HomeMy WebLinkAboutNCG210406_Inspection_20200219nvir r_.�rmn a Quality,
"MICHAEL c
5 <'r' =tciz S'
February 19, 2020
Godfrey Lumber Co. Inc.
Attention: Paul Comings
116 Whites Mill Road
Statesville, North Carolina 28677
Subject: Compliance Evaluation Inspection
Godfrey Lumber Co. Inc.
NPDES Stormwater Certificate of Coverage- NCG210406
Iredell County, North Carolina
Dear Mr. Comings:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for
the inspection we conducted at the Godfrey Lumber Co. Inc. facility on February.
Please note that in the stormwater inspection report summary we ask that you
update your Stormwater Pollution Prevention Plan (SWPPP) and conduct qualitative
monitoring from the pond outfall.
The report should be self-explanatory; however, should you have any questions,
please do not hesitate to contact me at (704) 663-1699 or by E-mail at
james.moore@ncdenr.gov.
Sincerely,
;Jae7sMoore
stant Regional Engineer
Enclosure
c: Stormwater Permitting Branch
Permit: NCG210406 Effective: 08/01/18 Expiration: 07/31/23 owner: Godfrey Lumber Co Inc
SOC: Effective: Expiration: Facility: Godfrey Lumber Company
County: Iredell 1715 Amity Hill Rd
Region: Mooresville
Statesville NC 28687
Contact Person: Paul Comings Title: Phone: 704-872-6366
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 02/13/2020
Primary Inspector: Lily C Kay
Secondary Inspector(s):
Certification:
Phone:
Entry Time: 02:30PM Exit Time: 03:50PM
Phone: 704-663-1699
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Timber Products Stormwater Discharge COC
Facility Status: ❑ Compliant, Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG210406 Owner - Facility: Godfrey Lumber Cc Inc
Inspection Date: 02/13/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The Permittee has not complied witht the permit since 2015. The SWPPP needs to be updated and qualitative montoring
must resume at the pond outfall. The facility had many barrels and tanks on the site without secondary comtainment and
miscellaneous materials throughout the site that could impact stormwater. If you have any questions, please contact me at
Lily.Kay@ncdenr.gov or by phone at (704) 235-2137.
Page 2 of 3
Permit: NCG210406 Owner - Facility: Godfrey Lumber Co Inc
Inspection Date: 02/13/2020 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
E
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices'?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
E ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
❑ ❑
# Does the facility provide all necessary secondary containment?
0
❑ ❑ ❑
# Does the Plan include a BMP summary?
0
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
N
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑0
❑ ❑
# Does the Plan include a list of Responsible Party(s)?
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
❑
0 ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
❑0
❑ ❑
Comment: The SWPPP has been developed, but has not been reviewed since 2015._
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment: Qualitiative Monitorinq_records were maintained until 2015, but no recent monitoring records
Yes No NA NE
❑ 0 ❑ ❑
were available.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑
Comment: The SWPPP indicated 5 sampling points for the facility, but all of those outfalls lead to a pond at
the back of the property. The pond was discharging at the time of inspection. Qualitative
monitoring should be done at the pond outfall.
Page 3 of 3