HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 22145 Morman, Alaina
From: laserfiche@ncdenr.gov
Sent: Thursday, February 20, 2020 9:56 AM
To: joseph.marin@leblon-us.com
Cc: Farkas, Jim J;joseph.marin@leblon-us.com; ctanis@american-ea.com
Subject: Construction Stormwater NOI Not Accepted
This email is to notify you that your application for Popeyes Wadesboro was not accepted for the following
reason:
Part A14 - This should be the total amount of impervious surface (in acres) that will exist on-site after
construction is finished. This number should not be larger than the total site area(Part A13).
Please RESUBMIT the eNOI with the above corrections made. A PDF of the prior eNOI submission can be
provided upon request. Contact Jim Farkas at Jim.Farkas@NCDENR.gov with any questions.
Please contact The Stormwater Program Administrative Assistant for more information at (919) 707-
3640. Please reference NOI application no. 22145 and Project ID NCC-ANSON-2020-Popeyes Wadesboro.
This email was automatically generated by Laserfzche. Please do not respond to this email address, as
responses are not monitored.
i