From: Paul M. Stephens IV, E.I., PWS <PStephens@ecslimited.com>
Sent: Monday, February 24, 2020 8:57 AM
To: Johnson, Alan; David.l.shaeffer@usace.army.mil
Cc: Brandon Fulton, LSS, PSC, PWS
Subject: Re: [External] RE: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
Attachments: Mallard Creek - Additional Information Response 2-merged-compressed.pdf
• ' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
ELort.spam@nc.gov
Alan & David,
Hope that you had a great weekend. Please see the attached response for the last email requests for
additional information. Once you get a chance to review, be sure to let us know if you have any questions or
need anything further.
Thank you,
From: Paul M. Stephens IV, E.I., PWS
Sent: Monday, February 3, 2020 10:37 AM
To: Johnson, Alan; David. l.shaeffer@usace.army.miI
Cc: Brandon Fulton, LSS, PSC, PWS; David E. Valentine, PWS, REM
Subject: RE: [External] RE: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
Alan,
Avoidance and Minimization principles have been reviewed throughout the course of the project, and have been a
considered a high value item on the list for the development. We appreciate the feedback and have taken it back to the
engineers and developers for consideration. We are in the process of preparing a formal response to you and David's
comments from previous email correspondence.
Thank you,
PAUL M. STEPHENS IV, E.I., PWS I Environmental Project Manager
ECS SOUTHEAST, LLP T 843.654.4448 1 D 843.284.7823 1 C 843.670.8821
www.ecslimited.com
Confidential/proprietary message/attachments. Delete message/attachments if not intended recipient.
From: Johnson, Alan [mailto:alan.johnson@ncdenr.gov]
Sent: Monday, February 3, 2020 9:49 AM
To: Paul M. Stephens IV, E.I., PWS; David.I.shaeffer@usace.army.mil
Cc: Brandon Fulton, LSS, PSC, PWS; David E. Valentine, PWS, REM
Subject: RE: [External] RE: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
I received your comments regarding how the development worked with the city to obtain their
zoning request, but it seems all that work was conducted prior to having the discussion with
the agencies regarding avoidance/minimization.
Thanks
Alan
From: Paul M. Stephens IV, E.I., PWS [mailto:Pstephens@ecslimited.com]
Sent: Wednesday, January 22, 2020 12:26 PM
To: Johnson, Alan <alan.iohnson@ncdenr.gov>; David.l.shaeffer@usace.army.mil
Cc: Brandon Fulton, LSS, PSC, PWS <BFulton@ecslimited.com>; David E. Valentine, PWS, REM
<DValentine@ecslimited.com>
Subject: RE: [External] RE: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
• External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
re am@nc.gov
David & Alan,
Hope that all is well. I wanted to provide a quick update for the site based on the David's initial comments on the permit
application on November 20, 2019. We revisited the site to review the additional area where the proposed Kings Grant
Drive will be constructed, but is not included in the current JD letter. This area was high and dry, and ECS did not
observe potentially jurisdictional waters during our site visit.
Please let us know what you need data -wise for this area to continue the permit application review.
Thank you,
PAUL M. STEPHENS IV, E.I., PWS I Environmental Project Manager
ECS SOUTHEAST, LLP T 843.654.4448 1 D 843.284.7823 1 C 843.670.8821
www.ecslimited.com
Confidential/proprietary message/attachments. Delete message/attachments if not intended recipient.
From: Paul M. Stephens IV, E.I., PWS
Sent: Monday, January 13, 2020 8:58 AM
To: 'Johnson, Alan'
Cc: David. l.shaeffer@usace.army.mil; BFulton (BFulton@ecslimited.com)
Subject: RE: [External] RE: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
Alan,
Hope you had a great weekend. Please see the attached picture of the stream proposed for impacts as requested.
Also, we sent the designers and engineers your comments below for discussion points. Please see the attached site
plans. Following rezoning approvals, the attached site plan shows how the development has been adjusted and
redesigned. This includes dropping 6 additional units and shifting some of the buildings and infrastructure towards the
northern portions of the site. Following zoning and stormwater approvals, a stormwater retention pond was re -located
to the northeastern portion of the site. By moving the stormwater retention pond, every bit of useable space in this
area was utilized as agreed upon with Duke Energy Transmission and City of Charlotte Engineering.
The open space/amenity areas that were referenced below were direct requests and commitments of the rezoning
approvals by the City of Charlotte. Therefore, these areas are non-negotiable and need to stay in place. These areas
have been reserved for uses such as potential dog parks, plaza/seating, park areas, etc. for pedestrian neighborhood
use.
City mandated buffers are also being coordinated with the City Stormwater department and a replanting plan is being
put in place. Nearly the entirety of the northern portion of the site, not being developed, will be planted with new trees
and along the stream riparian areas.
Thank you,
From: Johnson, Alan[mailto:alan.iohnson@ncdenr.gov]
Sent: Wednesday, January 8, 2020 4:34 PM
To: Paul M. Stephens IV, E.I., PWS
Cc: David.l.shaeffer@usace.army.mil
Subject: RE: [External] RE: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
I believe your are referencing this. This is a very general statement. Unfortunately, I am not clear if the the fill is till
proposed or if a retaining is being constructed. If the latter, please provide the new site plan showing the retaining
wall. Thanks... See below.
Avoidance & Minimization.
Based on the preliminary development plan and analysis by the builder team, the approve(
allows 18townhome units. Due to site engineering, grading, extent of jurisdictional w.
additional analysis, a reduction in the amount of proposed townhomes on site have been red:
current site plan currently proposed 180 to► nhome units, fri order to minimize overall site irr
maintain grades of the proposed to►+vnhomes at a higher elevation, a retaining wall is proposed 1
of the site. As further emphasis on minimization of impacts, the retaining wall limits have he
away from the jurisdictional streams and the Fetaining wall heights have been increasied to firr
to the jurisdictional waters and buffers down -gradient. Any other adjustments to dec
development in the impact area will have a significant impact in density and overall function
from a development and approved rezoning perspective.
The removal of two lot or possibly one with potential relocation of the channel doesn't seem
unreasonable. Also there is an amenity area and open area shown on the plan that could be
swapped an this area used as an open area.
3
4G (T4T•)�� '�
LA
OwQKMA9y �
ylw F tea+ F aNw
.AMJ U"h CIO UXL txti
a �+:K �e utiy;pttnj fiR� '
TQ TiiL
ISTMEuM C
okYU 11 OIn- Y I
M Lf "T[ t
16 Sr ( MT ABC) 0
14PW VAPPAC T
1
E Lf Of $t1�i1W
_
T �
�4* 5F (a("I AC) to C7 (An CO
P+MOPOM SO' PH= PL"D
MCId DCLPCArM SWAM
LIOTS• SU WATER *J&JtT
KJFF VST ROAMCE
APPUCAP M1 fOR MAL
NPACT WTS & AUJM O
V
L.r i
1" LF # STRCAY
TO SE MLED
"1 7 ,*1* AC)
1 p 6 CY OF MLPACT
441 (f}
PUFFM TO
i
Pf
GRC
•�
STY 5lOw.t(91d1'
s
qF
f
There appears some adjustment could be made to avoid impact?
..r•w aOw
4 a.�r
Aw
nor
+ �r
.YAK Yi 1j •tom -av'.X kk .,-
14q MaE a
,.� :;, - * ter. •s
74
IL
�4TF �: �y'SylR
' { L Y1 11
F
J I
y 01 �9
PePI
i 4'
# }-� •may+ r.►S 51 � � }k� �
4
From: Paul M. Stephens IV, E.I., PWS [mailto:PStephens@ecslimited.com]
Sent: Wednesday, January 8, 2020 4:03 PM
To: Johnson, Alan <alan.iohnson@ncdenr.gov>
Cc: David.I.shaeffer@usace.army.mil; Brandon Fulton, LSS, PSC, PWS <BFulton@ecslimited.com>; David E. Valentine,
PWS, REM <DValentine@ecslimited.com>
Subject: [External] RE: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Alan,
Hope that you're doing well. We had submitted a comment on this item in the attached email response to David
Shaeffer on December 11, 2019. To my knowledge, we haven't provided photos of the stream but certainly can do so.
Thank you,
PAUL M. STEPHENS IV, E.I., PWS I Environmental Project Manager
ECS SOUTHEAST, LLP T 843.654.4448 1 D 843.284.7823 1 C 843.670.8821
www.ecslimited.com
Confidential/proprietary message/attachments. Delete message/attachments if not intended recipient.
From: Johnson, Alan[mailto:alan.iohnson@ncdenr.gov]
Sent: Monday, January 6, 2020 2:51 PM
To: Paul M. Stephens IV, E.I., PWS
Cc: David. l.shaeffer@usace.army.mil; Brandon Fulton, LSS, PSC, PWS
Subject: FW: SAW 2018-01925, Mallard Crk Rd/ DWR 19-1548
Paul see below. Following up on earlier question regarding fill. I know it has been the
holidays.
Thanks
alan
From: Johnson, Alan
Sent: Wednesday, December 11, 2019 1:02 PM
To: Paul M. Stephens IV, E.I. <PStephens@ecslimited.com>; David.l.shaeffer@usace.army.mil
Subject: SAW 2018-01925, Mallard Crk Rd
Paul, do you have photos of the stream you want to fill. I have issues with filling stream for
the placement of lots. Filling the headwater could have impacts on the stream's viability, thus
having an indirect impact on the downstream viability.
A The removal of a lot and possible minor stream relocation, may be the trick to avoid the
impact.
5
don't have an issue with the road crossing and the minor bit of up gradient fill. But the
remainder doesn't seem to comply with avoid and minimize.
Thanks
Alan
DWR
D s"n of Wmer Resources
Alan D Johnson — Senior Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2200 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
-------------------------------------------------------
This message has been analyzed by Deep Discovery Email Inspector.
This message has been analyzed by Deep Discovery Email Inspector.
This message has been analyzed by Deep Discovery Email Inspector.
This message has been analyzed by Deep Discovery Email Inspector.
This message has been analyzed by Deep Discovery Email Inspector.
-------------------------------------------------------
This message has been analyzed by Deep Discovery Email Inspector.
6
Avoidance & Minimization:
Based on the preliminary development plan and analysis by the builder team, the approved rezoning
allows 186 townhome units. Due to site engineering, grading, extent of jurisdictional waters, and
additional analysis, a reduction in the amount of proposed townhomes on site have been reduced. The
current site plan currently proposed 180 townhome units. In order to minimize overall site impacts and
maintain grades of the proposed townhomesat a higher elevation, a retaining wall is proposed to the rear
of the site. As further emphasis on minimization of impacts, the retaining wall limits have been moved
away from the jurisdictional streams and the retaining wall heights have been increased to limit impacts
to the jurisdictional waters and buffers down -gradient. Any other adjustments to decrease the
development in the impact area will have a significant impact in density and overall function of the site
from a development and approved rezoning perspective.
m7(VMl/) $•CTfMm
vmrfe.°°°
VICINITY MAP
N75 \
1
STREAM A
AVG WIDTH: 4'
567 LF ONSITE
1,134 SF 1,.026 AC)
\ \ \SSipN
4111
STREAM C
AVG WIDTH: 3'
252 LF ONSITE
/ 756 SF (.017 AC)
/ STREAM B /
/ // AVG WIDTH: 3' ,
27 LF ONSI(.001 ;
// 81 SF (.001 AC)1117 /
r
f XJ •
i
♦
PROPERTY
LINE (TYP.) `
JJ\\
s♦ � �/
4000
STREAM/WETLAND TABLE
STREAM LABEL AREA LF
STREAM A 0.026 AC 567
STREAM B 0.001 AC 27
dra
DESIGN
RESOURCE
GROUP
LANDSCAPE ARCHITECTURE
CIVIL ENGINEERING
TRANSPORTATION PLANNING
2459 Wilkinson Blvd, Ste 200 Charlotte, NC 28208
70
343.0608
w .drgip.mm
Q
U) a
_j
U)
LU
c
J o
C a
H
Z
Zc=
DQ
�ZZ
0
z
O U
J o
U Df
w
��
a
=
Q Q
C U
0
USACE# 20191548
EXISTING
CONDITIONS
0 150 3000
SCALE: 1" = 300'
PROJECT #: 598-014
DRAWN BY: WSM
CHECKED BY: NB
JANUARY 31, 2020
REVISIONS:
#0i �j / STREAM C 0.017 AC 756
Copyright', 2019 Design Resource Group, PA Thls plan or drawing end any.—,,panying documents or calculations so, the property of Design Resource Gro,p, PA, end an: intendetl solely for the,,, of th, recipient noted. No thiol party use or—dification is penniff d with..t wniten authorization.
SHEET 1
dr
DESIGN
RESOURCE
GROUP
LANDSCAPE ARCHITECTURE
CIVIL ENGINEERING
TRANSPORTATION PLANNING
2459 Wilkinson Blvd, Ste 200 Chadotte, NC 28208
7 04.34 .0608
_ drgM.mm
U) Q
VJ
Q
J z
W
J o
H
/�
(! J
Z
Q
U
Z
�>N
Q rp
O
z
i
O Wk
Q LL
J o
U �
w
�2�
2Q=
a
1-
C U
r
USACE# 20191548
PROPOSED SITE
PLAN AND
3TORMWATER PLAN
0 100 2000
VA
SCALE: 1" = 200'
PROJECT #: 598-014
DRAWN BY: WSM
CHECKED BY: NB
JANUARY 31, 2020
REVISIONS
SHEET 2
Copyright 02019 Design Re source G—p, PA This plan or drawing antl any —ponying documents or calculations are the property of Design Resource Gmap,PA, antl are intend. solely for the use of the recipient noted. Nothint party use or modifice0on is permitted without wdden authorization.
TREE PROTECTION
FENCING (TYP.) i \
TREE SAVE AREA (TYP.)
PROPERTY BOUNDARY
Riprap (Class B) to be installed. Filter Fabric
(MIRAFI 140N or similar) shall be secured on
the slope prior to installing riprap. `\
STREAM C',� \
AVG WIDTH- 3'
252 LF ONSITE I
756 SF (.017 AC)
STREAM C RIPRAP IMPACT f
13 LF OF STREAM
SEE IMPACT TABLE THIS SHEET.
(SEE RIPRAP EXHIBIT)
i
4' WALKING TRAIL '
RETAINING WALL
ri
50' UNDISTURBED
PCSO BUFFER '
t so•-
i
IMPACT TABLE
IMPACT LABEL
IMPACT AREA
VOLUME OF IMPACT
LF
XSTREAM
C —FILL
447 SF (0.010
AC) 16.6 CY (447 CF)
149
STREAM C —RIPRAP
39 SF (0.001
AC) 1.4 CY (39 CF)
13
TOTAL
486 SF (0.011
AC) 18 CY (486 CF)
162
It \\
\
PROPOSED 50' PCSO BUFFER
`-��
II
FROM DELINEATED STREAM
LIMITS. SEE WATER QUALITY
\ I \
\ BUFFER DISTURBANCE
APPLICATION FOR FINAL
IMPACT LIMITS & ALLOWANCES
dr
DESIGN
RESOURCE
GROUP
LANDSCAPE ARCHITECTURE
CIVIL ENGINEERING
TRANSPORTATION PLANNING
2459 WIN—, Blvd, Ste 200 Charlotte, NC 28208
704.343.0608
—drgrp.com
� U) ¢
w
Q J z
W
J
^
v I Of C Q
z U
Z M
Z aN
T
2 oa Z
z
0>
Lul
�Qw
J o
U�g
�a
w �2�
0_
Q Q
C U
Q_
0
USAGE# 20191548
RIPRAP IMPACT
EXHIBIT
0 20 40 O
SCALE: 1" = 40'
PROJECT* 598-014
DRAWN BY: WSM
CHECKED BY: INS
JANUARY 31, 2020
REVISIONS:
EXHIBIT
Copyright 02019 Design Resource Group, PA This plan or drawing and any accompanying documents or calculations are the property of Design Resource Group, PA; and are intended solely for the use ofthe recipient noted. No third party use or modification is permitted without written authodza6on
u
MNW
j
VICINITY MAP O
NOTE: THE STREAM BUFFER PRESERVATION
AREA SHOWN IS TO BE PRESERVED IN
PERPETUITY FOR COMPLIANCE WITH LOCAL
STREAM BUFFER REGULATIONS. ANY
DISTURBANCE OF THIS AREA MUST BE
APPROVED BY CHARLOTTE—MECKLENBURG
STORM WATER SERVICES.
CTOTAL BUFFER DISTURBANCE AREA = 11,756 SF + 14,683 SF = 26,439 SF
BUFFER DEDICATION AREA = 5,492 SF
r REVEGETATED AREA = 18,108 SF
L--J
LEVEL 1 REVEGETATION (SEE NOTES ON SHEET 2 FOR REQUIREMENTS)
REVEGETATION REQUIRED: 20,947/1,000 X 10 = 210 TREES
REVEGETATION PROVIDED: 18,108/1,000 X 10 = 181 TREES
(SEE TREE & GROUNDCOVER SELECTION ON SHEET 2)
PAYMENT IN LIEU: $10.00/SQ FT = (26,439-5,492-15,108) X 10
_ $28,390
TREE PROTECTION FENCING
W PSCO BUFFER LIMITS
EXISTING +8' CALIPER TREES
SURVEYED WITHIN BUFFER (TYP.)
P 1r� I
RETAINING WALL I
4' WALKING TRAIL
REVEGETATED AREAS
50' PSCO BUFFER LIMITS
BUFFER DISTURBANCE AREA
TREE PROTECTION FENGNG (TYP.)
BUFFER DEDICATION AREA
=5,492 SF
NOTE: THIS AREA IS NOT PART
OF DEDICATED TREE SAVE PER
SDRMF 2019-00075.
EXISTING +6' CALIPER
SURVEYED WITHIN BUFFER
BUFFER DISTURBANCE AREA
' DUKE R/W dr
\ `DESIGN
RESOURCE
\ GROUP
1 ,.xosvre rncxnE ne
iw.`sE"wmA.�iw,.
co
q J a LU
Q
4 J 0 Z>�
a
z
p y5
N F
� < w- LD �o
o w
W J D_V�
Q a D_
O
BMP AREA
STREAM IMPACT LIMIT
—T.
1 A EX. STREAM & BUFFER
BUFFER IMPACT AREA REVEGETATION
=14.683 SF
EXHIBIT
SUE: 1—W m�
r\iEW vv PR ECT0 5 014
aMNU 31.2020
/ xEwsarvs
I_ EXISTING 50' PSCO BUFFER TO BE REMOVED