Loading...
HomeMy WebLinkAboutR-2553 Kinston Bypass_CP3 Concurrence Form_SignedDocuSign Envelope ID: EAE38EA7-C7C3-475D-BB51-51FED6FB6D42 Section 404 / NEPA Interagency Merger Process Concurrence Agreement Concurrence Point No. 3 — Least Environmentally Damaging Practicable Alternative (LEDPA) US 70 Kinston Bypass Lenoir, Craven and Jones Counties, North Carolina WBS Element No. 34460 STIP Project R-2553 Concurrence The Project Team has concurred on this date February 19, 2020 with the selection of Alternative 1 SB as the Least Environmentally Damaging Practicable Alternative (LEDPA) for the proposed project. % A5 USACE Tolpleffens DocuSigned by: USEPA gmalnt'fx Sbwtt,hM& mane a Sommerville DocuSigned by: - �" In)u�,d. NCDWR arcy Ward NCDOT A& ✓riP/ Heather Lane USFWS G4 Jo an NCWRC Travis Wilson SHPO Cat / — USCG (does not sign) Renee Gledhill -Earley Martin Bridges DocuSigned by: NCDCMr2iZ4 ERPO N f"k- rittingha versole DocuSigned by: II J—�Vlf" NOAA-Fisherie ECRPO n o e Micajah Anderson