Loading...
HomeMy WebLinkAboutNCG080731_Inspection Report_20200225ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Rolling Frito-Lay Sales LP Attention: Rob Sapienza 2700 Nevada Boulevard Charlotte, North Carolina 28273 NORTH CAROLINA Environmental Quality February 25, 2020 Subject: Compliance Evaluation Inspection Permit: NCG080000 Certificate of Coverage: NCG080731 Jackson County, North Carolina Dear Mr. Sapienza: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on February 19, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, CPSWQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 o.aarim.oimu..�aon,.om ooaip 828.296A500 Compliance Inspection Report Permit: NCG080901 Effective: 11/01/18 Expiration: 05/31/21 Owner: Rolling Frito-Lay Sales LP SOC: Effective: Expiration: Facility: Burnsville Bin County: Yancey 552 E Main St Region: Asheville Burnsville NC 28714 Contact Person: Rob Sapienza Title: Phone: 704-927-7377 Directions to Facility: head south on James H Quillen Pkwy then go south on US Hwy 19 - take left on Pensacola Rd & a right on E Main St - facility is on right System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 0211912020 Entry Time: 03:OOPM Exit Time: 03:30PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Transportation w/Vehicle Maintenance/Petroleum Bulk/Oil Water Separator Stormwater Discharge COC Facility Status: Compliant F1 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCGO80901 Owner -Facility: Rolling Frito-Lay Sales LP Inspection Date: 02/19/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On February 19, 2020 this facility was inspected for compliance. This was a follow-up to a previousely non -compliant inspection. I met with Steve Langdon on site. No major issues were observed on site. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCGO80901 Owner- Facility: Rolling Frito-Lay Sales LP Inspection Data: 02/19/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? M ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? M ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? M ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3