Loading...
HomeMy WebLinkAbout20200110 Ver 1_Updated Impact Table_202002052/5/2020 New Submission Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. J D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". 2a1 Reason * M 2b. Impact type* (?) �p.c. Tyof W. * 2d. W. name * 2e. Forested* —] � J 2f. Type of Jurisdicition * M 2g. Impact arear rlra�wer T Headwater Forest _�� W-10 Yes Both 0.015 (acres) Add 2g. Total Temporary Wetland Impact 0.015 2g. Total Permanent Wetland Impact 0.000 2g. Total Wetland Impact 0.015 2h. Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". F] 3a. Reason for impact* (?> 3b.lmpact type* 3c. Type of impact* 3d. S. name* 3e. Stream _11 Type*(?) 3f. Type of Jurisdiction* 3g. S. width* 3h. Impact length* S1 Sanitary Sewer Cros Temporary • Excavation • S-1 Perennial • Both • IJ Average (feet) 20 (linear feet) https://edocs.deq.nc.gov/Forms/Pre-Construction_Notification_Form 6/10 2/5/2020 New Submission S2 Roadway Crossing Permanent • Culvert • S-1 Perennial • Both • I` Average (feet) 70 (linear feet) S3 Sanitary Sewer Cros Temporary • Excavation • S-2 Perennial • Both • I` Average (feet) 20 (linear feet) Add another impact ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 70 3i. Total temporary stream impacts: 40 3i. Total stream and ditch impacts: 110 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: * 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: * 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS (https://ribits.usace.army.mil/ribits_apex/f? p=107:27:2734709611497::NO:RP:P27_BUTTON_KEY:O) website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No https://edocs.deq.nc.gov/Forms/Pre-Construction_Notification_Form 7/10