Loading...
HomeMy WebLinkAbout20200110 Ver 1_PLTS-GRADING AND DRAINAGE-C2.9_202002030 0 J Li_w wo J m (n J m N 00 �m w0 CD Q� Z N Q V -5ch O w �I D Om m� I POND-1 DATA BTM. AREA = 1,454 SF CAPACITY = 9,388 CF © 4' BTM. EL. = 2158.00 RIM EL. = 2164.00 Q1 EL. --MAX POOLING EL. = 2162.00 I I I BUILDING SETBACK LINE I - INV 2156.67 SWALE B, TO POND-1. SEE RIM PLAN ON C2.2 & PROFILE _ _ 2164. ON C2.7 2:1 SIDE SLOPES, TYP. SWALE A, TO POND-1. SEE�� PLAN ON C2.2 & PROFILE ON C2.7 RIM 216A 00 4" PERF. SCH 40 PVC SUBDRAIN SEE DETAIL BELOW. GENERALLY FOLLOW THE CENTER OF BASIN AND SLOPE AT 0.50% ACCESS & MAINTENANCE \ BERM. 8' MIN. WIDTH, TYP. \ % -1. SEE DETAIL BELOW. 18" HDPE, TYPE "S" SLOPE AT 1.0% MIN. FES CO-1. SEE STRUCTURE CO E SEED AS SPECIFIED AND INV / SCHEDULE ON C2.3 \/ STABILIZE W/ SC250 BY_ - _� _NORTH AMERICAN GREEN. I 2156.00 JURISDICTIONAL WETLAND" 30' MIN. STREAM SETBACK TYPICAL. TYP. EACH SIDE OF STREAM PROPOSED PROPERTY - - LINES, TYP. SEE Cl _ SERIES SHEETS. _ STORMWATER MANAGEMENT POND-1, ENLARGED PLAN SCALE: 1 " = 30' INV 2156.67 BTM 2158.00 PRE -DEVELOPMENT RUNOFF CALCULATIONS DRAINAGE AREA AREA CURVE Q1 Q10 Q100 NUMBER PRE -DEVELOPMENT 52.61 AC. 68 8.08 CFS 83.42 CFS 116.09 CFS PROJECT AREA / POND-2 DATA , j BTM. AREA = 10,132 SF CAPACITY = 48,384 CF ® 4 /BTM. EL. = 2164.00 j CENTERLINE OF STREAM, RIM EL. = 2170.00 TYPICAL. Q1 EL. _ MAX POOLING EL. = 2168.00 j RIM 30' MIN. STREAM SETBACK TYP. EACH SIDE OF STREAM ACCESS & MAINTENANCE BERM. 8' MIN. WIDTH, TYP. INV 2162.68 SWALE A, TO POND-2. SEE, ' PLAN ON C2.2 & PROFILE ON C2.7 PROPOSED PROPERTY ILINES, TYP. SEE Cl SERIES SHEETS. BTM 2164 co (_BUILDING SETBACK LINE I � I I / 2:1 SIDE SLOPES, TYP. I SEED AS SPECIFIED AND ST ABILIZE AMERICAN2GREEN. � � I I4" PERF. SCH 40 PVC SUBDRAIN RIM / SEE DETAIL BELOW. GENERALLY ' 2170.00 ,' FOLLOW THE CENTER OF BASIN AND IF / SLOPE AT 0.50% 18" HDPE, TYPE "S" BTM � SLOPE AT 1.07MIN. / / 2164 i INV CO-2. SEE DETAIL BELOW., 2161.00 'ES C0-2. SEE STRUCTURE SCHEDULE ON C2.3 STORMWATER MANAGEMENT POND-2. ENLARGED PLAN POST DEVELOPMENT RUNOFF CALCULATIONS DRAINAGE AREA AREA CURVE NUMBER Q1 Q10 Q100 ATTENUATED Q1 TO POND-1 7.00 AC. 70 1.53 CFS 12.63 CFS 17.28 CFS 0.28 CFS TO POND-2 13.27 AC. 70 3.32 CFS 27.07 CFS 37.00 CFS 0.69 CFS TO POND-3 4.53 AC. 70 1.08 CFS 8.89 CFS 12.14 CFS 0.26 CFS UN -COLLEGE CONTROLLED AREA 27.81 AC. 70 6.34 CFS 52.49 CFS 71.75 CFS 6.34 CFS TOTAL 52.61 AC. 12.27 CFS 101.08 CFS 138.17 CFS 7.57 CFS OUTLET CONTROL STRUCTURE FRAME AND GRATE. SEE PLAN ABOVE. a n° < PRIMARY OUTLET PIPE _ 15" HDPE SEE TABLE I - FOR INVERTS a ° - SCH-40 "TEE" SECTION INSIDE BOX. INSTALL CAP ON END POINTED TOWARD OUTLET AND DRILL CONTROL ORIFICE IN CAP (SEE TABLE). INSTALL PLUG IN EXISTING SUBGRADE OPPOSING OPENING AND ORIENT TO FACILITATE MAINTENANCE. CONTROL OUTLET (CO) STRUCTURE SCALE: NOT TO SCALE PRECAST CONC. DRAINAGE STRUCTURE. 4" PERF. SCH 40 PV OUTLET CONTROL STRUCI SLOPE AT C " WASHED STONE. 4" PERF. PVC SCH 40 UNDERDRAIN SEE PLANS ABOVE FOR LOCATION POND SUBDRAIN SCALE: NOT TO SCALE SCALE: 1 " = 30' CENTERLINE OF STREAM / / FLOATING SUCTION HOSE I VARIABLE SPEED PUMP \ IMPERVIOUS SANDBAG DIKE I JURISDICTIONAL - WETLAND, TYP. \M/ PRECAST CONC. HEADWALL, TYP. EACH END OF CULVERT. NCDOT STD., 838.80. SEE DETAIL ON C2.10 \DISCHARGE HOSE ' 72" RCP CULVERT. \ .EDGE OF PROPOSED ASPHALT PAVING. �� GREENWOOD PARK DR. 30' MIN. STREAM SETBACK SEE STREAM CROSSING TYP. EACH SIDE OF STREAM \ \ PROFILE ON C2.7 AND DETAIL ON C2.11 ENERGY DISSIPATION AREA RIP -RAP APRON - REMOVE ONCE PUMP -AROUND SEQUENCE IS , COMPLETE. SEED AND STABILIZE AS SPECIFIED. I ENLARGED STREAM CROSSING AND BYPASS SLOPE BOTTOM OF BASIN TOWARD SUBDRAIN AT 1.0% " WASHED STONE. EXTEND TO SURFACE/BTM OF POND. WRAP SIDES AND BOTTOM W/ SOIL SEPARATING FABRIC EXISTING SUBGRADE CONTROL OUTLET STRUCTURE DATA STRUCTURE ORIFICE SIZE RIM EL. ORIFICE EL. OUTLET EL. CO-1 3.00 2161.00 2156.42 2156.30 CO-2 4.00 2165.50 2161.75 2161.40 CO-3 4.00 2175.00 2172.17 2171.40 PUMP DETAIL SCALE: 1 "=20' '/ »`/-- - POND-3 DATA BTM. AREA = 2,088 SF CAPACITY = 13,924 CF ® 4' - / BTM. EL. = 2174.00 I RIM EL. = 2180.00 Q1 EL. / MAX POOLING EL. = 2178.00 / BUILDING SETBACK LINE - - I PROPOSED PROPERTY i I INFS TYP SFF C:1 I MH#6.0 STA=8+08.80 OFF=0.00 i RIM=2164.00 S 8" INV=2144.25 E 8" INV=2158.40 NW 6" INV=2158.40 - - 30' MIN. STREAM SETBACK TYP. EACH SIDE OF STREAM CENTERLINE OF - STREAM 1 MH#5.0 STA=7+09.61 OFF=0.00 RIM=2152.26 W 8" INV=2143.55 N 8" INV=2143.75 E 8" INV=2147,00 S 8" INV=2148.00 S PERMANENT STREAM CROSSING INSTALLATION NOTES: V / SWALE A, TO POND-3. SEE PLAN ON C2.2 & PROFILE ON C2.7 ' CENTERLINE OF STREAM, TYPICAL. , RIM 2180.00 --- BTM \ 2174.00 r \ INV \ / 172.67 \ 30' MIN. STREAM SETBACK TYP. EACH SIDE OF STREAM \ ACCESS Xr MAINTENANCF \ / 4" PERF. SCH 40 PVC SUBDRAIN ' SEE DETAIL BELOW. GENERALLY FOLLOW THE CENTER OF BASIN AND ' SLOPE AT 0.50% cn 2:1 SIDE SLOPES, TYP. Yl N SEED AS SPECIFIED AND _ STABILIZE W/ SC250 BY _ BTM NORTH AMERICAN GREEN. 2174.00 CB CO-3. SEE DETAIL BELOW. /'6/ RIM 18" HDPE, TYPE "S" ' 2180.00 SLOPE AT 1.0% MIN. ' FES CO-3. SEE STRUCTURE / INV SCHE DU LE ON C2.3 _ 2171.00 STORMWATER MANAGEMENT POND-3. ENLARGED PLAN SEE STREAM CROSSING PROFILE BELOW. PROPOSED 20' SANITARY SEWER EASEMENT, TYP. SEE STREAM BANK REPAIR DETAIL ON SHEET C2.11 \ PROPOSED 8" SANITARY SEWER MAIN. IMPERVIOUS SANDBAG _ DIKE --- FLOATING SUCTION HOSE VARIABLE SPEED I PUMP I DISCHARGE HOSE ENLARGED SANITARY SEWER STREAM CROSSING AND BYPASS PUMP DETAIL 1. ALL WORK SHALL FOLLOW STANDARDS SET FORTH IN WATER QUALITY GENERAL CERTIFICATION NO.4135. 2. ALL STRUCTURES SHALL BE PRECAST CONCRETE. NO "LIVE" CONCRETE SHALL BE USED IN OR NEAR THE STREAM IMPACT AREA. 3. ENSURE A FIRM AND STABLE BASE IS IN -PLACE PRIOR TO PLACEMENT OF PRECAST STRUCTURES. 4. REFER TO NCDOT STD. PIPE BEDDING DETAILS ON C2.9 FOR PIPE BEDDING. 5. GROUT FILL USING NON -SHRINK GROUT ALL JOINTS BETWEEN THE CONC. PIPE AND THE CONCRETE HEADWALL. INSTALL GROUT ON EACH SIDE OF THE HEADWALL. 6. WHERE PIPES AND HEADWALLS ARE SKEWED A LARGER HEADWALL MAY BE REQUIRED. HEADWALLS MAY BE ADJUSTED TO ALIGN WITH THE PIPE PROVIDED NO PORTION OF THE HEADWALL IMPEDES THE OPEN STREAM CHANNEL. 7. INSTALL THE PIPE AND HEADWALL SUCH THAT THE BOTTOM OF THE PIPE IS 12" BELOW THE EXISTING BOTTOM OF THE CHANNEL. 8. INSTALL PIPES AT THE SAME SLOPE AS THE EXISTING CHANNEL IN WHICH THEY ARE BEING INSTALLED. 9. ALL WORK SHALL BE CONDUCTED IN THE DRY. 10. CONDUCT WORK SO THAT THE FLOWING STREAM DOES NOT COME INTO CONACT WITH THE DISTURBED AREA. 11. STREAM BANKS TO BE STABILIZED IN ACCORDANCE WITH STANDARDS. DO NOT USE MATTING THAT INCORPORATES PLASTIC MESH AND OR PLASTIC TWINE ALONG STREAM BANKS. 12. STABILIZE ANY STREAM BANK DISTURBANCE AT THE END OF EACH WORKING DAY. 13. PUMP -AROUND SEQUENCE SHOULD BE KEPT TO THE MINIMAL AMOUNT OF TIME REQUIRED FOR CULVERT INSTALLATION. SCALE: 1 "=20' I4V-1;•7 2160 U) 2155 2150 2145 2140 BOTTOM OF STREAM BED SCALE: 1 " = 30' 19II�I..�'S�l 1. ALL WORK SHALL FOLLOW STANDARDS SET FORTH IN WATER QUALITY GENERAL CERTIFICATION N0.4133. 2. WETLANDS SHALL BE RESTORED TO ITS PRE -CONSTRUCTION CONDITION. 3. DURING EXCAVATION FOR THE TEMPORARY WETLAND IMPACTS TOP -SOILS AND SUB -SOILS SHALL BE SEGREGATED AND PLACED ON FABRIC TO MINIMIZE IMPACTS WHENEVER POSSIBLE. 4. REFER TO NCDOT STD. PIPE BEDDING DETAILS ON C2.10 FOR PIPE BEDDING. 5. BACKFILL WITH THE SEGREGATED SOILS IN APPROPRIATE LIFTS. 6. RESTORE GRADES TO PRE CONSTRUCTION CONDITIONS REMOVING EXCESS SOIL FROM THE AREA. TEMPORARY STREAM CROSSING INSTALLATION NOTES: 1. ALL WORK SHALL FOLLOW STANDARDS SET FORTH IN WATER QUALITY GENERAL CERTIFICATION NO.4133. 2. ALL STRUCTURES SHALL BE PRECAST CONCRETE. NO "LIVE" CONCRETE SHALL BE USED IN OR NEAR THE STREAM IMPACT AREA. 3. ENSURE A FIRM AND STABLE BASE IS IN -PLACE PRIOR TO PLACEMENT OF PRECAST STRUCTURES. 4. REFER TO NCDOT STD. PIPE BEDDING DETAILS ON C2.10 FOR PIPE BEDDING. 5. ALL WORK SHALL BE CONDUCTED IN THE DRY. 6. CONDUCT WORK SO THAT THE FLOWING STREAM DOES NOT COME INTO CONACT WITH THE DISTURBED AREA. 7. STREAM BANKS TO BE STABILIZED IN ACCORDANCE WITH STANDARDS, AND THE DETAIL SHOWN ON C2.11. DO NOT USE MATTING THAT INCORPORATES PLASTIC MESH AND OR PLASTIC TWINE ALONG STREAM BANKS. 8. STABILIZE ANY STREAM BANK DISTURBANCE AT THE END OF EACH WORKING DAY. 9. PUMP -AROUND SEQUENCE SHOULD BE KEPT TO THE MINIMAL AMOUNT OF TIME REQUIRED FOR CULVERT INSTALLATION. 0 N pp N N COZZ Z'O N z 11 1 � Ib tD x (n W Z 2165 2160 2155 2150 2145 99 LF OF 8" PVC SDR-35 ® 0.50% 2140 7+00 8+00 8+20 SANITARY SEWER STREAM CROSSING SECTION SCALE: HORIZ. 1 "=40', VERT. 1 "=4' m z O w 0 w Q 0 > w m co 0 o LL N N � t� �� 9 -o N � U r v . Z J Y 67 N co N d M 6 6 LoQcoU 3 2 Q� W � 1.4 a z _c:4 0 > � W co t, W E M W � co W Z C 04 W ,4 a 1-4 Q E--- E-- E-, O W W E� Q z (ra m C/) ISSUED FOR: DATE: BY: m REVIEW 01/14/20 RDH n REVIEW 02/03/20 DOB 0 O 0 z w w m CD JOB NO. GNW2001 .01 A c a SHEET E C2.9 0