Loading...
HomeMy WebLinkAbout520073_Plan of Action_20200216Feb 17 20 02:28p Mills & sons Farms 12524484577 p.2 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: SZ - 73 County:�JES Facility Name: %RIPLc X ICARrNS 112 Certified Operator Name: A41LLS Operator Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/identifier (ID): Al Spillway (Yes or No) Level (inches): 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. IZ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: ", •Z0'20 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. XE17H maj Phone: 2S2 - SDI - 1690 Facility Owner/Manager (print) Date: O Facility Owner/Manager (signature) PoA Cover Page 2/21100 Feb �17 20 02:28p Mills & sons Farms 12524484577 p.3 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID).- pLE K FAp#�c 2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard a, current liquid level according to marker /"]. 0 inches b. designed 25 yr./24 hr. storm & structural freeboard N. D inches c. line b - line a (inches in red zone) = Z p inches d. top of dike surface area according to design 140ft2 (area at below structural freeboard elevation) e. Jine c x line d x 7.48 gallons - gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design /jD days g. volume of waste produced according to structural design 1 16Ogl Jtft3 h. actual waste produced = current herd # x line g = /0 ft3 certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 55-g77, ft3 k. (lines h + i +i) x 7.48 x 30 days = ZOOGBZ gallons line f 4. Total PAN to be land applied during draw down period J. current waste analysis dated / •17. 2 0 1.73 Ibl1000 gal_ m. (lines e + k) x line I 3 lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2121100 1 Feb,17 20 02:28p Mills & sons Farms 12524484577 p.4 1. structure ID: # % lire m = lb PAN 2. structure ID: line m - lb PAN 3. structure ID: line m - lb PAN 4. structure ID: line m = lb PAN 5. structure ID: _ line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = cf`7'• 3 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD- ❑C? NOT I I-qT Fir-i nc Tn tntuIru DAM r•AK1 kits or Arl.M. �n -1 o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) j t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s "I r"G RIV U. u. application window' ZZ7 Cove 23.10 0 9 1- 3 •3! -- -- -- -' " -' -r .......y +NNn� c uvi I ua« �� �C�� �� L)N application ueginning gate for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2121100 2 Feb,17 20 02:28p Mills & sons Farms 12524484577 p.5 W. Total PAN to be land applied (line n from section II) _ .� � lb. PAN x. Crop's remaining PAN balance (line v from section III) = 701.0 lb. PAN y. Overall PAN balance (w - x) _ - 157. 7 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2121/00