HomeMy WebLinkAboutNCC200339_NOI Application_20200224Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 1/23/2020 10:04:27 AM (NCG01 NOI Submission)
Approve by Farkas, Jim J 1/27/2020 1:28:35 PM (Review- Construction NOI 21052)
• The task was assigned to Farkas, Jim J by round robin distribution 1/23/2020 10:04 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: January 27, 2020 5:00
PM 1/23/2020 10:04 AM
Submit by McCoy, Suzanne 2/24/2020 11:32:09 AM (Payment Verification for NCC200339)
* ReNewPetra Construction LLC
• McCoy, Suzanne assigned the task to McCoy, Suzanne 2/24/2020 11:31 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 9, 2020 5:00 PM
1/27/2020 1:28 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
la. Project Name * ATOOD SolarlV
1 b. Specific Lot This field may be used to list specifc lot nunbers.
Numbers
2. County* Brunswick
3. Highway or Street 2299 Commerce Drive NE
Address* Street name only is acceptable if no address number assigned yet
4. CityorTownship* Leland
5. State * NC
6. Zip Code* 28451
7. Latitude* Enter the latitude in decimal degrees
34.2730
8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative)
-78.0580
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
06/24/2019
Estirrated Construction Project Start Date
10. Date to End*
04/01/2020
Estinated Construction Project End Date
11. SIC (Primary)*
Commercial (1542)
Standard Industrial aassification for Development
12. Acres to be
21.00
disturbed*
(including off -site borrow and waste areas)
13. Total site area 37.00
(acres)*
14. Post- 14.00
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-BRUNS-2019-ATOOD SolarlV
Tracking ID Assignedautonatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Rowell Branch
Wate rbody* Nacre of waterbody into which storrrwater runoff w ill discharge
15b. Waterbody 18-77-1-1-1
Index No. * NC Waterbody Index Minter
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization ReNew Petra Construction, LLC.
Name *
2. First Name* Greg
IF Corporation, enter Pegistered Agent First Barre
3. Last Name* Peterson
If Corporation, enter Faegistered Agent Last %rre
3b. Title CEO
4. Permitee E-mail gpeterson@renewpetra.com
Address *
5. Permittee 919-961-1640
Telephone No.*
6. Permittee Mailing Street Address
Address* 11330 Vanstory Drive
Address Line 2
city
Huntersville
Fbstal / Zip Code
28078
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
V Yes
Street Address
11330 Vanstory Drive
Address Line 2
Cty
Huntersville
F bstal / Zip Code
28078
8. Type of Individual
Ownership*
State / Frovince / Faegion
NC
Country
us
State / Frovince / Fbgion
NC
Country
us
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Greg
Contact - First
Name *
2. Primary Site
Peterson
Contact - Last
Name *
3. Title
CEO
4. Site Contact E-
gpeterson@renewpetra.com
mail Address*
5. Site Contact
919-961-1640
Telephone No.
6. Organization
ReNew Petra Construction, LLC.
Name
7. Site Contact
Street Address
Mailing Address*
11330 Vanstory Drive
Address Line 2
City
Huntersville
Fbstal / Zip Code
28078
8. Consultant Name
(Optional)
First and Last nacre
9. Consultant E-mail
This person will be copied on all correspondence.
10. Consultant
Telephone No.
State / Rovince / Region
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 11/05/2018
Approved *
2. E&SC Plan Project BRUNS-2019-035
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Wilmington (WiRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project.
5. E&SC Plan ATOOD - ESC Permit Full_11-05-2018.pdf 1.74MB
Approval Wst be FDFfornat
letter/documentation
Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support
the application.
6. NOI Certification NOI Certification Form - ATOOD Solar IV.pdf 69.88KB
Form Mast be FDFformat
This is an Express F No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * Greg Peterson
Title CEO
Organization ReNew Petra Construction, LLC.
Date * 01 /23/2020
F. Tracking and COC Info
NOI Tracking No. 21052
NC Reference No. NCG01-2020-0339
Uses 'count number' variable (incremrented by SP)
Certificate of NCC200339
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 339
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)