HomeMy WebLinkAboutSW6190802_2020-02-17 Four Sierra Ranch Revised Drawings_2/17/2020OUTPARCEL SITE NOTES:
1. OWNER: CRAZY WOMAN READINESS TRAINING
EASTOVER, NC 28312
2. PIN:0444-21-3653
DB 10106, PG 251, DB 139, PG 50
3. TOTAL ACREAGE: 1 OAC
4. ZONE: RR
5. EXISTING CONDITIONS SURVEY DATA
PROVIDED BY GEORGE L. LOTT SURVEYORS
STORM DRAINAGE NOTES
1. ALL PIPE SLOPES AND LENGTHS ARE HORIZONTAL DISTANCES
TO CENTER OF STRUCTURE.
2. CONTRACTOR SHALL REMOVE ALL SEDIMENT FROM BASIN UPON
COMPLETION OF CONSTRUCTION.
GENERAL SITE NOTES
1. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL
INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC. THAT MAY BE
REQUIRED.
2. THE CONTRACTOR SHALL NOTE THAT THE DRAWINGS ARE
SCHEMATIC IN NATURE AND DO NOT SHOW EVERY OFFSET,
TRANSITION, FITTING, ETC. THAT MAY BE REQUIRED FOR A
COMPLETE AND WORKING SYSTEM.
3. THE ENGINEER AND / OR OWNER DISCLAIM ANY ROLE IN THE
CONSTRUCTION MEANS AND METHODS ASSOCIATED WITH THE
PROJECT AS SET FORTH IN THESE PLANS.
4. CONTRACTOR SHALL MAINTAIN AN "AS BUILT" SET OF DRAWINGS
TO RECORD THE EXACT LOCATION OF ALL PIPING PRIOR TO
CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE ENGINEER
UPON COMPLETION OF THE PROJECT WITH A COPY OF THE
TRANSMITTAL LETTER TO THE OWNER.
5. IF DEPARTURES FROM THE SPECIFICATION OR DRAWINGS ARE
DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH
DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO
THE ENGINEER FOR REVIEW. NO DEPARTURES FROM THE
CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN
PERMISSION OF THE OWNER.
6. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES
FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH
CAUSED BY HIM, HIS EMPLOYEES OR HIS WORK. ALL DEBRIS
SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS.
7. GEOTEXTILE FABRIC SHALL BE APPRVED BY ENGINEER.
8. CONTRACTOR TO PROVIDE PERMANENT GROUND COVER AT A
MINIMUM PER PERMANENT SEEDING SCHEDULE ON SHEET C-08.
9. NO WETLANDS, REGULATORY FLOOD ZONES, PROTECTED
VEGETATED SETBACKS, SURFACE WATERS OR PROTECTED
RIPARIAN BUFFERS ARE LOCATED WITHIN THE BOUNDARIES OF
THIS PROJECT.
LEGEND
EXISTING
PROPOSED
DENOTES REBAR OR BREAK IN
LINE 0
CONCRETE MONUMENT
❑
WATER METER
GATE VALVE
Da
►�
WATER LINE
EX. W—
W
FIRE HYDRANT
SANITARY SEWER MANHOLE
S�
SANITARY SEWER CLEAN OUT
•
SANITARY SEWER MAIN
—EXSS—
S
CATCH BASIN
w
DROP INLET
❑
❑
STORM DRAIN MANHOLE
(D�
OD
GAS LINE
—GAS—
FIBER OPTICS
FO
ELECTRIC
E
ALL PROPERTY CORNERS DISTINGUISHED BY REBAR UNLESS OTHERWISE NOTED
GRAPHIC SCALE
50 0 25 50 100 200
( IN FEET )
1 inch = 50 ft.
i
I
I
II.
i
ST ISM !ACCE
� SFMENT
I
I ;
TERESA & KENNETH L
PIN 0444-12-455(
DB 8955, PG 053E
PB 101, PG 148
C (P)
CHARLES THIGPEN DRIVE
60' R/W SOIL _
60' INGRESS/EGRESS
ESMT PB 73 PG 35
S 43°39'17" W 801.67'
URSULA M. ABBOTT
PIN 0444-22-6282
DB 2973, PG 0079
PB 082, PG 189
RR
KENNETH BOLTON
PIN 0444-22-6088
`DB 9071; PG 0306
PB 082, PG 189
RR
XISTING 16" DI WATER
NOT LOCATED)
�PROX. LOCATION
CHARLES ROBERT LIVINGSTON
PIN 0444-32-0170
DB 9725, PG 0531
PB 120, PG 031
RR
IEXISTING 16" DI WATER
`SNOT LOCATED)
APROX. LOCATION
Know what's below.
Call before you dig.
I
Q
W
�Za~o
�- W 00
UUQ
Z-1U
h
J
r O� �
0 � 0
N i
00
V) .�
O
0-00
O
h
iD 00
oU C5
U
H
Q
U E
C
08
� o
r, 0 0 0 C
ZC �Q
cp
M O N C U�
r
C
L,-)_ 00 J
�C
X O Se
0 5 E _
La�r�3
a
O�2co
n_
HI 3
'0�� ...... = �II`II`Ik
/41
1 SEAL
_ - 031459
F"Al
'�- F y
AWt�t��������`��.��#
0
W
0
o
0
E
s
a
Q
(n
O
J
�
q
b
a
LL
�
�
0
0
a�
r
O
�
N
O
O
z
-
N
Owner:
CRAZY
WOMAN
READINESS
TRAINING
2033 TAILWIND COURT
EASTOVER, NC 28312
PHONE:
FAX:
Project:
FOUR
SIERRA
RANCH
tax id #: 0444-21-3653
township: ROCKFISH
county: Cumberland
state: NC
DRAINAGE
PLAN
CONSTRUCTION
DOCUMENTS
job no.: P18-049
date: 11 /0412019
drawn by: PDM/JAN
survey by: GL
checked by: JAN
sheet no.:
C04
�M Psi 7"�. 7
RIPRAP
GEOTECH
LINED
FABRIC
SWALE TYPICAL RIP RAP LINED SWALE
RIP RAP GRADATION Scale: NTS NOTE
d50 = 6" DITCH HEIGHT
dmax = 9"
OF SWALE 1.50'
thickness = 13.5"
Rip Rap Channel —Construction Specifications
1. Remove all trees, brush, stumps, and other objectionable material from the
foundation area, and dispose of properly.
2. Excovote the channel, and shape it to neat lines and dimensions shown on
the plans plus a 0.2—foot overcut around the channel perimeter to allow for
bulking during seedbed preparations and sod buildup.
3. Remove and properly dispose of all excess soil so that surface water may
enter the channel freely.
4. The procedure used to establish grass in the channel will depend upon the
severity of the conditions and selection of species. Protect the channel with
mulch or a temporary liner sufficient to withstand anticipated velocities during
the establishment period (Appendix 8.05).
Rip Rap Channel —Maintenance Requirements
During the establishment period, check grass —lined channels after every rainfall.
After grass is established, periodically check the channel; check it after every
heavy rainfall event. Immediately make repairs. It is particularly important to
check the channel outlet and all road crossings for bank stability and evidence
of piping or scour holes. Remove all significant sediment accumulations to
maintain the designed carrying capacity. Keep the grass in a healthy, vigorous
condition at all times, since it is the primary erosion protection for the channel
(Practice 6.11, Permanent Seeding).
Rip Rap Berm —Maintenance Requirements
Inspect riprap berm weekly and after significant (1/2 inch or greater)
rainfall events to see if any erosion around or below the riprap has taken place,
or if stones have been dislodged. Immediately make all needed repairs to
prevent further damage.
INFILTRATION BASIN
SCALE: 1 "=30'
0i1►<014RI[.03I004 ID ►!,
Care should be used during installation to minimize
compaction of soil on the bottom and walls of infiltration
devices since this will reduce the permeability at the soil
interface. To avoid compacting the drainage media, light
equipment and construction techniques that minimize
compaction should be used.
A minimum of one observation well shall be included in the
design of an infiltration system to periodically verify that the
drainage media is fully draining. The monitoring well shall
consist of a 4— to 6—inch—diameter, perforated polyvinyl
chloride (PVC) pipe with a locking cap. The well should be
placed near the center of the facility or in the general
location of the lowest point within the facility, with the invert
at the excavated bottom of the facility.
A construction sequence must be followed that reflects the
need to stabilize the infiltration device. The longevity of
infiltration devices is strongly influenced by the care taken
during construction.
Once site is stabilized with permanent ground cover, scarify
the soil in the bottom of the basin and install the washed
sand.
SAND MEDIA NOTES
Uniform sand (i.e., uniformity coefficient of 2 or smaller) is
preferable as a drainage medium. Uniform materials have high
porosity and large storage capacities so less material is
required. The porosity of the material should be determined
by laboratory tests and be certified by the supplier. Drainage
media materials should be hard, durable, inert particles, free
from slate, shale, clay, silt, and organic matter. The material
shall be washed, and it is recommended that it be
double —washed.
The bottom of infiltration basins and trenches must be lined
with a layer of clean sand with a depth of 8 inches , unless
the native soil is equivalent (1-2% fines or less).
THREADED CAP
BASIN
BOTTOM
8" WASHED v
SAND
INSERT 12"-15"
INTO SOIL
SUBGRADE
SUBGRADE —
OBSERVATION WELL
NTS
RIP RAP
1. Use Class I rip rap.
2. Minimum 3' wide at top. 3:1 side slopes or flatter.
3. Alternative: Contractor may use gabion baskets with Class
I rip rap. Minimum 3' wide basket.
W
LL W �
a
�
UU�
ZJU
J
O L0
IDG
�F)�
N
co
C
.0
O O
00
(A
y
a
OU O
LL U E
E O o 0
0 0 C5
" z 't
r
�
cC p ) U
o'er
i,
0 �O E—I
b-
`Ip
�u 3
O��iJ3
CL_ _ n: Z 3
i.
11111IIilll '�
9
SEAL r = =
c 031459
t
Amlll�l`�1\`
W
U
Z
Z
Z
Z
Q
�
�
W
W
Q
O
m
3
a:
Q
W
o
rn
o
Q
o
0
Z
Owner:
CRAZY
WOMAN
READINESS
TRAINING
2033 TAILWIND COURT
EASTOVER, NC 28312
PHONE.
FAX.-
Project:
FOUR
SIERRA
RANCH
tax id #: 0444-21-3653
township: ROCKFISH
county: Cumberland
state: NC
STORMWATER
MANAGEMENT
DETAILS
CONSTRUCTION
DOCUMENTS
job no.: P18-049
date: 11 /04/2019
drawn by: PDM/JAN
survey by: GL
checked by: JAN
sheet no.:
c -10