Loading...
HomeMy WebLinkAboutNCC200705_NOI Application_20200224Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 2/20/2020 12:29:18 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 2/20/2020 12:35:13 PM (Review- Construction NOI 22205) • The task was assigned to Garcia, Lauren V by round robin distribution 2/20/2020 12:29 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 24, 2020 5:00 PM. The priority is: High 2/20/2020 12:29 PM Submit by McCoy, Suzanne 2/24/2020 11:12:37 AM (Payment Verification for NCC200705) * Lane Elizabeth Carr • McCoy, Suzanne assigned the task to McCoy, Suzanne 2/24/2020 11:12 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 2, 2020 5:00 PM. The priority is: High 2/20/2020 12:35 PM d� # NORTH CAROLINA Ernvlronmental qualily A. Project Information Part A. Project Location and Waterbody Information la. Project Name* 2020 Pole Replacement 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 2. County* Halifax 3. Highway or Street multiple Ridgecrest Rd. (start) - W. Battleboro Ave. (end) Address* Street name only is acceptable if no address nunber assigned yet 4. City or Township * multiple - Halifax 5. State * NC 6. Zip Code* 27839 7. Latitude* Enter the latitude in decimal degrees 36.3304 8. Longitude * Enter the longitude in decimal degrees (MJST be negative) -77.6742 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/02/2020 Estinated Construction Project Start Rate 10. Date to End* 07/31 /2020 Estirrated Construction Project End Cate 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 4.67 disturbed* (including off -site borrow and waste areas) 13. Total site area 46.80 (acres) * 14. Post- 0.01 construction (Estirrated) impervious area (acres) * NCC Project NCC-HALIF-2020-2020 Pole Replacement Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Marsh Swamp Waterbody* %rreof waterbody into which storrrwater runoff will discharge 15b. Waterbody 28-79-30-1 Index No. * NCWaterbody Index Nurrber Stormwater F No discharges will flow 17 Yes to additional wate rs * 15c. Additional Beaverdam Swamp Receiving Waterbody narre Waterbody 15d. Waterbody 28-79-30-1-1 Index No. NCWaterbody Index Number 15e. Additional Burnt Coal Swamp Receiving Waterbody narre Waterbody 15f. Waterbody 28-79-30-2 Index No. NCWaterbody Index Number 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Dominion Energy North Carolina Name * 2. First Name* Mark If Corporation, enter Registered Agent First f brre 3. Last Name* Allen If Corporation, enter Fegistered Agent Last %rre 3b. Title Director, Electric Transmission Lines Project Development & Execution 4. Permitee E-mail lane.e.carr@dominionenergy.com Address* 5. Permittee 8047714061 Telephone No.* 6. Permittee Mailing Street Address Address* 10900 Nuckols Rd, 4th Floor Address Line 2 City State / Rovince / Fegion Glen Allen VA Fbstal / Zip Code Country 23060 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 10900 Nuckols Rd, 4th Floor Address Line 2 City State / Rovince / Faegion Glen Allen VA Postal / Zip Code Country 23060 us 8. Type of Non -Government Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Eric Contact - First Name * 2. Primary Site Clay Contact - Last Name * 3. Title Construction Consultant 4. Site Contact E- james.e.clay@dominionenergy.com mail Address* 5. Site Contact 8043359534 Telephone No. 6. Organization Dominion Energy North Carolina Name 7. Site Contact Street Address Mailing Address* 10900 Nuckols Rd 4th Floor, Address Line 2 city Glen Allen Postal / Zip Code 23060 8. Consultant Name (Optional) First and Last nacre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region VA Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 02/07/2020 Approved * 2. E&SC Plan Project HALIF-2020-010 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project. 5. E&SC Plan Approval Letter HALIF-2020-010 LOA 20200207.pdf 380.21 KB Approval Site Map NCDENR Application Compiled_Express letter/documentation 919.68KB Review.pdf Mist be RDFfornat Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Fourth impacted waterbody is Swift Creek [28-78-(2.5)] 6. NOI Certification NCG01-eNO1 Certification Form.pdf 408.13KB Form Wst be RDFfornat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Mark Allen Title Director, Electric Transmission Lines Project Development & Execution Organization Dominion Energy North Carolina Date * 02/20/2020 F. Tracking and COC Info NOI Tracking No. 22205 NC Reference No. NCG01-2020-0705 Uses 'count number' variable (incremrented by SP) Certificate of NCC200705 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 705 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)