Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
960008_Inspection_20191210
Division of Water Resources / Facility Number ©- 0 Division of Soil and Water Conservation ►/ 0 Other Agency r Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Q 8 Departure Time: County: — Region: WARD Farm Name: �ev �,� 2 F/Ig,1L/71� Owner Email: Owner Name: �� �i K T�erLT� Phone: Mailing Address: q:j 1 Gram+%am sc "-/ ko M 1 O LIyE , lJC- --eg3 6 Physical Address: r Facility Contact: Title: Phone: A 19 � q a'5— -8103 �ll Onsite Representative: G e he V10 r►? �&_kq Integrator: e s Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Certification Number: 1 9 oz V O Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. I E]Layer I I :::::] Non -Layer Design Current ilry Pmfltry Canaeity Pon - Layers Non -Layers Pullets Turkeys Turke Poults Other Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow .Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes [ rNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes �No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes [R"'No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes E! No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes E5"No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: Date of Inspection: a -10— 1 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes dNo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes dNo ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes O No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [�No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? [:]Yes Ua�No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Fe"No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [g No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes WNo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes M"No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 814 S G' 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Q No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes dNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E!(No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes dNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes W(No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [9/No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes E3/No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes UdNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA [jj"'NE Page 2 of 3 21412015 Continued 19 Facility Number: Date of Inspection: Q I /b-_ 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes d�No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [:]Yes ZNo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes F?r/No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [!fNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [?No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 2/No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) NE 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA Q ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [E(No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [5 No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Q No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawines of facilitv to better explain situations (use additional pages as necessary). L, Sludge-y,I La SI"die - - i,73 L-T — 3 f- 3 — I `� „'Ir,Ice- - 4' Awl c-o-+ w1 c�- SCr o,v weed Sl jd SQ Le-�Norr e_"d "� aot � We lvEtJ I i'ty/s�r� �'�j�eGG,ds Wee*)) iW Reviewer/Inspector Name: Reviewer/Inspector Signatw Page 3 of 3 I,9y I. 05 � use Co Jpo s i�neY w4, evt Phone: ( 910) Date: I a-1 D 21412015