Loading...
HomeMy WebLinkAbout540109_Plan of Action_20200218Feb 19 2020 14:29 Meherrin 252-448-1323 page 2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 34 - 109 Facility Name: _ dYorQk1J BEAK wi0e ARM County: LEAVX Certified Operator Name: _/9400ejS 2u//CX Operator # /7/" 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): 10/ Spillway (Yes or No): A10 Level (inches): )0", D 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: ,8. /c9. 1 1 hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. NoRRAJ 44,ka,c,- Facility Owner/Manager (print) Facility Owner/Manager (signature) PoA Cover Page 2121100 Phone: Date: '1' /8 '10 Feb 19 2020 14:29 Meherrin 252-448-1323 page 3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): * c53e" /a? 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker IS. 0 inches b. designed 25 yr./24 hr. storm & structural freeboard 190 inches c. line b - line a (inches in red zone) = Z/ 0 inches d. top of dike surface area according to design 7/S'o0 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 ag Ilons = 178273 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design /80 days g. volume of waste produced according to structural design '79 /Z3 ft3 h. actual waste produced = current herd # x line g = '7,ZcS2 } ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period 1. current waste analysis dated 10.4 ā€¢ I m. (lines e + k) x line I = 1000 Q ft3 41708.3 ft3 qo q f I gallons 1.02- Ib/1000 gal. 2 N. 1 lb PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) W21100 1 Feb 19 2020 14:29 Meherrin 252-448-1323 page 4 1. structure ID: line m = lb PAN 2. structure ID: line m = lb PAN 3. structure ID, line m = lb PAN 4. structure ID: line rn = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines1+2+3+4+5+6 = 1N./ IbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WWIrW PAN ceN IunT RC A001 1CC rf1101A1f`_ YU10 9A MAN/ ocnll%r% o, tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s U. application window' 0 Z .Z. c5lr / . Z 396. o . / - ā€¢3 / ā€” Iā€” n -WI./ GIKIIl ly g1.1IJ IL,[,UVI I UdLt: VI next crop appncauon oeginning ante Tor available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) _ 6,670 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21100 2 Feb 19 2020 1429 Meherrin 252-448-1323 page 5 W. Total PAN to be land applied (line n from section II) _ lb. PAN x. Crop's remaining PAN balance (line v from section III) = 7.0 lb. PAN y. Overall PAN balance (w - x) _ - #12. 90 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled tb another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: POA (30 Day) 2l21/00 3