HomeMy WebLinkAbout20200276 Ver 1_Overlook at Mt Vernon Ph 3-Impact Maps-2020.02.10 (2)_202002194
Owe L nDo
� q
ZPH7ASE
ARBOR R lib!
M. VERNON
CRQSSIN1.a Pt Z
4-
7 itM0LNT VERA1QN
CROSSING
PHASE 1 & 2
TAILORS 4%'OODG
u
d LIB I
2
1<
�. fur;
o,
91
DEER TPAIL
TI-If -CATES AT
ETHAW GLEN.
0
0
T
Lu
Q
d erg l
. II:I BANS UP it
W
E
C 2019 Microsoft9or oration C 201 1ERE V t-.r'-q
i�Dift
9&
457
_ -` • `•
1\
1 1 I
1 1 '
1 1
------1-----_ ,STREET � I
PHASE 3 Tom, 1
\ % `/ T'
Fiq ,
NUESE RIPARIAN
BUFFER (TYP)
IMPACT LOCATION1�I ej
STREAM TOP OF BANK
I `
PHASE 1 & 2 /
IMPACT JUSTIFICATION STATEMENT
PROPERTY INFO THE PURPOSE OF THIS PROPOSED BUFFER AND STREAM IMPACT IS TO INSTALL INFRASTRUCTURE NECESSARY TO SUPPORT THE CONSTRUCTION
PROPERTY DEVELOPER: MARQUIS HOMES & COMPANY OF A NEW RESIDENTIAL SUBDIVISION IN WAKE COUNTY. DUE TO THE LOCATION OF THE EXISTING STREAM AND THE REMOTE LOCATION OF THIS
8368 SIX FORKS ROAD PORTION OF THE DEVELOPMENT, IMPACT AVOIDANCE CANNOT BE ACHIEVED BUT WILL BE MINIMIZED TO THE MOST PRACTICAL EXTENT POSSIBLE.
RALEIGH, NC 27615
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH WAKE COUNTY, NCDEQ AND USACOE APPLICABLE STANDARDS AND SPECIFICATIONS.
PIN: 0891-02-5319 & 0891-12-2200
SITE ACREAGE: 30.11 AC / 1,311,507 SF
GRAPHIC SCALE GRAPHIC SCALE
1000 0 500 1000 2000 10 0 5 10 20
1 inch = 1000 ft. 1 inch = 10 ft.
E
U
Q
Q �
�O
� J �
maa
X w O
w z �
U
� -)
5; �
Z �
w
\I
- GENERAL NOTE: / / / I \ / / / / 355 Jo mo _ 355 W
_i� aIF CONSTRUCTION CANNOT BE COMPLETED \ / \ _ / <oM �M
WITHIN 3 WORKING DAYS, BYPASS PUMP METHOD / / / \ o / ` / / / / / z+M +"'
.i l` l l IW¢z ¢z
SHALL BE INSTALLED AS SHOWN. SEE EXHIBIT 3. /
/ �Ll
/ I \ OPkN SPACE/ I \ /� — / / `� / 350 0 350 v =
\ \ / N j '3
�52LF54"RCP @1.54% / 9 --� \\ \'� // I / INIHE >z
rp p u
NRB 50 \ / N c° o` u
350
uo
HMIT-OF_QONSTnCTTIOh-�, _ / / / 345 345 a
I ` NRB---` —
_ P
LIMIT OF CO�f SFRU�TION \ / �� / / ^ \ \ / / / ,`
BURY PIPE 12" BELOW
SILT FENCE (TYP) \ \ \ ` ✓ / / / STREAM BED
DEWATERING PUMP \ — — — _ _ J , / 5199UF E IST.
340 V LOCITY 54" RCP G OU D 340
�R� ✓ SEDIMENT FILTER BAG_
\1�/ NRB 345 \ — / IDID
\ ` _ UPSTREAM \ / \ ` \�_ / — Q
�\\PERVIOUS DAM //• — , — — \ f ' ZO
` — \�Li
All 335 335 Co a u
L I / X -DOWNSTREAM
PUMP AROUND PUMP s / d Z O
OPEN -SPACE = W
IMPERVIOUS DAM
— �VETLA - / _ o \ \� \I 9+50 10+00 10+50 11+00 w30
NE 50' NEUSE O Q
/.SILTFENCE (TYP)\\\� \ �� 1 E1 mZO( CULVERT PROFILE
^
—RIPARIAN BUF�ER/ _ SCALE H: 1 "=50' w
Z
. V: 1 "=5'
_ J \ R \il l l 11 l 11 II I �/ '@ \ NI
ONE 2
SILT FENCE (TYP)
JJ- \\�EN XCE PROFILE VIEW Q a c
1\ \ _ - GRAPHIC SCALE z
7/� J� _360�\\�\\�\\ \Fi,� I _ _ - �i / 1" = 50' HORZ. p O
1"=5' VERT. w w
_30'-NEUSE \�\\\\ ������\\ \ \ _ ��=-'� o O z >
`�RIPAR ��FF`1`R \ \� ����\\\\\\\—\—~ ~ p o
PRELIMINARY
\ NOT FOR RECORDING OR CONSTRUCTION o a
AREA OF PERMANENT IMPACT 1 - CULVERT
Q NEUSE RIPARIAN BUFFER ZONE 1: 4,862 SF
Q NEUSE RIPARIAN BUFFER ZONE 2: 2,717 SF
NEUSE RIPARIAN BUFFER TOTAL: 7,579 SF
PERMANENT STREAM IMPACT 1 LENGTH: 77 LF
AREA OF TEMPORARY IMPACT 2 - DISSIPATER PAD
Q NEUSE RIPARIAN BUFFER ZONE 1: 949 SF
NEUSE RIPARIAN BUFFER TOTAL: 949 SF
TEMPORARY STREAM IMPACT 2 LENGTH: 31 LF
PLAN VIEW
GRAPHIC SCALE
50 0 25 50 100
1 inch = 50 Ft.
I -
PUMP AROUND PUMP TEMPORARY CONSTRUCTION STREAM CROSSING x M
x
PROPOSED EARTH BERM (TYP) _\
w
PROPOSED EARTH BERM, TYP
FLOW �>
12' MIN 5' MIN
POLYETHYLENE FABRIC ON
FACE (8 MIL THICK)
CLASS "I" RIP -RAP \ � '12' MIS FROM PUMP A TOP OF BANK
TO PUMP-
STREAM FLOW =>
A I'\ \.a. ' 1i '"I r` IA EX STREAM BOTTOM
STREAM FLOW
PUMP
CLASS "I" RIP -RAP J DEWATERING PUMP J %+—
FLOW
CONSTRUCTION EASEMENT (SEE NOTE 4)
NOTES:
1. EROSION STONE TO BE "CLASS I"
RIP -RAP UNLESS DESIGNATED
DIFFERENTLY ON CONSTRUCTION PLAN.
2. PUMP AND LINE SIZE TO BE DETERMINED
BY THE CONTRACTOR.
3. WIDTH OF CONSTRUCTION EASEMENT
SHALL BE MINIMIZED BASED UPON FIELD
CONDITIONS. ANY DISTRUBANCE(S)
EXCEEDING WHAT IS SHOWN ON PLANS
MAY REQUIRE ADDITIONAL WATER
QUALITY PERMITTING.
SEDIMENT BAG J
PLAN
PROPOSED EARTH BERM, TYP
MAINTENANCE NOTES:
1. INSPECT WEEKLY AND AFTER
EACH RAINFALL EVENT THAT
PRODUCES 1 INCH OR MORE OF
RAIN.
2. REMOVE SEDIMENT AND WOODY
DEBRIS PROMPTLY.
3. REMOVE COLLECTED SEDIMENT
FROM STONEIRIPRAP AREAS AS
NECESSARY. TOPDRESS WITH 2",
WASHED STONE AS NECESSARY.
GEOTEXTILE FABRIC
6" MIN SEDIMENT VARIES
FILTER BAG
24" MIN
10' MIN SILT FENCE
SILT FENCE EXISTING GROUND LINE
TEMPORARY STONE DAM
POLYETHYLENE FABRIC
ON FACE (8 MIL THICK)
TEMPORARY STREAM CROSSING BYPASS
SEDIMENT FILTER BAG
NOT TO SCALE
SEWN -IN CONNECTION SLEEVE
FOR PUMP DISCHARGE HOSE
24" MIN
SILT FENCE 6" MIN
COVER #57 STONE PAD
WITH GEOTEXTILE FABRIC
24" MIN
#57 STONE
POLYETHYLENE
SHEETING (6 MIL MIN)
VARIES WITH
ROUND SLOPE
USE #57 STONE TO — POLYETHYLENE SHEETING \ '
LEVEL BAG FROM \
NATURAL GROUND LINE
SIDE VIEW TOP VIEW
VARIABLE
(10' MIN.)
OPTIONAL LIFTING
STRAPS
VARIES WITH
GROUND LINE SLOPE
SEDIMENT FILTER BAG
NOT TO SCALE
MAINTENANCE NOTES:
CONSTRUCTION SEQUENCE
1. INSTALL PUMPS UPSTREAM OF TEMPORARY STREAM CROSSING
AND PUMP TO AREA DOWNSTREAM OF CONSTRUCTION AREA.
BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WITHIN
THE STREAM.
2. INSTALL UPSTREAM DAM AND DOWNSTREAM DAM WITH
POLYETHYLENE FACING.
3. INSTALL EARTH BERMS ALONG TOP OF BANK ON EACH SIDE OF
STREAM IN THE CONSTRUCTION AREA.
4. INSTALL SEDIMENT FILTER BAG AT TOP OF BANK. DEWATER
CONSTRUCTION AREA BETWEEN STONE DAM USING THE FILTER
BAG.
5. INSTALL THE NEW CULVERT AND CROSSING
6. UPON CONSTRUCTION COMPLETION, REMOVE TEMPORARY DAMS,
POLYETHYLENE, AND TEMPORARY CMP, DEPRESS TEMPORARY
DAM BOTTOMS INTO STREAM BED UNTIL TOP OF RIP RAP IS LEVEL
WITH STREAM BOTTOM.
7. REMOVE TEMPORARY EARTH BERM AND SEDIMENT BAGS AND
STABILIZE AREAS AS INDICATED ON DRAWINGS.
1. INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT PRODUCING 1 INCH OR MORE OF RAIN. ANY DAMAGE TO THE
SEDIMENT FILTER BAG SHALL BE REPAIRED IMMEDIATELY.
2. TEMPORARY SEDIMENT FILTER BAG SHALL BE REPLACED WHEN 6" OF SEDIMENT HAS ACCUMULATED OR IN ACCORDANCE
WITH THE MANUFACTURER'S RECOMMENDATIONS.
3. MONITOR SEDIMENT FILTER BAG REGULARLY FOR THE PRESENCE OF TURBID WATER BEING DISCHARGED. IF ANY TURBID
WATER IS BEING DISCHARGED FROM THE BAG THE SITUATION SHALL BE RESOLVED IMMEDIATELY. IF TEMPORARY
BLOCKAGES ARE NOT FOUND, ASSUME THE BAG IS AT SEDIMENT CAPACITY AND REPLACE IMMEDIATELY.
NOTES:
1. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE TEMPORARY SEDIMENT FILTER BAG WHEN
PUMPING.
2. THE LENGTH AND WIDTH OF THE TEMPORARY SEDIMENT BAG SHOWN ON THIS DRAWING MAYVARY PER VENDOR
SPECIFICATIONS.
3. TEMPORARY SEDIMENT FILTER BAGS SHALL BE EQUIPPED WITH A SEWN -IN SLEEVE OF SUFFICIENT SIZE TO ACCEPT A
MINIMUM FOUR -INCH DIAMETER PUMP DISCHARGE HOSE. THE DISCHARGE HOSE SHOULD BE EXTENDED INTO THIS
SLEEVE A MINIMUM OF SIX INCHES AND BE TIGHTLY SECURED WITH A HOSE CLAMP OR OTHER SUITABLE MEANS TO
PREVENT LEAKAGE. HOSE CONNECTION THROUGH A SLIT IN THE BAG WILL NOT BE ACCEPTABLE.
4. THE PUMP DISCHARGE HOSE CONNECTION SLEEVE SHALL BE SECURELY TIED OFF DURING DISPOSAL OF THE TEMPORARY
SEDIMENT FILTER BAG IN ORDER TO PREVENT LEAKAGE OF COLLECTED SEDIMENTS.
5. TEMPORARY SEDIMENT FILTER BAG SHALL BE REPLACED WHEN 6 INCHES OF SEDIMENT HAS ACCUMULATED OR IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL SIZE THE BAG DEPENDING ON USE AND FLOW REQUIREMENTS.
Ln
J
Q
11.I
r)
E