Loading...
HomeMy WebLinkAbout960008_Worksheets_20191210Waste Analysis: Within 60 days of application Waste Analysis Date PAN ID -jy- lot 616$ 4, 3-) 9 1►g3 Waste Analysis Date PAN ID Structure ID Expected FB Observed FIB 3& Waste Analysis Date PAN ID -1 -( ?? ag-1a 1.05 00 Waste Analysis Date PAN ID Slid dse ti � LrZ a , 5 01'* —, LTZ_- �(.3 Check lagoon levels for drops in level, do drop correspond to sludge removal or application? WUP dated Are all crops in fields consistent with WUP? Y/N If no: 00,)61 e 1 Facility # CI6 — g Date: 1 a _ — ((00 ,r Requirement Swine Permit Y/N Comments Certificate of Coverage and Permit V Issued every 5 years OIC card/name Must have on site Number of hogs permitted, type of operation 9380 t 4 4 F,,,.-,k Sludge evaluations Annual r�eeas col-q g ; Calibrations Everytwo years 11-aa- 12 t yo0 Observed Rate Apo Retain records 5 years (permit life) V Waste plan & changes Submit major changes with explanation to regional DWQ within 30 calendar days Waste analysis Date of report must be within 60 days before/after application event Soil sample analysis Every three years pH requirement Lime needed < IT/ac Zn indexes (pH 6.0) must be less than 500 for peanuts (35.3 Ibs/ac) 3000 for all crops (213 Ibs/ac) Cu indexes (pH 6.0) must be less than 3000 for all crops (108 Ibs/ac) Cease pumping >2000 call an agronomist PLAT P-index >400 must run PLAT within V 12 months or by Jan 21, 2021 A 3 6 — 30s - Weekly freeboard records Required • Daily rainfall records/ rain guage Required V Initials & date verifying waste system was Required checked after precipitation > 1.0 inch and at least monthly. Crop yield records Required Stocking & mortality records Required weekly (new permit) Transfer records when applicable (including new Required OIC) Weather codes & initials for 120m irrigation Required V system check & IRR2'S (IRRI when applicable) Sign IRR 2s Operator in Charge license/card Required