HomeMy WebLinkAboutNC0023965_plan of action_19790628 CH2M
:: H ILL
engineers
p nners
economists
SCIentISt_s
28 June 1979
Mr. Forest Westfall
N. C. Division of Environmental Management
512 North Salisbury
Archdale Building, 8th Floor
Raleigh, N. C. 27611
RE: City of Wilmington Outfall
Dear Mr. Westfall:
Attached is a copy of a letter and a preliminary design memo
I sent to Mr. Charles Wakild earlier this month. I would
appreciate receiving your opinion on the effects of our pro-
posal discharge point on water quality in the Cape Fear and
Northeast Cape Fear Rivers.
We would like to complete our design and furnish plans and
specifications to your agency for review by August 1. There-
fore , an early response to my request would be appreciated.
Sincerely,
/J� wCLL,
Glenn W. Dukes , P .E.
Regional Manager
jtc
Attachment
cc: Mr. Ward Andrews , City of Wilmington
Columbia Office
Dutch Center, 810 Dutch Sq. Blvd., Columbia, South Carolina 29210 803/798-4511
I
June 21 , 1979
MEMORANDUM
TO: Forrest Westall
Modeling and Allocations Unit
FROM: Charles Wakild, Regional Supervisor
Wilmington Regional Office
SUBJECT: Proposed Effluent Outfall
y of Wilmington
Northside WWTP
New Hanover County
Please find attached a copy of a preliminary design memorandum and cover
letter from Mr. Glenn Dukes of CH2M Hill regarding subject project. It
appears that the point of effluent discharge for the Northside Plant
originally approved in the New Hanover County 201 Facilities Plan has
been changed, due to the reason outlined in Mr. Duke's letter. He has
indicated that it would be very expensive, perhaps cost prohibitive, to
construct the outfall line within the limestone bedrock underneath the
navigation channel of the Cape Fear River. This would involve blasting
through approximately ten (10) feet of rock, due to the depth of the
channel and the buffer zone between channel bottom and the pipeline
required by the Corps of Engineers. For some unknown reason, this was
not foreseen by the engineer during the Plan's development.
It is requested that the original wasteload allocation be verified, if
possible, for this discharge point. It is our opinion that secondary
treatment will be adequate to protect water quality, based upon a review
of allocations received for other discharges in this vicinity. However,
if it appears the allocation will change, please notify me as to what
extent prior to sending the allocation to Mr. Dukes. Vernon Harris has a
copy of .the Facilities Plan, and has indicated he will provide any help he
can on this situation.
Please give Joey Hill or myself a call if you have any questions.
CW/JH/sh
Attachment
cc: Vernon Harris
A. C. Turnage
Wilmington Regional Office
, a . . Lj
.
•'�' 1 l.fir � � ��/ [�` .
MISS, 7w
7.
WT
� `Ili l�•"s'•'��'"� ,•� ��i �.���9! �)��['^'-�� -r !'.�xas. !I i� ��ir �.. '
Ali
10.
MCI mus"Lf,"PlIKAM
11
t��, a' fig■g■ ���� � �I � J :� �'p�f1:r,71{r���. i' rRi 11� �u�''�a t.� 1- �,� '�
'i ,ns.� —�` Hof TUS
wo
MWAM
i i '� ``11 .►ate `�` Illi , f � 11��, �_1�_�1 } � 4 ��NFV5.
amffl
MINOR
�M ;�� �L'VI/1M_� T}s 4l�fi,`ip�r`^w�i' •• .' J ��.
r ti..117� �j. ��� ter.' ��• rF���.S-1 I -
-
CH2M
ON
engineers
planners
eCOnorllsts
scientists
WILMINCTON
®EN1
5 June 1979
Mr. Charles Wakild
Regional Supervisor for
Environmental Management
N. C. Department of Natural Resources
and Community Development
3143 Wrightsville Avenue
Wilmington, N. C. 28403
RE: City of Wilmington Outfall
CA84000. 91
Dear Mr. Wakild:
Attached is a Preliminary Design Memorandum on the point of
discharge for the City of Wilmington' s Northside WWTP Outfall.
We have selected a discharge point on the East bank of the
Cape Fear River immediately upstream from the Cape Fear
Technical Institute dock in about 35 feet of water. At this
site there is not sufficient distance between the navigation
channel and the toe of the bank to construct a multiport
diffuser perpendicular to the river. Therefore, we propose
to terminate the outfall pipe with 3 nozzles. The nozzles
will break up the discharge into 3 high velocity jets for
blending with the river.
We are furnishing this information to you at this time for
your information. Should your agency have any comments or
suggestions regarding our proposed method and location for
introducing Northside WWTP effluent into the river we would
appreciate hearing them by 15 June 1979 .
Sincerely,
Glenn W. Dukes, P.E.
Regional Manager
j at
Attachment
cc: Mr. Ward Andrews
Mr. Bill Hoffman
Mr. Bob Stroud
Columbia Office
Dutch Center,810 Dutch Sq. Blvd., Columbia, South Carolina 29210 803/798-4511
in,
a�Hu
PRELIMINARY DESIGN MEMORANDUM
TO: Design Team
FROM: Glenn Dukes
DATE: June 1, 1979
SUBJECT: Northside WWTP Outfall Discharge Location
Introduction
The effluent from the City of Wilmington' s Northside -Waste
Water Treatment Plant presently discharges into Smith Creek,
a small tidal tributary to the Northeast Cape Fear River.
The purpose of this project is to relocate the point of
discharge into the Cape Fear River Estuary. The location
of the discharge point chosen .in the 201 plan is in the
vicinity of the confluence of the Cape Fear and Northeast
Cape Fear Rivers.
The object of this preliminary design memorandum is to
present a summary of .the work accomplished to date on
selecting the type discharge into the Cape Fear River.
Location
There -are two possible locations available for the diffuser
at the terminus of the pipeline route selected in the 201
study. The two locations are shown on Figure 1.
Point .Peter Site - This site is between the Northeast
Cape Fear Navigation Channel and the Cape Fear River
Channel approximately 400 feet downstream of Point
Peter at a depth of about 25 feet.
East Bank Site - This site is on the east bank of the
Cape Fear River, near the Cape Fear Technical Institute
Docks. It would be located at a depth of about 35 feet,
just inside of the pier line.
Location of a diffuser in the navigation channel is not
acceptable because of the potential for damage during
dredging. Also damage may occur to the diffusers by
ships dragging anchors.
Preliminary Design Memorandum
Page 2
1 June 1979
Receiving Water
The information on the receiving water is presented
below.
Tides - The average tide range at the outfall sites
is about 4. 2 feet. The tides are semi-diurnal (two
highs and two lows per day) . The extremes are from
about 1. 5 to 5. 2 mean low water datum. Storm surges
and floods will increase the level above this. For
example, the estimated water level for various floods
are:
- Recurrance Interval Water Level (MSL Datum)
10 years 6.5 feet
50 years 9 . 8 feet
100 years 1.1. 0 feet
500 years 13. 5 feet
Currents - From the "Tidal Current Tables 1979 Atlantic
Coast of North America" National Oceanic and Atmospheric
Administration, the minimum current (average) are 1. 7
knots on flood -tide and are 1. 5 knots on ebb tide.
The current will vary from near zero during slack
water to a maximum current about 3 hours after high or
low tide. The currents are generally parallel to the
center line of the river.
Flow - The range of flow in the two rivers vary greatly
from flood to drought conditions. There are no gaging_
stations near. Wilmington. The following information is
estimates from gaging. stations upstream and prorated
to Wilmington on a discharge per square mile basis .
Northeast Cape
Cape Fear Fear
Upstream Gaging Station Near Chinquapin ' Near Tarheel
Drainage Area at Station 600 sq. mi. 4, 810 sq. mi.
Drainage Area at Wilmington 1, 740 sq. mi. 7,060 sq. mi.
Avg. Discharge at Station 700 cfs 4 , 800 cfs
Estimated Avg. Discharge at 2,000 cfs 7,000 cfs
Wilmington
1954 Minimum Daily Discharge 5. 3 cfs 208 cfs
at Station
1954 Minimum Estimated Discharge 15 cfs 290 cfs
at Wilmington
Preliminary Design Memorandum
Page 3
1 June 1979
Salinity and Stratification - Data from various sources
indicate that generally the estuary is well mixed with
very low salinity. During period of low fresh water
inflow, high tide or heavy flood conditions, it is ex-
pected that the salinity will increase, and/or a salt water
wedge will be found.
Effluent Flows
Maximum 11, 000 gpm 16 mgd 24. 7 cfs
Average 5,500 gpm 8 mgd 12 . 4 cfs
Minimum 1,500 gpm 2 . 2 mgd 3. 4 cfs
Preliminary Design Concepts
The concepts of a diffuser at the two possible locations are
discussed below.
Point Peter Site - . The diffuser located between the two
river channels about 400 feet down stream below Point Peter
would be a multiport diffuser. The outfall pipe would be
constructed by trenching across the navigation channel and
terminating in a diffuser. Some of the problems associated
with a diffuser in this location are:
1. Depth of Trench: The Corps of Engineers has requested
authority to maintain a 35 foot deep channel in this
area with. a 3-foot over depth. _ This requires the top of
the :pip.e .to be at least 6 feet below the 3-foot over-
depth which would place the top of the pipe at 6-feet
below 38 feet or 44 feet below MLW.
2. Limestone: The trench will be in limestone rock,
probably requiring drilling and blasting.
3. Profile: Outfall pipes are generally constructed on
a decending grade without high or low spots. To con-
form to the practice will require that the diffuser
be constructed several feet below the mud line, and
the effluent brought up with long risers.
Locating the diffuser below Point Peter would distribute effluent
to both the Northeast Cape Fear- and Cape Fear River channels.
As will be pointed out in later discussion, there does not seem
to be any benefit due to long-term cummulative dilution and dis-
tribution of the effluent or rate of flushing from the estuary.
However, the construction cost associated with the Point Peter
location would be from $200 , 000 to $300, 000 greater than locating
the point of discharge on the East bank.
Preliminary Design Memorandum
Page 4
1 June 1979
East Bank Site - At this site there does not appear to
be sufficient distance. between the navigation channel
and the toe of the slope to construct a multiport diffuser
perpendicular to the river flow. A multiport diffuser
constructed parallel to the river flow does not distribute
the effluent efficiently because the current will sweep
the plume together. One scheme is to terminate the out-
fall pipe with 3 nozzles as shown on Figures 2 and 3.
This has the advantage of breaking up the discharge into
3 high velocity jets. There will be some over-lap of the
plume when the currents are strong, however, with the
fairly high current the jet should move: horizontally for
a substantial distance before blending with the river
current.
Advantages -of this type of outfall/diffuser system are:
1. Eliminate the expensive crossing of the navigation
channel.
2. Less vunerable to damage by dredging, etc.
3. Easy access to -repair:
4. Discharges into deep water thus providing good di-
lution if there is a density difference.
The obvious disadvantages to this scheme .is -that effluent
discharing on the flood tide will be swept up the North-
east Cape Fear Channel. On the ebb tide the effluent
will move downstream and be partially distributed across
the river.
Based on our present knowledge we recommend that the east
bank diffuser be constructed. The following section will
present a detailed discussion of the dilution process
which should take place.
Discussion of Initial Dilution, Short-Term and Long-Term
Distribution
Initial Dilution - The energy which produces the initial
dilution from a nozzle is the turbulent mixing caused by
the velocity of the jet, and the density difference which
causes the plume to form and rise, continuing to entrain
diluting water.
Preliminary Design Memorandum
Page 5
1 June 1979
The "salinity data, indicates that the river is generally
well mixed and it' s salinity is low. When this is the
condition there is no buoyant plume formed.
Based on this assumption, average dilution for various
port diameter at various distances downstream can be
estimated. For the proposed 11" diameter ports the
average dilution is predicted to be approximately 10
to 1 at a distance approximately 20 to 25 feet from
the nozzle, and 20 to 1 about 40 to 50 feet from the
nozzle. The jet will spread as a cone with the dia-
meter increasing at about 2 units for each 5 units down-
stream. Thus at 40 feet downstream the diameter of the
jet may be, about 16 feet.
When there is a density difference, the plume will form
and rise. This will produce additional dilution. The
height of rise will depend on the stratification. If
there is a salt water wedge then the effluent may become
trapped and not rise to the surface.
Short-Term and. Long-Term Distribution - Little informa-
tion is available for making a prediction of the short-
term distribution. For this case, short-term is con-
sidered to be over 2 or 3 tidal cycles. As the effluent
leaves the East Bank site with the current, the receiving
water has already been used for diluting previously
discharged effluent. It will travel with the current
and spread across the river by the turbulance and mixing .
characteristic. On the flood tide all of this effluent
is expected to be drawn into the Northeast Cape Fear
Channel. Based on the USGS Water Supply Paper 1873-E, the
distribution across the channel can be expected to be
quite rapid. On the ebb tide the flow will go past the
outfall and receive additional effluent. Depending on
how the two rivers mix, the effluent will spread out
across the estuary. The next flood tide will now carry
part of the effluent up into the Cape Fear River. After
two or three tidal cycles it is anticipated that the
effluent will be fairly well mixed in both channels .
The long-term dilution is dependent on the fresh water
inflow. Thus for the long-term average flow in the two
rivers, estimated to be about 9 ,000 cfs, the dilution
would be extensive if the average outfall discharge was
15 cfs. At this rate with complete mixing, the average
dilution would be 600 to 1.
Preliminary Design Memorandum
Page 6
1 June 1979
The critical time is when there are drought conditions.
If the fresh water inflow during an extended drought
was only 250 cfs, the long-term dilution would be 15
to 1.
During drought conditions the fresh water inflow appears
to be much less for the Northeast Cape Fear River than
for the Cape Fear River. Thus during this condition the
concentration will be considerably higher in the North-
east Cape Fear River.
qe•16
�5
PT. -PETER 3 -r�'.�---
,t POI T I �r , pf BAR �I VER
N PETER D�'TAASF- to TLC-
Its
tf
� `L• rSN
SO' �9�Dy �� 96• 9
qO' .:.� 0 9 4 ► O 8 +���t �' 6'
'�� Ors t'1� -'� .� 9b• - � 1 '� � 9b 6 lb,
h
9 0 9 fib. 9$. 'b.
g 6 6 ;o �b•* °� 9 9�• 910 9E'9 ti ��ti
a�rO A j '1'4 ° '�, 96• b-91g6o9
b6• °�"• 6 - 9 e •��` a�� 9 y�o' _9�D• y69
�y6 9b0 96, gg a
9 96 '1 e�ro• ss;
9lb
�9 °�6 '69 grOYy':�A E A S 1 �'�" N A L
g�6��9'g BANK
i9lifilS/'R
�b $z �6• SITE
C.F T.I. (I TOP .,5 z OPT
°9 2
P�POPDS�D
30 ,rORcfD
MAIN r
A 4TE. 4
SWUND/Ur S A,Qf 1
BELOW tit Llpy SCALE : /'z 2060 ' t
AL Ti-RNAT/I/E p/FFUSE,P Z OCAT/ONS
a
M S L
APPROXIMATE LOCATION
OF PIER
0•9 M L W -
DATUM PLANES AT P011,17 PETER
20
s
Q APPROXIM47-E EXISTING BOTTOM
27' ± DIA. PIPE
MUCK RIP RAP
PROTECriO�v
SILTY FINE SAND ;
P IT ! c P �•p1 p Q o Q
b� pe v q LIMESTONE v a Qn spa , a n
e Q Pd 0 4 /? a° p v TERM MATE PIPE
d y 6 P P Q v °° WITH /VOZZLF
SEE GIG UlZE 3
-60
O 20 40 60 80 /00 /20 140 /60 /80 200
FIGURE 2
PROPOSED E4S7 BANK NOZZLE
. � o
h
04 ,
-FLOW
27"DIA-
//"'D/A. T YP
o
APPROXIMATE JET
SHAPE UNDER
STAGNANT RIVER
CONDITIONS
F16 URE 3
NOZZLE