vA __ x, ,� moi'` /„ ,, .. - - - _ -_ _ r _.. -- .A. v _ ._ -- ,. ,�. v 1111.. ... -_ -� _ � - v , , , / .� _. _ _ _._ -111,1 S �. v 1111. ,._ -- _ - __ -_ < -_ - - __ .: - - <_ � ! , .�, _ ,. __ 1111 --__ ___ - -�-. -__ _..._....._.__ - 1111 �----�_ __ _ F „ < „ , > , ,1111 ,, .., v __ _ _. _ _ 1111 _. _. ___ _._ , 1111. .__ __ 1111 �- r _ v ~ - 1111 __ _ __ 1111_. 1111_ v r _ __ _ _ _. - .__ ,<-„<_ 111;1- 1111-- _.<_.- W 1111 _. 1111_ i - �. ~ - _. _. _. __. _ 1111. 1111 _. __ - _ _ . �,...,,, _. ._ ._. � _ _ _ 1111 - 1111 __ 1111._ � - M a - - _ _�- - _ _ 1111 i :_ a _ -._ <- 1111 _. V . u.. / .__ ......._ .� . �-+..- 1111 --_,_...___ 1111.__ __ 7 „., A, 1 A. v _ - -- `' '��- - �'i.--•--- ... _ ._126 ~ _ _ <. - - 1111 .. : t. - 1111. __ ,. __ -. 1111 __ _ -1111._. 1111..'-- -,_.. ',/ . -r 1111. �.. ,1111,,. ,... 1111.,.. ._ , 1111 - - _ _ .'"'__ 1111.. -.--. 1111 ._........... . , , ., . „ <.. ,.. t r. / .x% -x1,,4 -1111. -„+. .-,1111...x---"'"�_ v g., /, .. ., - .. / , 3. , . .. , -- \ '.,"- "•„ ""ws,.,,,,,,, - 1111. �' V V . ,., .,.. , ✓ , „ <-, >: ,.. ?. ,< ,:a. ,. t „ 1111_ a...,4 ., c.,., ,/, -';7---•;_ __.�w't""'"-•x�p1.,.n.-.. _ ._. ""'""°..r-�""' �. _ T; z v l a \ a v\ , __ w . _.__.__._ _ '. k _ "vt w` 1- ._ -- / , _i'., .-"f"b _ '�*�.ti.""uwwi.., \ ` ''\� \} i - •ti . ✓. \ 4 S. "` , ' ',y�' ~ '.`.SY v` .:'^�::"r'. L1ll l`- \. :lj'`'\\..,�, )\�h{ jj 7 -.,, - , 1111 - j •;,3" „�� ,." ">;^ _ -S\ ':\...y'i`p, :\.�"�:, -•� _ .. ... Y� ' r < ',. ¢' >.' )^ ..,. „ „ -,s. „ „ 't - / ... ,_.. .. 1111_.. ._ _ x „ \♦ ,•*. i,`` ,.! v �'„` bo, ,. ' - - ,~ S/'�\.��"x :\ _'/� 1. `\}`l ,.. 1111.. .. ... 1111. ,1111.. \ v,'v-/w.� .-,4 , / \, ,' - .~•\ \'^,� ;'�S \,�. .. .. 1111. 1111. 1111...-. 1111. ,,.. Y T ... 1111. _.. •_- „ -.•,,,. , ,.. 1-111_ �. ._. , � i ,, ._ - _ n, -....,T .�. 1111. t' m ,.. _ , -1111. .� �W <{.��-may® �\,� , !_„ „.4> �'.. >. ✓" , ,• - «.,,, " ^,•'Ri �w.w • ^.,'ems.,. �. \\`\__.�J.._.,\\ \\�, .% '1^� \ . w a\... ..-. • 1111 -` 1111^.'".,. .E .. ./.,� „ ., f �.., ^ 1111 �.. , -1111. "`^' ,,.� " wxu4i4n V "',`_,� ,�t•�i.i. \ `\. f \ . ,...:.;::_'.•..'. _�'�:.� - 1 - 7 .e.. / % .. +1111.. ..- \ ��.y -, a=. , .. ;'4i.:.`._:'. _ _ �, ..., - ') / „ ... -'- r,%, , ...'*, +, _ .!`c;.r'::?•:�' 1111 !. z , ,"; „ . .,, .....s ,.F ✓ / , r, } . . __ , :A� M 2V` r-�•._ .„. 1111 c' », ., , ,:, -' x ,_ - 11-11 .. -1111 ,.: : .M ti ..,,. ._ . , , , ., ,,.. '-. �, __ ,._ s •... 1111. .: ti _. :_y;';;r � r -'w:. = - . _ ,,�' 1,'10,1 / r n, p„ _. ,,,�.. c� ^- 'yy c- =-\ . 7"". x. .-r,. `.v �.;� 'i;;;='- - _ ` / / 1010 ,.,x., v . • r / / p , .. _-:.'„`�',w.� .:},' r.-..- . 1v„a,-o'..._ _a:cx"C Ate!- - ..=r,�i.. �"'.� � ,ham, / � 1111. �sgj r i _ 1111... ._<_.... 1111 ;0011,,. 1111__ -. 1.111.. ry ,.-. 1111 ,. .. , t , ••.•,.�,.,,,,�.._ __ .......... ;?,' / / w � ...-.-, 1111.-r "'1^':111 ........,.._< _ .. 1111 1 - �...._ .;43'. i � i. <•< fa <� ,> l+.. � ..�. X -„ rzt ,. ... \ .. i .. ,/ .. // � ... »... _. _ 1111 1111.. 1111. _ - '-,� 9 _. .r a . "',,. "'...: �:.._ -- 1111_ _ . 1111_ _...:�:.. _ - . - - - �`- ,< <a.a_ .). , l r . ei.: i .., : - - '., _ - A _' •111-1.^ - ,,. - _ __ 1111_ y � - - _ _-.._....._._._ 1111_ ti ,�, 1010 - ",,,- - 1111.._- "_ -- _ _ _ __ __ A >.. , 1011_ -... _ :1111.. ._ _.. _ „ r . ^1110,• < -` _ _ r '_:. X 5 �,,,,, „ # __ - - 1111.._ .. _ _ - - .r X X ., � r -_ 1011_ 1111. ,. ,. , , . ..x .. �: ., '_"'.` _ 1111. v �_� ' at - _ r _ _ _ _ v x_ _ r { r s, , . .. �• \ ? i , . ,. ? -_.r' 1111. 1111 ; �, . +,, ' „:c, :,, -t ...:: �. 3� -1111 1111 _ _ . >_ v. , .: , ., L TEMPORARY PIPE STREAM CROSSING /.�, ,. € -_ • , .:•. . • .. j / �z ,, „�i . 3 _- .. --- _ 0010, ,, }} r 1111 / /./ - .'- 0111 1011,, ,� / .. -1110 - - - G 2 X 12 LF OF 4$ PIPE / , :(t€ . a_. j /r / / / . - - 0110,., { F f . , , x „ 3, / 7: rn F /, ggs <, ,, ,# „ \ /< /. 1101 ,o X „ / ,.,% - 7 .} t 4. .- . .. ., , ., , lel\ y1,`..3 ._.�..___ -7��;t '.j�� ,. v „... :y .>: 0110 .� ..r •> *.,. \ , - - �p \ - •� „ x Q,� - \ z * : \��', �. .•"" .-.. _..e. 1111. /.. ✓1111. F{ �^ 0000 v. <.. X 4' t ._ :. • ::\ ? _ V" T 1111 ..� _.. ...`�. -, k- ... 0111 , ' : 0000 d , ,,,4'$c, �< ?: , dt X `.�: ;=2 X a>'. ,. ,�. ,.. ,' Q .._ l € „r'k ........_. _ _........ ._ - 1111. _, i // i �C. - X F __ ppp 1111... _._ ,, : - - 1111... ., J \ /.;, e`b /,° / :\ V� i .-1111._. _.. ^`\. _ :-•'7�i Y!.^ <\' - a i, 1 ---- / : \\ X X ..... W // 1110_ - 4;. „ f, -- _� , 1111 „ ,,, // X „ \ // _. r � 'N O %\_ \ �.,� _.. _ \ , `- / 1111... 4 \ ,, , s -_. ,c^, 1111 , , ,. - ,.. .. �., l <.. 1110 _. � . M1 0111 <•--o; / , 1111 # - _ « ; v' X ,z x „ `' . , i / j y\,; /I /�� \ TIMBER MAT OVER EXISTING a; ti\ � € jr -; \ \ o % i` \`s' `� x WETLAND L ( € W j( ¢, \ r . > \ V3 I < a, . ,. , r, i. r- \-,,\ . i' x x r X ,. <_ ., x " X x /'� � �� � `\' \ t `v _ „ .n .-. y ,, .r, o, Z \ 1111 .-- 11 -, r Q. „ a, :< R >w _, , ,t. X x x .. X:t /f �j� ....... 1, 0i 1, >o- ,� .�, x .rr ,d k }� :,,. M .4 x X X % r. X Y, % h ,< )? G / - , _ a, I x _ _ i' x x r -i! : -A � S11 1� 11 yam, / `-1 r -.2<.y \ \ ,.> ,._> , -, 0010 ,. X X \ 3. \ Y, :% x ,' x <s t . / . / /' < \ N t ' , %:qQ. 1111.. _._ 11 I n .•, 0111 0011 _, .". / .,. �, �, /.. ,: h.. n. :� I, ,:, k .. ,<. /: r •- r=Y3 , c.^'/ /' '\ { \ , �" ,f \ I' / \ \ t 4% I/ - 1111 . a< 6 ' /11 r M -\ h 11 11" t /1-;.1--1`1 F Q l ? \: 1111 _. / / / /„\ i ,�/it ,.� r / 'r .: _ ..... _ -..._. __.___......_ Q 3 ^ U , , l I 11 , pp `\\ p $ ra �. f ; c': d/`f - -; ,.f \ ` \1/111 //l ' `\ rX X. X >,. /. , , % r k f' r ,^ 1111 \� ( `' > a Y M, /, k. i i / ! t / / / („) ,:, ? Y. 0101 >, / �.X, r; X ,.: ,� „ x r ;, ,t t J ! , , t a.? \ F -- / \ .a /171 \, \\ 1111_., } j / t , «� € , ' .: i j '�/ '\. \ �l ---11 1. 30' 0 15' 30' 60' a MATCHLINE SEE SHEET 27 Know what's below. I Ca1E before you dig.' i '`'. 9/12/17 PROJECT: 6 PREPARED IN THE OFFICE OF: CLIENT: ��%uun#,, DATE: CITY F ;- �'..••sAR4• ''- DRAWN BY: SOUTH BUFFALO GREEK HABITAT C O GREENSBORO y : JLY NC LICENSE #F-0102 - 4 SEAL DESIGNED BY: A 111 D W A T E Ri Q U A L I T Y � 421 FAYETTEVILLE ST., STE. 600 044608 JLY DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 TITLE: IMPROVEMENT PROJECT PHASE I V Y REV. No.: REVISION: rj ' •� EROSION AND SEDIMENT = CHECKED BY: This document, together with the concepts and designs resented herein, as an instrument of service, is intended only for the specific p PHONE: (919) 677-2000 ,, �;* • • N • • WRVS/ 9 P 9 P Y P purpose � and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by -i- /�►•••••••• �. Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. 12017 CONTROL PLAN ",F ER L • 0:1 JOB NUMBER: SHEET NUMBER: Copyright Kimley-Horn and Associates, Inc., 2017 SEAL: t''11r""1 % t 7 012137010 11 26 OF 37 I I -C I 0- L_ MATCHLINE SEE SHEET 26 :3 - E ®/ % � 11� '..'___ � C, �� ,�\�­ 11"c,�- g _ � � 11 - L: .� - � 11^\ � rj , , 77 7 7, 1\ \� " I " , t �­�� 1-1 '�,v _1�1�1 / ,?? - �1 - 1'_�, I _� �Z�', � , , ,- /I / ---I#e-. -�-' I - ,­ --- - I—/ I ,'� - , , , 12 - . , ., - �i, I 1'� I �', ­__,'f.� " , , . / � I " , " �, , 1',�, 11 / __1 I - _,_ �.� - �, r- \ I 11 . . , � % 8 , I/ / C . . ; �� C / - / /I I "I \\ 11 - , I I , - I - _V� : :.1 I , , " ( / ,___ I / .1 11 , ; -2� // / `�", :� I , ...... , , , ! , .1 � _ I , . ! " � , / 11 1-1-_-, ��, j � ��\�, / \ , __ , , � 11 � 7 . I 1 5 . : . , . I \ ,� ,,� .1 . , � i ,_ / � / . � ; , _ __ � 11 -� . ` 5�1 1 / . . . . I . � . �;, , _ � Go . M ----,- / . . . . I I ! ­ � 1.1, ,� r- . . I I . . 2 I ; E .11 , 1, , " . , , / � --..--- _'..) I 0 � I /// 1q_ /I COV I I � I I— " I - % . i ; , , ,-, \ . . . � , - \ . . . . . . / i-� z . . . I � I , 1. , � . . �� : . / / 111. .""',/. , I'll . . . ­ . . . . . . . . -I- 11 ; . . � ; i , � - . I � . . . . . . . . � \ : ; ; , "- ,- I . � . . . . . - � di 1� ; I , . . . . . . � . . . � . . . . . , �� 1111\, - \ . I - . . I I , ; 04 / I - - - . . ; , /, -,-,�,,,,---, ,,, _-1, I , - I .1 - . I / ", , , � .�.." � ,,� " " I . . / � I - I . . r - , , e 10 � . .... .... .... - r.� 11 . . . . ��111 - . . . . \ . ... . . . . . . . . . . . ". . . . � � , �,11.1 .... _6-: ',�� � ,',- - '. � '. -.,. - '. - , , , _� ;�,-, . 1, _ / . . . I : � / ... 0- � , � � ds, --- ­;�� .... .... 1.,'_ - , I . ..... \ ,.­.­­­­_­­­ .... - . .... . I 11 / . ." . . I _ 11, ; i - . , : , -7. _." .*.� - ­ ­ ..... _ 1, , ­ 1: ", . . . I f __ I ; . . . . � - . 11 . � . . . . " - .1 .... ­." ­ ... � . 1 , -.1 .,. . . . . . . . . - �i`� .... �_� \, . I � I "�', �� � �, 1� , . . - \ , / . . . � , , !--,. ---- �'_ 0 \ . . . . ; � 11 I . . . ; . '. ;" N ) I * __ -1 . � _� - __ _ -,�,, ___ / . . . . / " :: ........... 10 . . , � ., ��,,-, � I .. .. .. �., Z � . I . : - . : 1, Z . . . I : , -9-- - ­ ,- ,-� " , ­i�, / � . . . . . . � - ,;,k -- --- -- � I ___ . ! .... � ...... . .......... \1 . . I . . I ,'--. , . .:_-, -:� " ___, ­ I 1. . . . . , � , . . . . � . . . . . ! , , " --\------.--- - � - - . , ­ : --.- -- - - �- ­�_,� _ ..... _ ... ...... 11 ............. -�-� . .. . , ;, 1, , , ,- . . . . , , -�,- . . . . .,/ 1�� . , __.__- , , , , " , , , V�' , , , , , .... I 11 / . . , , 0 I// I I , , , I . . I . _1111"'. - " , ,�� � . . � , ....... 11 I I . . 8,/ ,�', ,� - ..... 11 / Zi Z I 11 . . I \ .... . ..... ... ..... .. - 1\ . �. � ...... - .- __ ,_.,______ _ " I 1, . ,,,, ,,�-- 11 I , . . � �, ; / -",,' \\ .- .... j �;� . ,�;, --- " _. ­­­_ -.- , , �, .... --j,__ - 1. � � " " �, -,--. , � � ___ .... _ ... � -;Z�1.1 --i - __-,-_....__ - - _, ,,,��,' ­ -1 I/ 11 � " , � , t - - . , . I . . . - "" \ I 'I.,,­'I­ , ­� - , ,,, - , ­ ­___ _ ___ �t ____1 .... I—- . f, -0 .\1�_,��, � - --�- � - \ / / li,__ - ,-,- '­ -,-,- �: - I- -,�,11, * : ,I . � � �. � � � , I , ,�,- I - "-I-, __ ,:��, � , , , """, , , 11 " / ,� �,/�", -�, 5, -,t,,--. , �� - , , � ­ -- __ __ _ � % 11 . . - - "' - - - - -.��- �' <' \, �,' � - ­ ...... I ..... - I / " .::::::::�:::::, § \,_ - `­ I .11,- � , . � , " __ ....... ,,�--"/, -',' . - __ _::� � ,,,,, , \ - _ - _��- i - J, - . - . , -, - -- , , / I / / " " . _�,_ 1P ,�� I , , " " I ­ , ­ /�-,____­ " .............. I- L�__',' � ...... - .... __­__ . ....... . . _­ ... - .. ..... � ........ . ... � .... I - - I I - I. ��.,`, . - , I /, I , " -­ " , -,, - , , ... ------ _ .,.-,,, -',-_'. ,, -, - -, _, \ . " . . � . , ., , - ? I - -�- - ��--- -,�, -- --- --- - : , _ I / . . I -, ; 'I', " , I � I - � (n / 11 ,-, . . . . , � .... � . ... ..... ­­­ ..... . . 1'� I ,, '4, - � , , , , - , , , ,-- , . , I / � � _ , I /��/ ,�, / I. - I , �� I / '. . . I .." 11-1111, . , . - ­��* I / _:� -"' , -11 - � . -:1",* , - I , " , . . ,no . I I I/ "I" I . . . . . . / /' " , , � , , . . . , \" I / , __ __ ..... ..... 11-- ....... , , ., . . . ... " . - - - , 1, "_ . . I �......... _ , '. 11 " , , , �� , " ,��,� - �, � � ,-4 --,-.-.. . . . . . .................. � .... ..... � . ..... . � ... _4 1 �� \ , 1, I I "i " '. / , , , "I / / / I � , , , - 00 1/1 . , ,��/ / /� ,,, , , � 7,� - ______ 'I, / "� / . �,' -/ , ,� . . ." .1. , , ',',/, / , 1// _� �� � , "� �, , . " -, . . . " / ,�. " , � ,J.�,�;�_ 11 � 1, - . . . .. �__� .-'.- , " i ", ,- /Z I - -,.-.--.-.. - t I ',� , , , ", .... .. . I - - - - ­�,-, , / - � - __. I`�,,­j \ ./// / _ , �, / /'� / � � , , 1��._, . - � , , 11 1 � " , . . � . I - . , . � I / /,- / , � I , , , I _.. .� .'__�,�, � I /// /-/, /,, /_/�_,/_, �; _ , - , ,:, �_-_ �� / \ .��.'.-'.` , - - -Z-p --,, " --��-,��,:� , - _ I / . (0111 : I /,-, -/, I I/ �, � _ .- ...... I ... I . , . . ..., " � �,,,�. - I , " , , .. , � 00i I ..".- . /� � ., ­ " -� . ". Z / �� , � - - I /"// ,',-`,',�/,�" " /,-,_ /� , �,, /// Vv �- - - ­-, . I ;",,: . � I - - �! " ---z::. ,;� , Z I , , ,,�,,,,­ I - , I ­�_� -, " - -'-,---'----. - : -1 - - - - _ -1- - - __ _.- - _:,�Z_ 11, . . � . . . , , . . . " I / / �, - �� /�, --- ,� , ,�_ - .. .... .. . ....... � ...... \ I 1. 4 1 " -, , // " " �� -, , !,�,�� - - . _ � .. - . f . 11 .. I . .• . . : � � - , ,� __, _ . ... ...... __ .... � .... � .. .. . ......... __'. , . I � ­ ­­ ­ -.- ­ _ _-, _ .... .... ­ , , . -- .-_�.:.-. . "� ; ///, / � � ,/ , / , Z _�_ - - - -......- - - .. ,.-. - \ 11 �. ,..� M,': . � I- - \ ,� - � / - � - _,�' ­��,�� ��- -_ ­ ­ . . . . . . I ! I _ .. .. .. .. "I I " /-,'1-1 -.:� - _ - " , , , - - ,- ,,�Z Z:-: - - _ .11 I �, I 00i , , . . . . . _.. "" " " "I ,/ , Pz� % \ ,�� , - , . � // - __ _....... __ ,/, � p - \ , , - ... , , , / ,// � - --, " Z�, - -�­�� �� ��Z -_ --- - - - - - - - - - - - - I � /j/V " -, - - 1. . .1. . .1 1. .. i . . , , , _­ _� - . _ _ -_ _ - ­ -- - ­ - ­.. - - _ ..... ...... _ ­� " " `4 - _� , -1 -�,_1�7------ ---�=- :�� . ::__­.-__­­_____-_ _-----_.-_-___--1_-1-_-_1 _--._______,t__, - .1 I . . i " - �11 � I _. ;k- , . 1, � . . , // I ,�,W ,�, ,,, � /�.' ., ,,, " .7-35 . ............ . . .. ,", ....... � � . . . . I ,�-�, �-,,, ,-"-/, , _�,_ , ,,�, I _ �,, - 1. , . ,/ ,// ,-- 1:�-�,- `Zz- :Z-� -z- -: - -- ... � ... 4, I � I - . . .. �_ """" i I- // � �,, -,., - ,-, , /�­, , , ,,- . -------------- , -,.-- _..... . ..... .. ­ - - _ _... — 6 . : I . . .. _ i \� , /;" - -,, - ; V�Z_ -'f 1`20, � -1,..... I- - - ­.­­ , - - .11 ­ -1 L -1� ' 0/. - _ -,111 , . �-� ,,, - " 0011"""_1� ,��,:�� ­'_ -.-------.-- ..... . __ __-:1 __ - 1 1112� - __� - -_ -_ __...... _....- ... . _ __ " ­_ _. ­ - I I" -- ': ­:�7 - Q , , __ _ -, __ - - ­ - -"* -, _- 7:=._._ - - ,:�_ __ __:� - - -il ,� - -------> ­­­­.- _ � ------ �� - _'_ _: - __ , � - , , -­�-� --,,------��,--__-�.-.`_'--_.- .,-,::*- _:7,::�-,_.--_�-_- - -- �- =- - " �\ - , \ - - " ��, -;,-, '-, , - ,,­,-,- -�_ I , " / / , � - " I- -�,- ­,�.t,, __ - - - - - - -..,- __....._ , / ,/�,,, , ,-' , I __ ,I- - " .. ­ __ '_ - -..-.- - -, - - , I -- I � ;� - 11 _& - - / - '41 1�_ - , ,'� ­ .�,/X I . . . - ,�/ � , I -11 X, " A�_,�i_,__ I " ­ � , - � --- - , _- . - -!-:Z!-:-: ,.� , �:, !, I I-, - , , . . . . . . - ".��' " - , ­ ;­ / .. . . . . , i I ''. __ - _�_ I I ,�', , - - - �_ -.I--..-''- ", _. - - - _ -77Z:7__7:7 :�� _::� _ , , , , - - / 4 z �4� - I . . - / I - - ,�� - - - - _ " �Ii _ - ".., I " , __ - z � 1. " Z< ­ _Z�-- -- Z� �, - i "I gomm__­ '--'---- '- ,�- - -,:- - .. - 11 ; _ , -.,- - _ _�,,�_ ­_ ­ - _ - 1-1 - - - ----*.- � ; . ,­­_ 1�� '�, , - - ��4� ­ - __�. -:, -- ­ _:7: - - * I , - ­ : I � , - , - - ­ ". Z� , � - - -�, - 11��, - - - - - - � ,> - I \ % \ I /.. .. . . I �-1, ­� -'- - ,,- , ,� ,- - , , / I ---- - - . _ -:�, --- \ , I * .", ,7 - % , .,. - �p� . L7,, , ,,, �,,, . . . . . . . . . , , : ; � I I , Z ..... ... . .. . . ..... : _ " " I i ... . . .•11 - . . SKIMMER , ,� , " --11I= �. ..i .1.I "" ,,. . %��.' / w ',.,_1M / �I . . . . . . . , , � \ . _'_I.; ,��rg, 0-___� 11 ... . � I I'll I . 'i�, 11�_,:„,,-­___.­�,_-----. --`-I,. . �11. - . - , , - I 11 ” �, - I I— __ __ - ___ ____ �I �: 11 11 . . . �,,; / ��/I" �_F�", , , , , �, _ � I ,� I I . I'. . GRADE TO DRAIN TO SIN �_ .� 11 � , , -::" - , "'� ,, -- .11 ,,, - ­ _ - ___ _ ,. . - . . _ -­�--- _ ­_ \ "\,,­._-_",1.,/�,1--�, --111__,"4;_ Z"�--,--.- --- qZ -, . ._:,.,," ,11.I- ---..---_-�� - Z-- ­ , __ "� �� - - �, ­ - -, " __­-1-Z.��__ -, , �',_- - ' \ _ '1� I I " I , ,�� , " - - - - �� - ­-,'�'&,' _­ " ', , � -1 - - _,:� R_ / / /,/ "o " __ 00, , , , , " I - - �_��,\`\,\�\\_,�\\\ , " ­­ - - - , � /0, � - -= :x - ­ - �,\\\\, \,\ � ;, '2 "" ""I _ - � ,�',' \,\\ �, , '' _ - _ , _140 ?, , _1 .- _ _ - . I `�,�P __. "I I - 2ep ­­­ _ , &, / I " � , �_ w , - \ "I ____-1 -, _�Isa, - 'I- , - __ - _ _ _ , , \\�­ -, \'�-,\\\\N -- - 71\- _-, 1. , , " \ "I I ..... ,� / -- - - / I ;, __­ ✓,,�, 1_"`� ',.,',,I 1� I 1\ \ \-, \ -1 - - . . / " " , i , \ ­ \ �­ \ - / I ,;", , ...* - ,/.", � __ ", ­_­ __ _ __ _.,.-..- - ___ _ __1 ", - __ _. \ , \\ � \ ,,s,�-, � - � /,/ � � "" ..- - ____ _ I ; ,/�,;�' -1 - ,�', , " , __ ­_ -1 I -,\ \ - �\\\\,\\\,\ / //,� " I , I - I . " I "I "I "I "I , I 1, -, .� . . , I" I I I � , , , , , __ \:\\\\ " 1\ , , � I I I .. ... / ,, - `5�,, 1 1 -,- - __ ", ,-, - . � , , , � , " 11 , / � , I , 1 -",;7 _,.,�� , ,x , . . . \� , e, , I., I I I I " `" �, , " � I , ., , ,z� - , , \ __ -..-,.--- _ I " - , �,� - I � - " , , , i �,\\�\'�'\ ­ . �/ - \ . . . . I -1 ,� j ;I. N4 . ; I I i , I . __ " '11\, \�\\ Qo, , - '\ ,;.,:_" - / I �, - _� , \ , -1 -1, I __,, , " . ,, - /, / - ---.---I.-- I----* .. ... " I , , \\ \ I I \ ,��, , X, \ 1\ \ . I " 11 . I . . . . . . / " 'O, - - �, I _­ �,,­_5�!r!' , , �, I � . , �_,_, ` � ­­ /. / I ,,, i - �, " , � �r^- � __ I . � */ ­ '7- - "\, '�f',/ � V111 I I y I " , . / , I -V -- - ". "I 1 '. I - " , \ � \\�\ ,, \\ \ �\ I � .1 1 , . / �, \ 1/,:,-----_----- �,d� , -, , - " I \ \ \ \ , \ �­"'x ,\ \, � . _,5�,­ �� ,\ I . . . ,,� , _­ " ,,- , 11 GRADE TO DRAIN TO SKI � ,\ \ \ ) ?I--, <_ \ - / I I ., , . - � . . __ - -� �1 /< BASIN \ ,� �7,'� 1 1 ,, _- i , . �,g/\ �\M\�. � \ ,\'�\" ,1, .. ,. / __ ,,��""X :,-- 55 � \ ., , - " \ rl�,-, I ,, I 11 - "� / �, ,\\, , , ,-1�f, 1�1',, /�--7-51� - \,I\\n ,� __/ . ;� � �� � \\ \,\ , \��­, , . , . ,/ , . r/-,- - 116 '1� ,\\ \ \, �, � "I ," iI I 1� , , A - , , , ,I� ... / ,,�, " " - - , - - - - - - - - ---- I � , \, , �, � , _1 ! j . I ","", ✓ , I - - �, \ ,,\ \ \ - - . " .. . - ,,�. I . "I I 1- , .- ,'_14 _ ,,, , -, \ ,Z§,�­ ,� t, , 1 � 'O " 1, - < , � - 'N. / _. " ,,, V\ � !,� � 1, , " " "'Z,' -1 " .. . _ " " 1. I 1\ ,I\ 1\ I ..A. I I �, \ - , _ ". � . � .- � Q0 - I � _ 11 �� \ \\� � . / \ , - -,� , /�_ t . - _,x , . , - \� \ " , , " " , ('N'L, ' . / , 1,56 - -, , � , A -- -, TEMPORARY PIPE CROSSING ­ - - - 11�1 _\ , , , ­_ 1_ - 11 ; -,= - .... . i I - \ \ \ \,\ ��,� _1 11 _ � . . . . . . ��,IN / ----A.- , , _ V ,� ,_1 . \ '�, 20 LF OF 12" CMP , ­-','-' -7 - ­ 11 . . , I / , � _ ,_, _ , I I - , / \ I�A, , lil, I / _ _ _ _ _ _ \ \ \ I . 1 1 1 r', / , \ ,�,,y/' _­ ­ I I , I \ \ "' I "', "I,. ­ -1 " � - \ I , , , I " , " , _ , , / , " , " t \ � - , _� / �� - � - . " i �� � , / , , / , _ \ ��, - ____ --­ � , I ' J I , _/ .A -,- __ _ __ � ,\ A - -_ \✓ , ", ,/ ­__ / I � _ \\ SIF � �;�Z , I I TioN," I / , 1�1_ , I I I I I I I 11 _\ ,_ _ ­\ ��/ \ �, I , PIPE INLET PROTECTION; , , \ , / I ,11 \ _5 11� ; * / , i , 1, / 0_1`� I- I - ,� /" I , , , I I - � 5) i , , , , i I � _,1 ,,�� - - i /Ij � , , ,r __� � - . . �______757 - / 1\ �, *�, � , ; 1 , , " -, " ',� Z '�, -7 . . . . . . . % - � , 1�, __01 1 _1 I ,\ , . . . � _._____ .. .... _____._............_, 1�' � 60 11\ � \ \\ I 1�11 \ ,\" �; I ; ii� 7.- I N" / 11 �!L _.­ - - .- 11 , , � . . __ � I . . .1. �\ I , � * . . . I '\ 1\ 11 _/ / -1 11 I Q�� - - \., , /./ /I ,II I I'll, ; � - 0 v 1, / _/ "I'll I I "I i \ \ I ,,, � IN- -�_p - , \ / / �., ,� \\ ,-\\,��,\�, " \ , A .. * , \ I I �\ � . � x � � \ x-, - \"RX" \�\ " - -\�\oz, \ \ - . \\ \ \\, _ i... . .... I I . I \ 11 11 \1\ \ // % - - � \\ �, . % \ " \`., - --.-., ", .- ­ I \', , " \' ,, . . . ... . . ... - ;x. \ \ \ "� ", , , , I �,'�­ � \ _- 11 \\� \ "' ', . . , , - _.-_. - - 7 58 -- ­ -- - - - .- - __ __ __ _ \� ,/ \ , " " 1, 'I N \ �\, .-�N I . , ___ - - _. - _.- _ I - , I % , , __ I / l_� \, , A \ � 11 - � \ \ _ �"I � , \ � \ \\, ,,,`,� \ . '�.. .. . - "I \ I , , .. �". - '. 11 "� , _­ I " , ", 11. . . . I \ \ " ­ k ; 11 1\ \, �,\'_ % \ , I , .. " \ . , 5 \ , I � � , 1, \\ , ". 1,�, , - - � I , 1\1 \ I 'Al, - ,,, , -1 1-� \ \ � " 11 / . \ \ � M I � \ \ / � , x ..... < "✓ - , V�,.' .,-.- _ _ _ . . \ \ ''I � , , I '' , . . . -=\ \ 111� � I - __ _ _ _\ 'X , " . .. . . .. . . . . . .... - - / I , , \1 , "k \ \ / I I " . . . --- ,�, , , I , , 1- - \\ � I" \, \ ",... I 1. 1, \ \\ \ \ -\`,x, % ...... I I :�: % '\ I I � - .� ,� \\ ; _�/� 1� \ I " �, . >11� I " �? .�., 1� 1, 1�_�, ..... / / _\ ✓ � \ \ \ A 111 � - , , . . K, I � 11� V ­�,,,- -- ­ .- .- - \ , , \". \ " , " Zx - , ::-:..,., . . � M " � -, \\ " %, I I \ , \, , I.- . I �, �, \, \"",\", ,\ \\"5"� - '= , � _k� _� ,\ , _ 1� \1 - . .. * . 11 . \ 11�1 \ \ \,., , \ -","�� , I?- , , DRAIN TO DIVERSION t "I (-.,-. - - �1\ .. .. . I \N- 1\,� � , ." \ \ " "�-�, \ - * - , V il / , \ ", ,� . . % A . . 00 ! ;��, .1, I \ " \, , \,\\ ,\ �",, C% . . . . . LES, 2% MIN GRADE. "I 1\ "' / - , 11 , �, , \ , ,-, . . . � I ... 11 I 11 1\ I -A , .1 I I \ , I \ 1- ....... I "I " 1_1 .1 \ I ,\ (�� \�\ \ 1�\ " " I �i \�,✓ , ­ / , \ \ \ \ 1 , , \ \ , "\ ", , ! ;r, . . .., . I , / % �1�111" --,� I I I \ I' % 1 .46, I/ i , . .. � V11 � - �_, '_ -'-'-' IS !1 I � I Z , _____ \i}} I R 11 / I \ 11 \k-, , - .. - ..,..-. - - �&� k� I \ - - - " " 11/� \ \� ­_ - 760- _\ I \ \ " , ,A � , , ... _. :1 - I , -, . . � ,\' ; i, . . I- I z \ . I t, 1, " \\ " ". " �---',' �1, ......... I I __ �_ \ � / � 1\ '�, - . I SPOIL AREA __ \ � !,'g'-, � ';� 11 11 , � \ �� , . I I I I ,_ \ ,,�, � i ,,, \ " `Vft . . . I __ ! '101 " , � �, t ir, - , ., — I I \ , \, _,_ I—\ v, " 1\ 'k � .., ,,`O�, .., . �'. 1. I _� -I- CLEAN WATER DIVERSION. GRADE TO f I ?K,�,'�', , I ! , -- \ \', 11 �\ , " - \&, .... . STAGING AND , \ 11 ,I . I I 1 ,% . ,� , 1\ \, ,� \ � \ - \ , t I A - 1*.. ,.-."�.�. I 1�1 r , ; i "', 1,1� I �, " , � � IN % - I `1_1 , " I I 1. " 14� , %, i �',"l I �, , I \\ , '�, \ \ " . . I -SITE FLOW. LINE WITH i 1�' il . \ 'I- \, ,�� " � 1, �,� ',`,��, � . "I DIVERT OFF 5,a� � " . � I . * .. ... 1�1 SOD OR RIP RAP. t f- 1 1 1, I--,' I I -_ , " " , , . " ', , i "" I " . . i �� . I . . ", � I .... . . __ : i i , , I _ , , , � " 1� . , - ,-� , , - . . I 1�\ I , � , �' �, � " " , , " ., . �, �W, \ / I , _ , \ " 1� -N,,'. ;r� _­ , ,\ " "" - . . " " � ,,, ,',� "\ *� \,;, " ", ""l, . I . . ,/ - ,\ i I -11 \ __ , _ _­ . I - %, , - - " z� � , �,,, . W " _ , , " I . "ZL ;k � - �i I'll 111� *�x \ _ -,- I , � . - , _ , i , -, - -` \ " \ , �, , . . I _� I , � � � - I , " -- ��. � - " , , , - -i - = . I - � i ,� I� , � �' V\ \1 \� \ \1 "N", ­ ", . . __7 - �/�_, I 11 , I \ ,�,�,��. � ... - - - - - _� - � � \ " - 0) \ 1.11\, ,\ 1 . , . I " - ­_ ­ _ -4 , I 11 , , I - " , �,��,'� . .. "\ �,��\\,\\\\ I . ., \ � , "', 7 ,�\ 1�,\,\ - \, \�X'-�� % t i .-,., ".'�.*. I -, __ .. .... .... ____ .. .... ... - - -, 11 � \ \ I -,- . I I - _ i �\ �\,\ , ,;" f ...I 1. � , , Z \ �,,, \\ \ \ \ \ , ��" I I . . . I I -, - I I . 1�1 \ \ \ \ \,� N1111 I : . . . . . I \ � i \ I 11 z , i .... .... I \ ,,� \ 11� I ,\,\ , \ I \ ,� . . -,--, \1 I I " " \ -'% - \ \ \A/ i i; . . . \ \ - � . . I - Q �, \ ,\, \ \�\\, I I \ \,, , 11 " ; . I I . . I - " \ '� - � � � I 11 " \ I \ "x... ... I i _._ _____, \ ­ \ ,\ �,, , �N . I 1\ , ;r� " I ,.,. '. I 1 -_- \ � i 0 _j \ \ \ _� 1\ \\,\:�kk . S -= . . / il, 1 \ I , , , i . . I -1 I", 1� 1\ \ ", I . . . . \ � i __ '- � ! I , \, ��- i .. .. 1 2��- f� ..., , . . . 11 - 1'� \ ^ , . . . 1� ;_ I 1, 11 . . I s .. 1. I - � I ;�,�, , � - il - . - \1 � I k 7 , \, " , -\ ",\ \ \, \, "�', " . . I . '% *1 , " 1\ I \ ____ I \ , I \ X ; I \ / I __­�� " I \ � 1?i , , .1 * , .1 , - _� ,,,,,IN& . . .. ..... - - 0�1 , 1. \ \ \,\ \, �A \ \ , , * � I ____ /_00;_-_—, / 1��' , �� � I \ -�-Z,,,-,,,, ir . . ..� i " , ___ I I , " �­ � I \ \�, � � \ \" \�\ \ \�\",�,t, , "2 , \ "f I I C-) ­� �1_ \ �\, \ \ �' 11, \\ ,�", . , � Al � \ 1�'600, � , Z MAINTAIN 50' BUFFER FROM EXISTING ,,,, \�\ " \ \,�;,�, "I" , \ � 11 / 0 CHANNEL TO STAGING AREA. , N / I \ \ \ - I \ � " I I . . ..� � �.. som i 0- __ , 1­11_dvlw� I 11 � \ " " " ,!,& 11 11 /// VF _� M4------ 1 1 LLJ I I __ \\ I I \ �-, , 1, � \ � , � 1. ��_,, I 11 ,I 11 \ I \:, __ - '.'-.'.'-- ; . - _/// ______ I ­ , 11, \ -I "L \ , iaL<-----' (LL< . . . , , \ 1\ \ k � � , I � " � I \ \ -, -, ____ --- -1-1-14M ....... 0 I", � I \ � - . .. , I rf ------- � - � I , , I I , � - � - , � * , ", \ \ � ir. � 11 \ I I 1, I ,�,\\ ", '� ", I.1 . -,-" Li __ \ "x ---///10 t0-11 \ , " , '_ '' * , ­­ I 09 �\- , 11 , \ " %, A e "��, - - _mw�z�:�JIA �_.4_ ------- � - , , I 1P ..1.*..-.,. i I --1 , \,`��\ " %. ,\ "'N 11 . . . _�� - (n \ , " \ % i , � % / � ... � \ , . 11 , I _t". 11 . . . 11 \ vw,�/// 14_____ CIL< ­ , --- ,��_ - . I ------ . , �� , \ , " '_'_ \1 \ \ .� . I � I ___ /// TP,7- - -- al: __ ­ wp",� �_ I ____­_­___, ­ __­,,­,­ , X�l In _ \ \ , - �, . . - Z_ =11 \\ , 0 , , , .. .., __ __ 1-11_ " \ N. �� \ 11 1� �Ilk _�Um­ 1, - , % \ I . , Z .... � 'I \ � � . . .�. 11 / IPF, , W15 , * I . W , /' -_ -_ ­.­_ _ - _. - , , -I' 'I. -1 - - I I \ , � � ­�­ \ , I . . . ­. ) ___— '__ /I i / // ,�, .-----,---,-- " I _ . .. .... -.,.- - ­.. - Ill 1 " ; � ­ __ ,.-,- _ _ _ __ I ---..- .- ­ '------ ....-1 11 "I, , , � 11" ,_�, I -.--..,., __ - _.- , . I I 11 , . . ��,�,r , , '� / ____�, \ " \ \ 11 1� , , I , ,,','� I \ ��r --- , � i� t \ N-, , , ;b�uw- , - - - 1_1_1� - 11 \ , , ,� , \ X ",", _ I -1 I � I__ , , \!, " . __ ,,,�,�,�� _ , i\ I � '- '�N%"�'� \ , - . I - ____�__ _ � __ I Z , \ 1, , \ � �1 � ! (/ � "". __ __ _., -, .1. _ - _ ._ .... .. ___ ... _ .. .... _ � / 11 \ ,5 �, , I - I � __/_ " _.- . . ..... ..... . . . ___ \ I ,�, $ 1 0 1 \ -, \1 I/ \� _- , �, ­ __ ' ­_ I- _.- -.-..- --- - _ -1 ­ I - - - - - T " ' — / "' � 7W'-��' . _ . . . . . . , . _ _ . . . . _ . � _ _ . _ . _ , - �1, ;11 ,---_=,7_-_,==::_, I , .1- .............. .... ........ ... ... 11. - - -­ ; , 11 I I I - I - - , ,\ I- " -- ­ "__ � " -­­ , � 11 ­ I—, /�i � , -1 - I - - �� M, � / _ _ - 11 , -.11 I // /I , : ./ -�� --� " x " I __ __ \,--- ." ,\__ ,-" ,� 11 - I.- _' _' I 1�� I- " -, . 'ROTECTI&G) / ___ - , __ -, _/ - I I " W -'- ­!. \ ­ " 1, I -1 3 I PIPE INLET F / __ 1, Z_::! ... ; - �. -, ,- � - -, , 11 __�_ � ,,,�-�> 1, , I �, ______ __ _ 1- 11 ' - ­­­ I .�, - - ­ _---::_,4,�� -,3�, , ' , /I � 11 - Z L-"�,:, -_11 �� \ �-\_ ­___�: " /I _::� __ I ... .. I - - --- -------- ­_ - " ,_� .1, 11. I 1-1 -I---- - - _' " ,111 - - _ - - - . : I , , " � _ --.--.-., ­ ,-V � ! ,013 . : I/ . - _ " , � , _ I-- �� __ - . Zi - --- ____ _ -_ " .... - _ - r- .. .. ,�� - - -1---11-1 , , ,4 --A il . \ I ­ 111.1- ....... � \ ,\ --!�,,,�� I N .... � ..... . .... _ i, \ 1\\ , I \ � " _ I I I 8 _� 11 _� - ­ - "I ��.�, _ ., � -_�L �4. ) ,_ - I I � __-1 I " - ........ � ... . �­ \ � I 11 - �_ �, .--✓__---� Q) " ­ __ __ __ - . - I'll . / -1-1-1 1- --1-1 -11- ___:��_____.­ , . 1-1 ­ - - - . I I \ ... ... IN ­ I - ___ � ­?. i 1 . ­..... - _ __\ I 11, ". ____ - _. __ - - _ I -, 11 _ _��_ ___ � / ___ - ­ � _ __ " .- . ... " \ � \ �__ \" \ ­__ � " ,_ ,:� _::� I I 9 I ;Z� "W , k �_ -, ___ _ _ -, - - _.­ 0 , I , / , 1� __ I � "I , . .11/i��---- -- I ­ I _ .--. - - NOTES: 1. SOME FEATURES SHOWN AS EXISTING ARE .BASED ON PRESUMED CHANGES FROM .THE CONSTRUCTION OF PREVIOUS PHASES. 2. CHANNEL WORK MUST BE COMPLETED "IN THE DRY". TO CONSTRUCT STRUCTURES IN I STREAM CHANNEL, FLOW TO BE DIVERTED AROUND WORK AREA AND SILT CURTAIN INSTALLED DOWNSTREAM TO REDUCE SEDIMENT ENTERING DOWNSTREAM CHANNEL. STRUCTURE MAY BE BUILT IN SECTIONS TO WORK "IN THE DRY" STREAM DIVERSION AREA. AN EXAMPLE OF STREAM DIVERSION IS SHOWN ON SHEET 24. 3. SEE PLANTING NOTES AND DETAILS (SHEET 29) FOR LOCATION OF COIR MATTING INSTALLATION. .r- I \1 \ 1� \ - - �, .-.--- 11 . � ; - ­� ,--,-.,- -, -, ­ -- ­ ­ _ -, -_ — — _,, _,-, - - "I \\ \ 11 .".1-1...... \"\-. ___ I " �11 ­ 1-1-- I� 1\�,A;�--`I­ -%­ - TEMPORARY PIPE CROSSING ", " I _ _ / " - - _e�� i I/ - ­_ ­ - . .. . ...... . - , � 11 / C . - - ,�� I ,� ---A'' >'-_'!� "' �(­" ::Z - CMP - - - - - "I _', 11"��,___.________I I . , _ ___. __ I 11, f-1 , i a . -\. - , . " . ..... \r,., - 11 ­__--� - _,_' - j ! !1� ....... . I :��: I � , __5, "' �� , ' 24 LF OF 12 - .1 I - _-_1 / - �, ,� � ,--,--' ; 1", j �, ---*--,--, ,,, - , " ., , I �, \ -,---------, - -1 .... ­.".- I 1�' . � I - . � Z " , , , , 11 I -, i , I _____ .................... I ................ -1 ` ................. _ , \ -, 1-1.11 __1 .­­ __ __ 1], '1-4 r;l _­ \ i . \ -...-I - _ ..-. - -1 _,-* I _ _-­-- - -QA -...,-.- ____ a ----- " / -1111 ­ 1-1 -.1-1-, r ­ -111- -, _­ 1-1 '), \ , - - - / // "","",,-�,Z,�& . 11 , , \ O_ - \ - , -11 - 3 --------------"- It 11 __ 1, _1,­".�,�__.­_­ ­, 1. - , \ �_ 1/�� __ I - ; - I '_, - ", I "'. 0 __ 1, 1 - -, - '11_ , _ , 2 _` \ , � - , "" ,__ - " �_ - ", 1� , _____� - \ - ___� I � ", I _�I � ___ I .11 \ ___ ------- J __ \ ____1___Z__._ " 0 1 1 ", 1�1 /� , ." - � �� 1, ­ ... 1­-_7"`� : , I 11 \ " ­ ___ _ - "" L) ;I /I - I i \ _______ 11 'I , i M I ,, " — i I I � "__ �, 30 0 15 30' 60' U) �, ­ .1 ; / . / 11 � � ., / I " 11 f , � I ; I -------, I 11 11 , I ­ I------,-----,-- ­ " I I I I ./ I "I'll, I , ,�,�� —.------/ / I 0 1.1-1 Z , / r, --f I -,------ // I \ I 11 I I i PM111 siiiiiiii � wmm?��N I I / " � �-, -, yr S1 ,, �,<,, nf�x / / \ I i I I I I n Know what's below. �! Call before you dig. 0 -a PREPARED IN THE OFFICE OF: I CLIENT: -.0111 It Ili#,, I .*.# DATE: 9/12/17 PROJECT: CARP "I SOUTH Q) " E .......**... ,�, ,-, . *o DRAWN BY: HABITAT ,, C % , CITY OF GREENSBORO I S - 0 . .;r I I , JLY > Z . S C: NC LICENSE #F-0102 SEA : = DESIGNED BY- AND WATER QUALITY 13, I — - . = _j 1 421 FAYETTEVILLE ST., STE. 600 = . 44 0 JLY TITLE: . Z < REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY. RALEIGH, NORTH CAROLINA 27601 Co. *. IMPROVEMENT PROJECT PHASE IV x I I _ I Vol CHECKED BY: oI .. .. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose PHONE: (919) 677-2000 EROSION AND SEDIMENT 1:11 ..... * hl� and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by � I- I 11, ... ... VVRW 1�1* . - . Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. 02017 "', L - %*- SHEET BER CONTROL PLAN I, jj�Z JOB NUMBER: NUMBER: Copyright Kimley—Horn and Associates, Inc., 2017 SEAL: "##lilts, 012137010 - 27 OF 37 � �Wl a _ I -�j € µ NOTES. -._ 1. SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. a CD °� - =_ 2 D "IN " __,.__ �� ✓, £ _ y- - CHANNEL WORK MUST BE COMPLETE THE DRY TO CONSTRUCT STRUCTURES IN STREAM CHANNEL FLOW TO BE DIVERTED AROUND WORK _�_ __ - _ __-�� — _ -__, `�•~ AREA AND SILT CURTAIN INSTALLED DOWNSTREAM TO •REDUCE SEDIMENT _ ENTERING DOWNSTREAM CHANNEL. STRUCTURE MAY BE BUILT IN SECTIONS T {N THE DRY STREAM DIVERSION AREA. AN EXAMPLE OF STREAM WORK _ - DIVERSION IS SHOWN ON SHEET 24. ;: ✓� r f' �-✓ \ - { t f-_�_.. — �:. �- 3 SEE PLANTING NOTES AND LS SHEET 29 FOR LOCATION OF COIR MATTING INSTALLATION. _„_ w� N\�✓r� _ ._. t tt t i 11 t _ / AFI t p _ t i r ✓� �, i tt i St i 11 tt I i � � x� � � ✓ ✓ a ' �� r'-__..,,�""" 7w.i t � t � t i t i -I f i f i s t lm r f t 3`Y r Q f/ lilt ., • c � tt s s g j RSTGING:. AREA t \ , .t yy• ; t �' ' i / J I�,moi t f ' f d t t t€ �\� �' q i I � ext I t } i � •t '�y� \ i t l 1 S 4 \ ^ F g i - . : l 1 i \ r j _ ... Z g .•1-. I i f k I t \\ _ a t ^ # t 4t "q t \\ y a 4.✓ vv... �i i' 4. Q w... -v- S \ !`t Jt O it i ✓ � I 4 i ` i •.•. \ } 1 } E �/ � ' '� li 11 s i O CJ. z- 4- -r i' ,� ,• t w keyLd ! ; : En Q ,. u:,s � $... ,•,g '{ � �� is 7 t � ".,. _,� O i to O r._ _.,.,. r \ f k .. , r' \ :t LLI 00 VT ,,,. v........... _-734 3 ov ...ii-. !L 732 .. .. - ... ..... .733 731 . ......... .... � SEE SHEET 24 CL D 100' 0 50' 100' 200. 0 N Know what's below. Call before you dig. 0 •a CLIENT: DATE: PROJECT: PREPARED IN THE OFFICE OF: �un�ff�,,,�� ,,,,. c�Ro N BY: 7 SOUTH BUFFALO CREEK HABITAT lz CITY OF GREENSBORO ;..o�...••......�•� -, DRAWN BY: a' SLY AND WATER QUALITY C NC LICENSE #F-0102 SEAL Cn 1 421 FAYETTEVILLE ST., STE. 600 - _ DESIGNED BY: im ornTITLE: 0608 = J`Y IMPROVEMENT PROJECT PHASE IV REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 27601 EROSION AND SED 1 M E N T ��` PHONE: (919) 677-2000 CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose �� ,•• WRW and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by moi, Kimley–Horn and Associates, Inc. shall be without liability to Kimley–Horn and Associates, Inc. ©2017 CONTROL PLAN ''�,�FR L -�� JOB NUMBER: SHEET NUMBER: Copyright Kimley–Horn and Associates, Inc., 2017 SEAL: ' �11fnu1 012137010 28OF 37 E L v C T� W 0 0 z Q W 0 Z Z F_ Z Q n 11 i PLANTING ZONE DESCRIPTIONS AND NOTES ZONE 1 - LIVE STAKE PLANTINGS LOCATION DESCRIPTION: LOWER GRADED BANKS LOCATED BETWEEN NORMAL WATER ELEVATION AND BANKFULL ELEVATION. PROPOSED GRADED BANK APPLICATION: 1. AMEND SOIL AS DESCRIBED IN SPECIAL PROVISIONS. SOIL AMENDMENT SHALL BE SUITABLE FOR STREAM BANK APPLICATION, SO THAT AMENDMENTS ARE RESISTANT TO FREQUENT WATER INUNDATION. 2. APPLY TEMPORARY SEED AND PERMANENT SEED MIXTURES PER TABLES 2 AND 3 ON THIS SHEET AND THE SPECIFICATIONS. 3. APPLY WHEAT STRAW MULCH PER GENERAL NOTES THIS SHEET AND THE SPECIFICATIONS. 4. INSTALL COIR FIBER MATTING PER THE COIR FIBER MATTING DETAIL. 5. INSTALL LIVE STAKE OR LIVE CUTTINGS PLANTINGS IN ACCORDANCE WITH TABLE 1, LIVE STAKE DETAIL THIS SHEET, AND THE SPECIFICATIONS. E= ZONE 2 - SLOUGH, INNER BERM, AND BANKFULL BENCH PLANTINGS LOCATION DESCRIPTION: BOTTOM OF SLOUGH AREAS BETWEEN SLOUGH LINES AND INNER BERM AND BANKFULL BENCHES, AS SHOWN IN THE PLAN AND PROFILE SHEETS. APPLICATION: 1. AMEND SOIL AS DESCRIBED IN SPECIAL PROVISIONS. SOIL AMENDMENT SHALL BE SUITABLE FOR STREAM BANK APPLICATION, SO THAT AMENDMENTS ARE RESISTANT TO FREQUENT WATER INUNDATION. 2. APPLY TEMPORARY SEED AND PERMANENT SEED MIXTURES PER TABLES 2 AND 3 ON THIS SHEET AND THE SPECIFICATIONS. 3. APPLY WHEAT STRAW MULCH PER GENERAL NOTES THIS SHEET AND THE SPECIFICATIONS. 4. INSTALL COIR FIBER MATTING WHERE SHOWN IN THE PLANTING PLANS AND ON BANKFULL AND INNER BERM BENCHES. 5. INSTALL BARE ROOT PLANTINGS IN ACCORDANCE WITH TABLE 1, BARE ROOT DETAIL THIS SHEET, AND THE SPECIFICATIONS. 0 ZONE 3 - RIPARIAN PLANTINGS LOCATION DESCRIPTION: UPLAND AREAS, UPPER STREAM BANKS, AND SLOUGH SIDE SLOPES APPLICATION: 1. AMEND SOIL AS DESCRIBED IN SPECIAL PROVISIONS. 2. APPLY TEMPORARY SEED AND PERMANENT SEED MIXTURES PER TABLES 2 AND 3 ON THIS SHEET AND THE SPECIFICATIONS. 3. APPLY WHEAT STRAW MULCH PER GENERAL NOTES THIS SHEET AND THE SPECIFICATIONS. 4. INSTALL COIR FIBER MATTING PER THE PLANTING PLAN. 5. INSTALL BARE ROOT PLANTINGS IN ACCORDANCE WITH TABLE 1, BARE ROOT DETAIL THIS SHEET, AND THE SPECIFICATIONS. + + ZONE 4 - WETLAND PLANTINGS River Birch LOCATION DESCRIPTION: DEPRESSIONAL WETLANDS CREATED IN LOW SPOTS WITHIN SLOUGHS AND VERNAL POOLS CREATED IN BACKFILLED STREAM CHANNELS. APPLICATION: 1. AMEND SOIL AS DESCRIBED IN SPECIAL PROVISIONS. 2. APPLY TEMPORARY SEED AND WETLAND SEED MIXTURES PER TABLES 2 AND 4 THIS SHEET AND THE SPECIFICATIONS. 3. APPLY WHEAT STRAW MULCH GENERAL NOTES THIS SHEET AND THE SPECIFICATIONS. 20/5 Lindera benzion ZONE 5 - UTILITY EASEMENT PLANTINGS LOCATION DESCRIPTION: UTILITY EASEMENT AREAS WITHIN THE PROJECT. APPLICATION: 1. APPLY TO PROPOSED UTILITY ACCESS AREAS AND EXISTING UTILITY ACCESS AREAS UTILIZED DURING CONSTRUCTION AS HAUL ROADS. 2. AMEND SOILS WITH TOPSOIL AS DESCRIBED IN SPECIAL PROVISIONS. 3. APPLY TEMPORARY SEED AND PERMANENT SEED MIXTURES IN ACCORDANCE WITH TABLES 2 AND 3 ON THIS SHEET, AND THE SPECIFICATIONS. 4. APPLY WHEAT STRAW MULCH PER NOTES THIS SHEET, AND THE SPECIFICATIONS. TABLE 1: TREE AND SHRUB PLANTING TABLE SCIENTIFIC NAME COMMOM NAME � TYPE MAX%/MIN.% COMPOSITION OF EACH ZONE MIN. NUMBER OF SPECIES PLANTED PER ZONE PLANT SPACING FEET ON 2 CENTER NUMBER PER 3 1,000 SF ZONE 1 Cephalanthus occidentalis Buttonbush LS, LC 40/15 4 2 250 Salix nigra Black Willow LS, LC 20/10 Salix sericea Silky Willow LS, LC 40/15 Sambucus canadensis Elderberry LS, LC 20/10 Cornus amomum Silky Dogwood LS, LC 40/15 Populusdeltoides Eastern Cottonwood LS, LC 40/15 ZONE 2 AND 3 (UPLAND AND SLOUGH BOTTOM) Betula nigra River Birch B 20/5 7 6.0 28 Cornus amomum Silky Dogwood B 20/5 Lindera benzion Spicebush B 20/5 Nyssa sylvatica Blackgum B 20/5 Platanus occidentalis Sycamore B 20/5 Quercus phellos Willow Oak B 20/5 Hamamelis virginia Witch -hazel B 20/5 Liriodendron tulipifera Tulip Poplar B 20/5 Quercus nigra Water Oak B 20/5 Rhododendron periclymenoides Wild Azelea B 20/5 Acer rubrum Red Maple B 20/5 Quercus lyrata Ove rcup Ook4 B 20/5 Taxodium distichum Bald Cyprus4 B 20/5 1. LS = LIVE STAKE, LC = LIVE CUTTING, B = BARE ROOT SEEDLING 2. AVERAGE FEET ON CENTER SPACING 3. AVERAGE NUMBER PER 1,000 SQUARE FEET OF PLANTING ZONE 4. THESE SPECIES MUST COMPRISE ALL OF THE TREES PLANTED ON THE SLOUGH BOTTOMS. GENERAL NOTES TEMPORARY PLANTING AND PERMANENT SEEDING SHALL OCCUR IMMEDIATLEY AFTER CONSTRUCTION TO STABILIZE AREAS OF BARE SOIL. PERMANENT PLANTINGS SHALL BE COMPLETED BETWEEN NOVEMBER 15 AND MARCH 1. HOWEVER, PLANTING MAY OCCUR OUTSIDE THIS WINDOW AS APPROVED BY DESIGN ENGINEER. APPLY SOIL AMENDMENTS TO DISTURBED AREAS ACCORDING TO THE FOLLOWING TABLE AT 1,000 LBS/ACRE (UNLESS SOIL TESTING INDICATED OTHERWISE AS APPROVED BY ENGINEER): N2 10 P205 10 K20 10 APPLY LIME TO ADJUST SOIL pH IN ACCORDANCE WITH THE SPECIFICATIONS. EXOTIC AND INVASIVE PLANTS, VINES, AND GRASSES SHALL BE TREATED AND REMOVED INSIDE ALL OF THE PLANTING ZONES. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING, WITH BIODEGRADABLE NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE PER SECTION 6.10 OF NCDENR EROSION AND SEDIMENT CONTROL DESIGN MANUAL. SEE EROSION AND SEDIMENT CONTROL PLANS AND SPECIAL PROVISIONS FOR GROUND COVER ESTABLISHMENT REQUIREMENTS. GROUND COVER MUST BE ESTABLISHED ON ALL DISTURBED SURFACES PER NCDENR REQUIREMENTS OR SPECIAL PROVISIONS, WHICHEVER IS MORE STRINGENT. CUT TOP END FLAT, AND CLIP OFF HAMMER DAMAGE. LATERAL BUD - FACING UPWARD BARK RIDGE; -� UNDAMAGED BARK SIDE BRANCH - REMOVED 5/8" - 1 1/4" J 44 11 u LIVE STAKE NOTES: LIVE STAKE DRIVEN SEE SPECIAL PROVISIONS FOR INSTALLATION AND AT RIGHT ANGLE TO CARE OF LIVE STAKES AND LIVE CUTTINGS. TABLE 2: TEMPORARY SEED MIXTURE SPECIES NAME COMMON NAME PLANTING DATE Secale cereale Rye Grain JAN 1 - MAY 15 Utochola ramosa Browntop Millet MAY 15 - AUG 15 Secale cereale Rye Grain AUG 15 - DEC 311 Triticum aestivum Wheat Gross AUG 15 - DEC 311 * APPLICATION RATE OF 20 lbs/ac 1. IF APPLYING TEMPORARY SEED BETWEEN AUG 15 DEC 31, USE MIX OF 60% RYE GRAIN AND 40% WHEAT GRASS TABLE 3: PERMANENT SEED MIXTURE' SPECIES NAME COMMON NAME MIX PERCENTAGE2 Andropogon gerardii Big Bluestem 5 Andropogon virginicus Broomsedge 5 Arisaema triphyllum Jack -in -the -Pulpit 5 Helianthus angustifolius Swamp Sunflower 5 Juncus effusus Common Rush 15 Panicum clandestium Deertongue 20 Panicumn virgatum Switchgrass 40 Sorghastrum nutans Indiangrass 5 1. SIMILAR SEED MIX CAN BE USED WITH ENGINEER'S APPROVAL. 2. APPLICATION RATE OF 20 LBS/AC 1 TABLE 4: WETLAND SEED MIX SPECIES NAME COMMON NAME MIX PERCENTAGE Panicumrigidulum Redtop Panic Grass 60 Carex lupulin Hop Sedge 10 Juncus effusus Soft Rush 10 Carex lurida Lurid (shallow) Sedge 7 Scirpus cyperinus Wool Grass 5 Saururus cernuus Lizard's Tail 4 Carex squarrosa Squarrose Sedge 4 1. SIMILAR SEED MIX CAN BE USED WITH ENGINEER'S APPROVAL. 2. APPLICATION RATE OF 20 LBS/AC BARE INSTALL WOVEN COIR FIBER MAT OVER S EDLINGOT SEED AND MULCH APPLICATION PER COIR BARE ROOT NOTES: FIBER MATTING DETAIL SEE SPECIAL PROVISIONS FOR INSTALLATION AND GROUND CARE OF BARE ROOT PLANTINGS. SURFACE ESTABLISHED PLANT SHOWN FOR INFORMATION ONLY EARTHEN SAUCER INSTALL WOODEN STAKES p TO SECURE COIR FIBER MATTING DETAIL fV / v _ V LONGER STAKES SHOULD BE/\,I\��/\ Y ill �SODISTURBED _C _ PLACED HIGHER ON THE BANK TO \UNDISTURBED /�\j /,✓`�' U) - HELP WITH PENETRATION INTO THE i , SOIL �� •�,\ \ o WATER TABLE. \ ��\`�� n WATERTABLEL �' \ \\ �\ AMENDED SOIL � 0 c`�i 45' TAPER 2'-3' LIVE CUTTING (DORMANT) BUTT END x e o_ M LIVE STAKE DETAIL LIVE STAKE INSTALLATION BARE ROOT PLANTING NOT TO SCALE NOT TO SCALE NOT TO SCALE o Know what'sbelow. Call before you dig. N iCLIENT: ���+u�nu� DATE: a PREPARED IN THE OFFICE OF: , �•�'� CAR''',,�� 7/11/17 PROJECT: C CITY OF GREENSBORO 4 `•••••$s•• .�y--, DRAWN BY: SOUTH BUFFALO CREEK HABITAT o JL > NC LICENSE #F-0102 AND WATER {QUALITY L Q S : = DESIGNED BY: C W 421 FAYETTEVILLE ST., sTE.600 TITLE: ° JLY IMPROVEMENT PROJECT PHASE IV RALEIGH, NORTH CAROLINA 27601 Q►.•• CHECKED BY: Q REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: � �• •• � • � i m orn PHONE: (919)677-2000 PLANTING NOTES AND , y c,N This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose ---�, ��•..„��..•'�� `,�.` WRW Y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by ©2017 DETAILS '' i�j 'i FR L • JOB NUMBER: SHEET NUMBER: Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. ' SEA 17 012137010 29 OF 37 Copyright Kimley-Horn and Associates, Inc., 2017 L: r s� ✓ ' �� ... . « _ .. ... i r t �t v E c i e r L t - w v 111 4 1 ,i SHEET 3B ' t \ ,ti _r� !f- / ; ,. ._ __, �_ _ �:. __�..-w_ _..._ _,___.>"-.._.. tom ...:......... . .. .___ „_p_A ?' _�„r�,:. -♦ � �� .-. -:: _. _. ,. , .� // , //�' '"��` a ,:..-;�.a_ y e „^,-,� ..^:�-._,._. _s , �.._ ,,., .. , : :o',_..... ::... :..... .... . ... _. .r,-�-o'o-a'o-P^'b^ .a+- u -o- - -R .,-..o.p:, ,. .p -a "'a o ••n'o'v -a-s, „ ,.p_a � -a'v o -o -u v -o' aK F' .,..,�:�,:.. .t�,�-. .- _ ,-a ...-. dt...: ... ..... ... .. .. ... ... ..... ... ._.-._..... ,I ';:,�✓ - - on.. pAa ° p q .a pRo n o qv aoo v°p POP oa Aaa - - ..., c y. 7 � -. O O ., .•a ... .. ... .. .,,.., ... .... .- _. .. ,- , v.:e. ...n" R R 4 P O :.1 � O O p o o a O 6 4-0 ° O a a p O O O p P° p n O O a .- -,,, , y,..�,,-,.x'L9 'ti-.�.?< � �"..^�.,.c � •.-,, r' (,r: l f -c .y: 6 P a° O O °0 P 7 ORA O o D a 0 O a O a a 6 O q 0 0_0 - � M.f..e'xrxx, .... .�' - -P4.,.„..a. .Hz,..w ",P.'�.-te��-r" .:` <:� !-__,',x-'>1."v�,„;:.�:�`a;��'C,.r''.._' ,-x1:.�..- .::-,,,--.<:.�..ww>a-�....^ �.-,-.. --.-_-. . P AP : ;•. -.-. sS'kR , .. .. _6 _ ..0-,.- »-:6- O_, ,. -,.....a,,.�,,':... __:6 •..;" OA...,.. , .R :c oA.. 4V6 _.. D.. a,p._.O 6 .O.n .._P .�....p_M_ - ._•'^-��_,-..,._-,.e»-..". �A-�.... _,.�..�..-.. ',. _.«_,- . >--9r_-. ". , \ _..' ...... t.'-...:. .. .. _.. :..?...q.,,:,. :. �-_> .-.h., ,-.. t - ..,,.:__.• . . '_•....'_^«•. --..... . : .. _K"r^e+,_„-e�,e.>,-_..,: : _•.�Y.-_3`--.-;,,, :.„. ...✓-.....,.- .:: ..:t .:-:...-__._...... ..__,. ,a _ _-..-_........,_.... . -s'.O,- ._ ... , 0 ,i - .„,,,, O,.,.. _. f:`.,>..a� ., -.-...�-.!,.,.. ...6..Q ... . ..O._ �«.. �..:a:^, s' . 'r,. _..' : 1 ✓ ,_-.'-3-....--r.-:::K. �,-.-^-'>'_,.-_.. -:,.- -,::.:\.,., ..,....... v/: .... _.....-_¢� ✓a" "4'� __,--- ._..-.::-'.T. •..,,:..' ._. _ .. :- ".,_ i '_ a OA v 2?O D-9 °A Pp DR 4 ab 0 p D AO P.O Oa A A 4 D O0p DO PP O O°Q DO O6 ffR ° 4 a n� O DO nb O6 g. o D OR °PP p0 aDa OOp ° RpO a 4 ° _ '/` :„:1`i -f, _... O 4b pP6b oDO ° °a O °A a OO aO 0a O °a A p aO OR OOR aA °n Po a PO4 pa O -7- 1-J” - .nRO° aD6 ADp°o-6 °a D¢ba0o Oa OnnoPO aOg0A° a 4naO0° ap 4R4A 0 p aPo Aaa ° qOP44an DO4 a0pP n°OppooR 0DnRR 0a DAO°°0pa 0Oqa46 A P9 p° ° nO aO°0On oa sb 0 v6°4°°p0apOPR4440°oaxD0aqo Ap 0o 0°°D 4°axobDpna 00 aaD 0° 6 b9 °QDa0 ga°b 0° P poo O°°0Oo OopO PP oO 6pg°a PO pOP pAD a pvq °Do qR DaDn p o o0 Opo 6°0Ofl ppO ROP6 °PO°O OQaq dtl eOPpa b Pp p O Oa 6 0 Oop0 4aaO ap trp R4pntln Oa a P \ / 4 T , :_...:-"... ".v-"r"L. "' �, .. =-•. .. __, .,-.._ ..-.. -- P 4 A O ° O b R O P p A -' ..: R 0- a Q° 0 q A D� o a 0 D p 9 ° P a q A 6 P 0 O P p O O p 4 0 o p 0 6 P P a b a b a° mWr.k<�, ._ :f �....�. ....... D4 a a 9 O O 9p tl 0 Oo D 6 D O a 00 p 4.p .:v -•k D O 6 R n R _ .- .!" e� A d 4 Opo Pp.P ggbp o AD°P°p Op°ARD PP 0 a a O D o 04 RD.O o 4pOe 040pPa n Oo 6 ppoR04 Opop04 D OR00 O 04Pa O 6 OgOp o flpab P 040400 a4a4O6 P a40q 4 Dgap°O DPP \ °a i 6 ag4o°O D Op�fl apOgdR4pOpad40popQ p040 p O g 4 O D 4 R P O \ E 4 0 4 0 D O D P 4 O DD QPC6a a �tl°Oa 6 O°O° D P O OPO D Oo P 0 a ° 4 o A OqR ° M I ° 0 6 d °. a O P A a D q o D 4, P p P Op AQa 'Op A 44O40p¢n°A4Apb404QpOa4pptlpQA�tlpOQOpoo4fl�tl0p0a690pOOgQOpagQP�Agp�aaQpQp�aOPOpOgoOA 1.:,; 4r : a P x 6 0 O a 0 R- .es- G.:^'. � ,_., -. "',• —.. r- tl Q O D P P O x 0 0 \- a a D 0 ,r ' O 4 P O P- O �' •.-.. na ....Y ... - ...,. ;-.,'. ..- �. ;., :, ::., c�.'A:`�. a A o 0 b P ° O t Y n: n O a 4 apq ooR 6q°Raq R PO°O o opon a OAaPP4 a °ROO P agn0 O ao pa0 P °p°n P ag40 6 Oon Pa A A 4460 O A O ,, , .....� ...:.✓`':R. � O R O °P O q Op o° Ob a P � a .., °- O R R p p n O p Q R II O P .» _.._. -, :- ': '+, b O O a P O 4 O / "` �»`. ° '-0 PO P DO P ° 6a�D'- q: gnR p pqA°ap n 4gpR O RODOOp000R4appRPapOOAaaOpORP ROa OpOn°6°°pdpap°DOD°ap°n Op ' R O. U P , �" 1, - ... �. , ,. , -" ,-• - :-__ « � . • -' �`•_ ; - ", _ ,. .! \'ei 44°4 p. O 4p O D46 q O ° Pq // b ap q ° O P O a O P O A 4 a 4 o A4 e O 40 O O ab a O O Oq O a Do p a D404 n O Op q a D p ° O O � '- :.:., / �,:. -� � .•-..:z,. ,.;.a' O O O O O R o 0 0 O \ r o 0 O O x 0 4 a O 044 O o 0 a 6 ,\ D 4 p 0 0 04 D �.e-• aR q O a o O 6 R 0 aP °0 6 R p paP O n A 6 O p OR " ': oo b a°o baa oao °b a o noapnR oao pops aatl PA ob.P o 4 :,,. -r -. , 1 i o a o a a o o o D P DPA P a o a °Dap o n°Agop a agog o°Donpaa°n$Ppao°o°a$D000 � .. .. "... •. ., ... ... ao o°P D a0 a ao°O O O PpAO° Dp R O Pp b o P4 P A Op o D O A4 O a a6 n 4 °D°a a oP°A b P 60 o O ° p a o e -aP a D _.. ,,....I //J ., b _ 6 as°P e D a P a A a 4 a Oq n a O A 4p 0 P 040tl p°44°4°O npa44a P apab a OgoOOp pnapOp p a f -bP. O C'tl9 �i f / ,, .. a .. _. 6 P ° 0 0 as O 0 V O D a 0 6 O ap6 oR °gOpOp ° OOOR A p00° 0 anAP°a R apDO o apop p BaO pap i .. � .. ., C _. .,. _.�..... •--�-"^..'.:.,._ ,: :'mac .i ... .. ,. ..--. '. �� • ..:. P a P p dn y.: ,' .:: ._� , : o ° O 00 0 O •' ,. / � qq 4 A n40q O Aga4°o°a4a q00°6 4°apap°P°0 o ° 0 0 0 0 0 o a o n a R o >1 R ., // .:6i ! p 4ngb bDOp OapoQa° 0464Pp pa4a°°pQOQO00gODpRaQOPOgO6t°,OaPAagRP40pa�gpaa09p4 Qaa60�04040pRp p 6pa4 p a Og p a ! �,/� /_ ' .... r ' N�` r ..- ... -.. .. .,,��'•'. -^,.>. : _'.--: �.><--,..,. ,-,_..�.. O e O ab ° O R Aa 0 go°oa°oC ° AP a a a q a .p P p b i> a ...._. ��_ ..:,. . -4j ' ,.w. - '-.:::.....'.-. .,.. .(. :.-...,.' ;..'.- �._. \.. ,.�.. ....-. -, ,•,.... '. � \l 1\ \` \ '�-...,. ., .. .. ..»�:,.,....v�r.:..: �.^.;:;.-�, :, _•:] � �Y,',,: __ ....-.: .,.,....'.r:".y- : .. ; \ 2�'bs.. ^•'.w,.. ' � '°o° p' ` 4a0� o0. a A4 v 0 a ° ob aaooP so o aD b o aoPv aDP°O°bv a° bnoo P ° a op:u p n oo bp 6aoopba°aePO P o oaA ° 4 o a o0 aaa ° oo 00o D 0 oapO.a�a0 D° o°O a v P°A v a DG D o o RPPD a a aAO D n oan° aa° o a °PP k ° e RR q o aoaa o bbnOa o ooOa po ons°aoaaP o a oaO Aq ava aq oo AoaD on RpaPnoP pe4aa oa aaon nA s pP° o0 P pDOflo o oo o°aan Pa o aOo i .-�" p 6 R 0 a a D O D Q 6 4 a s 0 0 8 pip O 4g p° Ob°a D P ao A d apOn O n ap j / `- - ,�'' O 0 D {i '-.' "' •, •.- ,`.' ,. �. a b A a .. ~.,•. ...-.--�•. :. �': o O O 4 0 R 0 4 6 D 6 A a n A 5 0 a - .. :+n„.. OO fl - ,r'.. \ \ tlO 0 .-... _ ., ... ••- ... f nA ba 8A °O P° °D Da O OO bO A O O d 0 O A ... ��... - ,:..,'� .. :;-...,... ... .. ... � , � •.. .. .. ''• r I 3�i.A. :,,, ,., --'av ,.m -!p .� , l' O O o 4 4 6 0 D 4 a P g Apo o n p 0 0 p O a ,,0 0 6 0 0 q n 0 a o o P O D O q a a a s a '-.:' a o O Op p .. ., . .....:...... ✓s. .. - -:,, : .... \ , ... ...., .......�F .-. � �=,x:, .... ;'.,, ..... ,.,.: .. �...:.., .:.:v�”" O O 4 R D 6 O O O a a O a A O O q o ¢ O O Ro ° n O O 4 a p 4 D O P ° P° o O / _ p rs=W'v'P"" ro, - .!:.r. _ _ ,.:.- . . ., ... ..... .. .. , _.. _ ._. V. -.,. _...», -.. ..:... � x'O _.. -_, -.. ,: ,., :. .. - .., -_. _ ... ..-- " - l J - •�', ' a O D 4 n O p R ° PD a 4 R a O P A 0 P D a D D Q 9 O D 6 a P P O 4 4 0 _ �, .,.��'-"" 4 - .: a O - .._..... ... :...., r , ..-. \ ., - `fir .: � r ._, e.. ,,.. . r-,.. .. ..�, -.�- _ ..• _ ... ... "-: ... �. %' O 4 4 O ° b a b .p O ° D O a A O a a"4P O O A 6 p O p P O A p Qo ° O A tl A p .., .,- .. .., _ :..", '. .:.., � \ ,�. - \: �\ , r, ,,: *,:men -ems? .� .4 .:..., .,:. mi .. ._ ... - :.• {3'%, a O a 6 °a.0 O O b A k a® a a8 4 6'DpOa D OpOp .4 a Qa A 4 DPOp °n'a a6 n a' ° Ap O a ° O aq p O D ✓-,acv 0404o flo a A O Rq O a Pp o A 00 _ „ :.- '.• .. -.. _ ., .. ., .... ......-. ,,. ..\ � :: ..d .,.» m,,.. `R� O q ° tl q a 6 b p O o R a O 4 ° 0 4 0 P D A a 0 6 4 g O A q p ,... - -:. :. - ,- :,, '; ,,-., ._ » 'F®-•. __-, /)/` - a ao °pDo as a4b qPa �o as poa4aao Hao r .., : '..: ..,_ -. , --. ^'+ �; � - .' �':.;< :,., ,.., •. .. \\ ,. •-'ywry_.... _- _•. ..... � ". �",�.��' "Mr .»_ p A p- 6 ° O O O O R q ° p p 6 D O O O p 6 4 tl P O R D ° o ° ..-...# 'r. , . •., �. t. n _ .r _. .. ,..... r;, . / , 1 aq a a a D Op ° o ap q O Oq a a q. Oq O Pp 0 a °a ° 0 Ppop a O R4 tl O a .,,- . .._.., .. _... .' �� ...ars-„ ,' � - , ,w ••--. .. � % - -. .•�>,�- ':: ,, .. :. ai}., ,.• - ia .r ♦ a o a o 0 oao ° a A .. - ... , . ,.•„"' ( <' , , -, is `i , : :r. - ,. ,_ _ ,.,. "-'"W _ - ,-' '- .:' __ . k' . - ago4opo4 ogoR ogo4opop Apbo-°Ppa4e4oA°o axone°°° l' ,, >. ' „ ;, ., .-,, 1 ` . I a ♦ -:,i. oo° P`q°°°o°Qn°o°P°opon°°°Hoop D °aA°b°a°apoo � , i / - r no DPo oao ° 4oa BR a DooD '. - •', / -. oY ao oa aoo 4qa v q �_ j �,�', �"�mx a ba 4p OpOnOp D ap4a O gggpR" npaq Y '1 .. .�'"w"�„_�'e_:, ' \ • 4- , °e ° o apopAp n4ago4 v apoo o ! /" ♦ r �:� o A D o 0 O O R p 0 a . ,.-.,,,/. �::-f: / _:, .:. / _:+O i� / ., :.,'•' ' 1 �\ \\. �°0 °p AO°a°O D °p°a D ° D` r\ \ r� a 61PA°o s4 poo° R Uj D , t .i. / ......_..,. \ v sa/:sy qs .w'Ae,. J r�aya� ae»x�. m. ,.rr ;nen-»n • � - _ ........ .. .. -""'--,--,._ .,..-. _,_., - r v , \ / : / \ : : r Ui I t , , _ a / Q y : fL , : NOTE AS ti A 1 S r , i i�"-'-.- FEATURES SHOWN EXISTING ARE BASED ON RESUMED CHANGES FROM THE : / \ i CONSTRUCTION of PREVIOUS , in : / : : , , , , , W� r y, i ..y , V " 50' 140' 2o0' ' j600017775M Know what's A Call before you dig. a PREPARED IN THE OFFICE OF: `�tii}t��r�r�t� DATE: CLIENT- PROJECT: C 10 '�., 8116/17 CITY F :,�'�•'` SOUTH BUFFALO CREEK HABITAT a C O GREENSBORO DRAM BY: C NC LICENSE #F-0102 SEA `= DESIGN DLBY: AND WATER QUALITY i m e421 EIGH, NEVILI E ST., STE. 600 TI TLS: - 0446© JLY IMPROVEMENT 1— R O J E C T PHASE I Y `� REV- No.: REVi310N: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 2701 "" �� � • e- CHECKED CHECKED BY. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose PHONE: (519) 677-20(iQ j /� [ j © /� A� �` ;� �i � .• L �� � and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by PLANTING PLAN �1 KEY SHEET �f,� `••••"` ��.�' �R� Kimley' -Horn and Associates, Inc. shall be without liability to Kimley–Horn and Associates, Inc. O2Q17 '�., j %%, I ,SOB NUMBER: ISHEET NUMBER; Copyright Kimley- Horn and Associates, inc., 2017 SEAL: ,��°fj111111CJ �� 11 012137010 130 QF 37 I / l , / f / i / a ,:..-;�.a_ y e „^,-,� ..^:�-._,._. _s , �.._ ,,., .. , : :o',_..... ::... :..... .... . ... _. .r,-�-o'o-a'o-P^'b^ .a+- u -o- - -R .,-..o.p:, ,. .p -a "'a o ••n'o'v -a-s, „ ,.p_a � -a'v o -o -u v -o' aK F' .,..,�:�,:.. .t�,�-. .- _ ,-a ...-. dt...: ... ..... ... .. .. ... ... ..... ... ._.-._..... ,I ';:,�✓ - - on.. pAa ° p q .a pRo n o qv aoo v°p POP oa Aaa - - ..., c y. 7 � -. O O ., .•a ... .. ... .. .,,.., ... .... .- _. .. ,- , v.:e. ...n" R R 4 P O :.1 � O O p o o a O 6 4-0 ° O a a p O O O p P° p n O O a .- -,,, , y,..�,,-,.x'L9 'ti-.�.?< � �"..^�.,.c � •.-,, r' (,r: l f -c .y: 6 P a° O O °0 P 7 ORA O o D a 0 O a O a a 6 O q 0 0_0 - � M.f..e'xrxx, .... .�' - -P4.,.„..a. .Hz,..w ",P.'�.-te��-r" .:` <:� !-__,',x-'>1."v�,„;:.�:�`a;��'C,.r''.._' ,-x1:.�..- .::-,,,--.<:.�..ww>a-�....^ �.-,-.. --.-_-. . P AP : ;•. -.-. sS'kR , .. .. _6 _ ..0-,.- »-:6- O_, ,. -,.....a,,.�,,':... __:6 •..;" OA...,.. , .R :c oA.. 4V6 _.. D.. a,p._.O 6 .O.n .._P .�....p_M_ - ._•'^-��_,-..,._-,.e»-..". �A-�.... _,.�..�..-.. ',. _.«_,- . >--9r_-. ". , \ _..' ...... t.'-...:. .. .. _.. :..?...q.,,:,. :. �-_> .-.h., ,-.. t - ..,,.:__.• . . '_•....'_^«•. --..... . : .. _K"r^e+,_„-e�,e.>,-_..,: : _•.�Y.-_3`--.-;,,, :.„. ...✓-.....,.- .:: ..:t .:-:...-__._...... ..__,. ,a _ _-..-_........,_.... . -s'.O,- ._ ... , 0 ,i - .„,,,, O,.,.. _. f:`.,>..a� ., -.-...�-.!,.,.. ...6..Q ... . ..O._ �«.. �..:a:^, s' . 'r,. _..' : 1 ✓ ,_-.'-3-....--r.-:::K. �,-.-^-'>'_,.-_.. -:,.- -,::.:\.,., ..,....... v/: .... _.....-_¢� ✓a" "4'� __,--- ._..-.::-'.T. •..,,:..' ._. _ .. :- ".,_ i '_ a OA v 2?O D-9 °A Pp DR 4 ab 0 p D AO P.O Oa A A 4 D O0p DO PP O O°Q DO O6 ffR ° 4 a n� O DO nb O6 g. o D OR °PP p0 aDa OOp ° RpO a 4 ° _ '/` :„:1`i -f, _... O 4b pP6b oDO ° °a O °A a OO aO 0a O °a A p aO OR OOR aA °n Po a PO4 pa O -7- 1-J” - .nRO° aD6 ADp°o-6 °a D¢ba0o Oa OnnoPO aOg0A° a 4naO0° ap 4R4A 0 p aPo Aaa ° qOP44an DO4 a0pP n°OppooR 0DnRR 0a DAO°°0pa 0Oqa46 A P9 p° ° nO aO°0On oa sb 0 v6°4°°p0apOPR4440°oaxD0aqo Ap 0o 0°°D 4°axobDpna 00 aaD 0° 6 b9 °QDa0 ga°b 0° P poo O°°0Oo OopO PP oO 6pg°a PO pOP pAD a pvq °Do qR DaDn p o o0 Opo 6°0Ofl ppO ROP6 °PO°O OQaq dtl eOPpa b Pp p O Oa 6 0 Oop0 4aaO ap trp R4pntln Oa a P \ / 4 T , :_...:-"... ".v-"r"L. "' �, .. =-•. .. __, .,-.._ ..-.. -- P 4 A O ° O b R O P p A -' ..: R 0- a Q° 0 q A D� o a 0 D p 9 ° P a q A 6 P 0 O P p O O p 4 0 o p 0 6 P P a b a b a° mWr.k<�, ._ :f �....�. ....... D4 a a 9 O O 9p tl 0 Oo D 6 D O a 00 p 4.p .:v -•k D O 6 R n R _ .- .!" e� A d 4 Opo Pp.P ggbp o AD°P°p Op°ARD PP 0 a a O D o 04 RD.O o 4pOe 040pPa n Oo 6 ppoR04 Opop04 D OR00 O 04Pa O 6 OgOp o flpab P 040400 a4a4O6 P a40q 4 Dgap°O DPP \ °a i 6 ag4o°O D Op�fl apOgdR4pOpad40popQ p040 p O g 4 O D 4 R P O \ E 4 0 4 0 D O D P 4 O DD QPC6a a �tl°Oa 6 O°O° D P O OPO D Oo P 0 a ° 4 o A OqR ° M I ° 0 6 d °. a O P A a D q o D 4, P p P Op AQa 'Op A 44O40p¢n°A4Apb404QpOa4pptlpQA�tlpOQOpoo4fl�tl0p0a690pOOgQOpagQP�Agp�aaQpQp�aOPOpOgoOA 1.:,; 4r : a P x 6 0 O a 0 R- .es- G.:^'. � ,_., -. "',• —.. r- tl Q O D P P O x 0 0 \- a a D 0 ,r ' O 4 P O P- O �' •.-.. na ....Y ... - ...,. ;-.,'. ..- �. ;., :, ::., c�.'A:`�. a A o 0 b P ° O t Y n: n O a 4 apq ooR 6q°Raq R PO°O o opon a OAaPP4 a °ROO P agn0 O ao pa0 P °p°n P ag40 6 Oon Pa A A 4460 O A O ,, , .....� ...:.✓`':R. � O R O °P O q Op o° Ob a P � a .., °- O R R p p n O p Q R II O P .» _.._. -, :- ': '+, b O O a P O 4 O / "` �»`. ° '-0 PO P DO P ° 6a�D'- q: gnR p pqA°ap n 4gpR O RODOOp000R4appRPapOOAaaOpORP ROa OpOn°6°°pdpap°DOD°ap°n Op ' R O. U P , �" 1, - ... �. , ,. , -" ,-• - :-__ « � . • -' �`•_ ; - ", _ ,. .! \'ei 44°4 p. O 4p O D46 q O ° Pq // b ap q ° O P O a O P O A 4 a 4 o A4 e O 40 O O ab a O O Oq O a Do p a D404 n O Op q a D p ° O O � '- :.:., / �,:. -� � .•-..:z,. ,.;.a' O O O O O R o 0 0 O \ r o 0 O O x 0 4 a O 044 O o 0 a 6 ,\ D 4 p 0 0 04 D �.e-• aR q O a o O 6 R 0 aP °0 6 R p paP O n A 6 O p OR " ': oo b a°o baa oao °b a o noapnR oao pops aatl PA ob.P o 4 :,,. -r -. , 1 i o a o a a o o o D P DPA P a o a °Dap o n°Agop a agog o°Donpaa°n$Ppao°o°a$D000 � .. .. "... •. ., ... ... ao o°P D a0 a ao°O O O PpAO° Dp R O Pp b o P4 P A Op o D O A4 O a a6 n 4 °D°a a oP°A b P 60 o O ° p a o e -aP a D _.. ,,....I //J ., b _ 6 as°P e D a P a A a 4 a Oq n a O A 4p 0 P 040tl p°44°4°O npa44a P apab a OgoOOp pnapOp p a f -bP. O C'tl9 �i f / ,, .. a .. _. 6 P ° 0 0 as O 0 V O D a 0 6 O ap6 oR °gOpOp ° OOOR A p00° 0 anAP°a R apDO o apop p BaO pap i .. � .. ., C _. .,. _.�..... •--�-"^..'.:.,._ ,: :'mac .i ... .. ,. ..--. '. �� • ..:. P a P p dn y.: ,' .:: ._� , : o ° O 00 0 O •' ,. / � qq 4 A n40q O Aga4°o°a4a q00°6 4°apap°P°0 o ° 0 0 0 0 0 o a o n a R o >1 R ., // .:6i ! p 4ngb bDOp OapoQa° 0464Pp pa4a°°pQOQO00gODpRaQOPOgO6t°,OaPAagRP40pa�gpaa09p4 Qaa60�04040pRp p 6pa4 p a Og p a ! �,/� /_ ' .... r ' N�` r ..- ... -.. .. .,,��'•'. -^,.>. : _'.--: �.><--,..,. ,-,_..�.. O e O ab ° O R Aa 0 go°oa°oC ° AP a a a q a .p P p b i> a ...._. ��_ ..:,. . -4j ' ,.w. - '-.:::.....'.-. .,.. .(. :.-...,.' ;..'.- �._. \.. ,.�.. ....-. -, ,•,.... '. � \l 1\ \` \ '�-...,. ., .. .. ..»�:,.,....v�r.:..: �.^.;:;.-�, :, _•:] � �Y,',,: __ ....-.: .,.,....'.r:".y- : .. ; \ 2�'bs.. ^•'.w,.. ' � '°o° p' ` 4a0� o0. a A4 v 0 a ° ob aaooP so o aD b o aoPv aDP°O°bv a° bnoo P ° a op:u p n oo bp 6aoopba°aePO P o oaA ° 4 o a o0 aaa ° oo 00o D 0 oapO.a�a0 D° o°O a v P°A v a DG D o o RPPD a a aAO D n oan° aa° o a °PP k ° e RR q o aoaa o bbnOa o ooOa po ons°aoaaP o a oaO Aq ava aq oo AoaD on RpaPnoP pe4aa oa aaon nA s pP° o0 P pDOflo o oo o°aan Pa o aOo i .-�" p 6 R 0 a a D O D Q 6 4 a s 0 0 8 pip O 4g p° Ob°a D P ao A d apOn O n ap j / `- - ,�'' O 0 D {i '-.' "' •, •.- ,`.' ,. �. a b A a .. ~.,•. ...-.--�•. :. �': o O O 4 0 R 0 4 6 D 6 A a n A 5 0 a - .. :+n„.. OO fl - ,r'.. \ \ tlO 0 .-... _ ., ... ••- ... f nA ba 8A °O P° °D Da O OO bO A O O d 0 O A ... ��... - ,:..,'� .. :;-...,... ... .. ... � , � •.. .. .. ''• r I 3�i.A. :,,, ,., --'av ,.m -!p .� , l' O O o 4 4 6 0 D 4 a P g Apo o n p 0 0 p O a ,,0 0 6 0 0 q n 0 a o o P O D O q a a a s a '-.:' a o O Op p .. ., . .....:...... ✓s. .. - -:,, : .... \ , ... ...., .......�F .-. � �=,x:, .... ;'.,, ..... ,.,.: .. �...:.., .:.:v�”" O O 4 R D 6 O O O a a O a A O O q o ¢ O O Ro ° n O O 4 a p 4 D O P ° P° o O / _ p rs=W'v'P"" ro, - .!:.r. _ _ ,.:.- . . ., ... ..... .. .. , _.. _ ._. V. -.,. _...», -.. ..:... � x'O _.. -_, -.. ,: ,., :. .. - .., -_. _ ... ..-- " - l J - •�', ' a O D 4 n O p R ° PD a 4 R a O P A 0 P D a D D Q 9 O D 6 a P P O 4 4 0 _ �, .,.��'-"" 4 - .: a O - .._..... ... :...., r , ..-. \ ., - `fir .: � r ._, e.. ,,.. . r-,.. .. ..�, -.�- _ ..• _ ... ... "-: ... �. %' O 4 4 O ° b a b .p O ° D O a A O a a"4P O O A 6 p O p P O A p Qo ° O A tl A p .., .,- .. .., _ :..", '. .:.., � \ ,�. - \: �\ , r, ,,: *,:men -ems? .� .4 .:..., .,:. mi .. ._ ... - :.• {3'%, a O a 6 °a.0 O O b A k a® a a8 4 6'DpOa D OpOp .4 a Qa A 4 DPOp °n'a a6 n a' ° Ap O a ° O aq p O D ✓-,acv 0404o flo a A O Rq O a Pp o A 00 _ „ :.- '.• .. -.. _ ., .. ., .... ......-. ,,. ..\ � :: ..d .,.» m,,.. `R� O q ° tl q a 6 b p O o R a O 4 ° 0 4 0 P D A a 0 6 4 g O A q p ,... - -:. :. - ,- :,, '; ,,-., ._ » 'F®-•. __-, /)/` - a ao °pDo as a4b qPa �o as poa4aao Hao r .., : '..: ..,_ -. , --. ^'+ �; � - .' �':.;< :,., ,.., •. .. \\ ,. •-'ywry_.... _- _•. ..... � ". �",�.��' "Mr .»_ p A p- 6 ° O O O O R q ° p p 6 D O O O p 6 4 tl P O R D ° o ° ..-...# 'r. , . •., �. t. n _ .r _. .. ,..... r;, . / , 1 aq a a a D Op ° o ap q O Oq a a q. Oq O Pp 0 a °a ° 0 Ppop a O R4 tl O a .,,- . .._.., .. _... .' �� ...ars-„ ,' � - , ,w ••--. .. � % - -. .•�>,�- ':: ,, .. :. ai}., ,.• - ia .r ♦ a o a o 0 oao ° a A .. - ... , . ,.•„"' ( <' , , -, is `i , : :r. - ,. ,_ _ ,.,. "-'"W _ - ,-' '- .:' __ . k' . - ago4opo4 ogoR ogo4opop Apbo-°Ppa4e4oA°o axone°°° l' ,, >. ' „ ;, ., .-,, 1 ` . I a ♦ -:,i. oo° P`q°°°o°Qn°o°P°opon°°°Hoop D °aA°b°a°apoo � , i / - r no DPo oao ° 4oa BR a DooD '. - •', / -. oY ao oa aoo 4qa v q �_ j �,�', �"�mx a ba 4p OpOnOp D ap4a O gggpR" npaq Y '1 .. .�'"w"�„_�'e_:, ' \ • 4- , °e ° o apopAp n4ago4 v apoo o ! /" ♦ r �:� o A D o 0 O O R p 0 a . ,.-.,,,/. �::-f: / _:, .:. / _:+O i� / ., :.,'•' ' 1 �\ \\. �°0 °p AO°a°O D °p°a D ° D` r\ \ r� a 61PA°o s4 poo° R Uj D , t .i. / ......_..,. \ v sa/:sy qs .w'Ae,. J r�aya� ae»x�. m. ,.rr ;nen-»n • � - _ ........ .. .. -""'--,--,._ .,..-. _,_., - r v , \ / : / \ : : r Ui I t , , _ a / Q y : fL , : NOTE AS ti A 1 S r , i i�"-'-.- FEATURES SHOWN EXISTING ARE BASED ON RESUMED CHANGES FROM THE : / \ i CONSTRUCTION of PREVIOUS , in : / : : , , , , , W� r y, i ..y , V " 50' 140' 2o0' ' j600017775M Know what's A Call before you dig. a PREPARED IN THE OFFICE OF: `�tii}t��r�r�t� DATE: CLIENT- PROJECT: C 10 '�., 8116/17 CITY F :,�'�•'` SOUTH BUFFALO CREEK HABITAT a C O GREENSBORO DRAM BY: C NC LICENSE #F-0102 SEA `= DESIGN DLBY: AND WATER QUALITY i m e421 EIGH, NEVILI E ST., STE. 600 TI TLS: - 0446© JLY IMPROVEMENT 1— R O J E C T PHASE I Y `� REV- No.: REVi310N: DATE: DRAWN BY: CHECKED BY: RALEIGH, NORTH CAROLINA 2701 "" �� � • e- CHECKED CHECKED BY. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose PHONE: (519) 677-20(iQ j /� [ j © /� A� �` ;� �i � .• L �� � and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by PLANTING PLAN �1 KEY SHEET �f,� `••••"` ��.�' �R� Kimley' -Horn and Associates, Inc. shall be without liability to Kimley–Horn and Associates, Inc. O2Q17 '�., j %%, I ,SOB NUMBER: ISHEET NUMBER; Copyright Kimley- Horn and Associates, inc., 2017 SEAL: ,��°fj111111CJ �� 11 012137010 130 QF 37 ++ 1 Z. t- oN fi7 03 Ci z P z a i �NSAP r ft ` s � � � f E I •� / o 0 0 000 op:`° °ar OOo0 t 0d°�O/6 o .� —-, Z -XI- ;,� ° a o 0 000 ' a 0 i, �_ 1 E m t r.o°o o Q o 0 0 ° Q o ice, ° Q � � ':. " VA `•f sit •----""" ... i/ � oO,0 0 Oo aO;` � I � � � ? ,� �� , . = .� ,i-; •:r o © o p o ccs Q � p ,°00oo0op0a a0ooaolo° °f % ,.` z `,;,;,,\ �,� •,���� F`' z %,;,,,,, , o°o^opp° .,000°0`.0o p oca o apo 0 �� , /,. O Oo ; a O Q o p, �?.�n L� �° �, 'r ��� '° QUg000 °ppppQO0 oQoa / .y, / .:- / �?,,� d°o000 oQO4pp°Opo Q0 00 Q''Od i y } Sl � '•i 1 � . \\ \ \� � n�� � �fyL'r, ✓� __ !,. �\ 1 � O © zJ o � / Q p p ° ° ' o .. oft OaO° op p( °04QiO rLJ 1 �J 0 0 -'o O o 0 0 r .-„'c?� `tit \ '-, �} � `'� ;A .y\ � ��\ .T� f '/ �\:A `� � ^ � ° .�• Q �N o Q I Op Q o 1 1 4l`e1i ,, FY '; '_ + ,::` 'i � �•4j1.�' �. �„-. .yr, -..,r;✓r.}}`��y,�\ \.� O i�' _o 'a, o” 'p xt j ''"":�� / 0 0,Q Cl !, Y i 0 Ery i'� ti .(� w ,. `fe% L r �'-• ✓ i.'0 r , o�'}p/� O ^/ "' 33 1 t,`SSS� i }S ;11 Y,'`i '\ -.. , \. ,. � - �..., -� �,�.. 'V •V � > 0 ° sr ,.�� Q p ° o Q � \ � J.-- ,-� ° !f�Wf`'''` p t) ° ° O ° t F e j w r i 1i Y hw T�3d� ° °✓ ` 000 O O o 0 0 4, ^ �.• oao 0 0 0 0, I1 oo000 t7O poo Q' ! Wry - o,o 9 1 v j r� i 31 SSS j ` „4 A '0 © ppt s. 4 ;1 t a � � '• t O I t - o O" t y � , { 't t 1 O`^`O 't %-,'.a Q "' � t t -.:� 4•� I 1 t \ ` �+ � I _ !y i2! 4 It 1 0 ,0— 3_ . 0°° bo '0© iE i OO° ! 00 Q QQ° ^ z ;3 ,t d 1 1 ktw ra to =r MATCHL[NE SEE SHEET 32 NOTE: SOME FEATURES SHOWN AS 'EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. 30' 0 15' 30' 60' Know what's bell Ar. Call before you dig. PREPARED IN THE OFFICE OF: CLIENT: �''� �A `�'',. �M£�8i16f17 PROJECT: CITY OF GREENSBORO -4.•,.....''.`. - DRAWN BY: %OUTH BUFFALO CREEK HABITAT rz AW SLY AND WATER QUALITY c NC LICENSE #F-0102 SEAL � : r DESIGNED BY: 421 FAYETTEVILLE ST., STE.600 TITI*E: R a" � JLY �A �w Q r� PHASE rr ,I REV. No.: REVISION; DATE; DRAWN BY: CHECKED BY.i m RALEIGH, NORTH CAROLINA 27601 � s � � � � CHECKED BY: � � � � � V E � r l E N T P! i � J E C T E H A S E Y i r PHONE: (919) 677-2000 l .• This document together with the concepts and designs resented herein as an Instrument of service, €s mended only for the specific purpose prepared. P 9 PY P y P PLANTING �G PLAN '-i � "'�....s" �►*� ��� and client for which it was re orad. Reuse of and improper reliance on this document without written authorization and adaptation b � l� t Kimley—Horn and Associotes, Inc. shall be without liobifity to Kimley—Horn and Associates, Inc. 2017 ��,��' ,. @C ` JOB NUMBER: SHEET NUMBER: Copyright Kimley—Horn and Associates, Inc., 2017 SEAL: 7 012137010 31 OF 37 E L 12 M E 0 a) N 6 I 0 N 2- -:3 z d J n 0 z_ z Q J CL N a) s V) Q U �* n 0 M rn 0 0 r, M N- 0 a C Q) E C 0 MATCHLINE SEE SHEET 36 r� s / T., t� h ; /' - \ . , /� (', .. ._ \. " \ \ rI �rD , - 1 -. / \11 / ,`_ - y� _ _, v Ae � � \ ,r ..\S , , ,. ..._. _ 1 � Y _. _� ..-11 , - "" ..,.. ,.. - ..a _, ...,..... -" - _ . _ ._ _.. _. _. .. _ _ .... .., ... - -11 I'll - _ a ��\a \ I .. ,,, ,.,, ._....,. Y.., ..,__.... - ......_ .. -... r ` ��* } \ v S T`tii-r t 11 �_- ,,- .,.. .. ,,,<..,...__„_„ ,^............................_..,.,rte.._«___,...«._.....,,..._.. ��.._..,._... - _.._........ .... , .„_ , ..._ ... .,......... _ ..... _...... _. •^---'� �� z. ,r v ._...,...,...._ .. _ _.. ,.. - - ., .........._ ..._l. i \ _, _. -- _ .. _._ m L V ' _._ .__. _,_._.._._ ._ ___ ,.,..� _.. _.__ _..._.._ _._ . °��� � -.u�` �-�.. �� 00000'0000OOOU000O OO v, .v _._.._ �- __ __ _ _. r � _. -- M _,. ..__1._....... # .� M -� _ , „ /s O O - __ - ter,._.. _ 'tJ OO OO - �.. I - _ _.. ___ _............. ___.. ,_,__ _ _ .___. 730 . - ___ __ __._.. -c.r r� ✓�... sxw,� r r' _...._ ,� _..._,_, ._ ..�.._ _, _ . �.,... �'_.,._.... _�. -„- O..O.. `Q''` 0 0~� %;,, moi, __ _ __ w m ._ _-> u __ O .,, O, O �. ' i ri Imo/, ! , i� Z f I w- r O �9 i- /moi'<: -b ,� .,- r _ -,,,< __.w .� ._ __. r..._ _ _.. _w... F.._ f /, J✓ ��/ice i11/ _. n , ;;; _. _�.._ \ -' _ _ _ f,. I 11 .. __ . _._ s ____._... ...... . .. . ......... .. _..,_ . ,,_. - . - _ - _ . %/' _,. _ _. _.«, s \, _.- _... _,,._.,_ _ .. ,L _,. _. .,r - .. \ i� \ 11 1-1 1. _.. ...,,” .. _,. �.. ._.. .. ... _.. „ V \ G n ,., ,,_...,. ,,.,. ,._. .,.._. .. _. .... ..... .. .. .. ........ -. _„r✓,..-, ,,.,. ..,,\ .a.�. .. �\\, \ `'' mal .. .. ' ,✓ r., ..... „. _... �. U J _ ; . - _. O rr M ._.� �# 1 n O O O % , _ _.. ,__._._ 3 ...__ O 11 �:. t � O O: �o,v-- --- - _ r -Pl w.,_�«., O O O O O, 0 : ,O O O w �_z-_....� --_ .. _,..._. C3 v_ M _.. _.... .. Z1 0 O O O O Q O O, O h:ti�� _«,.. 0...,.._ P ,� . ,, .._ O O C> O O O O O O O O .. 0 O 0 O -�._, ._ .;;< ,.„,.__.. ;.� _�� 0..._ � �. - �a ;s7 _ ,, -/ } ��� __..___, — _._ _...- _ __-, , _d . 0 O O O O O O O 6 O O O O O O d O �} r �, Zj fl I- „- -r s (},% O O O O O O ' O Q Q. O O rw,� /y www. �' o o �,o O �Q o o'„Q �.. „11 �� o O O 0 0 0 0 0 0 o Q o o� o- . r � ..: , 6 0 o O ; o O Q Q. o O o O o O O o O O � 1 :_ �� O o 0 0, O __ Q:: ___ 0 0 0 0 �� ._ v >�x r O O 0 o O o ,w O_ O o 0 0 o o o o� -T i 0 0 0 0 Q� __ _ O_ o of �., « o O o Q� Q_: _ o o . _._ . 0 0� o._ a, _ r_ ._, _ �0” _,_. o o , ; �.,�� « oo�_v y_ o O 0 0 O..... �.,0 O o _ O _ a„ o 0 0 0 o+� �< ,� :, Q.... _. r O O 11 xa>� .; O O _.) - .D O O ', ., b x a ,;,.,,, 0 0 o-, _ o 0 „w _ o _.o_ o O _._ _ O O 4 O �. / O O _ O N O O _ , ,. w„ O « _ O Q „ O O� O O __� r: , u:,.. a „ . „ o 0 0 �,.. ,,. , o C) P o «O / n< O O m _. U O _. Ci ,.y, _,... -- M O M U} _..., _ , _ .' .. _ _.... __ .__ .. _ .... . O' O O O - fir' .. �.:, , . _ r ; O ,- ^ w.:,: _ .: 0 0„ `` ,. _ M .„ O O �� 4 ,. O O n _. 4 t- - ” \a 0 ,O O O O O Q �s/.. �- 1 � _ _ O O _.__«_,_«.__. w O (3,. O O 4---� -'�.. _ ...___ ,_. - -- - _� _. _ O , w, « O Q_ , 107+00 � W __,, w?. _ O z�� �:” .,.. .. _ ._ ._ ,.. ,.. ,-,,. ,., ., 1 .� ( 6+ /.,_ ; __ _ __.. ....... _. - (n __«_. _ ,. _....__ __:m.,_ 1. _. �, __ m. F- -- o 0 1 U-1 . <: �r w o _ f... r f f „, „, T „% + �„ 5 .. , _. to ___ � _ � _ .� � � � f v, f f r ._. _, . .,._ < ,,.;,,,.LLJ .. I .. , , `:-r, .. .. ,,.,. .: _,..... ,._ _.. ,,. _. 1, 11”�. f /I 11 11 - (n ..,_ .t, -. ... n „ , ;, . , ,-, '? ., is,, , , W „ «. f a. ✓ ✓ v;, / , ,, „,ILLI „. r c J __ -. <, ,, , , ,, , , ,,, , , , ..: , . ._� ,.'4: ,::.tea' , . .� - ,. ,;. ,,, ,. ,..- ,.., x, ..� .. :: ;: ✓.. , .... .. 1 , J ., J c� ,.�, �_' t l J �"�._ , „s1�1 ,O / __ U _ _. f , .., _. _._. _. IliOfi a �: _ _ , _., _-, - CQ - _ : ,Z f-� , O. y v i- ,_ 0h O , O , r , �_ _ __ - . __ � _ _. _'tom _ Q,. .:_._ � _ O __.._ _ a v Q „,. _.,_.._ _.. „� ..« _.._ _ _, _. _ _ , Q _ _. _, .._ _ �, - t�. __ O O O: o cs ----o-- _.._... _ _ _ O, o _ ry 0 0 �, O o __-_._” __ o o O_ , O _ . _ ._ , �� _ _... _ Q_ ow _. _ _ O Q Q .- _,_. r o 0 0 0 O Q_� _._ ,__ ,: , o_ c� o _ _.. e , , o _v o ,...,.w O .� ©,. o _O . _O O O , x ; _, _._m, _ __o r� 00 s M_ ,11 ___ , c o o Q w__ _ _. o F; :. o O O O Q O O c- r o O © O o O O o'er __ 0 O O 0 O 6. �1 O O O U .,Y �1.�. O O O, .., 0 O Q 0 O ,,..,� , ; O O ; ; O ._ � _, ._..,.. , - ...C) 0 .0 O fl , } -,24 �: J O O O O G:, .�.n�'J , 1 O O O �. �0 Q: G-.._0_- 0 O ,_ ..C.:_ ._„_...._._ �.:0..U_ ._.._. _ . �,0 . r ci O O _.... ... _ ,_ , / , ,, v O „� _ ..O_,... .. 4 O O O ri11 vvv �, O O O_ ,._ �.. / , b n O O O_ _. «._.` O �' 0 ZONE 2 O _S? .� _. _.. C5 / �_ 5 ..... _.,... - v - C1 / ( 0.. _.Q _ ., .._j�' O__ O �v O „ 0 - C1 „” ` „ -.«O"" O ,1/. , , _ ..._--- _ ._.._ - _ _ .. r _. f , , r n a w, ._ ._ ._,O. _, , ' - .,.1.L,» .Q- -_ O `^' _.....,,, .. / r O _... y \ J A . , \\.11 O , .,,_ . O O Qom..._. __ _. «3 �, ; , ,, 4 0- m_« ,E 0 _ _i-_ Q O� O .._ �, F` 0 Q _ ._ � 0 Q f _O .. O._ O w_ _ „ f 11 O O _. - . O,1... _.. 0 0 C�, 0 'y 0 C? _. 0 _ 0. O O O 6 O: _ �_ __ ,_..., .._ __ ._ ... p O _.CQ �� CO _ . O O Q _ ....... 0... O �,` O „ �. _ O _ ._ _.O __ .._ _. Q, 11 _ CY '' O ,« O O Q _., _. _. _ , «.._ _ , o- o. _ _ O 0,. Q .y _„ �, �O� _� _ . _ , , , % o O O O _; r J o �. O.... _.,_9,� ,_.� I �.. __ _ - „ Q o n �_ , �. - _,.,,. O n , .. a O a � � , __ n , ..� .. G- _ �_ 2 > €� F O _ _ ,.,,.� - � � cam,. r _ � .. � r / � , '- _ _ _ <-< _ _,_, _ ._ s, - fr � w / w_,.__.._ __..,.,. „Y` 5 11 S ,. aw , „ _ s v, _ _ _" ll .. , _. M _.. , - INSTALL COIR u� v - _ �� �.-_� � __ MATTING ON CH 11 � ��� \ � _,F-- _ - � v ,. BEN „_.,_- � _._;mow _M `v r' \ - s; \, _, ..... _ _ _. _ _ _ . .. t p 4_ . ...___.. __...__ / .- _u p, _ �_.-11 / , s �, s f , 11, ,..., - . - .....,. .. l _„ r e,.,,..,- iii .»,.. ... \ 3 f' - `�,. , ti� Z s.,,,. £ may` ,. - , f F , / J /If f!/ \ \ I \ _ - \ f I— a / j / _ cv F ,,, ;. a -«� �, . / Z, , i `v. r ,% / t , \ �r` t. _ v,` «,✓ �/ /i ////I 11, f I r11 11 , / , / .-'./' ,.'l ,, ✓ , /rs , / ,/ / _� .,„. r i / , /r / f / / / - -� w v s / /F - _ F % f / , _ __.. �� e' F /r /'�I 11 1 f t ' j ' ' / ' 1 r / r i i , ,. �`/ r r / �� 11 11 // / v � , / ✓ � / / / f / 4 /� / .e � / ��., /” j /���' r 1 z " r t / � ,- s c �, / s / �„ /.:. f i / l/ / F' / I /, -_._ , // / /I'll / ,-. .. -- // _ 1 t # / / - - / / / �f/ < , f f � f I , s / / � „ / f r s i > i / j' i r` ,11 ___ __ --_----------- _ . -- ._ _____._.. � _ __ ____- _. �„_. _ _ _a__,.�_, _ -__ I I 1-11-1-1-1-111,1111- � � I I 98 6498, PLG 265 7<53`630179,3358 & . , ,/ I ' 12' '' 5 7 t / --_-..._....,.,.._..._ S c,;.i,r, j � REV. No.: REVISION: DATE: '� This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose y and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2017 PREPARED IN THE OFFICE OF: i CLIENT: NOTE: (SOME FEATURES SHOWN AS 'EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. V 00%J1111111" 4 %CARO ,`� eooeeee0000 0 I e SEAL , 4460 = v Q %,y IN�.e �j ooeoeeNoe� fiR Int, L SEAL: ,,1f1►11111111i 30' 0 15' 30' 60' JLY DESIGNED BY: V::: V 00%J1111111" 4 %CARO ,`� eooeeee0000 0 I e SEAL , 4460 = v Q %,y IN�.e �j ooeoeeNoe� fiR Int, L SEAL: ,,1f1►11111111i J���JOB NUMBER: !! 012137010 PROJECT: SOUTHBUFFALO CREEK HABITAT AND WATER QUALITY IMPROVEMENT PROJECT PHASE IV T NUMBER: 32 OF 3 7/11/17 �i, DRAWN BY: JLY DESIGNED BY: V::: JLY CCHECKED BY: WRW J���JOB NUMBER: !! 012137010 PROJECT: SOUTHBUFFALO CREEK HABITAT AND WATER QUALITY IMPROVEMENT PROJECT PHASE IV T NUMBER: 32 OF 3 � / ' ,IF- , rl ;-------'T 7�7---- <�[>cc/ F'. �- } ` c/ 0 '[[ -[}F L/ ` 1011 NN -00 LJ � LLJ Uj '/��,,^/,,, UJI� �.\ ` - _- --- ' {} ��- ��~~��= <]- � --^- ~--- --- *�� '' ' ^*~ ' ' / INSTALL COIR_ WAT71NW ON BENCH�' �~DQ�Uj �uJ z uu W W .�-. 'INSTALL COIR ' ~'~ <MATTING ON BENCH ''~'. . .~ '' < ZONE 2 ` ^ INSTALL COIR MATTING ON BENCH C/7rT7F-----' .~~�~~~-----���^'`_.��-�-��������������~.~��-~ ~'`^~`~~xm ~`~ ~~ .~ '~' .' -~-----_ 6�57, P6 2562 � \ ` ---`-```'. -------- '� -----'------------ ```'. an SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE ------ --** � ' , -`-CONSTRUCTION OF PREVIOUS ` . ``, `\ ```�` `^ --`'`','~--_�� ----'-_'----~_�� -`-'~. ** _7�p --_--_=° -___. '~ U) \ / CL Know what'sbelow. Call before you dig. '5 PREPARED IN THE OFFICE OF: CLIENT. DATL PROJECT: CA110. 8/16/17 E DRAWN BY: SOUTH BUFFALO CREEK HABITAT CITY OF GREENSBORO In c: NC LICENSE #F-0102 SEEAL, t DESIGNE0 BY: AND WATER QUALITY JLY 421 FAYETTEVILLE ST,, STE. 600 TI TLE: 04460 REV, No,; RE:MSiON: DATE: DRAM BY-. CHECKED BY. RALEIGH, NORTH CAROLINA 27601 CHECKED BY: IMPROVEMENT PROJECT PHASE IV I M PHONE: (919) 677-2000 This document, together with the concepts and designs presented herein, os an instrument of serv�ce, is intended only for the specific purpose WRW 54 and client for which �t was prepared, Reuse of and improper rePance on this document without written authorization and adaptation by PLANTING PLAN Kimley—Horn and Associates, Inc. shall be without RaWllty to Kirnley—Horn and Associates, Inc. @2017 JOB NUMBERi SHEET NUMBZR: map Map C m cl ^'" `\ • %" , } t RDM� 742A7 NNW IN: 731,14 r zn 3m C O ., j i" 7rv..,..- ', i,rr"r�"'-'i 4�-� % $ X12 �t`�� "`•, "0 v�iA ° a 01i O° O / f :Wad S �^ .. \ 3.•'% } ll r 1,14V OUT,, 728.7i' ° 0 0\ F n Cf3_ % O oO O p p 0 i 0000 O, 00 p OO°O pOOOOOOOOp. i o0p0°000000°O O'F Opop 0 .000 O O00 i� °O°o°°° 0 °`O 0°o°O00 ° O O Oy OO°000'p00 O o0 O0 p 0 pU.. 0 °.�p0000?, O�0�00o0° 0000p op�°°opOppopppt�(o' ` T °o° o°°p0o°0°Q 00 °oop oo°o0po°00p °O0O Op oo O°°°0O00O000 """o Op0p� ppp0 °p° 0°° 00 °pOoOQ; 6' �£ , 1 i / 00°000 0000°0'O 0 0p0p0pp0pOpQpi 0000°0°0000°O°0' O O°° o°' �` i u 0 0 0 O 0 0 0 °p o opop , �: Op°o°o O; #. r o O O O St ^ r , 7/11/17 �.♦`,�� ``��® Iii N, DRAWN BY: REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: , O O° pp0 SEAL a DESIGNED BY: �S^) 7.2. 2V- s fI� • �. ee ,��j °•Y`�'4?"l� eeeee• epee WRW ,*,� 'F L ♦ JOB NUMBER: 012137010 R tiffW 739A3 dY is F.f-3 ry ...•. I / f :Wad S �^ .. \ 3.•'% } ll r 1,14V OUT,, 728.7i' ° 0 0\ F n Cf3_ % O oO O p p 0 i 0000 O, 00 p OO°O pOOOOOOOOp. i o0p0°000000°O O'F Opop 0 .000 O O00 i� °O°o°°° 0 °`O 0°o°O00 ° O O Oy OO°000'p00 O o0 O0 p 0 pU.. 0 °.�p0000?, O�0�00o0° 0000p op�°°opOppopppt�(o' ` T °o° o°°p0o°0°Q 00 °oop oo°o0po°00p °O0O Op oo O°°°0O00O000 """o Op0p� ppp0 °p° 0°° 00 °pOoOQ; 6' �£ , 1 i / 00°000 0000°0'O 0 0p0p0pp0pOpQpi 0000°0°0000°O°0' O O°° o°' �` i u 0 0 0 O 0 0 0 °p o opop , �: Op°o°o O; #. r o O O O St ^ r , MATCHLINE SEE SHEET 32 PREPARED IN THE OFFICE OF: I CLIENT: i ', CARO�'�, 7/11/17 �.♦`,�� ``��® Iii DRAWN BY: REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn and Associates, Inc. Copyright Kimley—Horn and Associates, Inc., 2017 MATCHLINE SEE SHEET 32 PREPARED IN THE OFFICE OF: I CLIENT: i ', CARO�'�, 7/11/17 �.♦`,�� ``��® Iii DRAWN BY: eeeeesee••eeeee' JLY SEAL a DESIGNED BY: e 04460 JLY s fI� • �. ee ,��j CHECKED BY: eeeee• epee WRW ,*,� 'F L ♦ JOB NUMBER: 012137010 NOTE: SOME FEATURES SHOWN AS EXISTING ARE BASED ON PRESUMED CHANGES FROM THE CONSTRUCTION OF PREVIOUS PHASES. • • • SOUTH i CREEK HABITAT AND WATER QUALITY IMPROVEMENT PROJECT PHASE IV SHEET NUMBER: 36 OF