Loading...
HomeMy WebLinkAbout20070228 Ver 4_Acceptance Letter_20091120,A NCDETIR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary November 20, 2009 EXPRESS REVIEW ACCEPTANCE LETTER Nash County Attn: Mr. Wayne Moore 120 W. Washington St. Nashville, NC 27856 Project Name: Middlesex Corporate Infrastructure Project (Modification) Nash County DWQ #: 07-0228v4 On November 20, 2009, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a request from Mr. Paul Smith, PE, of Stocks Engineering, PA, regarding a project known as "Middlesex Corporate Infrastructure Project" for acceptance into the Express Review Program. This letter advises you that your project will be accepted into the Express Review Program once the following items are received: 1) The application fee of $1,000.00 [half price for 401 Water Quality Certification with major impacts + Riparian Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water Quality]; 2) Five (5) complete and collated copies of the PCN Application and all documents we requested in the pre-application meeting (instead of providing five copies of the full size plans you may provide two copies of the full size plans along with three copies of the 1 I X 17); 3) One (1) copy of the completed PCN Submittal Checklist (http://h2o.enr.state.nc.us/ncwetlands/documents/PCNChecklist v1 4.doc); 4) Diffuse Flow Plan (for the road); 5) A conceptual stormwater plan for the entire site - the proposed BMPs must treat at least 85% TSS and 30% Nitrogen; 6) One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color). If the plans are too large to store in TIFF format, they can be stored in PDF. A pre-application meeting (to include the property owner) was conducted on November 20, 2009. Please ensure that the property owner is listed as the applicant on the PCN form. The clock for this project will not start until receipt of the completed application package and required fee are received. If the impacts are greater than indicated on the Initial Interest Form and/or the services are different, you may be required to remit an additional fee. If you have any questions or wish to discuss these matters further please do not hesitate to call Lia Myott Gilleski at 919-733-9502. CBK/jg/Img 401 OversightlExpress Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http://h2o.enr.state.nc.us/ncwetlands/ Sincerely, Cyndi Karoly, Supervisor 401/Express Review Oversite Unit No. thCarolina ?aturallt? An Equal Opportunity 1 Affirmative Action Employer Nash County Page 2 of 2 November 20, 2009 cc: File copy Mr. Paul Smith, PE, Stocks Engineering, 3344 Hillsborough St., Suite 250, Raleigh, NC 27607 Ms. Leilani Paugh, NCDOT, PD&EA Natural Environment Unit, 1598 Mail Service Center, Raleigh, NC 27699-1598