HomeMy WebLinkAbout20070228 Ver 4_Acceptance Letter_20091120,A
NCDETIR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
November 20, 2009
EXPRESS REVIEW ACCEPTANCE LETTER
Nash County
Attn: Mr. Wayne Moore
120 W. Washington St.
Nashville, NC 27856
Project Name: Middlesex Corporate Infrastructure Project (Modification)
Nash County
DWQ #: 07-0228v4
On November 20, 2009, the 401 Oversight/Express Permitting Unit of the Division of Water Quality
received a request from Mr. Paul Smith, PE, of Stocks Engineering, PA, regarding a project known as
"Middlesex Corporate Infrastructure Project" for acceptance into the Express Review Program. This
letter advises you that your project will be accepted into the Express Review Program once the following
items are received:
1) The application fee of $1,000.00 [half price for 401 Water Quality Certification with major impacts
+ Riparian Buffer Authorization ($2,000)], made payable to the North Carolina Division of Water
Quality];
2) Five (5) complete and collated copies of the PCN Application and all documents we requested in
the pre-application meeting (instead of providing five copies of the full size plans you may provide
two copies of the full size plans along with three copies of the 1 I X 17);
3) One (1) copy of the completed PCN Submittal Checklist
(http://h2o.enr.state.nc.us/ncwetlands/documents/PCNChecklist v1 4.doc);
4) Diffuse Flow Plan (for the road);
5) A conceptual stormwater plan for the entire site - the proposed BMPs must treat at least 85%
TSS and 30% Nitrogen;
6) One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color).
If the plans are too large to store in TIFF format, they can be stored in PDF.
A pre-application meeting (to include the property owner) was conducted on November 20, 2009. Please
ensure that the property owner is listed as the applicant on the PCN form. The clock for this project will
not start until receipt of the completed application package and required fee are received. If the impacts
are greater than indicated on the Initial Interest Form and/or the services are different, you may be
required to remit an additional fee. If you have any questions or wish to discuss these matters further
please do not hesitate to call Lia Myott Gilleski at 919-733-9502.
CBK/jg/Img
401 OversightlExpress Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX: 919-733-6893
Internet: http://h2o.enr.state.nc.us/ncwetlands/
Sincerely,
Cyndi Karoly, Supervisor
401/Express Review Oversite Unit
No. thCarolina
?aturallt?
An Equal Opportunity 1 Affirmative Action Employer
Nash County
Page 2 of 2
November 20, 2009
cc: File copy
Mr. Paul Smith, PE, Stocks Engineering, 3344 Hillsborough St., Suite 250, Raleigh, NC 27607
Ms. Leilani Paugh, NCDOT, PD&EA Natural Environment Unit, 1598 Mail Service Center,
Raleigh, NC 27699-1598